Loading...
HomeMy WebLinkAbout527-05.3(l) CONTINUED BE CONSTRUCTED IN THE SA04E MANNER AND OF THE SAME MATERIAL All THAT REQUIRED FOR NEW INLETS. THE INSIDE OF THE INLETS SHALL BE MORTARED AND PLASTERED- mOKtb,E:NTS APO CAST IRON FRAME AND COVER: 40NLJMENTS NZ MONUMENT CASTINGS SHALL BE ADJUSTED TO GRADE IN THE SAME MA14,F_R AS FOR VALVE BOX CASTINGS: ADJUSTMENTS OF VALVE BOX CASINGS SHALL BE MADE IN THE SAME MANNER AS FOR MANHOLES. 7-05.4 CTION) REPIJACE PARAGRAPH I WITH: MANHOLES AND CATCH BASINS WILL BE MEASURED PER EACH FOR THE FIRST 10' AS MEASURED FROM FINISHED RIM ELEVATION 70 THE INVERT OF THE LOWEST OUTLET PIPE. ALL DEPTH GREATER THAN 10' WILL BE PAID AS EXTRA DEPTH MAWMES -, OR EXTRA DEPTH CATCH BASINS, TYPE F�R VERTICAL FOOT REPLACE PARAGRAPH, 4: WITH: STRUCTURE EXCAVATION CLASS 3 AND STRUCTURE EXCAVATION M-ASS B, INCLUDING HAUL WILL BE MEASURED AS SPECIFIED IN SECTION 2-09. 7-:15.5 PAYMENT (PARTIAL REPLACEMENT SECTION) DE,ETE ITEMS I r.*tOUGH 10 AND REPLACE WITH: 1. aStandard ManhoieS ", Per each 2. -Extra Depth per V.F. 3 -Catch Basin Type-_ -, per each A. "Catch Basin Type_, without catch, per each 5. "Extra Depth Catch 6a �Ih -, per V.F. 6. -Adjust Manhole-, per each 7. -Adjust Catch basin-, per each 8. "Adjust Val�es', per each 9. NAdjust MorwAvents", per each DELETE PARAGRAPH A 7-4)9 PIPE APO FITTINGS FOR WATER MAINS 7-09.2 MATERIALS (PARTIAL REPLACEMENT SECTION) REPLACE PARAGRAPH I WITH: MAT-_RIALS SHALL MEET THE Ri7QUIREMENTS OF THE FOLLOWING SECTIONS: Pipe ............................. 9-30.1 Ductile Iron Pipe ................ 9-3O.IA Fitting .......................... 9-30.2 Ductile I� Pipe ................ 9-30.2A Plastic Film Wrap ................ 9-30.8 Tracer Tape ...................... 9-30.9 7-10 TREM�H EXCAVATION, ING, AND BACKFILL FOR WATER MAINS 7-10.3�07)B EXTRA EXCAVATION (PARTIAL REPLACEMENT SECTION) REPLA,�E PARAGRAPH A WITH: NCqSUREMENT OF -BANK RUN GRAVEL FOR TRENCH BACTiLL' WILL BE By THE TON. Supplemental Specifications (Re� 05/01/86) Page 30 U.