HomeMy WebLinkAbout48Will 16-Apf-07
City of Renton . Department 0 Engineering
rapt J
Project: - 19% Small Bridge Repair and Beard Rail
Cantract bm*wz
CAB OW-96
Contractor Coral Ccastruction Cc
Estimate Members 3 & FINAL
CA Dsinq late:
April 10, 1"7
Had lars Description
T LAW t
Est. Unit
Previous
prMous
Thi a
This
Total
Total
I&D. ND.
I
goantit, Price
Quaptit,
A..t
Qwtity
Amount
Quantity
Amount
MERLE C,
01. Epary Grast Bridge Deck i1oles
Law SM
LOD 3,100.00
0.00
0.00
0.00
0.00
0. M
Total schedule - C"
0.00
O.OD
0.00
904AU - D"
01. Epoxy Broat Bridge Deck Holes
Lump go
J.00 3,100.00
0.00
0.00
0.00
0.00
OM
Total Schedule - D"
0.00
O.OD
0. 00
SOOMILE - E"
01. Can Bridge Dwwwl
Low SIA
1.00 2,000.00
1.00
2000.00
0.00
1.00
20D.00
02. Asphalt Patch of beck Pavement
Low Sm
1. OC W. 00
0.00
0.00
1.00
6M.00
1.00
60.00
Total SchWale - E-
20DO. OD
60D. 00
2WO.40
BOOM - F"
01. Mineral of Stricture & (Intruction Lane Sus
1.00 5,000.DD
1. OD
3M.00
0.00
1.00
3DOO.,DD
A - OW Dispose Existiag Bridge
Deck
02. Clem Bridge OWNWI
Low gn
1.00 2,00D.OD
1.00
2DO0.00
0.00
1.00
2DOO.' 30
OL fi"isk & lastall No bridge W
LAW Sem,
1.00 9,500.00
1.00
"M.00
0.00
1.00
TW*
Tow Schedule - F-
145M.DD
D.00
IMMOO