Loading...
HomeMy WebLinkAbout35?74 1-07.17 UTILITIES AND SIMILAR FACILITIES (ADDITIONAL SECTION) LOCATION AND DIMENSIONS SHOWN ON THE PLANS FOR EXISTING LNDEROROUND FACILITIES ARE IN ACCORDANCE WITH THE BEST AVAILABLE INFORMATION WITHOUT LNCOVERING AND MEASURING. THE OWNER DOES NOT GUARANTEE THE SIZE AND LOCATION OF EXISTING FACILITIES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO (MNTACT ALL PUBLIC AND PRIVATE COMPANIES HAVING UTILITIES AND/OR FACILITIES IN THE VICINITY OF THE CONSTRUCTION AREA. CALL BEFORE YOU DIG THE 48 HUM LOCATORS 1-SOD-424-5555 IF, IN THE PROSECUTION OF THE WORK, IT BECOMES NECESSARY TO INTEW-PT EXISTING SURFACE DRAINAGE, SEWERS, LNDERDRAINS, CONDUIT, UTILITIES, SIMILAR UNDERGROUND STRUCTURES, OR PARTS THEREOF, THE CONTRACTOR SHALL BE RESPONSIBLE FOR, AND SHALL TAKE ALL NECESSARY PRECAUT1016 TO PROTECT AND PROVIDE TEMPORARY SERVICES FOR SAME. THE CONTRACTOR SHALL, AT HIS OWN EXPENSE, REPAIR ALL DAMAGE TO SUCH FACILITIES OR STRUCTURFS DUE TO THIS CONSTRUCTION OPERATION TO THE SATISFACTION OF THE CITY; EXCEPT FOR CITY OWNED FACILITIES WHICH %ILL BE REPAIRED BY rdE UTILITY DEPARTMENT AT rONTRACTOR'S EXPENSE, OR BY THE CONTRACTOR AS DIRECTED BY THE CITY. 1-07.23(l) PUBLIC CONVENIENCE AND SAFETY (ADDITIONAL SECTION) THE CONTRACTOR SHALL NOTIFY BY MAIL ALL PROPERTY OWNERS ALONG THE CONSTRUCTION AREA PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY ALL LOCAL POLICE, TRANSIT, AND FIRE DEPARTMENTS BY MAIL PRIOR TO CONSTRLJCTION. NAMES AND ADDRESSES WILL BE FLFN19-1ED BY THE OWNER. THE CONTRACTOR SHALL FURTHER MOTIFY EACH OCCUPANT IN PERSON A MINIMUM OF THREE DAYS PRIOR TO CONSTRUCTION IN FRONT OF EACH PROPERTY. 1-07.730) FLAGMEN, BARRICADES, AND SIGNS (REPLACEMENT SECTION) FLAGMEN, BARRICADES, SIGNS AND TRAFFIC CONTROL FURNISHED SHALL CONFORM TO THE STANDARDS ESTABLISHED IN THE LATEST ADOPTED EDITION OF TFE 'MANUAL ON LJNIFORM TRAFFIC CONTROL DEVICES-, PUBLI94FO BY THE U. S. DEPARTMENT OF TRANSPORTATION. COPIES MAY BE PURCHASED FROM THE SLF"INTENDE)Iff OF DOCUMENTS, U. S. GOVERNMENT PRINTING OFFICE, WASHINGTON, D.C., 20402. THE CONTRACTOR SHALL IMPLEMENT THE TRAFFIC CONTROL PLAN(S) APPEARING IN THE CONTRACT PLANS, AS APPLICABLE. IF THE CC"TRACTOR'S PLAN OF OPERATIONS IS IN CONFLICT WITH THE CONTRACT TRAFFIC CONTROL PLAN, HE KAY PROPOSE MODIFICATION OF THE TRAFFIC CONTROL PLAN BY S40WING THE NECESSARY CONSTRUCTION SIGNS AM BARRICADES REQUIRED FOR THE PROXCT, AND SUBMIT IT TO THE ENGINEER FOR APPROVAL AT LEAST TEN DAYS IN ADVANCE OF THE TIME THE SIGNS AND BARRICADES WILL BE REQUIRED. THE CONTRACTOR SHALL, AT HIS OWN EXPENSE PROVIDE ALL SIGNS, BARRICADES, GL"RES, FLAGMEN , AND EQUIPMENT, CONSTRUCTION WARNINGS, AND NIGHT LIGHTS IN ORDER TO PROTECT THE PUBLIC AT ALL TIMES FROM INJURY AS OF RESULT OF HIS OPERATIONS (SEE M.U.T.C.D.). IF THE CONTRACTOR SHOtJLD FAIL TO MAINTAIN SUFFICIENT LIGHTS AND BARRICADES, IN THE OPINION OF THE ENGINEER, THE CITY SHALL HAVE THE RIGHT TO PROVIDE THESE LIGHTS AND BARRICADES AND DEDUCT SUCH COSTS FROM PAYMENTS DUE THE CONTRACTOR. WORK SHALL BE RESTRUCTURED, THE ORDER OF WORK MODIFIED, THE HOl-lRS OF WORK MODIFIED OR THE ktW HALTED ALTOGETHER AT THE ENGINEER'S DISCRETION' WHEN THE ENGINEER FINDS SUCH A COURSE OR COLlRSES OF ACTION NECESSARY TO PROTECT THE PUBLIC OR THE CONTRACTOR'S SAFETY, HEA�TH, AND WELFARE ALL SIGNS RE -MOVED SHALL BE SALVAGE AIC DELIVERED TO THE CITY YARD. Supple�ntal Speclficati�s (Re� 05/01/86) Page 13 m