Loading...
HomeMy WebLinkAbout2Datat 16-Apr-W City of PAnton � DoWteewt o4 Engineering Pages Project. Ift gull Bridge Ampair and Board Rail Contract Member: CAB 039--% Contractor Coral Construction Do Estimtr Mimmert 3 & FIWL Closing Datir. April 10, 1%7 Itu DNS Ono ipti on T limit Est. Unit Prenom Prmous Thi s This Total Total ft No. I Asentity Price Oaantity Amount Ramatity Amount 960titY Ammt 4 SDGULE - C" 01. EPOKY &IWA Bridge back NDIVS Low am 1.00 3,100.00 O.OD 0.00 Total sdadule " C" 0.00 gaimu " D" 01. Epoxy Wout Iridpe lack Holes usp so 1.00 39101D.00 0. OD 0.00 TOW Sctv&do " D" 0.00 KNOXII - E" 01. Clan Bridge Channel Lum gum 1.00 2,000.00 LOD 290D.00 O.OD 0.00 0.00 0.00 0.00 0.00 0.00 MID 0.00 0.00 0.00 1.00 2DWOD 02. Adpwt patch of Back Pavement LUMP 'AN 1.00 6W.OD 0.00 0.00 1.00 00.00 1.00 600.00 Total Sdm*Alo " E- 20DO. DD 60D.00 2600.00 9DENIF - F" 01. Rowel of 3-1tracturs, & Sestroctim Lump Sea 1.00 3,000.00 1.00 3000.00 0.00 1.00 3000.00 A and Dispose Existing Bridge Back 02. Clem Bridge Owammel Low SM 1.00 2,001).OD �M 2000.00 0.00 1.00 2DO0.00 OL Fwuob & Install Has Bridp OWEk UNIV SON 1.00 9,500.00 1. DD M.00 0.00 1.00 95WOD Total Schmilmle " F" 14500.00 0.00 14500.00