Loading...
HomeMy WebLinkAbout547-11/3(09)A 'CNrIMJV) COUPLINGS ARE INSTALLED SHALL BE WRAPPED A MINIMUM OF 3 FEET ON EACH SIDE OF THE COUPLING. ALL JOINTS OR SEAMS IN THE PLASTIC FILM WRAP SHALL BE MADE USING THE 2-INCH WIDE POLYETW -74E ADHESIVE TAPE. THE PLASTIC FILM WRAP NEED NOT BE WATERTIGHT, BUT NO PART OF THE PIPE OR COUPLING SHALL BE EXPOSED TO THE BACKFILL. CARE SHALL BE EXERCISED DURING BACKFILLING TO PREVENT 111E PLASTIC FILM WRAP FROM 13EING PUNCTURED OR OTHERWISE DAPtAGED. PLASTIC FILM WRAP AND ITS INSTALLATION SHALL CONFORM TO AWWA C105 EXCEPT AS MODIFIED HEREIN. WW_N WORK 15 ONCE STARTED ON A CONNECTION, IT 94ALL PROCEED CONTIMXXJSLY WITHOUT INTERRUPTION, AND AS RAPIDLY AS POSSIBLE UNTIL COMPLETED. NO SHUTOFF OF MAINS WILL BE ITTED OVERNIGHT OR OVER WEEKENDS OR ON HOLIDAYS. IF THE CONNECTION TO THE EXISTING SYSTEM INVOLVES TURNING OFF THE WATER, THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE REFIDENTS AFFECTED BY THE SHUTOFF. THE ENGINEER WILL ADVISE WHICH PROPERTY OWNERS ARE TO BE NOTIFIED. THE CONTRACTOR MAY BE REQUIRED TO PERFORM THE CONNECTION DURING TIMES OTHER THAN 043RMAL WORKING HOURS. THE CONTRACTOR -94ALL NOT OPERATE ANY VALVES ON THE EXISTING SYSTEM. WATER SYSTE)-q PERSrX44EL WILL OPERATE ALL VALVES ON THE EXISTING SYSTEM FOR THE CONTRACTOR WHEN REQUIRED. No WORK SHALL BE PERFOlR?AED ON THE CONNECTIONS UNLESS A REPRESENTATIVE OF THE WATER DEPARTMENT IS PRESENT TO INSPECT THE WORK. THE TYPES OF CONNECT 'GESTFD PIPING ARRANGEMENTS HAVE BEEN SHOWN IN THE IONS ARE VARIED AND SUG PLANS. FOR THE 7NSTALLATION OF THESE CONNECTIONS, THE SURFACED PORTION OF THE ROADWAY SHALL NOT BE PENETRATED UNLESS THE CONNECTING POINT IS DIRECTLY Lt4DER IT. FOR CONNECTION BY ANY OTHER METHOD, THE LONTRACTOR SHALL FLIRNISH A DETAILED SKETCH FOR APPROVAL NOT I ES THAN TWO WEEKS PRIOF. TO THE E)Q'E—_TED CONSTRUCTJON. CITY INSTALLED CONNECTIONS: CONNECTIONS TO EXISTING PIPING AND TIE-INS ARE INDICATED ON THE DRAWINGS. THE CONTRACTOR MUST VERIFY ALL EXISTING PIPING, DIMENSIONS, AND ELEVATIONS TO ASSURE PROPER FIT. CONNECTIONS TO THE EXISTING WATER MAIN SHALL NOT BE MADE WITHOUT FIRST MAKING THE NECESSARY ARRANGEMENTS WITH THE ENGINEER IN ADVANCE. WOW SHALL NOT BE STARTED UNTIL ALL THE MATERIALS, EQUIPMENT AND LABOR NECESSARY TO PROPERLY COMPLETE THE WORK ARE ASSEMBLED JN THE SITE. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS NECESSARY TO INSTALL ALL CONNECTIONS AS INDICATED ON THE CONSTRUCTION DRAWINGS. THE CONTRACTOR SHALL PERFORM THE EXCAVATION, BEDDING, AND BACKFILL, AND PROVIDE CONCRETE BLOCKING FOR THE CONNECTIONS TO EXISTING MAINS. THE CITY WILL CUT THE EXIFTING MAIN AND ASSEMBLE ALL MATERIALS. WHEN THE CITY MAKES THE -CONNECTIONS To THE EXISTING SYSTEll ALL LABOR, MAT-ERIALS, AN1D EQUIPMENT REQUIRED OF THE CONTRACTOR SHALL BE CONSIDERED INCIDENTAL P#,10 ALL RELATED COSTS SHOULD BE INCLI 1-4 OTHER ITEMS OF WORK. 7-11.3(il) HYDROSTATIC PRESSURE TEST (REPLACEMENT SECTION) ALL WATER MAINS AND APPURTENANCES SHALL BE TESTED UNDER A HYDROSIATIC PRESSURE EQUAL TO 150 PSI IN EXCESS OF THAT UNDER WHICH THEY WILL OPERATE. IN NO CASE SHALL THE TEST PRESSURE BE LESS THAN 200 PSI. ALL PUMPS, GAUGES, PLUGS, SADDLES, CORPORATION STOPS, MISCELLANEOUS HOSE AND PIPING, AND OTHER EQUIPMENT NECESSARY FOR PERFOF04ING THE TEST SHALL BE FURNISHED A6ND OPERATED BY THE CONTRACTOR. THE PIPELINE TRENCH SHALL BE BACKFILLED SUFFICIENTLY TO PREVENT MOVEMENT OF THE PIPE L#4DER PRESSURE. ALL THRUST BLOCKS SHALL BE IN PLACE AND SUFFICIENTLY CURED TO REACH DESIGN STRENGTH BEFORE TESTING. WERE PERMANENT BLOCKING IS NOT REQUIRED, THE CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY BLOCKING AND REMOVE IT AFTER TESTING. Supplemental Specifications (Re� 05/01/86) Page 32 L_ _j _1