Loading...
HomeMy WebLinkAbout422-03 FIOADWAY EXCAVATION AND EMBANKMENT 2-03.1 DESCRIPTION (PARTIAL REPLACD404T SECTION) REPLACE PARAGRAPH 2 WITH: THE WORK INCLUDES THESE ITEMS UNLESS THEY ARE DESIGNATED AS PAY ITEMS IN THE CONTRACT: 1. HALL 2. SLOPE ROUNDING 3. EXCAVATION OF STRUCTURES, DITCHES AND CHN**D-S. A. REMOVAL OF UNSUITABLE MATERIALS. 5. REMOVAL OF PAVEMENT, SIDEWALKS, DRIVEWAYS, CURB AND GUTTER, FXTRUDED CURBS, AND OTHER SURFACE IMPROVEMENTS 2-03.3(2) ROCK CUTS (PARTIAL REPLACEMENT SECTION) REPLACE PARAGRAPH 1 ClWrR(X-LEE) BLASTING WITH: CONTROLLED BLASTING — BEFORE BLASTING WILL BE APPROVED THE CONTRACTOR MUST DEMONSTRATE TO rHE E14GINEER AND LOCAL POLICE AND FIRE DEPARTMENTS THE WED FOR THIS METHOD OF EXCAVATION. IF APPROVED BEFORE ANY BLASTING BEGINS, THE ENGINEER WILL REQUIRE THE CONTRACTOR TO PROVIDE 1WOF04ATION ON HOW DRILLING, LOADING AND SHOOTING WILL BE ACCOMPLISHED. ALSO, TFf'- CONTRACTOR WILL PROVIDE A DETAILED EXPLANATION OF WHAT PRECAUTION WILL BE FOI-LOWED IF BLASTING IN AN URBAN OR RESIDENTIAL AREA. 2-03.3(14)E UNSUITABLE FOUNDATION EXCAVATION (REPLAC'-.MENT SECTION) klHEN SHOWN ON THE PLANS OR WHEN SPECIFIED IN THE SPECTAL PROVISIONS, UNSTABLE NATURAL GROUND Sl-kALL 13E EXCAVATED PRIOR TO THE PLACEMENT OF EMBo*&(MENT OVER THE AREA. THE UtiSTABLE MATERIAL MAY CONSIST OF PEAT, MUCK, SWAMPY OR UNSUITABLE MATERIALS, INCLUDING BURIED LOGS AND STLH-S. THE MATERIAL SHALL BE EXCAVATED BY THE CONTRACTOR AS DIRECTED BY THE ENGINEER TO GIVE THE CONSTRUCTED EWAM04ENT FULL BEARING ON SOLID GROUND. 04ATERIALS EXCAVATED FROM THE ROADWAY OR aW#4EL (>(ANGE PRISMS, WILL NOT BE CLASSIFIED AS LJNSIJITA13LE FOUNDATION EXCAVATION UNLESS THE REMOVAL MUST BE ACCOMPLI%�M BY DRAGLINE OPERATION OR BY SPECIAL EXCAVATION METHODS REQUIRING DIFFERENT EQUIPM04T FROM THAT IFSEn FOR ROADWAY EXCAVATION, IN WHICH CASE MEASUREJEAT AND PAYMENT AS 'LWSUITABLE FOUNDATION EXCAVATION' ON A PER CLA31C YARD BASIS WILL APPLY. 2-03.3 14)F DISPLACEMENT OF UNSUITABLE FOUNDATION MATERIALS - DELETE 2-03.4 MEASUREMENT (SUPPLEMENTAL SECTION) ADD TO ITEM 1. AT THE DISCRETION OF THE ENGINEER, ROADWAY EXCAVATION, BORROW EXCAVATION, AND UNSUITABLE FOUNDATION EXCAVATION - BY 71-C CUBIC YARD 14AY BE MEASURED BY TRUCK IN THE HAULING VEHICLE AT THE POINT OF LOADING. THE CONTRACTOR SHALL PROVIDE TRUCK TICKETS FOR EACH -OAfj REMOVED. EACH TICKET SHALL HAVE THE TRUCK NUMBER, NAME AND DATE, AND BE APPROVED BY THE ENGINEER. 2-03.5 PAYMENT (PARTIAL REPLACEMENT SECTION) ADD TO BEGIW41NG OF PARAGRAPH 1: "ALL MATERIAL UNITS COVERED IN THIS SECTION SHALL INCLUDE THE HAUL TO AND FF40M THE -008 SITE AS PART OF THEIR UNIT PRICE. Suppl�ntal Speclficati�s (Re� 03101186) Page 20