1986 Small Bridge Repair
and Guard Rails
SPECIAL PROVISIONS
1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC
1-07.16 PROTECTION A1,1D RESTORATION OF PROPERTY (SUPPLEMENTAL SEC-.�ON)
Private property su�ch as plants, shrubs, tree.3, feo�ces and rockeries within the public right-of-way
shall be removed and restored to the satisfaction of the Property owner. It shall be the contractors
responsibility to notify each property owner when it is necessary to remove such Improvements to
facilitate the contractors progress, and to remove those Improvements to locations requested by the
property owner or to restore them in their original location in as near original condition as
possible.
Such re�oval and restoration shall be considered incidental to the project and no further
compensation Will be made.
2-01 CLEAPING, GRUBBING, AND ROADSIDE CLEANUP
The contractor shall clew the bridge channel by removing all unwanted material and debris between
the bridge abutments and within the 60' wide road right -of —ay. The small Wooden structure under the
bridge shall be removed as well as all trees and brush, except those marked to be saved.
The contractor shall dispose of all Wood debris by hauling to a commercial disposal site or may
dispose by chipping as outlinec. in the Standard Specifications.
The method of payment will be Lump Sum per site.
2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
The contractor shall remove all brush and trees as necessary for a proper installation of a new guide
rail Installation. Removal of existing rails and posts shall be incidental to the project, and all
salvaged material shall be delivered to the City Shops. All roadway signs disturbed shall be
reinstalled as directed by the Engineer. No separate payment shall be made foir clearing, grubbing
or structure removal and shall be incidental to other Items of work.
2-02.3(3) REMOVAL OF PAVEMENT, SIDEWALKS AND CURBS
2-02.5 PAYMENT (SUPPLEMENTAL SECTION)
1. Rernoval of existing walks shall be considered incidental to the project and no further
compensation shall be paid.
2. Sawcutting shall be considered indiceotal to the project and no further compensation shall
be made.
3. Cold mix MC asphalt shall be considered incidental to the project and no further
compensation shall be made