Loading...
HomeMy WebLinkAbout169-26 (CONTINUED) The method of payment shall be Lump Sum for all grouting on each bridge deck. This unit price is for all cleaning, material removed and disposed, traffic control, grouting, traffic bearing coverings, etc., for a complete installation. 04/17/86 MI.4.4