HomeMy WebLinkAbout401-09.3 CUKTINLED PARTIAL PAYMENTS ON EST104ATES MAY BE WITH1-1ELD LNTIL A WORK PROGRESS S>EDLILE, AS DESCRIBED IN SECTION 8, HAS BEEN RECEIVED PjV APPROVED. IN THE EVENT THAT ANY MATERIAL OR WORKMIANSHIP DOES NOT MEET THE FEQUIR04ENTS OR SPECIFICATIONS, T14E CITY MAY HAVE THE OPTION TO ACCEPT SUCH MATERIAL OR Wfb*4ft,6HIP IF THE DIRECTOR OF PUBLIC VKM(S DEEMS SUCH ACCEPTANCE TO BE IN THE BEST INTEREST OF THE CITY, PROVIDEO THE CITY KAY NEGOTIATE PAYMENT OF A LOWER UNIT PRICE FOR SAID MATERIAL OR WORKMANSHIP. PAYMENT FOR PIPE INSTALLED SHALL BE MADE ON THE FOLLOWING SCHEDLLE ONLY: CONDITION OF PIFw_ INSTALLED PERCENT OF BID PRICE PAID PIPE INSTALLED AND NOT TESTED. 80.0% PIPE INSTALLED AND TESTED. 9O.G% PIPE INSTALLED, TESTED, TIE-INS AM SERVICES INSTALLED AND CLEAN - LIP COMPLETED. 100.0% Supplemental Specifications (Rev 05/01/86) Page 18