HomeMy WebLinkAbout440
�7
2-09.3(1)D DISPOSAL OF EXCAVATED MATERIAL (PARTIAL REPLACEMENT SECTION)
REPLACE THE SECOND AND THIRD PARAGRAPHS WITH:
THE UNIT CONTRACT PRICE FOR STRUCTURE EXCAVATION CLASS 8 SHALL INCLLJDE ALL CrISTS FOR LOADING
AND HALLING THE MATERIALS.
2-09.4 MEASURX]MENT (PARTIAL REPLACEMENT SECTICN)
MINIMUM TRENCH WIDTH FOR PAYMENT SHN-L BE I FOOT.
HORIZONTAL LIMIT FOR PIPELINES LARGER THAN 42 INCHES, PIPE ARCHES MORE THAN 50 INL>IES IN SPAN,
STRUCTURAL PLATE PIPE, AND UNDEFOPASS SHALL BE 1.5 FEET.
LOWER LIMITS '-OR PIPE. THE BOTTOM OUTSIDE OF THE PIPE, OR THE BOTTOM OF THE REQUIRED BEDDING
MATERIAL WILL SERVE AS THE LOWER LIMIT FOR MEASURING EXCAVATION. THE ENGINEER MAY SET ANOTHER
LIMIT WHEN EXCAVATION WST BE MADE BELOW GFLADE.
DFI TE THE LAST TWO PARAGRAPHS.
2-09.5 PAYMENT (REPLACEMENT SECTION)
WIEN THE PROPOSAL INCLLK31-5 ANY OF THE FOLLOWING BID ITEMS, THE OWNER WILL PAY AS FOLLOWS:
1. 'STRUCTURE EXCAVATION CLASS A, -PER CUBIC YARD.
2. 'STRLICTLN;tE EXCAVATION CLASS B,-PER CUBIC YARD.
THE LJP41T CONTRACT PRICE PER CUBIC YAPtD FOR THE BID ITEMS LISTED ABOVE SHALL BE FULL PAY FOR
ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, AND PUMPING INn UDING K4LK-. IF THE ENGINEER ORDERS
THE CONTRACTOR TO EXCAVATE BELLOW THE ELEVATIONS SHOWN ON THE PLANS, THE UNIT PRICE PER
CLM31C YARD FOR "STRUCTURE EXCAVATION CLASS A OR 8' SH1ALL APPLY. BUT IF THE CONTRACTOR
EXCAVATES DEEPER THAN THE PLANS OR THE ENGINEER REQUIRES, THE OWNER WILL NOT PAY FOR
MATERIAL EXCAVATED FROM BELOW THE REWIRED E�EVATIONS. IN THIS CASE, THE CONTRACTOR, AT
HIS EXPENSE 94ALL REPLACE SUCH MATERIAL WITH CONCRETE OR OTHER MATERIAL THE ENGINEER
APPROVES.
WHE) 'STRUCTLRE EXCAVATION CLASS B" IS NOT INCLUDED IN THE BID ITEMS THEN ALL EXCAVATION,
AND ALL HAUL AND DISPOSAL OF EXCESS OR UNSUITABLE MATERIALS, TOGETHER WITH ALL LABOR, TOOLS
AND EWIPMENT REQUIRED TO EXCAVATE TO LINE AND GRADE FOR ANY PIPE, CULVERT OR CONDUIT SHALL
BE CONSIDERED INCIDENTAL To rHE PRICE PAID FOR THAT PIPE, CLJLVERT OR CONDUIT AND NO
ADDITIONAL PAYMENT SHALL BE MADE.
5- "SHORING AND CRIBBING OR EXTRA EXCAVATION CLASS A ....... LLW SUM.
THE LUMP SUM CONTRACT PRICE: SHALL BE FULL PAY FOR ALL LABOR, MATERIALS, TOOLS, AND
EQUIPMENT NEEDED TO BUILD, DEWArER, PLACE RIPRAP TO PREVENT SCUJR, AND REMOVE THE SHORING,
CRIBS, COFFERDAMS OR CAISSONS -
IF THE ENGINEER REQUIRES SHORING, CRIBS, COFFERDAMS, OR CAISSONS WHEN THE CONTRACT PROVIDES
NO 810 ITEM FOR SUCH WORK, THE OWNER WILL PAY AS PROVIDED IN SECTION 1-04.4. IF THE
ENGINEER REQUIRES THE CONTRACTOR TO BUILD SH,,RING OR CRIBS OR EXTRA EXCAVATION CLASS A THAT
EXTENDS BELDW THE ELEVATION SHOWN ON THE PLANS, THE OWNER WILL PAY THE LLJMP SUM PRICE AND
NO MORE WHEN THE EXTRA EXCAVATION DEPTH DOES NOT EXCEED THREE FEET. FOR DEPTHS GREATER
THAN THREE FEET BELOW THE ELEVATION SHOWN ON THE PLANS PAYMENT WILL BE AS PROVIDED IN
SECTION 1-U4.4.
Supple�tal Speclficat'�s
(Re� 05/01/86) Page 22
Y6