Loading...
HomeMy WebLinkAbout224 Ar t I-D M '.0 W 0 M C� E 0 F- 0 F_ E CLI COMMENTS Remove & Replace Remove & Replace Remove & Replace Remove & Replace New N.J. Barrier against fence at E Remove Cable Sys, New Beam Guardra Remove all old rail Install new Rr oR St kornergaS d nj I 'Od-JUY ip ap iver new a Add Type "G" Ends to Exi sting Rai I Remove old rail -instal I Curb & Pat( Inst Rail on W. Side of Benson Roa Inst New Rai I -Protect Conc Mine Si Add Term 3Cor-Rebld SE Cor-Add Asp RemoVd ol d rai I -Inst Curb & Patch f New C&G & Patch to L i mi t Acce ss to C Repr Double Guardrail -Straighten Removal of Old Guardposts Removal of Old Guardposts New N.J. Barrier/New Crush Rock Suy lRemove old Deck-Inst Conc Bridge I jPatch AC Bridge Deck, Clean Channe lGrout Deck Only Xtend New rail to Con.w/Xist.Beam Repl rdwy -Remove rail-Inst N.J. Ba Repl walks Relocate 21 Plants, Adj! Remove rail-Inst Beamrai VBr Rail& Remove & Replace i 54 10 10 50 10 2 5 4 12 5 1 120 26 330 10 5 'Appy— n�104W i I L.S. L.S. 12 L.S. 400 15 ,3 12 33 1 2 6 23 4 8 5 16o 10 42 10 649 55 bow Tons Rd e Wk oad PL ail lace ick