Loading...
HomeMy WebLinkAbout12C-1 cc) SEP1*0'b P,ARBARA Y. SHINPOCII MAYOR TO: F ROM: SUBJECT PUBLIC WORKS DEPARTMENT Df--Sl(;N/UTII I I Y ENGINEERING 0 235-2631 MUNICIPAL BUILDING 200MILLAVE.SO. nENTUN.VVASII.9BU55 June 17, 1986 MEMOHANDUM Richard C. Houghton, Public Works Director Robert E. Bergstrom, Engineering Supervisor 19136 Small Bridge Repair and Guardrails COUTRACT AWARU This bid was opf?ned al- 3:00 p.m. , June 10, 19116, from which olle bidder responded: Coral CoiisLruction of Wilsonville, Oregon. The bid sc-liedulp,; werp bid as Lwo base bid,, Schedules A and 13 and all other bids s(,h—hilps were additive alternal-es, as well as Schedule G was set up to be expanded as funds were available. We have budgeted: 317/106 1981i Carry forward $15,342.ou 317/073 1986 Small Brid(je/Guardrail Repair 50,000.00 421/000/15 1926 Water Utility 5,450.00 191,16 Parks 1,250.00 $78.042.00 The schedules bid and award recouviendations are: Base Bid - h—he I p A - llardie Ave. SW R/R Undercrossino Hid - h, -, I i i I,, I � - done,; Ave. rlf/May ('rvvk Brid,je P? Al lj�i nal.f, - S, hodiil,- (, - J(mes Ave NF/May Creek Bridqv #1 A I tm mi Le - ' ( hedij 1,� 1) - S1,1 l6t.h St Bridge A I I.orem Le - Sc?iedide? F - Lake Washington/May Creek Bridge A I Lerna Le - Schedule F - Golf Course Bridge Br�doe Work Subtotal Schedult! G - Guardrail Work - Misc. Jobs 11,-mahiiim Cil�y Imids $30,637 is award hased tipon Schedule G at: 774:`-- 3, -0" $ fl,fmo.00 Award 15,?,"i.011 Award 3, 1 (it). 0,) Awa r d 3. 101). 1 jo Award 2,600.00 Award 14,5oo.00 Award S47,405.00 $130,766.(X) $ 29,687.00 T 7;'