Loading...
HomeMy WebLinkAbout41DIVISION 2 EARTHWORK 2-01 CLEARING, MMING, AND ROADSIDE CLEANUP 2-01.2 DISPOSAL OF USABLE MATERIAL & DEBRIS (PARTIAL REPLACEMENT SECTION) DELETE: "THE CONTRACTOR SHALI_ DISPOSE OF N-L DEBRIS BY ONE OF THE THREE DISPOSAL METHODS DESCRIBED BELOW." ADQ- -THE CONTRACTOR 94ALL COMPLY WITH ALL LAWS AND RULES GOVERNING THE DISPOSAL OF DE13RIS AND CONSTRUCTION MATERIALS IN APPROVED LAND FILL.S.- 2-01.2(l) DISPOSAL METHOD No. 1 - OPEN BURNING - DEI_ETE 2-01.2(2) DISPOSAA_ METHOD NO. 2 CONTROLLED BURNING - DELE­rE 2-01.2(3) DISPOSAL METHOE, Mo. 3 - DELETE 2--Gl.2(4) DISPOSAL METHOD No. i LAND FILLS (ADDITIONAL SECTION) ALL DEBRIS, WASTE, ED(CESS CONSTRUCTION MATERIALS AND OTHER MISCELLANEOUS MATERIAL NOT SALVAGED BY THE OWNER OF THE CONTRACTOR OR DISPOSED OF BY ANOTHER APPROVED METHOD ARE TO BE DISPOSiED OF AT A LANDFILL APPROVED AJ4D LICENSED BY THE APPROPRIATE GOVERNING BODY. 2-01.3(4) ROADSIDE CLEANUP - DELETE 2-01.5 PAYMENT (PARTIAL REPLACEMENT SECTION) DELETE ITEM 4 2-02 REMOVAL OF STFbr-nAJFS AND OBSTRUCTIONS 2-02.3(3) RE)�OYAL OF PAVEME-MT. SIDEWALL< �AND CuR�Bs ADD: 5. WHEN AN AREA WHFRE PAVEMENT HAS BEEN REMOVED IS TO BE OPENED TO TRAFFIC BEFORE PAVENNT PATCHING HAS BEEN FINISHED, TEMPORARY MC COL-D MIX AS"HAL-T CONCRETE PATCH --tAl-L BE REQUIRED. TEMPORARY COLD MIX PATCHING SHALL BE PLACED TO A MAXIMUM DEPTH OF 1 INCH IMMEDIATELY AFTER BACKFILLING AND COMPACTION ARE COMPLETED AND BEFORE THE ROAD IS OPENED To TRAFFIC. 2-02.5 PAYMENT (SUPPLEMENTAL SECTION) ADD: 2. -SAW CUTTING,- PER LINEAL FOOT. 3. -COLD MIX MC ASPHALT,PER TON. ALL COSTS RELATED TO THE REMOVAL OF STRUCTURES AND OBSTRUCTIONS INCLUDING SAW CUTTING AND COLD mix ASPHALT SK4LL BE CONSIDERED INCIDENTAL TO AND INCLUDED IN THE UNIT CONTRACT PPICE OF OTHER BID ITEMS UNLESS DESIGNATED AS A SPECIFIC BID ITEM. Suppl�tal Specifjcatjo�s (Re� 05/01/86) Page 19 orsom