Loading...
HomeMy WebLinkAbout27THE CONTRACTOR SHALL SECURE ALL NECESSARY PERMITS AND APPROVALS FOR ANY WASTE SITE TO BE USFD. COPIES (IF THE PERMITS AND APPROVALS ARE TO BE SUBMIT= TO THE ENGINEER PRIOR TO STARTING ANY WORK. 1-04.13 HOURS OF WORK__�ADCITIONAL SECTION) THE WORKING HOURS FOR THIS PROJECT WILL BE LIMITED To WEEKDAYS DURING THE PERIOD FROM 8:00 A.M. TO 5:00 P.M. THE HOURS OF WOW MAY BE CHANGED AT THE DISCRETION OF THE ENGINEER WHEN IT 15 IN THE INTEREST OF THE PUBLIC OR THE COWTtACTOR DUE TO REASONS OF SAFETY, HEALTH, OR WELFARE. - 1. rnUTRArTnR'S COPIES OF CONTRACT DOCUMENTS (ADDITIONAL SECTION THE CONTRACTOR WILL BE SUPPLIED BY THE OWNER WITH 5 SETS OF PLANS AND SPEC IFICATI JKS. AT LEAST ONE COMPLETE SET OF W4TRACT DOCUMENTS, INCLUDING ONE FULL SIZE SET OF DRAWINGS, SHALL BE KEPT AT THE SITE OF CONSTRUCTION IN GOOD CONDITION AND AT ALL TIM" AVAILABLE TO THE OWNER AND rNE ENGIMEER. ADDITIONAL COPIES OF THE CONTRACT DOCUMENTS, IF REQUIRED, WILL BE Ft.FNISHED By THE OWNER AT NET COST OF REPRODUCTION. 1.05 CONTROL OF WOW 1-05.3 PLANS AM WORKING DRAWINGS (PARTIAL REPLACEMENT SECTION) DRAWINGS SUBMITTED SHALL BE ON 22 INCH BY 34 INCH MYLAR OR SMALLER SHEETS WITH DIMENSIONS IN MULTIPLES OF 8 1/2 BY 11 INCHES. 1-05.3(l) SJE04ITTAI-S (NEW SECTION) THE CONTRACTOR SHALL FURNISH FIVE COPIES OF ALL DRAWINGS, SPEC IF ICAT IONS, OESCpIPTIVE DATA, CERTIFICATES. -.*IPLES, TESTS, METHOD, SCHEDULES, AND MANUFACTURER'S INSTRUCTIONS A.S REQUIRED TO DEMONSTRATE FljLLY ThAT THE MATERIALS AND EQUIPMENT TO BE FL04ISHM AND TFE MFTj-M OF WORK COMPLY WITH THE PROVISIONS AND INTENT OF THE SPECIFICATIONS AND DRAWINGS. IF T�E INFORMATION SHOWS ANY DEVIATION FROM THE CONTRACT REQUIREMENTS, THE CONTRACTOR SMALL, BY A STA-7EAENT IN WRITING ACCOMPANYING THE INFORMATION, ADVISE THE ENGINEER OF THE DEVIATION AND SrATE THE REASONS THEREFORE. 1-05.5(l) CONSTRUCTION STAKING (REPLACEMENT SECTION) THE ENGINEER %jALL HAVE T14E RIQ4T TO MAKE REASONABLE CHANGES IN THE GPADES AS THEY ARE SHOWN (jN THE DRAWINGS. GRADES WILL BE E-iTABLISHED IN THE FORM OF OFFSET STAKES AT DISTANCES NOT GREATER THAN 25 FEET FOR BATTER BOARDS OR 30 FEET FOR LASER, SET IN ADVANCE OF THE WORK. WHENEVER WCRX IS IN pRWESS, THE CONTRACTOR SHALL HAVE IN HIS �34PLOYMENT A WORKER COMF`Ele,�7 TO SET A BATTER BOARD OR OTHER CONSTRUCTION GUIDE FROM THE LINE AND GRADE STAKES GIVEN BY THE EW.INEER. SUCH EMPLOYEES SHALL HAVE THE DUTY AN[) RESPONSIBILITY OF PLACING AND MAINTAINING SUCH CONSTRUCTION GUIDES. A BATTER BOARD SET WITH AN ENGINEER'S LEVEL SHALL BE USED FOR ALL LINES SET ON A GRADE OF 0.50 PERCENT OR LESS. AT LEAST THREE BATTER BOARDS SHALL REMAIN IN PLACE DURING PIPE LAYING OPERATIONS. IF, THROUGH T14E CONTRACTOR'S NEGLIG8110E, ANY STAKES SHALL 13E DESTROYED AND REQUIRE RESETTING, A SUlM SHALL BE DEDUCTED FROM THE CONTRACTOR�S FINAL PAYMENT EQUIVALENT TO THE EXTRA COST IN ENGINEERING REQUIRED FOR SUCH REPLACEMENT - THE LASER METHOD OF ESTABLISHING GRADE MAY BE USF-D PROVIDING; 1. REQUESTS FOR USE LISTING EQUIPMENT, AND METHOD OF OPERATION ARE SUBMITTED FOR CITY REVIEW AND APPROVAL AT LEAST FIVE DAYS PRIOR TO USE. SWple�tal SpecificatlO�s (ReY 05/01/86) Page 5 L---- - -1 —1