Loading...
HomeMy WebLinkAbout37. SECTION) -HE CONTRACTOR SHALL PROVIDE A MINIMUM 1,500 GALLON CAPACITY WATER TRUCK WITH A PRESSURE SPRAY T THE STREETS SHALL BE CLEANED OF DUST AND DEBRIS AT THE ENO OF SySTEN DESIGNED FOR STREE CLEANING. , 70 ALLEVIATE EACH WORKING DAY' IN ADDITION, rHE CONTRACTOR SHALL PROVIDE SPRINKLING, AS NECESSARY DUST NUISAiNCE OR AS DIRECTED BY THE ENGINEER. 1-07.24 RT2jLS OF W�y A�IT�-O-NALSECTION) L THE CITY SHALL OBTAIN ALL EA-S�TS AND ACCESS PERMISSION NECESSARY To THE CONSTRUCTION OF ALL IMPRfYVEMENTS LOCATED ON PRIVATE PROPERTY AND PAY ALL COSTS OF THE SAME. COPIES OF ALL EASEMENTS AND ACCESS PERMISSION WILL BE PROVIDED To THE CONTRACTOR. THE CONTRACTOR 94ALL PERFORM ALL WORK ON PRIVATE PROPERTY IN STRICT COMPLIANCE WITH THE TERMS AND CONDITIONS OF THE EASEMENTS AND RIGHT -OF - ACCESS DOCUMENTS. I-OB PROSECUTION AND PROGRESS 1-08.3 PROGRESS SCHEDULE (REPLACEMD4T SECTION) IMMEDIATELY AFTER EXECUTION AND DELIVERY OF THE CONTRACT, AND BEFORE THE FIRST PARTIAL PAYMENT ID MAOE, THE CMTRArTGR SHALL DELIVER TO THE ENGINEER AN ESTIMATED CONSTRUCTION PROGRESS SCHEDULE IN A FDF64 SATISFACTORY TO THE ENGINEER, SHOWING. THE PROPOSED DATES OF COMP4ENCEMENT AND COMPLETION OF EACH OF THE VARIOUS PAY ITEMS OF WORK REQUIRED UNDER THE CONTRACT DOCUMENTS AND THE ANTICIPATED AWLINT OF EACH MONTHLY PAYMENT THAT WILL BECOME DUE To THE CONTRACTOR IN ACCORDANCE WITH THE PROGRESS SCHEDULE. THE CONTRACTOR 94ALL ALSO FURNISH PERIOrIC ITEMlZEr ESTIMATES OF WORK DOW FOR THE pLffOSE (IF KWING PARTIAL PAYMENTS TME�REON- THE COST INCLftRED ON MAKING UP ANY OF THESE SCHEDULES WILL BE USED ONLY FOR DETERMINING THE BASIS OF PARTIAL PAYMENTS AND WILL NOT BE CONSIDERED AS FIXING A BASIS FOR ADDITIONS To OR DEDUCTIONS FROM THE CONTRACT. SHOULD IT BECOME EVIDENT AT ANY TIME DURING CONSTRUCTION THAT OPERATIONS WILL OR KAY FALL BEHIND THE SCHEDULE OF THIS FIRST PROGRAM, THE CONTRACTr�`t SHALL, UPON REQUEST, PROMPTLY SUBMIT REVISED SCHEDULES IN THE SAME FORM AS SPECIFIED HEREIN, SETTING OUT OPERATIONS, METHODS, AND EQUIPME) T, ADDED LABOR FORCES OR WORKING SHIFTS, NIGHT WORK, ETC.. BY WHICH THE LOST TIME WILL BE MADE LIP, AND CONFER WITH THE ENGINEER UNTIL AN APPROVED MODIFICATION OF THE ORIGINAL SCHEOULE HAS BEEN SECURED. FURTHER, IF AT ANY TIME A PORTION OF THE ACCEPTED SCHEDULE IS FOUND TO CONFLICT WITH THE CONTRACT PROVISIONS, IT -%-&ALL UPON REQUEST BE REvISED By THE CONTRACTOR AND THE WOW SHALL BE PERFORMED IN COWLIANCE WITH THE CONTRACT PROVISIONS. PAYMENTS OF P14Y FJRTHER ESTIMATES TO THE CONTRACTOR AFTE31 SUCH REQUEST IS MADE AND UNTIL AN APPROVED MODIFIED SCHEDULE HAS BEEN PROVIOED BY THE CONTRACTOR KAY BE WITHHELD. EXECUTION DF THE WORK ACCORDING To THE ACCEPTED SCHED(I.E OF CONSTRUl-TION OF APPROVED MODIFICATIONS THEREOF, IS 1-�Y MADE AN OBLIGATION OF THE CONTRACT. 1-08.3(l) PW-CONSTRUCTION CONFERENCE (NEW SECTION) PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR, ENGINEER, ALL SUBCONTRACTORS, UTILITY DEPARTMENT, QUASI PUBLIC UTILITY COMPANIES, AND OTHER INTERESTED PARTIES SHALL ATTEND A PRE - CONSTRUCTION CONFERENCE, WITH TIME, PLACE, AND DATE TO BE DETERMINED AFTER AWARD OF THE CONTRACT. SUBSEWENTLY, A REPRESENTATIVE OF THE CONTRACTOR WILL ATTEND A WEEKLY CONFERDICE TO REVIEW PROGRESS AND DISCUSS ANY PROBLEMS THAT 14AY BE INCURRED- THE TIME, PLACE AND DATE OF THESE WEEKLY MEETINGS SHALL BE ES�ABLISHED AT THE PRE -CONSTRUCTION CONFERENCE. Supplem�tal SpecificBti�s (Re� 05/01/86) Pag- 15