HomeMy WebLinkAbout44VUMLI[Fk— VY%—.#KKZ WrZrAUM I 1"CrA 1
DESIGN/UTILITY ENGINEERING o 235-2631
MUNICIPAL BUILDING 2MMLLAVE.90. RENTON. WASK 99066
'to SEP1
BARBA,RA Y. SHINPOCIH
M^YOR June 12, 1986
CORAL CONSTRUCTION
13236 N.E. 177th Place
Woodinville, Washington 98072
Subject: CITY OF RENTON
1986 Small Bridge Repair and Guard Rail Bid Award
Ladies and Gentlemen:
As I discussed by phone, the City is proposing to award the above
referenced bid's Additive Schedules to your firm as listed below for a
total contract price of $81.231.
We propose to award Schedules as follows:
Schedule A: $ 8,880 100% Award
Schedule B: 15,225 100% Award
Schedule C: 3,100 100% Award
Schedule D: 3,100 100% Award
Schedule E: 2,600 100% Award
Schedule F: 14.500 100% Award
Schedule G: 33,826 - the Work Tasks are identified on the
attached sheets. -01i� Aspk--,4
I would appreciate a letter concurring with this award.
Thank you.
Very truly yours,
Robert E. Bergstrom, P.E.
Engineering Supervisor
mf