HomeMy WebLinkAbout79�
CITY OF RENTON
1986 SMALL BRIDGE REPAIR AND GUARD RAILS
SCOPE OF WORK
The work involved under the terms of this contract document shall be full and com-
in the specifications;
plete installation oF the faci lities as shown on the plans and
to include, but not �3e limited to:
4-e
Schedule "A" - BASE BID
r 0 dercrossing. installation.
�Hardi�eve p_ltic concrete sidewalk
,,,�rWraSWil�Raiin�t�al'lqation and as
Beam guard rail
S -hedule "B" - BASE BID
c
---May Creek/Jones e. NE p E i d _qe
�am instalTaiifo?n ana asphaltic pavement installation.
T� guard rail
"C" - ADDITIVE ITEMS
Schedule Deck
May Cr ek/Jones Ave. Nt gi Bridge - Epoxy Grout
Schedule "D" - ADDITIVE ITEMS
-ck
S.W. 16th St Bridge - Epoxy Grout Dc
Schedule "E" - ADDITIVE ITEMS
Lake ashington tSIVO/Mdy Creek Briage Patching and Debris Rem.val
Schedule "F" - ADDITIVE ITEMS
GoIT Lourse or lug__
Insta il new concrete DrIUYe duck
� I ADDITIVE ITEMS
A
c e u e
Misc. CltX wT-deBeam Guard Rail and New Jersey Barrier Replacement and
Installation.
T-nstallation of new Beam Guard Rail and Pre -cast New Jersey Barrier in misc.
locations throughout Renton. Removal of existing rails and minor asphaltic
or Portland cement concrete pavements.
Complete restoration of all surface material so as not to be a visual detraction.
All work shall be as set forth in the design drawings and specifications.
Any contractor connected with this project shall comply with all Federal, State,
County and City codes or regulations applicable to such work and perform the
work in accordance with the plans and specifications of this contract document�
S"