Loading...
HomeMy WebLinkAbout37_"y 0F 0 PUBLIC WORKS DEPARTMENT DESIGN/UTILITY ENGINEERING 0 235-2631 AL WJNICIPALBUILDING 200MLLAVE.80. RENTON, WASK 28066 '�%" Co SEP( BARBARA Y. SHINPOCH b"YOR June 12, 1986 CORAL CONSTRUCTION 13236 N.E. 177th Place Woodinville, Washington 98072 Subject: CITY OF RENTON 1986 S"ll Bridge Repair and Guard Rail Bid Award Ladies and Gentlemen: As I discussed by phone. the City is proposing to award the above referenced bid's Additive Schedules to your firm as listed below for a total contract price of $81.231. We propose tc award Schedules as foliows: Schedule A: $ 8,880 100% Award Schedule 8: 15,225 100% Award Schedule C: 3,100 100% Award Schedule D: 3,100 100% Awdrd Schedule E: 2,600 100% Award ,chedule F: 14,500 100% Award Schedule G: 33,826 - the Work Tasks are identified on the attached sheets. -"- Aapk�14 I would appreciate a letter concurring with this award. Thank you. Very truly yours. r- Robert E. Bergstrom. P.E. Engineering Supervisor mf