HomeMy WebLinkAbout43j7:_ 2�03.5 CONTINUED REPLACE PARAGRAPH I ITE)4 1 WITH: 'WHEN THE JNGINEER ORDERS DCCAVATION 2 FEET OR LESS BELOW SUBGRADE, UNIT CONTRACT PRICES FOR ROADWAY EXCAVATION AND MAUL SHALL APPLY. IF FIE ORDERS EXCAVATION MORE THAN 2 FEET BELOW SUBGRADE ' THAT PART BELOW THE 2-FOCT DEPTH SHALL BE PAID FOR AS PROVIDED FUR IN SE-CTION 2- 03.50) UNSUITABLE FOUNDATION EXCAVATION. - REPLACE TEXT OF ITEM 3 WITH: 'UNSUITABLF FOUNDATION EXCAVATION-, PER CUBIC YARD. WHEN THIS BID ITD4 APPEARS IN THE SCHEDULE OF PRICES, THE CONTRACT PRICE PER CLM31C YARD SHALL BE FULL COMPE)4SATION FOR EXCAVATING, LOADING, PLACING OR OTHERWISE DISPOSING OF THE MATERIAL INCLUDING HAUL. WHEN NO BID !TE34 FOR 'URSUITABLE FOUNDATION EXCAVATION' APPEARS IN -.HE ScHEMLILE OF PRICFS, BUT AN ITEM FOK FOUNDATION MATERIAL CLkSS A OR CLASS 8 APPEARS IN THE SCHEIX�E OF PRICES, THE PAYMEI�ff SHALL BE AS SET FORTH IN SECTION 2-09.5.7. WHEN NEITHER OF THE ABOVE ITEMS IS PROVIDED IN THE CONTRACT SUCH WORK AS MAY BE ORDERED BY THE LNGINEER SHALL BE ACCOMPLISHED AS EXTRA WOF*( AND PAYMENT WILL BE MADE AS PROVIDED IN SECTION 1- 04.4. REPLACE TEXT OF ITEM 7 WITH: "ALL COST FOR EMBANI(MENT COMPACTION SHALL BE INCIDENTAL TO OTHER PAY ITEMS INVOLVED.- 2-04 HALIL 2-04.5 PAYMENT ( �-'_ACE)4DVT SECTION) ALL COSTS FOR THE HAULING OF MATERIAL TO, FROM OR ON THE JOB SITE SHALL BE CONSIDERED INCIDENTAL TO AND INCLUDED IN THE UNIT COWRACT PRICE OF OTHER UNITS OF WORK. 2-05 SLOPE TREATMENT 2-05.5 PAYMEEN'T (REPLACEMENT SECTION) ALL COSTS FOR SLOPE TREATMENT SHALL 13E CONSIDERED INCIDE�AL TO A.-C INCLUDED IN THE UNIT CONTRACT PRICE OF OTHER UNITS OF WORK. 2-09 STRUCTURE EXCAVATION 2-09.1 DESCRIP'TION (SLF-PLEMENTAL SECTION) THIS WORK ALSO INCLUDES THE EXCAVATION , HALL AND DISPC� OF ALL _JNSUITABL-_ MATERIALS SUCH AS PEAT, MUCX, SWAMPY OR UNSUITABLE MATERIALS, INCLUDING BURIED LOGS PoC STUMPS. 2-09.3(1)C REMOVAL OF UNSTABLE BASE MATERIAL (PARTIAL r��EPLAC84ENT SECTION) REPLACE PARAGRAPH 2 WITH: GRAVEL BACKFILL FOR FOUNDATION MATERIAL SHALL BE CRUSHED OR PARTIALLY CRL6HlED MATERIAL MEETING 'HE REQUIREMENTS OF SECTION 9-30.76 FOR GRADATION AND QUALITY. suppl�tal speclficatio� (Re� 05/01/86) Page 21