Loading...
HomeMy WebLinkAbout33om m 1-07.11(10) CONTINUED WHENEVER A CONTRACTOR lXjQUESTS PERMISSION TO SUBLET A PART OF ANY CONTRACT AND SUCH CONTRACT COMES WITHIN THE PROVISIONS OF THE EQUAL OPPORTUNITY REGULATIONS OF THE SECRETARY OF LABOR, REVISED MAY 21, 1968, HE SHALL OBTAIN THIS CERTIFICATION FROM HIS PROPOSE!) SUBCONTRACTOR AND FORWARD IT TOGETHER WITH SUCH REQUEST. NO SUBCONTRACT WILL BE APPROVED BEFORE FECEIPT OF SUCH CERTIFICATION FROM THE SUBCONTRA--TOR. FOR THIS PLRPOSE, CERTIFICATION FORMS MAY BE OBTAINED FROM THE PROJECT ENGINEER ASSIGNED TO THIS PROJECT. CONTRACTOR'S FESPONSIBILITY FOR WORK (RE -PLACEMENT SECTION) THE WORK 94ALL BE UNDER THE CONTRACTOR'S RESPONSIBLE CARE AND CHARGE. THE CONTRACTOR SHALL BEAR ALL LOSS NO DAMAGE WHATSOEVER AND FROM WHATSOEVER CAUSE, EXCEPT THAT CAUSED SOLELY BY THE ACT OF THE OWNER WHICH MAY OCCUR ON OR TO THE WORK DUFl:4G THE FULFILLMENT OF THE CONTRACT. IF ANY SUCH LOSS OR DAMAGE OCCURS, THE CONTRACTOR %AJ-L IMMEDIATELY MAKE COW ANY SUCH LOSS OR DAMAGE, AND IN THE EVENT OF THE CONTRACTOR REFUSING OR NEGLECTING TO DO SO, THE OWNER MAY, ITSELF OR By THE 04PLOYMENT OF SOME OTHER PE�-, MAKE GOOD ANY SUCH LOSS OR DAMAGE, AND THE MST AND EXPENSE OF SO DOING SHALL BE CHARGED TO THE CONTRACTOR. THE CONTRACTOR ALONE SHALL AT ALL TIMES BE RESPONSIBLE FOR THE SAFETY OF HIS AND HIS SUBCONTRACTOR'S EMPLOYEES, AND FOR HIS AND HIS SUBCONTRACTOR'S PLANT AND EQUIPMENT AND THE METHOD OF PROSECUTING THE WORK. DURING UNFAVORABLE WEATHER AND OTHER CONDITIONS, THE CONTRACTOR SHALL MRSUE ONLY SUCH PORTIONS OF THE WORK AS SHALL NOT BE DAMAGED THEREBY. NO PORTION OF THE WORK WHOSE SATISFACTORY QUALITY OR EFFICIENCY WILL BE AFFECTED BY UNFAVORABLE CONDITIONS SKqLL BE CONSTRUCTED WHILE THESE CONDITIONS EXIST, UNLESS BY SPECIAL MEANS OR PWZAUTIONS ACCEPTABLE TO THE ENGINEER, THE CONTRACTOR SHALL BE ABLE TO OVERCOW niEM. .1-07.14 RESPONSIBILITY FOR DAMAGE (ACCITIONAL SECTION) THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTROLLING DUST AND MUD WITHIN THE PROJECT LIMITS AND ON ANY STREET WHICH IS UTILIZED BY HIS EQUIPMENT FOR THE OLORAT10N OF THE PROJECT. THE CONTRACTOR SMALL BE PREPnRED TO USE WATERING TRUCKS, POWER SWEEPERS, AND OTHER PIECES OF EQUIPMENT AS DEEMED NECESSARY By THE ENGINEER, TO AVOID CREATING A NUISANCE. DUST AND MUO CONTROL SHALL BE CONSIDE);tED AS INCIDENTAL TO THE PROJECT, AND NO CD4—'NSTION WILL BE MADE FOR THIS SECTION. COW-AINTS OF DUST, MUD OR UNSAFE PRACTICES AND/OR PROPERTY DAMAGE TO PRIVATE O-�ERSHIP WILL BE TRAN-94ITTED TO THE CONTRACTOR AND PROMPT ACTION IN CORRECTING THEM WILL BE REQUIRED BY THE CONTRACTOR. 1-07.16 PROTECTION AND RESTORATION OF PROPERTY (REPLACEMENT SECTION) THE OWNER WILL OeTAIN ALL EASEMENTS AND FRANCHISES REQUIRED FOR THE PROJECT. THE CONTRACTOR SHALL LIMIT ;lIS CPERATION TO THE AREAS OBTAINED AND SHALL NOT TRESPASS ON PRIVATE PROPERTY. THE OWNER MAY PROVIDE CERTAIN LANDS, AS IN01CATED IN CONNECTION WITH THE WOW UNDER THE CONTRACT TOGETHER WITH THE RIGHT OF ACCESS TO SUCH LANDS. THE CONTRACTOR 91ALL NOT L04REASONABLY ENCL44BER THE PREMISES WITH HIS EQUIPMENT OR MATERIALS. Supplemental Specificati�s (Re� 05/Di/m) Page 11 M",