HomeMy WebLinkAbout391-08.12 CONTRACTOR'S PLANT AMC E@UIpMENT (NEW SECTION)
THE CONTRACTOR ALONE SHALL AT ALL 1114ES BE RESPONSIBLE FOR THE ADEQUX'Y, EFFICIENCY, AND
SUFFICIENCY OF HIS AND HIS 9-OCONTRACTOR,S PLANT f-!D EQUIPMENT. THE OWNER SHALL HAVE THE RIGHT TO
MAKE USE OF THE CONTRACTOR'S PLANT AND EQUIPMENT IN THE PERFORMANCE OF ANY WORK ON
NOW. THE SITE OF THE
THE USE By THE OWNER W SUCH PLANT AND EQUIPMF-NT SHALL BE CONSIDERED AS EXTRA ORK D
ACCORDINGLY. W AM PAID FOR
WITHER THE OWNER NOR THE ENGINEER ASSUME ANY RESPONSIBILITY. AT ANY TIME, FOR THE IT-y OF rH
-ED UNTIL FINAL ACCEPTANCE OF THE WOW By THE
SITE FRO04 THE TIME CONTRACTOR'S OPERATIONS HAVE COMNCNr SECUR E
ENGINEER AND THE rX*4M- THE CONTRACTOR SHALL EMPLOY SUCH WASUlIES CLS ADDITIONAL FENCING;,
BARRICADES, 40 WATCHMEN SERVICE,
PROTECTION OF THE SITE AND HIS PLA AS HE DEEMS NECESSARY FOR THE PUBLIC SAFETY AND FOR THE
FENCED, SECLRED AREAS. WT AND EQUIPMENT. THE OWNER WILL 3E PROVIDED KEYS FOR ALL
1-08.13 ATTENTION To WORK (NEW SECTION)
THE CONTRPCTOR SHALL GIVE HIS PERSONAL ATTENTION TO AND SHALL SUPERVISE THE WORK TO THE END THAT IT
SHALL 13E PROSECUTED FAITHFULLY, 440 WIEN HE IS NOT PERSONALLY PRESENT ON THE WORK SI'E, HE SK43U AT
ALL REASONABLE TIMES BE FdYRESEN7M BY A COMPETENT SUPFRINTENDENT WHO SHALL HAVE FULL AUTHORITY L To
EXECUTlE THE SAME, AND To SUPPLY MATERIALS. TOOLS, AND LABOR WITHOU, DEI_AY, AND 010 SFiALL BE THE
LEGAL REPRESENTATIVE OF THE CONTRACTOR. I OBSERV
THE CONTRACTOR SHALL BE LIABLE FOR THE FAITIFUL ANcE
OF ANY INSTRUCTIONS DELIVERED TO HIM OR TO HIS AUTHORIZED REPRESENTATIVE.
1-09 MEASURE]MENT AND PAYMENT
1-22-1 MEASUREAENT OF QLL46NTITIES (ADDITIONAL SErTT��
7W CONTRACTOR WILL BE RESPONSIFx-E TO ASSURE THAT ALL DELIVERY TICKETS THAT ARE REQUIRED FOR THE
PURPOSE OF CALCULATING QUANTITIES FOR PAYMENT OR FOR VERIFYING TYPE OF MATERIAL ARE RECEIVED By THE
ENGINEER AT THE TIME OF DELIVERY IN ORDER FOR PAYMENT TO BE MADE.
A. By TRUCK
PAYMENT WILL NOT BE MADE FOR DELIVERY TICKETS WHICH DO NOT SHOW TYPE OF MATERIAL, MOSS I
TARE WEIGHT, TRUCK mj43ER, DATE, WEIG+L4STERS CERTIFICATION,AND INSPECTOR 'S INITIALS. WE GHT,
SCALE CERTIFICATION SHALL BE SUBMITTED AS EARLY IN THE PROJECT AS POSSIBLE. EACH WEIGHT STATION
94ALL MAINTAIN A RECORD OF THE TRUCK NUMElER, TIME, DATE, AND WEIGHT OF ALL TRUCKS PROVIDING
MATERIAL TO THE PROJECT. THE WEIGHT LIST SHALL BE MAINTAINED IN DUPLICATE WITH ONE SIGNED COPY
TRANSMITTED DAILY TO THE CITY By THE SCALE ATTENDANT. IN ISOLATED CASES WHERE SCALE WEIGHT 15
NOT AVAILABLE, THE INSPECTOR SHALL MEASURE THE TRUCK VALLAC AND CERTIFY AS TO ITS FULL LOAD
DELIVERY.
B. By OTHER MEANS
METHOD FOR 04EASUREMENT AND PAYMENT FOR MATERIAL BROUGHT TO THE SITE BY ANY 0, MEANS WILL BE
DETETW.INED By CONTRACTOR/G**4E�R AGREEMENT BEFORE AWARE) OF THE CONTRACT.
1-09.3 SCOPE OF PAY�!� (AppITIDNAL SECTION)
ALL COSTS AND EXPENSiES FOR ITE]MS OF WORK, EQLJIPME�NT, OR MATERIALS, INCLUDING INSTALLATIONS, NOT
IDENTIFIED AS BID ITEXS IN THESE SPECIFICATIONS SHALL BE INCIDENTAL TO THE PROJECT. NO SEPARATE
PAYMENT OF ANY KIND WILL BE MADE FOR THESE INCIDENTAL ITES.
�i'WlOm�tsl SPecificatims
(Re� 05/01/86) Page 17
IN
-1