Loading...
HomeMy WebLinkAbout17SPECIAL PROVISIONS Detailed Scope of Work The 1986 Small Bridge Repair and Guard Rail bid proposal includes 2 Schedules that are the base bid: Schedule "A" - Hardie Ave. S.W. Rail- road Undercrossing, and Schedule "B" - May Creek/Jones Ave. N.E. #2 Bridge. The alternate, Additive Schedules are: Schedule "C" - May Creek/Jones Ave. N.E. #1 Bridge; Schedule "D" - S.W. 16th St. Bridge; Schedule "E" - N.E. Lake Washington Blvd./May Creek Bridge; Schedule "F" - Golf Course Bridge Replacement; and Schedule "G" - City Wide Beam Guard Rail and Precast New Jersey Barriers. Award The City may award only the base bid items, some or all of the Additive Schedules C, D, E, F, and none, all, or part of Schedule G. All bidders must respond to complete Schedules, and partial bids will be accepted for complete Schedules. The City reserves the right to award all Schedules, or any combination of the Schedules to different bidders. The bid Schedule "G" is comprised of the 20 different work s ites listed in the Standard Drawings. The City reserves the right to award and proceed with none, any, or all of the work sites, using the as bid prices in the proposal. Hardie Ave. S.W. Railroad Undercrossi 7 _' NHE LK "A" This work task involves installation of new beam guard ra a ria ch approach To the railroad bridge columns. The existing east sidewalks must be removed and replaced to accorrwnodate the new guard rails. The existing east side landscaping, irrigation, and existing manhole must be adjusted as required and replaced, inked, and adjusted to meet the new walks and guard rail. The new beam guard rail on all bridge approaches shall be the standard 37 112' parabola with a beam guard rail anchor Type 1, at the outboard ends, and a Type 2 transition and a bridge connector Type 8, per Standard Plan C-5. The northwest bridge approach shall be ex- tended northerly beyond the large Puget Power Utility Park, before starting the 37 112' parabola and standard anchor Type 1. All work shall be accomplished within the 5 as bid pay item S. Any pit run gravel, crushed rock surfacing, and asphalt pavement required, shall be incidental to the as bid pay items, May Creek/Jones Ave. N.E. #2 Bridge SCHEDULE "B" This work task involves pavement reconstruction and new, New Jersey Concrete Barrier Type 2 installation. The existing rails and post s shall be removed, the existing brush, grass and debris cleared 5' beyond the existing traveled roadway. New crushed rock surfacing, shall be installed on shoulder areas and compacted. Con s truct a 24' wide roadway on all approaches to the culvert bridge, and as wide as practicable across the culvert bridge, and 100' outward from the center of the bridge culvert,