Loading...
HomeMy WebLinkAbout79� CITY OF RENTON 1986 SMALL BRIDGE REPAIR AND GUARD RAILS SCOPE OF WORK The work involved under the terms of this contract document shall be full and com- in the specifications; plete installation oF the faci lities as shown on the plans and to include, but not �3e limited to: 4-e Schedule "A" - BASE BID r 0 dercrossing. installation. �Hardi�eve p_ltic concrete sidewalk ,,,�rWraSWil�Raiin�t�al'lqation and as Beam guard rail S -hedule "B" - BASE BID c ---May Creek/Jones e. NE p E i d _qe �am instalTaiifo?n ana asphaltic pavement installation. T� guard rail "C" - ADDITIVE ITEMS Schedule Deck May Cr ek/Jones Ave. Nt gi Bridge - Epoxy Grout Schedule "D" - ADDITIVE ITEMS -ck S.W. 16th St Bridge - Epoxy Grout Dc Schedule "E" - ADDITIVE ITEMS Lake ashington tSIVO/Mdy Creek Briage Patching and Debris Rem.val Schedule "F" - ADDITIVE ITEMS GoIT Lourse or lug__ Insta il new concrete DrIUYe duck � I ADDITIVE ITEMS A c e u e Misc. CltX wT-deBeam Guard Rail and New Jersey Barrier Replacement and Installation. T-nstallation of new Beam Guard Rail and Pre -cast New Jersey Barrier in misc. locations throughout Renton. Removal of existing rails and minor asphaltic or Portland cement concrete pavements. Complete restoration of all surface material so as not to be a visual detraction. All work shall be as set forth in the design drawings and specifications. Any contractor connected with this project shall comply with all Federal, State, County and City codes or regulations applicable to such work and perform the work in accordance with the plans and specifications of this contract document� S"