Loading...
HomeMy WebLinkAbout11a'aaa VftshkWton State r DgparbTalwd ot TrarapportmOcin VrAff T,,an,�tatjon Building KF 01 5201 Olympia, Wiiehingt� 96504 206 753 6005 April 14, 1986 L%uaine niarentman sac,eta,y of Tlandip�t-,I— "M F� All CA Agencies Re: Beam Guardrail Anchors An error in bolt dimension on Standard Plan Numbers C-6, the 5/8" C-6c, and and 91�" C -6d bolt has been broug ht to' our attention. In particular, Type Anchor, the Alternate Type 4 Anchor, and shown the in the Alternate .1 Type 5 Anchor is too long 'or the two bottom bolts. These two bolts go through the smaller dirDension of the 6" x 81, post and should be 73�." long. The upper single bolt requires a 91�" bolt as shown. followin alternates are -o . I - R For projects that are under construC—on, e available t o resolve this problem: 1. A change order revising the bolt length with a credit equal If the longer bolts are to the cost differential in material. restocking charge ma_� be in order. o the project. n 2. If the 9;,�" bolts have sufficient threads, us�� them. 3. If the 9;�" bolts do not have sufficient threads, revise bolt length as noted abo ve or provide a spacer, by change order. so the nut can be tightened adequately. For pr ojects that have not been advertised, a special provision must be from 9��11 to 71,2" until revised Standard written changing the bolt length Plans o r a General Special Provision is issued. Sincerely, WILLIAM I. HORDAN State Aid Engineer WIH:cej LJJ 15: 7 4 cc: J. K lasell, District I R Selstead, District 2 B. George, District 3 B Elderkin, District 4 R Howry, District 5 D. Guhlke, District 6