THE CONTRACTOR SlAJ-L NOTIFY THE CITY OF RENTON AT LEAST AS FkX�JS PRIOR To CD,,ENCING WORK. THE
SAME NOTIFICATIONS SHALL BE PROVIDED TO ALL EMERGLNCy SERVICES,
RENTON EXCHANGE TELEPHONE NUMBER, AND 13Y DIALING 911 FROM A PHONE WITH A
THE SCHOOL DISTRICT WH,-N WOWING WITHIN A RO44DWAY RIGHT-OF-
WAY- THE CONTRACTOR SHALL ALSO NOTIFY PROPERTY OWNERS ADjACENT To TjE CNSTRUCTIDN AREA,
INDICATING THE DURATION AND PROPOSED T114E OF ACCESS CLOSURE TO THEIR PROPERTY.
1-08.5 TIME OF COWLETION (ADDITIONAL SECTION)
REPLACE PARAGRAPH I WITH:
THE CONTRACT TIME SHALL START WIT-HIN 10 DAYS FROM THE DATE OF THE LETTER NOTIFYING THE
CONTRACTOR TO PROCEED.
THE SPECIAL PROVISIONS WILL STATE THE CONTRACT TIME IN WOWING DAYS.
A WOWING DAY IS ANY DAY NOT OTHERWISE DEFINED HEREIN AS A MGM WORKING DAY. A NON WORKING DAY
IS DEFINED AS A SATURDAY, SUNDAY OR RECOGNI ZED HOLIDAY OR A DAY ON WHICH THE CONTRACTOR IS
SPECIFICALLY REQUIRED By THE CONTRACT TO SUSPEND CONSTRUCTION.
ALL DEFINITIONS OF RECoGNIZEI, FjL,[)AyS IN THE
RECO�IZED HOLIDAYS - STANDARD SPECIFICATIONS ARE DELETED AMC VOID.
SHALL BE AS FOLLOWS:
NEW YEAR'S DAY' NEMW'AL DAY, JULY 4, LABOR DAY, VETERANS DAY, THA,,SGIVI Y
FOLLOWING, AND CHRISTMAS DAY. THE DAY BEFORE CHRISTMAS 5% NG 440 THE DA
OCCURS ON A TUESDAY OR FRIDAY. THE DAY AFTER CHR:ES IALL BE A HOLIDAY WHEN CHRISTM(�S DAY
OCCURS ON A MONDAY, WEDNESDAY, OR THL ZAY. THAS -SHALL BE A HOLIDAY WHEN CHRISTMAS DAY
PRECEDING WORKING DAYS SHALL -D WHEN CHRISTMAS DAY OCCURS ON A SATURDAY, THE TWO
THE TWO WOWING DAYS FOLLOWING S
BE OBSERVE AS HOLIDAYS. WHEN CHRISTMAS DAY OCCUR ON A SUNDAY
-%-YV-L BE OBSERVED As HOLIDAYS.
THE CONTRACTOR IS E)FECTED TO UILIGENTLY PROSECUTE THE WOW TO COMPLETION IN ALL PARTS AND
REQUIREMENTS. THE PRGJECT SHAL- K- COMPLE7ED WIrrllN THE TIME NOTED IN THE CALL FOR BIDS.
PROVlOM, HOWEVER, THAT THE CITY SHALL HAVE THE RIGHT UFUN REQUEST OF THE PUBLIC WOWS DEpAR
To "TEND THE TIME OF COMPLETION OF SAID WOW. NO EXTENSION SHALL BE VALID UNLE THEW ,
WRITING AND ACCOMPANIED By -SS THE SAME BE IN
THE WRITTEN COKM4T TO SUCH EXTENSION By THE SURETY ON THE BD4D OF THE
CONTRACTOR. TIME LOST IN REPLACING IMPROPER 00RK OR MATERIAL SHALL NOT FURNI-41 ANY GROL,,GS TO THE
CONTRACTOR FOR CLAIMING AN EXTENSION OF TIME FOR THE
THE CONTRACTOR FROM DAMAGE OR LIABILITIES FOR FAILURF COMPLETION OF THE WOW, AND SHALL WIT REI-EASE
REQUIRED. TO COMPLETE THE WOW WITHIN THE TIME
1-08.9 LIQUIDATED DAMAGES (ADD, 1�1= SECTION)
THE LIQUIDATED DAMAGES DO NOT It --I AND ARE IN ADDITION TO, DA14AGES FROM CO
SUPERVISION, LEGAL EXPENSE, AND LMIURT COSTS - STS FOR !NSPECTION,
'N"b"M BEYOND CONTRACT COMPLETION DATE. THE COST OF -
ADDITIONAL INSPECTION AND SUPERVISION SHALL BE AN ANDUNT EXAL To ACTUAL SALARY COST PLUS., IGO
PERCENT FOR OVERHEAD.
1-08-11 OVERTIME WORK BY_2n�
WHEN THE CONTRACTOR PERFORms co� JCTION WOW OVER THE ACCEPTED 8 HOURS PER DAY
WEEK, OR ON ANY CITY HOLIDAY, AND HE WORK OR 40 HOURS PER
THE CITY AT THE RATE OF $50 PER HOUR. REQUIRES INSPECT. [ON THEN THE CONTRACTOR SHALL REIMBURSE
I'HE SOLE AUTHORITY IN DETERMINING THE
-NSPECTION, AND SHALL NOTIFY THE CONTRACTOR OF ITS INTENT TO
NECESSITY OF HAVING THE OVERTIME I THE CITY SHALL HAVE
REQUIRE SAID INSPECTION. SAID COSTS WILL 13E DE
MONTHLY ESTIMATE. DUCTEI) FROM MONIES DUE THE CONTRACTOR ON EACH