Loading...
HomeMy WebLinkAbout607-18.3�2) CEMENT _C�--TE PAVEENTS' AFTER THE SUBGRADE FOP THE PAVINENT HAS BEEN COWACTED AND CONSTRUCTED TO LINE AND GRADE, THE CEMENT CONCRETE PAVEMENT PATCH SlHALL BE PLACED, COMPACTED AND SrR" OFF TO THE CRADE OF THE ADJACENT PAVEME�NT IN ACCORDANCE WITH THE PERTINENT MrTIONS OF SECTION 5-05. THRO" AkU DUMMY JOINTS 94ALL BE PLACED AND EDGED WHERE DIRECTED. THE SURFACE SHALL BE FINISHED AND BRL&-lED WITH A FIBER BRUSH. APPROVED CURING COMPOUND SHALL BE PLACED ON THE FINISHED CONCRETE IMMEDIATELY AFTER FINISHING. 7-18.3(3) RIGID -- p.—T RF�PFArFn WITH ASPHALT CONCRETE STREETS WHICH HAVE RIGID TYPE PAVEMENTS W-SURFACED WITH ASPHALT CONCRETE SHALL BE PATCHED AS SHOWN ON THE STANDARD DRAWING, OR AS OTHERWISE SPECIFIED, THE S-RFACE OF THE CEMENT CONCRETE PORTION OF THE PATCH SIALL BE LEFT LOW ENOUGH To ACCOMMODATE THE ASPHALT PORTION OF THE PATCH. BRUSH FINISHING WILL NOT BE REQUIRED. JOINTS SHALL BE PLACED IF DIRECTED BY THE ENGINEER. CURING SHALL BE ACCOMPLISHED WITH A SS-1 E)&LSION CUT BACK WITH WATER AS DIRECTED BY THE ENGINEER - ASPHALT CONCRETE OR BITUMINOUS PLANT MIX SiHALL NOT BE PLACED UNTIL THE DAY AFTER THE C04ENT CONCRETE HAS BEEN PLACED, UNLESS OTHERWISE PERMITTED By THE ENGINEER' THE EDGES OF THE EXISTING Ag-HA-T PAVEMENTS AND CASTINGS SHALL BE PAINTED WITH HOT ASPHALT IMMEDIATELY BEFORE PLACING THE ASPHALT PATCHING MATERIAL. THE ASPH�LT CONCRETE PAVEMENT SHALL THEN BE PLACED, LEVELED, AND COWACTED TO CONFORM TO THE ADJACENT PAVED SURFACE- IMMEDIATELY THEREAFTER, ALL JOINTS BETWEEN THE NEW AND ORIGINAL ASPHALT PAVEMENT SHALL BE PAINTED WITH HOT ASPHALT OR A-5-rtALT EMULSION AND BE COVERED WITH ORY PAVING SAND BEFORE THE ASPHALT SOLIDIFIES. 7-18.3(4) ASPHALT CONCRETE STREETS ON UWA-'LAR BASE AFTER THE SLE)GRADE HAS BEEN PREPARED AS SHOWN ON THE STANDARD DRAWING, OR AS DIRECTED By THE ENGINEER, A.9-HALT CONCRETE PAVEMENT CLASS B OR CLASS F 9-LALL BE PLACED TO A THICKNESS OF THE EXISTING A51HALT PAVE)CNT DEPTH, OR TO A MINIM-IM OF TWO (2) INCHES, WHICHE"YER DEPTH IS THE GREATER, AND COMPACTED IN THE MANN[:-� SPECIFIED IN SECTION 7-18.30). 7-18.3,5) OIL MAT STREETS THE EXISTING OIL KIT SHALL BE UNIFORMLY TRIMMED TO A STRAIGHT LINE. AFTER THE SUBGRADE HAS BEEN PREPARED AS 94DWN ON THE STANDARD DRAWING, OR AS DIRECTED BY THE ENGINEER, A MINI" OF TWO (2) INCHES OF ASPHALT CONCRETE PAVEMENT CLASS B SHALL BE PLACED AND COMPLETED IN THE SAME KANNER AS SPECIFIED IN SECTION 7-18.3(3). 7-18.3(6) INCIDENTAL WORK ALL INCIDENTAL WORK AS REQUIRED TO Dl*'L-ETE TH11 PATCHING OF STREET aWACES AS SPECIFIED, INCLUDING JOINTS WHERE REQUIRED, SHALL BE CONS:-FAED 4,; �._TDENTAL TO THE PATCHING AND THE COSTS THEREU- SHALL BE INCLUDED IN THE ITEMS FOR W—CA F'A L- " N IS Pf'GVIOED. 7-18.4 MEASUREMENT PAYMENT FOR PAVEMENT PATCHING WILL ONLY BE MADE FOR MATERIALS I WITHIN THE NEAT LINES 1 (ONE) FOOT ON EITHFR SIDE OF THE MAXIMUM TRENCH WIDTH AS SPECIFIED IN SECTION 2-09.4. kCA-�� AND PAYMENT FOR CRUSHED ROCK SHALL BE AS COVERED IN OTHER SECTIONS OF THIS DOCUMENT. &jpple�tal Spf-cificati�s (Re� 05/01/86) Page 38