Loading...
HomeMy WebLinkAbout7111 DIVISION 9 04ATOUALS 9-03 AGGREGATF-s 9�03. 10 AGGEEr-ATI FOR GRAVEL BASE (PARTI�- REPLACEMENT .ADD TO PARAGRAPH 2 SENTENCE - —EXCEPT THAT IN NO CASE 91ALL THE MAXIMUM SIZE EXCEF- EIGHT (8) INCHF-S. REPLACE PARAGRAPH 3 WI TH: GRAVEL BASE SHALL MEET THE FOLLOWING REQUIREMFN7 HAULING VEHICLES FOR DELIVEDRY TO THE ROADWAY, S FOR GELAD'NG AND QUALIT-y WHEN PLACED IN TEMPORARY STOC1,3-ILE. THE EXACT POINT OF ACCEPT TRENCH OR OUR'NG MA"&FACTL-RE AfC R-ACEW-NT INTO A ANCE WILL BE DETERMINIED By THE ENGINEER. GRAVEL BASE GRAVEL BASE CLASS A CLASS 8 S PASSING 1/4" SIEVE 25% MIN. 25% MIN. 75% MAX. 75% MAX. X PASSING U.S. NO. 200 5% MAX. 10% MAX . SIEVE (NET SIEVING) RAT101- X PASSING #2GO 2/3 MAX. 2/3 MAX. S PA5�>INU �AO SAND EQUIVALENT 50 MIN. 30 MTN. 9-03.12(1)A CLASS A (REPLACEM1ENT SECTION) GRAVEL FAC)(FILL FOR FOUNDATION, CLASS A, SHALL CONSIST OF CRUSHEI) MATERIAL AND SHALL CONFORM TO THE REQUIREMENTS OF SECTION 9-03.9 FOR BALLAST. 9-03.12(1)8 CLASS B (REPLACEMENT SECTION) GRAVEL BACKFILL FOR FOUNOATIONS, CLASS 8, IS NOT AN ACCEPTABLE SUBSTITUTION FOR GRAVEL BACKFILL FOR FOUNDATIONS, CLASS A, LOA-ESS APPROVED IN WRITING By THE ENGINEER. IF APPROVED THE GRAVE FOR FOUNDATION, CL -L BACKFILL -ASS B, SHALL CONFORM TO THE REQUIREMENTS OF 9-03.1(3)C GRADING 34 OR 9-03.10 AGGREGATE FOR GRAVEL BASE, CLASS A, 9-03.12(3) GRAVEL BACKFILL FOR PIPE DING (PARTIAL REF-ACEMENT SECTION) REPLACE SENTENCE 1, PARAGRAPH 1 WITH: GRAVEL BACKFILL FOR PIPE BEDDING &-tALL CONSIST OF PEA GRAVEL. ADO: WHEN APPROVED IN WRITING By THE ENGINEER, OTHER CRUS GRANULAR MATERIAL HED, PROCESSED OR NATURALLY OCCURRING BEDDING. MEETING THE REQUIRvJCNTS LlS=. ABOVE CAN BE USED AS GRAVEL BALXFILL FOR PIPE �3 14 —GRAVEL 2TROW (FU-LACEMENT SECTION) GRAVEL BORROW SHALL CONSIST OF CLASS A OR CLASS B GRAVEL BASC CONFORMING TO THE REQUIREMENTS OZALINF-D IN 9-03.10 AGGREGATE FOR GRAVEL BASE Supplemental Specifications (Rev 05/01/86) page 49 w