HomeMy WebLinkAbout291-05.5(3) CONTRACTOR PROVIDED AS -BUILT INFOF04ATION
IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO RECORD THE LOCATION, By CENTERLINE STATION, OFFSET,
AND DEPTH BELOW PAVEMENT, OF ALL EXISTING UTILITIES UNCOVaIED OR CROSSED DURING HIS WOW AS CXMMED
UNDER THIS PROJECT.
IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO HAVE HIS SURVEYOR LOCATE BY CEN"TERLINE STATION,
OFFSET AND ELEVATION, EACH MAJOR ITEM OF WORK DONE UNDER THIS CONTRACT.
MAJOR ITEMS OF WORK SHALL BE DEFINED 'TO INCLUDE THE FOLLOWING ITEMS:
MANHOLES CAICH BASINS ANU INLETS
VALVES VERTICAL AND HORIZONTAL BENDS
JUNCTION BOXES CLEANOUTS
SIDE SEWERS STREET LIGHTS & STANDARDS
HYDRANTS MA-XR CHANGES IN DESIGN GRADE(S)
VAULTS CULVERTS
AFTER THE COMPLETION OF THE WORK COVERED BY THIS CONTRACT, THE CONTRACTORS SURVEYOR SHALL PROVIDE
TO THE CITY THE HARD COVER FIELD BOOK(S) CONTAINING THE CONSTRUCTION STAKING, AND AS -WILT NOTES;
AND ONE SET (IF WHITE PRINTS OF 71-E CONSTRUCTION DRAWINGS LF40N WHICH HE HAS PLOTTED THE NOTES OF THE
CONTRACTOR LOCATING EXISTING UTILITIES, AND ONE SET OF WHITE PRINTS OF rHE CONSTRUCTION DRAWINGS
UPON WHICH HE HAS PLOTTED THE A --BUILT LOCATION OF THE NEW WOW AS RECORDED IN THE FIELD BOOK(S).
THIS DRAWING SHALL BEAR THE SURVEYORS SEAL AND SIGNATUiRE CERTIFYING ITS ACCURACY.
THE LUMP SUM UNIT PRICE FOR CONSTRUCTION STAKING WILL BE FULL COMPENSATION FOR ALL SURvE'yING NEEDED
TO CONSTRUCT THE IMPROVEMUNTS TO THE LINE AND MADE PER THE APPROVED p ANS, A 70 PROVIDE THE
ND
REQUIRED CONSTRUCTION AND AS -CONSTRUCTED FIELD NOTES. PARTIAL PAYMENTS FOR THIS ITEM WILL BE MADE
IN CL*#,IECrioN WITH THE MONTHLY PAY ESTIMATES BASED UPON WOW COMPLETE ETEP44
_D pS 0 INM By THE
ENGINEER.
1-0�-12 FINAL ACCEPTANCE (REPLACEMENT SECTIONJ
THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN WRITING OF THE COMPLETION OF THE WORK WHEREUPON THE
ENGINEER WILL PROMPTLY, By PERSONAL INSPECTION, SATISFY HIMSELF AS TO THE ACTUAL COMPLETION OF THE
WORK IN ACCORDANCE WITH THE To;ms OF THE CONTRACT, AND SHALL THERELF40N RECOMMEND TO 'HE OWNER THAT
THE WORK IS ACCEPTABLE. FINAL DETERMINATION OF THE ACCEPTABILITY OF THE WORK SHALL BE MA.DE ErY THE
OWNER' ACCEPTANrE By THE CONTRACTOR OF FI04AL COMPEISATION FOLLOWING FINAL ACCEPTANCE By THE CITY
SHALL CONSTITUTE FULL AND FINAL PAYMENT FOR ALL WORK UNDER THE CONTRACT, INCLUDING ANY CLAIM FOR
CHANGED CONDITIONS OR CHANGED WOW ORDERS OR EXTRA WOW, DELAY OR ANY OTHER CAUSE FOR CLAIMS FOR
ADDITIONAL COMPENSATION.
1-05-15 METHOD OF SERVICE OF NOTICE (REPLACEMENT SECTION)
WRITTEN NOTICE SHALL BE DEEMED TO HAVE BEEN DULY SERVED IF DELIVERED IN PERSON To THE INDIvIDUAL
-0 A PARTNER OF THE FIRM, OR TO AN OFFICER OF THE CORPORATION OR OWNER DR TO THE CITY CLERK, OR
OR T
IF SEN-T By REGISTERED UNITED STATES MAIL TO THE BUSINESS ADDRESS SFC%N IN THE CONTRACT DOCUMENTS.
'"30eme�tal Specificati �s
(Re� 05/01/86) Page 7