HomeMy WebLinkAboutLUA83-029 (2)I
zi- *-:... tiIIFT '-
f,,,
I.X. .-?. ,,, - ,'
1;'' k. ie,' ti--,i '; :g.• k', i. F.,: .6 fe ,-,
xs. ..:.. 4 V:- •,%, ., ‘V:: '•-'• lii.-,... : 1..1.. - ,,,,-:-tizt...,-7 4::,
P:.1
4. 7.. F.''' li,..f•-•.“s 4?
4... -, c.
r.....
4.
FILE TITL1E
i;•, •
1
S 4
1..,
7. le,
4,.NIe _,•g.
1.. 14
P,
r?.
1.r: •
g 411111 41 4440gib v•
a' '4e.s
1,
Z !''' •Vn.tt. It.;*
r 7t.2." .47 t'' 4.•/,' .
1.:. ....",...
47,,.
I,••
t:1 f;;? . 1 •••,•4'
7,tirf.,'
tol,`,. ;:,1'
3.'
i.r1t.: 'I
g5.••113i.'6%, ' ; ,t1V..,i •.>,,',•.. ,,
I, , •'.i.,
N• in'-
G•• 4.••
t
i'1,4 r'ts,,,,rtc.,., 1,2,, ,/^ •,,,.. , 1?:,•7
t';..‘ 14', '''':
11s.:"
I'lii••. '''
1'.
K., ,•,-. 3-iti.; . ttg-
1:,::,,;,• . .
1.1; -4;.i....,),,„-3,...f..v.I'.. •.-44„
r.
k• 11..A. •Zi., ri,. v.:,,,, ,„..• -.1, —
c.,
144-fi,,
t.,,,,... .
s.• ..4Ch;it.l.,J;.fa'''' i.)34'1.."'
s agi,.1
1.C.4:21..3!.., •.
c.,
a
i
J \
OF 1
A
t0$ BUILDING & ZONING DEPARTMENT
mill t
RONALD G. NELSON - DIRECTOR
o MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
0,
9gT D SEPT
O
P
BARBARA Y. SHINPOCH
MAYOR
May 4, 1983
Mr. Paul S. Chiado
The Austin Company
800 S.W. 16th Street
Renton, WA 98055
SUBJECT: SPECIAL PERMIT FOR FILL AND GRADE; FILE SP-029-83, ECF-018-83
Dear Mr. Chiado:
The Renton Environm'ental Review Committee met on May 4, 1983, to discuss the above
referenced special permit application.
It was decided in this meeting that before the Committee will issue an environmental
declaration on this project, that we will first need some additional information in the
following eight areas of concern:
1. Detailed survey and specifications of how much fill area remains.
2.Detailed analysis of storage requirements for illegally filled site west of Raymond
and south of 19th.
3. Detailed analysis of compensating storage volume for subject site and illegal site,
location, consistency with FEMA, Flood Hazard Ordinance, and SCS project design
including wetlands preservation.
4. Analysis of why this site should be filled now in light of +500 undeveloped and filled
acres within the immediate vicinity of site.
5. Detailed specifications for acquisition, preservation and enhancement of wetlands
consistent with City Council adoption of SCS/P-1 system plan.
6. Update traffic impact analysis including estimates of shares of cost for I-405 bridge
replacement and Grady and Lind intersection improvements.
7. Provide a detailed analysis of the traffic impact of the filling operation itself.
Mr. Paul S. Chiado
May 4, 1983
Page 2
Once this information is received, it will be circulated to all federal, state, local agencies
and interested parties for comments . The Environmental Review Committee will not
make a decision until these comments can be considered. Please provide twenty (20)
copies of all requested information for review.
Please submit this requested information at your earliest convenience so that an
environmental determination can be made. Until this is accomplished, the application will
remain on our agenda under pending business.
For the Environmental Review Committee:
Roger J. Blaylock
Zoning Administrator
RJB:JFL:cl
0058N
pF R 4.
THE CITY OF RENTON
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
oIMMO BARBARA Y. SHINPOCH, MAYOR • LAND USE HEARING EXAMINER
90 co-
0 Q FRED J. KAUFMAN, 235-2593
9
TFD SEP1—
Ci y ci f^ iBuifrG
October 20, 1983 1" E. _
OCT 2 0
Mr. Paul Chicado
Austin Company
800 S.W. 16th Street
Renton, WA 98055
RE: SP-029-83; ECF-018-83 - DISMISSAL
Dear Mr. Chic ado:
Based upon a staff recommendation that your application be dismissed for failure to
respond to city requests for additional information necessary to process your application,
the matter is dismissed this date. •
The application has been dismissed with prejudice since the failure to supply information
was due to your inaction.
If you have any questions concerning this matter, you may contact the Building and Zoning
Department.
Very truly yours,
Fred J. Kau an
Land Use Hearing Examiner
F J K:se
0296E
cc: City Attorney
City Clerk
Zoning Admininstrator
Public Works Department
Environmental Review Committee
OF R4,4
0386Z
BUILDING & ZONING DEPARTMENTCs
z RONALD G. NELSON - DIRECTOR
0 MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON. WASH.98055 • 235-2540
0
94?
eb SEPSE
P
BARBARA Y. SHINPOCH
MAYOR
MEMORANDUM
DATE: October 17, 1983
TO:Fred Kaufman, Land Use Hearing Examiner
FROM -- Roger Blaylock, Zoning Administrator
SUBJECT: Austin Company Special Permit for Filling& Grading, SP-029-83
The above application is being submitted to the Hearing Examiner for dismissal. The
application was received by the Building and Zoning Department on April 22, 1983. On
May 4th, the Environmental Review Committee requested additional information. After
four months without a reply, the ERC, on September 20th, restated their request for the
additional information.
The Environmental Review Committee, therefore, requests that the Land Use HearingExaminerdismisstheapplicationbecauseofincompleteinformation.
AP
INTER-OFFICE MEMO
TO: ;1.Le'g DATE /
r 2 / 5
FROM:
RE: 7/,/ ,e2t4 rk"C. 66(41 e(3
c.eefi.eze4,<, Ct
0) ad/we 4/10-pe-e-e0A_
2.441_64.,t
e.6ace.4.x_3 iz.,1---c,L(4.(t4e-LQ eb-w-oz/146
L.,
i
OF R
A.
BUILDING & ZONING DEPARTMENT
RONALD G. NELSON - DIRECTOR
09A MUNICIPAL BUILDING 200MILL AVE. SO. RENTON. WASH. 98055 • 235-2540
oTFD SEPS
tt# - •
BARBARA Y. SHINPOCH
MAYOR
September 20, 1983
Mr. Paul S. Chicado
The Austin Company -
800 S.W. 16th Street
Renton, WA 98055
SUBJECT: SPECIAL PERMIT APPLICATION FOR FILL AND GRADE PERMIT.
FILE: SP-029-83, ECF-018,83
Dear Mr. Chiado:
On May 4,; 1983, the Renton Environmental Review Committee met to discuss the above
referenced special permit application. At that time, it was decided that additional
information would be required in eight areas the Committee had concern over. On this
date, the Committee also notified you by mail for detailed information on these items so
that we could proceed to render the necessary environmental determination.
As of this 'date, we have not received any reply to our request. Would you please let us
know when you expect to submit this additional information for our review. Unless we
hear from you within ten (10) days of this letter, we will forward the application to the
Hearing Examiner for dismissal.
For the Environmental Review Committee,
Tota.e...
Roger J. BlaYlock
Zoning Administrator
RJB:JFL:cl
0176N
Io ®.:6.M.' ° BUILDING & ZONING DEPARTMENT
M '
RONALD G. NELSON - DIRECTOR
moll rc;
9 MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
0 P
9
TFO SE P, -
BARBARA Y. S!HINPOCH
MAYOR:
September 20, 1983
Mr. Paul S: Chicado
The Austin Company
800 S.W. 16th Street
Renton, WA 98055
SUBJECT: SPECIAL PERMIT APPLICATION FOR FILL AND GRADE PERMIT.
FILE: SP-029-83, ECF-018,83
Dear Mr. Chiado:
On May 4, 1983, the Renton Environmental Review Committee met to discuss the above
referenced special permit application. At that time, it was decided that additional
information would be required in eight areas the Committee had concern over. On this
date, the Committee also notified you by mail for detailed information on these items so
that we could proceed to render the necessary environmental determination.
As of this date, we have not received any reply to our request. Would you please let us
know when you expect to submit this additional information for our review. Unless we
hear from you within ten (10) days of this letter, we will forward the application to the
Hearing Examiner for dismissal.
For the Environmental Review Committee,
Taficep,
I
Roger J. Blaylock
Zoning Administrator
RJB:JFL:cl
0176N
OF
P ; + ° BUILDING & ZONING DEPARTMENT
z
RONALD G. NELSON - DIRECTOR
p9 MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
t
O P
so SEP1°
4'
BARBARA Y. SHINPOCH
MAYOR
May 4, 1983
Mr. Paul S. Chiado
The Austin Company
800 S.W. 16th Street
Renton, WA 98055
SUBJECT: SPECIAL PERMIT FOR FILL AND GRADE; FILE SP-029-83, ECF-018-83
r
Dear Mr. Chiado:
The Renton Environmental Review Committee met on May 4, 1983, to discuss the above
referenced special permit application.
It was decided in this meeting that before the Committee will issue an environmental
declaration on this project, that we will first need some additional information in the
following'eight areas of concern:
1. Detailed survey and specifications of how- much fill area remains.
2. Detailed analysis of storage requirements for illegally filled site west of Raymond
and south of 19th.
3. Detailed analysis of compensating storage volume for subject site and illegal site,
location, consistency with FEMA, Flood Hazard Ordinance, and SCS project design
including wetlands preservation.
4. Analysis of why this site should be filled now in light of +500 undeveloped and filled
acres within the immediate vicinity of site.
5. Detailed specifications for acquisition, preservation and enhancement of wetlands
consistent with City Council adoption of SCS/P-1 system plan.
6. Update traffic impact analysis including estimates of shares of cost for I-405 bridge
replacement and Grady and Lind intersection improvements.
7. Provide a detailed analysis of the traffic impact of the filling operation itself.
Mr. Paul S. Chiado
May 4, 1983
Page 2
Once this information is received, it will be circulated to all federal, state, local agencies
and interested parties for comments . The Environmental Review Committee will not
make a decision until these comments can be considered. Please provide twenty (20)
copies of all requested information for review.
Please submit this requested information at your earliest convenience so that an
environmental determination can be made. Until this is accomplished, the application will
remain on our agenda under pending business.
For the Environmental Review Committee:
Roger J. Blaylock
Zoning Administrator
RJB:JFL:cl
0058N
OF RFC
e$ Co . o
BUILDING & ZONING DEPARTMENT
RONALD G. NELSON - DIRECTOR
MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.98055 • 235-2540
90 co'
0,
9grEQ ,0#
Sf'P4
BARBARA Y. SHINPOCH
MAYOR
May 4, 1983
Mr. Paul S. Chiado
The Austin Company
800 S.W. 16th Street
Renton, WA 98055
SUBJECT: SPECIAL PERMIT FOR FILL AND GRADE; FILE SP-029-83, ECF-01'8-83
Dear Mr. Chiado:
The Renton Environmental Review Committee met on May 4, 1983, to discuss the above
referenced special permit application.
It was decided in this meeting that before the Committee will issue an environmental
declaration on this project, that we will first need some additional information in the
following eight areas of concern:
1.Detailed survey and specifications of how much fill area remains.
2.Detailed analysis of storage requirements for illegally filled site west of Raymond
and south of 19th.
3.Detailed analysis of compensating storage volume for subject site and illegal site,
location, consistency with FEMA, Flood Hazard Ordinance, and SCS project design
including wetlands preservation.
4. Analysis of why this site should be filled now in light of +500 undeveloped and filled
acres within the immediate vicinity of site.
5. Detailed specifications for acquisition, preservation and enhancement of wetlands
consistent with City Council adoption of SCS/P-1 system plan.
6. Update traffic impact analysis including estimates of shares of cost for I-405 bridge
replacement and Grady and Lind intersection improvements.
7. Provide a detailed analysis of the traffic impact of the filling operation itself.
R
F•
a
Mr. Paul S. Chiado
May 4, 1983
Page 2
Once this information is received, it will be circulated to all federal, state, local agencies
and interested parties for comments . The Environmental Review Committee will not
make a decision until these comments can be considered. Please provide twenty (20)
copies of all requested information for review.
Please submit this requested information at your earliest convenience so that an
environmental determination can be made. Until this is accomplished, the application will
remain on'our agenda under pending business.
For the Environmehtal Review Committee:
6t s' __)l.0.
kiRogerJ. Blaylock
Zoning Administrator
RJB:JFL:cl
0058N
ENVIRONMENTAL REVIEW COMMITTEE
AGENDA
May 4, 1983
THIRD FLOOR CONFERENCE ROOM:
COMMENCING AT 10:00 A.M.
PENDING BUSINESS:
ECF-011-83 SCHNEIDER HOMES, INC.
PP-020-83 Application for preliminary plat approval for a 15-lot single family
development on a 3.42 acre tract; property located on the south
side of N.E. 20th Street at Kennewick Avenue N.E.
ECF-015-83 RAX SYSTEMS RESTAURANT
B-287 Application for building permit to construct a 2,800 square foot
fast food restaurant; property located at 4114 N.E. 4th Street.
NEW BUSINESS
ECF-017-83 LOUIS L. ANDERSON
SM-105-83 Application for substantial shoreline development permit to allow
V-030-83 a sundeck for a residence and variance application to allow said
deck into rear yard setback; located at 3703 Lake Washington Blvd.
North.
ECF-018-83 AUSTIN COMPANY
SP-029083 Application for special permit to allow completion of filling and
grading of 29 acre site_ previously granted under permit No.
B-' 6671, file SP-320-79, 100,000 cubic yards proposed; located
between Ea_st valley Road and-Lind Avenue S.W. and between S.W.
16th Street and S.W. 19th Street.
INFORMATION:
Letter from David R. Clemens to Mayor Barbara Y. Shinpoch
regarding Maple Valley Highway improvement status.
City of Tukwila Planning Department
For ERCts Review: Draft Environmental Impact Statement for the
Tukwila Bend Office Park. Any comments are due by June 3, 1983.
f
Q THE AIv STIN 800 SOUTHWEST 16TH ST.
l RENTON. WA 98055
COMPANY PHONE: 206/226-8800
TELEX: 910.423.0882
DESIGNERS • ENGINEERS • BUILDERS 223-01 AU-ST-IC-T377N3
Crni- RF.IvT
11 59 R.
April 30, 1982 Q '
MAY 3 1
City of Renton
2
Building Department
B'1L 'lrvC;i +ivi:5.,.
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
Attention: Roger J. Blaylock
Dear Mr. Blaylock:
Thank you very much for meeting with Messrs Chiado and
Hemstreet and me on April 29, 1982, where we discussed our
plans for the development of property in the valley owned by
Valley Office & Industrial Park , Inc. Your suggestions were
quite helpful .
As a result of this meeting, would you please clarify for us
that the construction of the storm sewer proposed for South-
west 19th Street in LID 314 will satisfy the conditions
associated with our approval to fill the 29 acres north of
Southwest 19th Street and east of Lind Avenue Southwest.
Please call me if you have any questions.
Very truly yours,
j4,.
R. A. Grafer
Project Manager
RAG:jlw
OF RANA
4,
41 z THE CITY 'OF RENTON
U `$
POLICY DEVELOPMENT DEPARTMENT • 235-2552
aMUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.98055
o
94TFD SEPS •
O
BARBARA Y. SHINPOCH
MAYOR
MEMORANDUM
April 27, 1983
CITY OF RENTON
TO: Building and ZoningRP ! ri \V PI.
FROM: David R. Clemens ry
Policy Development Director APR t 1983
RE: SPECIAL PERMIT SP-029-83 BUJILDING ZONING DEPT.
Austin Company - Fill portion of site
S.W. 19th and Lind Ave. S.W.
More deailed information needed on:
1. Detailed survey and specifications of how much fill area remains.
2. Detailed analysis of storage requirements for illegally filled site west of Raymond
and south of 19th.
3. Detailed analysis of compensating storage volume for subject site and illegal site,
location, consistency with FEMA, Flood Hazard Ordinance, and SCS project design
including wetlands preservation.
4. Analysis of why this site should be filled now in light of 500+ undeveloped acres
within the immediate vicinity of site.
5. Detailed specifications for acquisition, preservation and enhancement of wetlands
consistent with City Council adoption of SCS/P-1 system plan.
6. Update traffic impact analysis including estimates of shares of cost for I-405 bridge
replacement and Grady and Lind intersection improvement.
7. Review and comment by all Federal, State, local agency and interested parties.
DRC:wr
0124G
OF Ri
4
THE CITY OF RENTON
POLICY DEVELOPMENT DEPARTMENT • 235-2552
n - MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.98055
09 Co,
A
CO SEP1c_N
BARBARA Y. SHINPOCH
MAYOR
MEMOE,ANDU
City of
Zoning
P,erdonBuilding& eg j
April25, 1983
APR 6 1985
TO: Ronald G. Nelson
Building Director
FROM: David R. Clemens
Policy Development Director
RE: AUSTIN COMPANY FILL PERMIT, S.W. 16th/Lind to East Valley
As you are probably already aware, the Austin Company grading permit for the area
immediately south of 16th expired on Sunday, April 24th. Apparently, the Austin Company
is also aware of its expiration, since they have applied to revitalize and expand the permit
to complete the remaining fill work. To be absolutely certain that no inadvertent
violations of the expired permit occur, it might be appropriate to provide written notice to
Austin Company of the permit's expiration.
DRC:wr
0121G
cc: Roger Blaylock, Zoning Administrator
Fred Kaufman, Hearing Examiner
ecY o TY OF RENTON, FILE NO(S): sr- pa9-o
Es ® : BUILDING & ZONING DEPARTMENT cF- olI- 2.J,
Nrc° MASTER APPLICATION
NOTE TO APPLICANT: Since this is a comprehensive application form, only those
items related to your specific type of application(s) are to be completed.
Please, print or type. Attach additional sheets if necessary.)
APPLICANT TYPE OF APPLICATION
NAME FEES
The Austin Company
0 REZONE*(FROM TO
ADDRESS
800 SW 16th Street 0 SPECIAL PERMIT*
TEMPORARY PERMIT*
CITY Renton , Washington
ZIP
98055 Q CONDITIONAL USE PERMIT*
TELEPHONE
D SITE PLAN APPROVAL
2 0 6 ) 2 2 6-8 8 0 0 ED GRADING AND FILLING PERMIT 1 ,0 2 5 . 0 0
No. of Cubic Yards:i O 0 ,00000
CONTACT PERSON
Q VAFromRIANCE
Section:
Justification Required
NAME
Paul S . Chiado
ADDRESS
SUBDIVISIONS:
800 SW 16th Street 0 SHORT PLAT
CITY ZIP 0 ' TENTATIVE PLAT
Renton , Washington 98055
PRELIMINARY PLAT
TELEPHONE 0 FINAL PLAT
206 ) 226-8800 0 WAIVER
Justification Required)
OWNER NO. OF LOTS:
NAME Valley Office & Industrial
PLAT NAME: -
Park , Inc .
ADDRESS PLANNED UNIT DEVELOPMENT:
800 SW 16th Street 0 PRELIMINARY
CITY ZIP 0 FINAL
Renton , Washington 98055
P.U.D. NAME:
TELEPHONE
206 ) 2 2 6-8 8 0 0 El Residential EJ Industrial
QCommercial Q Mixed
LOCATION
MOBILE HOME PARKS:
PROPERTY ADDRESS Between East Valley Road and
Lind Ave. between SW 16th St. and SW 19th St. 0 TENTATIVE
EXISTING USE PRESENT ZONING
a PRELIMINARY
Vacant Rroperty H-i
d FINAL
PROPOSED USE Future light industrial and office
PARK NAME:
park. Same as described in Austin letter of NUMBER OF SPACES:
April 5, 1979 as noted on page 1, Public
Hearing ;File SP-320-79 date,d 4/17/79. XD ENVIRONMENTAL REVIEW COMMITTEE 64.00
L) L kSQ 1,-FT,s D.?t. ) U ACRES
AREA:2 IE 2 Dj 7I , 29
TOTAL FEES 1,089.00
JJJ lllllllS 15L1 iJ
STAFF USE ONLY -- ADMINISTRATIVE PROCESSING
DATE STAMP iy APPLICATION RECEIVED BY v.-,_. n-<-,'t_e, LAPR221983APPLICATIONDETERMINEDTOBE:
41. 111)
Legal description of property (If more space Is required, attach a separate sheet).
Blocks 19 , 20 and 23 of C . D . Hillman ' s Earlington Gardens Addition
to the City of Seattle Division No . 1 , as per Plat recorded in
Volume 17- .of Plats on page 74 , records of King County less lots
8 . 9 . 10 . 49 . 50 and 51 of Mork 19 , lracc that pnrtioc of Block
19 conveyed to the State of Washington by Deeds recorded under
Auditors File No.. 3916580 and No . 4554803.
AFFIDAVIT
Paul S . Chiado , an officer of Valley
Office & Industrial Park , Inc .
I, formerly Metro Industrial 11i ctri r_t, being duly sworn, declare that I am
El authorized representative to act for the property owner,®owner of the property involved
in this application and that the foregoing statements and answers herein contained and the
information herewith submitted are in all respects true and correct to the best of my knowledge
and belief.
SUBSCR,BED AND SWORN TO BEFORE ME THIS
36
C.
1 DAY OF a
19 .
NOTARY PUBLIC IN AND FOR THE STATE OF
WASHINGTON,RESIDING AT
Name of Notary Pu ic)Signature of Owner)
Donna J . Trulson
Paul S . Chiado
Valley Office & Industrial Park ,
800 SW 16th Street , Renton , WA 98055 800 SW 16th Street , Inc .
Address) n
Address)
CL..."-udd==trDept.
M Q MOVIE Renton , Washington 98055
A Minh:Minh:A f7in1
s
CITY OF RENTON, WASHINGTON
ENVIRONMENTAL CHECKLIST FORMCuil ctyetrn
FgigU V
FOR OFFICE USE ONLY
Application No. st'- ba9-8 APR 2 2 1983
Environmental Checklist No. EGF - 0 8-8,5
PROPOSED, date: FINAL, date:
Declaration of Significance Declaration of Significance
Declaration of Non-Significance Declaration of Non-Significance
COMMENTS:
Introduction The State Environmental Policy Act of 1971, Chapter 43.21C, RCW, requires
all state and local governmental agencies to consider environmental values both for their
own actions and when licensing private proposals. The Act also requires that an EIS be
prepared for all major actions significantly affecting the quality of the environment.
The purpose of this checklist is to help the agencies involved determine whether or not a
proposal is such a major action.
Please answer the following questions as completely as you can with the information
presently available to you. Where explanations of your answers are required, or where
you believe an explanation would be helpful to government decision makers , include your
explanation in the space provided, or use additional pages if necessary. You should
include references to any reports or studies of which you are aware and which are rele-
vant to the answers you provide. Complete answers to these questions now will help all
agencies involved with your proposal to undertake the required environmental review with-
out unnecessary delay.
The following questions apply to your total proposal , not just to the license for which
you are currently applying or the proposal for which approval is sought. Your answers
should include the impacts which will be caused by your proposal when it is completed,
even though completion may not occur until sometime in the future. This will allow all
of the agencies which will be involved to complete their environmental review now, with-
out duplicating paperwork in the future.
NOTE: This is a standard form being used by all state and local agencies in the State
of Washington for various types of proposals. Many of the questions may not apply to
your proposal . If a question does not apply, just answer it "no" and continue on to the
next question.
ENVIRONMENTAL CHECKLIST FORM
I. BACKGROUND
1. Name of Proponent The Austin Company
2. Address and phone number of Proponent:
800 SW 16th Street
Renton, Washington 98055
206 226-8800
3. Date Checklist submitted April 21, 1983
4. Agency requiring Checklist City of Renton Planning Department
5. Name of proposal , if applicable: Completion of Grading and Filling previously
granted under Permit #B6671 and Hearing Examiner Report dated 24 April 1979.
File SP 39 79
6. Nature and brief description of the proposal (including but not limited to its
size. general design elements, and other factors that will give an accurate
understanding of its scope and nature):
Completion of filling and grading of 29-acre site previously granted
under Permit #B6671 to create a more presentable appearance of our property
for the benefit of the community. At date of filing this permit application,
the filling and grading is approximately 75% complete. Unable to complete
work under previous permit due to restriction on filling south half of
property pending completion of positive water outfall installed under
LID 314. South half of property was released on approximately February 7,
1983.
2-
7. Location of proposal (describe the physical setting of the proposal , as well
as the extent of the land area affected by any environmental impacts, including
any other information needed to give an accurate understanding of the environ-
mental setting of the proposal ) :
Partially filled and graded property located between East Valley Road and
Lind Avenue between SW 16th Street and SW 19th Street, Renton, Washington
previously approved under City of Renton Hearing Examiner File SP 320-79
on April 24, 1979.
8. Estimated date for completion of the proposal :
One year from date of permit release.
9. List of all permits, licenses or government approvals required for the proposal
federal , state and local--including rezones) :
Grading and filling permit - City of Renton
10. Do you have any plans for future additions, expansion, or further activity
related to or connected with this proposal? If yes , explain:
No immediate plans; however, future light industrial and office park as
described in Austin letter of April 5, 1979 in Hearing Examiner File SP 320
79. No change in status.
11. Do you know of any plans by others which may affect the property covered by
your proposal? If yes, explain:
No
12. Attach any other application form that has been completed regarding the pro-
posal ; if none has been completed, but is expected to be filed at some future
date, describe the nature of such application form:
Previous Hearing Examiner Report File SP320-79 and Building Permits
B6671, 67501, 68479 and B9379 attached.
II. ENVIRONMENTAL IMPACTS
Explanations of all "yes" and "maybe" answers are required)
1) Earth. Will the proposal result in:
a) Unstable earth conditions or in changes in geologic X
substructures? TES— MAYBE WU—
b) Disruptions, displacements, compaction or over- X
covering of the soil?
YES MAYBE NO
c) Change in topography or ground surface relief
features? yr MAYBE WO—
d) The destruction, covering or modification of any
unique geologic or physical features?
UWE !FX
e) Any increase in wind or water erosion of soils,
X
either on or' off the site?
YES RKTETE NO.
f) Changes in deposition or erosion of beach sands, or
changes in siltation, deposition or erosion which
may modify the channel of a river or stream or the X
bed of the ocean or any bay, inlet or lake?
Y-E- MAY tm—
Explanation: (b) and (c) Same as previously approved under Hearing Examiner
File # SP320-79 and Permit Nos. 66671, B7501, 68479 and 69379 including com-
paction `and overcbverinq of existing soil and change in topography as
shown on drawings Y2, Y3 and _Y4. No change in drawings except for addition
of LID 314 improvements and addition of curb cut on Lind Avenue, change in
title from Metro Industrial Park to Valley Office & Industrial Park, and
revision to show remaining area to be filled to complete the work.
JU
3-
2) Air. ' Will the proposal result in: A P R 2 2 1-953
a) Air emissions or deterioration of ambient air
X
quality? vrs- ABBE W
b) The creation of objectionable odors?
Wit WU-
c) Alteration of air movement, moisture or temperature,
or any change in climate, either locally or
Xregionally?yr AY E N B
Explanation:
3) Water. Will the proposal result in:
i (a) Changes in currents, or the course of direction of
X
water movements, in either marine or fresh waters?
YEB MABE NO
b) -Changes in absorption rates, drainage patterns, or X
the rate and amount of surface water runoff?
MMAY B E 1-
c) Alterations to the course or flow of flood waters? X
YES M_A16E
d) Change in the amount of surface water in any water X
body? YET- MBE NO •
e) Discharge into surface waters , or in any alteration
surface water quality, including but not limited to
temperature, dissolved oxygen or turbidity?
X
Y MAYBE
X
f) Alteration of the direction or rate of flow of X
ground waters?
Vf- MA BE NO
g) Change in the quantity of ground waters , either
through direct additions or withdrawals , or through
X
interception of an aquifer by cuts or excavations?
YES MAYBE NO
h) Deterioration in ground water quality, either through
direct injection, or through the seepage of leachate,
phosphates, detergents, waterborne virus or bacteria, X
or other substances into the ground waters?
Q-f- WIT AO
i) Reduction-in the amount of water otherwise available .• X
for public water supplies?
YET MAYBE FIT-
Explanation:
4) Flora. Will the proposal result in:
a) Change in the diversity of species, or numbers of any
species of flora .(including trees, shrubs, grass, crops,
X
microflora and aquatic plants)? vrr— Wit O-
M Reduction of the numbers of any unique. rare or X
endangered species of flora?
V T RUNT iTh
c) Introduction of new species of flora into an area, or
in a. barrier to the normal replenishment of existing X
species? V MAYBE N
X
d) Reduction in acreage of any agricultural crop?
MAYBE Au-
Explanation: (a) Same as previously approved under Hearing Examiner
File # SP320-79, overcovering of existing grass and weeds with fill .
4-
5) Fauna. Will the proposal result in:
a) Changes in the diversity of species, or numbers of
any species of fauna (birds, land animals including
reptiles, fish and shellfish, benthic organisms,
Xinsectsormicrofauna)?
l!tT NAM Fir
b) Reduction of the numbers of any unique, rare or
Xendangeredspeciesoffauna?
1T MR' NO
c) Introduction of new species of fauna into an area,
or result in a barrier to the migration or movement •
of fauna?
PEA MIT NO
d) Deterioration to existing fish or wildlife habitat? X
VET— WirN
Explanation:
6) Noise. Will the proposal increase existing noise levels? X
YES MAYBE N
Explanation:
7) Light and Glare. Will the proposal produce new light or X
glare? ems- AAA W
Explanation:
8) Land Use. Will the proposal result in the alteration of the
Xpresentorplannedlanduseofanarea?yr
Explanation:
9) Natural Resources. Will the proposal result in:
a) Increase in the rate of use of any natural resources? X
Y NUR NO
X
b) Depletion of any nonrenewable natural resource?
lirrg_ M'
Explanation:
10) Risk of Upset. Does the proposal involve a risk of an
explosion or the release of hazardous substances (including,
but not limited to, oil , pesticides, chemicals or radiation)
in the event of an accident or upset conditions? X
V - WIT ff
Explanation:
11) Population. Will the distri-
bution, density, or gro
proposal
wthrate
aofe r h location,e
thehumanpopulation
of an area? vrr- luvur A
Explanation:
5-
12) Housing. Will the •proposal affect existing housing, or , APR 2 .2 19513'
create a demand for additional housing?
YES- MAYBE NO
Explanation:
13) • Transportation/Circulation. Will the proposal result in:
a) Generation of additional vehicular movement? X
YES MAYBE NO
b) Effects on existing parking facilities, or demand
Xfornewparking?
YES MAYBE HB
c) Impact upon existing transportation systems? X
Y1:8 WEE' NB
d) Alterations to present patterns of circulation or Xmovementofpeopleand/or goods?
YEB PITTETE T5-
e) Alterations to waterborne, rail or air traffic? X
YE! MAYBE NU-
f) Increase in traffic hazards to motor vehicles,
Xbicyclistsorpedestrians?
YET— MAYBE 0—
Explanation: Temporary increase in truck traffic during filling operation.
Anticipate approximately 5800 truck trips to complete.work previously granted
under Hearing Examiner File # SP320-79. Hours of operation and routing to
be coordinated with the City of Renton to minimize traffic . disruption.
14) Public Services. Will the proposal have an effect upon, or
result in a need for new or altered governmental services
in any of the following areas:
a) Fire protection?
YES MAYBE "A
b) Police protection?Y18 MATTE
c) Schools?
YES MAYBE NB
d) Parks or other recreational facilities? X
YES MAYBE NO
e) Maintenance of public facilities, including roads? X
YES MAYBE NO
f) Other governmental services?X
YES MAYBE NO
Explanation:
15) Energy. Will the proposal result in:
a) Use of substantial amounts of fuel or energy? X
YPr NU—
b) Demand upon existing sources of. energy, or require
the development of new sources of energy? X
Y€S- MAYBE W
Explanation:
16) Utilities. Will the proposal result in a need for new
systems, or alterations to the following utilities:
a) Power or natural gas?
X
Vt MAYBE FB
b) Communications systems?X
YES- MAYBE M
c) Water?
X
YES MAYBE NO
4i
6-
d) Sewer or septic tanks? X
YES ME NO
e) Storm water drainage?
X
V-E'— M BE W-
f) Solid waste and disposal? X
YES M YBE NO
Explanation:
17) Human Health. Will the proposal result in the creation of
any health hazard or potential health hazard (excluding X
mental health)? Yli MAYBE AU
Explanation:
18) Aesthetics. Will the proposal result in the obstruction of
anyanyscenes vista or view open to the public, or will the
proposal result in the creation of an aesthetically offensive
site open to public view?
MAYBE N
Explanation:
19) Recreation. Will the proposal result in an impact upon the
quality or quantity of existing recreational opportunities?X
ESY MAYBE N
Explanation:
20) Archeological/Historical . Will the proposal result in an
alteration of a significant archeological or historical X
site, structure, object or building? v5 MAYBE A-
Explanation:
III. SIGNATURE
I , the undersigned, state that to the best of my knowledge the above information
is true and complete. It is understood that the lead agency may withdraw any decla-
ration of non-significance that it might issue in reliance upon this checklist shouldtherebeanywillfulmisrepresentationorwillfullackoffulldisclosureonmypart.
Proponent:
signe•
Paul S. Chiado
name printed)
City of Renton
Planning Department
5-76
KS .CH/ADO
RE LU kd
F. GARaIA r
D. & ow .April724, 19i
OFFICE OF T}IE LAND USE _HEARING EXAMINE001-AUWOE
CITY OF RENTON
REPORT AND RECOMMENDATION . APR 2 2 198
APPLICANT: Austin Company FILE NO. SP-320-79
LOCATION: Between the East Valley Road and Lind Avenue S.W. on the south
side of S.W. 16th Avenue S. to proposed S.W. 19th Street.
SUMMARY OF REQUEST: Applicant requests special permit approval for fill and grade
of approximately 300,000 cubic yards of material on a 29-acre
site along the East Valley Road.
SUMMARY OF ACTION: Planning Department Recommendation: Approval with conditions.
Hearing Examiner Decision: Approval with conditions.
PLANNING DEPARTMENT The Planning Department preliminary report and the subsequent .
REPORT: addendum were received by the Examiner on March 29, 1979 and •
April 12, 1979, respectively.
PUBLIC HEARING: After reviewing the Planning Department report, examining
available information on file with the application, and field
checking the property and surrounding area, the Examiner
conducted a public hearing on the subject as follows:
The hearing was opened on April 3, 1979 at 9:25 a.m. in the Council Chambers of the
Renton Municipal Building.
David Clemens, Associate Planner, referenced staff concerns denoted in Section J.
Environmental Assessment/Threshold Determination) and Section L.4 (Analysis) of the
Planning Department staff report pertaining to provision of additional information to
clarify the environmental checklist requirements to allow issuance of a declaration of
non-significance for the proposal. He advised the applicant's request for a two-week
continuance to enable provision of the required information.
The public hearing was subsequently closed by the Examiner at 9:30 a.m. and continued
to April 17, 1979 at 9:00 a.m.
CONTINUANCE:
The hearing was opened on April 17, 1979 at 9:07 a.m. in the Council Chambers of the
Renton Municipal Building.
Parties wishing to testify were affirmed by the Examiner.
It was reported that the Hearing Examiner and the applicant had received and reviewed
the Planning Department report and addendum, and the reports were entered into the
record as Exhibits #1 and #2, respectively.
David Clemens, Associate Planner, reviewed Exhibits #1 and 2, and entered the following
additional exhibits into the record:
Exhibit #3: Vicinity Map
Exhibit #4: Existing and Proposed Contour Sheets (2)
Exhibit #5: Cross Sections of Proposed Fill
Exhibit #6: Letter from King County Planning Division to
Planning Director, dated April 4, 1979.
Exhibit #6 relates concerns of the King County Resource Planning Division for landfill on
industrially zoned land in designated flood hazard areas until applications for building
permits have been filed on 75% of the currently filled and vacant lands.
The Examiner requested clarification of the number of truck trips required to deposit the
proposed landfill. Mr. Clemens advised that dependent upon truck capacity, 24,000 truck
trips were estimated.
The Examiner asked the applicant if he concurred in Exhibit #1 and #2. Responding was:
Q 1.
g, \ oG
Paul Kosteniuk
Austin Company
p
r... _
800 S.W. 16th Street
Renton, WA 98055 A PR 2 2 3983
Mr. Kosteniuk indicated his concurrence in Exhibit #2, noting that disagreements relating
to finish grades which originally existed with recommendations contained in Exhibit #1
had been clarified by the supplementary report. He inquired if the permit would allow
increased volume of landfill if determined necessary at a later date to meet proposed
elevations, or if revision would require an additional public hearing through the Examiner
process. Mr. Kosteniuk noted that due to unknown factors relating to degree of settlement,
the exact amount of landfill cannot be determined. Following further discussion, it was
determined by the Examiner and Mr.. Clemens that if additional landfill is required to
meet basic design parameters and proposed elevations, the revision could be reviewed by
staff during the annual license process. Mr. Clemens indicated his opinion that if the
site area and, elevations are not exceeded, the current permit would remain valid, although
substantial increase of volume to the extent of 400,000 cubic yards would require additional
review through the hearing process.
The Examiner requested an estimated completion date for the project. Mr. Kostenium
indicated that current available material would provide 50% of the estimated landfill
within a period of one year, with the remaining landfill provided as soon as possible as
it becomes available. Responding to the Examiner's inquiry regarding the applicant's
willingness to comply with ordinance requirements for fill composition, Mr. Kosteniuk
indicated his concurrence.
The Examiner requested a representative from the Public Works Department to respond :to
the -traffic analysis contained within Exhibit #2. Responding was:
Paul Lumbert
Traffic Engineering Division
Mr. Lumbert indicated that the projected volume of truck trips from the site could be
adequately accommodated by existing roadways in the area.
The Examiner requested a final recommendation from the Planning Department representative.
Mr. Clemens indicated that the recommendations contained in Exhibits #1 and 2 would remain
as submitted with the addition of the previous clarification of ordinance requirements
pertaining to site area and final elevations.
The Examiner requested further comments. Since there were none, the hearing on File No.
SP-320-79 was closed by the Examiner at 9:35 a.m.
FINDINGS, CONCLUSIONS & DECISION: Having reviewed the record in this matter, the Examiner
now makes and enters the following:
FINDINGS:
1. The request is for approval of a special permit to fill 29 acres to elevations of 17
and 18 feet per Exhibits #4 and 5.
2. The Planning Department report accurately sets forth the issues, applicable policies
and provisions, findings of fact, and departmental recommendations in this matter, and
is hereby attached as Exhibit #1 and incorporated in this report by reference as set
forth in full therein.
3. Pursuant to the City of Renton's Environmental Ordinance and the State Environmental
Policy Act of 1971, as amended by R.C.W. 43.21.C. , a Declaration of Non-Significance
has been issued for the subject proposal by Gordon Y. Ericksen, responsible official.
4. Plans for the proposal have been reviewed by all city departments affected by the
impact of this development.
5. Opposition to the proposal was expressed by the King County Department of Community
Development (Exhibit #6) on the basis of availability of surplus filled industrially
zoned land within the flood zone and absence of a "watershed project."
6. All existing utilities are available and in close proximity.
7. The proposal is compatible with the requirements of Chapter .23 (Mining, Excavation
and Grading Ordinance) of Title IV, Ordinance No. 1628, Code of General Ordinances;
except for:
a. Plans for rehabilitation of the site were not submitted per Section 4-2306.
111 L `
SP-320-79 Page-•-Th
b. Compliance with the setback requirements of Section 4-2314.
c. Plans for mud and dust control were not submitted per Section 4T3312 2 "2 •t983
d. Storm drainage plans do not clearly comply with Sections 4-2307.5.E, 4-2313 and
4-2318.
e. Erosion control was not specified per Sections 4-2312.10, 4-2313, 4-2318.2 and
4-2319.
8. An annual license from the Planning and Public Works Departments is required per
Sections 4-2307.2.B, 4-2307.4, 4-2310 and 4-2309. The staff reviews the project
prior to issuance of the annual license for compliance with the Examiner's decision
and the provisions of Chapter 23.
9. The landfill will be 50% accomplished within one year, and the remainder of the site
will be filled as material becomes available.
10. Estimated traffic impacts (Exhibit #2) can be accommodated adequately on existing
streets according to the testimony of the Public Works Department.
11. A State Flood Zone Control Permit is required of the King County Division of Hydraulics.
CONCLUSIONS:
1. The proposal is compatible with the Green River Valley Comprehensive Plan. Appropriate
wildlife habitat mitigation measures per the Plan and Resolution No. 1923 will be .
required during development of specific site plans for the property or during . • •
rehabilitation of the landfill per Chapter 23.
2. The landfill operation will ". . .not be an unreasonable detriment to the surrounding
area." (Section 4-2303.2.B) . However, this is based upon staff approval of appropriate
erosion control, storm drainage and wildlife habitat mitigation measures prior to
beginning the landfill and during review of the annual license.
3. Compliance with requirements of Chapter 23 (per Finding No. 7) can adequately be
secured by staff prior to issuance of the permit for the landfill operation and/or
issuance of the annual license. The Planning, Public Works and, Police Departments'
should collectively review the permit and license to achieve a single set of conditions
for approval of the permit and license.
4. Although 50% of the site will be filled within one year, leaving completion of the
landfill operation open ended to whenever fill material becomes available does not
appear within the intent of Section 4-2307.3. The applicant did not indicate when
the operation would be completed. However, a reasonable completion period appears
to be four years from issuance of the permit to begin the operation. This will
provide approximately three years to complete the operation following filling 50% •
of the site in the first year.
5. The cumulative impacts of truck traffic within the general area where extensive
landfill operations are occurring should be monitored by staff relative to the
proposal. This site lies at the intersection of two key streets serving the area
East Valley Road and S.W. 16th Street) . Also use of Lind Avenue S.W. over the
freeway may prove more difficult and congested during and following work on- the
Lind Avenue LID. However, it appears that sufficient authority exists in the annual
license for staff to require alteration of access to the site in response to changing
traffic conditions in the area.
6. King county's Department of Community Development (Exhibit #6) did not give the
details and basis of the conclusion that sufficient industrial zoned and filled
property exists in the Green River Valley to accommodate industrial or manufacturing
park uses for some time. It is clear that the analysis is based upon some general
data collected in 1978, almost one year ago. Sufficient accelerated building activity
north of S.W. 43rd Street has occurred within the past year to draw skepticism of the
County's projections and conclusions.
However, the Other contention of the County is that landfills should be disapproved
until an "East Side Watershed Project" is completed. This recommendation has not yet
been approved by the Basin Executive Committee, but is at this time only a
recommendation of the King County staff. Until this becomes adopted policy of the
Committee and the City of Renton, it appears unreasonable to impose such a
recommendation upon the application at hand.
In effect, the County requests a moratorium upon landfills until some to-be-specified
ratio of undeveloped/filled to developed/filled- land is determined by future study.
SP-320-79 Page Four
This is a policy decision of the King County Council and Renton City Council which
has yet to review this issue. In the meantime, it seems reasonable to approve the
application.
DECISION:
4Approve the application subject to compliance with all requirements of Chapter 23 per
review and approval of .the Planning and Public Works Departments per Conclusions No. 1
through 5 and completion within four years.
ORDERED THIS 24th day of April, 1979.
I/AP
1 ,A•eal ciia".IIIIIIIIW
L'c reeler
Land Use Hearing Examiner
TRANSMITTED THIS 24th day of April, 1979 by Affidavit of Mailing to the parties
of rebord:
Paul Kosteniuk, Austin Co. , 800 S.W. 16th St. , Renton, WA
TRANSMITTED THIS 24th day of April, 1979 to the following:
Mayor Charles J. Delaurenti
Councilman Richard M. Stredicke
Warren C. Gonnason, Public Works Director
Gordon Y. Ericksen, Planning Director
Ron Nelson, Building Division
Paul Lumbert, Traffic Engineering Division
Pursuant to Title IV, Section 3015 of the City's Code, request for reconsideration must
be filed in writing on or before May 8, 1979. Any aggrieved person feeling that the
decision of the Examiner is based on erroneous procedure, errors of law or fact, error
in judgment, or the discovery of new evidence which could not be reasonably available at
the prior hearing may make a written request for review by the Examiner within fourteen
14) days from the date of the Examiner's decision. This request shall set forth the
specific errors relied upon by such appellant, and the Examiner may, after review of the
record, take further action as he deems proper.
An appeal to the City Council is governed by Title IV, Section 3016, which requires
that such appeal be filed with the City Clerk accompanying a filing fee of $25.00 and
meeting other specified requirements. Copies of this ordinance are available for
inspection in the Finance Department, first floor of City Hall, or same may be purchased
at cost in said department.
nCity
of
longCsildmg&icain Dept.
Lg t i t
7[
A
1985
6L4 WJ fiz I c7. cat'
x. .) i
EZTHE AU STI N BOO SOUTHWEST 16TH STREET
RENTON.WASHINGTON 9EC=r
COMPANY
TELEPHONE 206'226.6E00
TELETYPE 910.423.0662
DESIGNERS • ENGINEERS • BUILDERS
April 5, 1979
Mr. D. Clemens
City of. Renton
Planning Department
City Hall
Renton, Washington 98055
Dear Mr. Clemens :
With reference to your Preliminary Report to the Hearing
Examiner for File No. SP-320-79 , Section L, Item 4 , we
have the following response:
A minimum finish floor elevation of 21 . 8 feet
using M.S.L = 0. 0 DATUM (U.S.G.S) is required
V
by King County Hydraulics Division. Finish
grade elevations will obviously be less. For
warehouse or light industrial development which
require truck-dock operations finish grades of
21. 8 ft. - 4. 0 ft. = 17. 8 ft. , were found to be
acceptable by King County Hydraulics Division
and by the City of Renton in past discussions.
Therefore, rough grade elevations ranging from
17.0 ft. to 8 .0 ft. would appear to be acceptable.
Although there are no present plans which indicate the type
of development, we would anticipate the following as pos- . •
sible types : The 29 acre site could be subdivided into ap-
proximately six 5 acre developments consisting of two Ware
house facilities, two Light Industrial Complexes, and two
Office Parks . Each Light Industrial Development could
generate a traffic count of 483 trips, each Warehouse deve-
lopment could generate a traffic count up to 700 trips.
The Office Parks could each generate a traffic count of
1032 trips.
These assumed developments could give use to a total traffic
count of 1490 trips at the intersection S.W. 19th Street
and East Valley Road, a total of 1190 trips at the intersec-
tion of S.W. 19th Street and Lind Avenue, and, finally, at
2Bui ldinng&2Zoninng
Dept.
A PR 2 2 19f13
THE AUSTIN 600 SOUTHWEST 16TH STREET
RENTON.WASHINGTON 9B0EE
COM PAN
TELEPHONE 206'226-8600
TELETYPE910.423.08E2
DESIGNERS • ENGINEERS • BUILDERS
City of Renton, Planning Department
April 5 , 1979
Page Two
the intersection of Lind Avenue and S.W. 16th Street 330
total trips west along S.W. 16th Street and 1320 total trips
north along Lind Avenue. (See attachments)
This completes our response to your request for additional
information.
Very truly yours ,
THE AUSTIN COMPANY
Ralph E. Luke
Manager of Design and Engineering
by P. w• K 0
P.W. Kosteniuk
Chief Structural Engineer
PWK:lk
Attachments
cc: P. S. Chiado
emu'
APR -2- 2 '1983
ui.,.._ ..:::3,..L.:.: ,_-.2
a THE AUSTIN f-Ag&u&[E COMPUTATION
COMPANY SHEET
DESIGNERS/• ENGINEERS • BUILDERS
LISTED BY OWNER AiC•T7' APR 2 2 i98
EST. NO.
CHECKED BY LOCATION /C.::N 7 ..././
1 LA, / . SHEET / OF '
CONTRACT NO. 7 9 . r; 9 DATE `•'• - . •' `•'
lr1LL PEE?N1r -- T,AC/7 C A'OALVS/S N
k"" J
ct
z
3 3<--- .
F- s VJ 1 cD`. SI IL_-.'
TTh'.r.,..
n35'71.,PS 3-'a1'rs.ios
I
3 S' 1 Pj pS
7 - 1
I
C I Lin,'" iiJL Lfl ./'.
1
LAflIT lL L
I
1
I
i
I
t
Sk., or eE /)44,k ox"r/rr-
sli
LI
516 11IPs
5w rkIPS
0-
sit
v 5140 slw
Q —Sto 19 4`STRtET
a
slif I 1
FOR NO.48 r
14ob I11^'(
i
t
a THE AUSTIN COMPUTATION
COMPANY SHEET -
DESIGNERS • ENGINEERS • BUILDERS
LISTED BY PK OWNER ' A44 TRO EST. NO.
CHECKED BY LOCATION / C &J To,-) W A SHEET OF 3
CONTRACT NO. -PI-.57123 7? .4cr,c ifiNALY $iS DATE
1 ,LIGNr /NC!/.STR//= L CJE L-" LaPllc/v !`/ 1.4)fKC,4QvsE ,C---„Ls,/E.:..y%'`•':J_=T
I SPOga PC/ e' -3 SE;. Tr. o F Cr:.' a _ ,LL:. i:/f 1.9,7:.6,-.7
8 J _,_, _ // I SPA+c s I?Eb r
8OJ
G4: ••--G z SP cE;
400
T VL la cLL TF,P: 5. ¢ )( e G.t.- 4 3 7.f,r , L r.,t .- „_,/_ ',:-.,='-
Si VLN,c cc 7F„-% `.i4 _4 of 2 . 70—, 7./0 t9 — 14';9/:• Ej-/, s i
Si•n
I
c.
r' r- ., --
1
4 • . t ) 11. - , r
L.
1
e. a
h
r 1
o' 14o i
1
ty of Ce don
1
BuildingCi E Zoning Dept. ) —
APR 2 2 198
FORM NO.48
F -
C
I
SITHE AUSTIN COMPUTATION
COMPANY SHEET
DESIGNERS • ENGINEERS • BUILDERS
LISTED BY •09&OWNER 1 r;‹,0 EST. NO.
CHECKED BY LOCATION X7C4 7arJ LCJ/= SHEET OF
CONTRACT NO. 7l- -ram' lc't T/FAA-f/C 4A-14 Z.- /.(_:- DATE
72-7 1 DrriC GA...(' DE E c-,I. mE.,JT
3 E.•le : .^ 27 ' _r%, ;_ p,/ /c re.:,:.
4 V U
IV Eil,(i t- ir-'/.--s 7. . C S- , r:, -,_ _ /
3 : 1-1C'/,^,
J
S1.D
1
4'fi res.{C 11X,
ti
2a5x' -' -- tGti;AS=•, ,
g L 0 6,
N6Lf S1or• y
a.
N
r r7
ZSXZZS ! SD,o»
F
N
M f 4,d _il r k'.r L„,
4.,,, zzs 26'5 1L( CCU L_-.)
APR. 2 -2 1983
FORM NO.48
Q'JILDING DEPARTMENT In
rY OF RENTON, WASHINGTO _
OWNER
LOCk ION OF WORK•NUMBER&STREET PERMIT NUMBER
ADDRESS
VALLEY OICFICE i INDUSTRIAL PARR D . S.M. 16th BETWEEN
j
LpIND &EAST B 9379
LOT BLOCK v' O6DIVISIOIV"'
A 20ESTIMATEDVALUE1/2 OF VACATED B 13 & & E OF C.D. $/LLMA
OF
COMPLETED WORK RARLING'NQN GARDENS ADDITION 81
INSPECTION RECORD
I
FOOTINGS
BUILDING USE ZONE
FOUNDATION PERMIT FIRE ZONE
f
FRAMING VOID IF WORK IS NOT
OCCUPANCY
COMMENCED IN 180 DAYS
PERMIT FEE 243.00
LATH
FLUEa JANUARY 10, 1983 PLAN CHECK FEE
DATE ISSUED
MFIREPLACE110.00
LATE PERMIT
APRI
FINAL
RXP illy Il9ATE TOTAL FEE
353.00 '
DESCRIPTION OF WORK:
EXTENSION OF PERMITS 8-6671, B-7501 i 8-8479
ANNUAL. LIC USE FOR FILL 200.000 CUBIC YARDS e-'l f r'r-r.pT
Li j, ,:rlir.;L2 i.:,:i Dept.
1))i rffrUvl -,
A-H 2 1983'
CONSTRUCTION ROOF COVERING FRONT YARD SIDE YARD SIDE YARD REAR YARD
FIRE RESISTIVE HEAVY TIMBER
0 ORDINARY MASONRY 0 WOOD FRAME
NO.OF STORIES NO.OF UNITS TYPE HEATING
O UNPROTECTED METAL
PLANS
PLOT
PLAN
SUBMITTED TES SUBMITTED
NAME OF BUILDER
RENTON LICENSE NO. • STATE LICENSE NO.
THE piterxn O014pANY G-R31 AI1-S'T-IC-7377N3
ADDRESS
STATE SALES TAX NO.PHONE
800 S.W. 16th. RENTON. WA. 226-$8OO
THIS PERMIT DOES NOT AUTHORIZE ANY WORK IN PUBLIC RIGHT-OF-WAY
OR ON UTILITY EASEMENTS, OR ANY ELECTRICAL OR MECHANICAL WORK
I HEREBY CERTIFY THAT NO WORK IS TO BE DONE EXCEPT AS DESCRIBED ABOVE AND IN APPROVED PLANS AND SPECIFICATIONS AND THAT ALL WORK IS TO
CONFORM TO RENTON CODES AND ORDINANCES.
CALL FOR INSPECTION i -
BEFORE WORK IS CONCEALED OR APPLICAN
1 li: /•"7'
POURING CONCRETE. I
J SUBJECT TO COMPLIANCE WITH THE ORDINANCES OF THE CITY OF RENTON AND
f INFORMATION FILED HEREWITH,THIS PERMIT IS GRANTED.
PHONE . •
235-2540 BUILDING DIRECTOR
BY
TO APPLICANT-THIS CARD MUST BE POSTED ON THE JOB SITE" ea
3UILUINU utrAK I Imcrr 1_
TY OF RENTON, WASHINGT
LOCATION OF WORK.NUMBER&STREE I
ISM MIMBEI
OWNER
PALL S. CHIADO, an Officer of VALLEY B +'ELN EAST VALLEY ROAD A Th L!!1) B 8479
ADDRESS AVE. SOUTh OF SI, 1ETP STRFFT
OFFICE & IND. PARK, INC.
800 5" 16th STREET
LOT BLOCK SUBDIVISION
ESTIMATED VALUE
OF
NORTH HALF OF VACATED BLOCKS 19,20 & we OF C.D. MIL-
COMPLETED WORK $ 1--..'.... MIX R
S Lin L'C'TON, 'c pDEN ADDITIO" irn CTT rr Srern F
INSPECTION RECORD DIY. t1 LESS LOTS 8.9.10,49,50,51 OF BLOCK 19
FOOTINGS
BUILDING USE ZONE
FOUNDATION - P E R I T FIRE ZONE
OCCUPANCY
FRAMING VOID IF WORK IS NOT
COMMENCED IN 180 DAYS
LATH
PERMIT FEE 2.40_CO
FLUES PLAN CHECK FEE En OnJULlc, 2931
DATE ISSUED
LATE PERMIT
JLZY 14
PIK.%HON L ATE TOTAL FEE rr ^
FINAL 4 '`C
DESCRIPTION OF WORK:
A'UAiL LICENSE FOR FILL - 5^,000 CY
EXTENSION OF YYi'1ZTS E-E671 & 8-7501
FLD,r-- atjcIrzito 1
LII':r&i.cTin3 Dept. ) D
APR 2 2 1-983
CONSTRUCTION ROOF COVERING FRONT YARD SIDE YARD 'SIDE YARD REAR 1 ARD
FIRE RESISTIVE 0 HEAVY TIMBER
O ORDINARY MASONRY 0 WOOD FRAME
NO.OF STORIES NO.OF UNITS TYPE HEATING •
O UNPROTECTED METAL
PLANS
PLOT
PLAN
SUBMITTED SUBMITTED
NAME OF BUILDER
RENTON LICENSE NO. STATE LICENSE NO
TTE 113TTI! Cn'1P"? r- c4i 4T'-."T--IC-T1774-3
ADDRESS
STATE SALES TAX NO.PHONE
800 SV 1bth STRUT RE_rO", W.FLIN' TO'+ 22C f:(:
THIS PERMIT-DOES NOT AUTHORIZE ANY WORK IN PUBLIC RIGHT•OF•WAY
OR ON UTILITY EASEMENTS, OR ANY ELECTRICAL OR MECHANICAL WORK
I HEREBY CERTIFY THAT NO WORK IS TO BE DONE EXCEPT AS DESCRIBED ABOVE AND IN APPROVED PLANS AND SPECIFICATIONS AND THAT ALL WORK IS TO
CONFORM TO RENTON CODES AND ORDINANCES.
CALL FOR INSPECTION r
BEFORE WORK IS CONCEALED OR APPLICANT • t
POURING CONCRETE. SUBJECT TO COMPLIANCE WITH THE ORDINANCES OF THE(CITY OF RENTON AND •
INFORMATION FILED HEREWITH,THIS PERMIT IS GRANTED.
PHONE
235-2540 BUILDING DIRECTOR
8. 1`1J•l`A. (......."Li 1 a•t_
TO APPLICANT-THIS CARD MUST BE POSTED ON THE JO E" el
ILDING bEPARTMEN'
CiI I OF RENTON, WASHINGTON
OWNER LOCATION OF WORK-NUMBER&STREET PERMIT NUMBER
PATTI. S. MIADO, brr n ILMUgTrThL DTSS_ RETsiali LAST VALLEY ED. ANL LIi:D iNi B 7501ADDRESS
Pan rI'I>b},!•;ti SA:. l 6rh 1LI'tiT] S___V_l pry 52
LOT BLOCK SUBDIVISION
ESTIMATED VALUE
BLOCK 19,20 and Z3 C.D. I. AN' EAP.Iti ON
OF L 7 of tai
COMPLETED WORK $ r..AFDIINE ADZiTTTD'I TO crry _OF SIATtI..1. IIIC_ `(1 1 1.FSP
INSPECTION RECORD LOTS O, 9, 10, 49, 50 AND 51 OF BLOCK 19
FOOTINGS BUILDING USE ZONE
FOUNDATION P E MI T FIRE ZONE
F
FRAMING VOID IF WORK IS NOT
OCCUPANCY
COMMENCED IN 60 DAYS
LATH PERMIT FEE 111_0C
FLUEb
FIREPLACE IMF. 11 PLAN CHECK FEE
DATE ISSUEDIS8(
0S J LJ Are I( 098 f LATE PERMIT
HNAL i p
zee,b•
E RATIONbATE TOTAL FEE 1?l_Bc-;
DESCRIPTION OF WORK:
pro
jyttOAL LImSL FOR TILL - Bo,DUG or PLTL
riTrAISTest,1 1117 R-A.A71 I j
Lion - FILL nVJ FtC T-•flF-tUAY Tfl RE RMIVFD LZTEtrZ 60 DAYS
APR 2 2 1983'
CONSTRUCTION ROOF COVERING FRONT YARD SIDE YARD SIDE YARD REAR YARD
FIRE RESISTIVE HEAVY TIMBER
ORDINARY MASONRY WOOD FRAME
D UNPROTECTED METAL
NO.OF STORIES NO.OF UNITS TYPE HEATING
PLANS
PLOT
PLAN
SUBMITTED SUBMITTED
NAME Of BUILDER STATE LICENSE NO.
Tint .11tL'STlii CC*" i.Y I-1;124W All-FT-Tr-T377ri1
ADDRESS PHONE
800 ri Lis 16th STFrrT, un-Nr•n•:• t:AKi TLrg_C 226-tfcic)
THIS PERMIT DOES NOT AUTHORIZE ANY WORK IN PUBLIC RIGHT-OF-WAY
OR ON UTILITY EASEMENTS, OR ANY ELECTRICAL OR MECHANICAL WORK
I HEREBY CERTIFY THAT NO WORK IS TO BE DONE EXCEPT AS DESCRIBED ABOVE AND IN APPROVED PLANS AND SPECIFICATIONS AND THAT ALL WORK IS TO
CONFORM TO RENTON CODES AND ORDINANCES.
CALL FOR INSPECTION
ice
r.
BEFORE WORK IS CONCEALED OR APPLICANT
POURING CONCRETE. Li
SUBJEi 0 COMPLIANCE WITH THE ORDINANCES OF T CITY OF RENTON AND
INFORMATION FILED HEREWITH,THIS PERMIT IS GRANTED.
PHONE
235-2540 BUILDING DIRECTOR
BY
BRTA. A elm I/'A SIT TUIC III^A DIN AAI ICT DC DACTCF AM TUC IAR CITC" s„
I . -
4,•+.•
r ,
1:::' ."
Vt, :
11 -
14::
A•• , •, • • , .
1i.': '
W.-
r-,-" ;
1',..
tt-
t.',
g"',- '
cf%'• •
1
i
i
I . .
I
t•-•
I-•
At ‘
41.,.,:
k. -
i1-!:',,-*.--
14)-.
0.
41 - •
0 "•-• ..-.• ,•••
ti, -- ? .,, .,,,,,,,,;,-, .,-,
i.,,,,.,,
i.,;.,..
i,-
4, ,, .„..,
2
kz., -
4. ,-,
t.
1;;;:"
Y41-‘
3.,'
Iri.-
7..'.
5)
V-.
4;'-•
s-
k,;-...-,- •'
4,-
4
I.,,.•-•••,,,:
1,-.. .,•.,'
k
i"
ivf• .
1•'",•':',.••,`•
r". •''• '
A..
or
k:';
le
li2.'.'
4.
1.
1,
9.•''.'''',!•';. *
AO'''.•
g
I
a. •
1
ti".•
q4-
1:
1-.
1
Az'',.$-','
N.
f•,-?
4,
1••.,.... •;
It'
I.
2%;:-•:.*-'
9'
1;. '-
7-'
V'' ''''
a • •
1
i
11
eft.
k*:
Ii.',-
A4•
4.;•
Kifir •-..
k,,
ipi,.
4,
i. .
1-.-
4.
4,,::
t„.,
il,',•
t,-.
4r
A!
ktT.,•
11,,,-,•
41..,....,... :
0. ...
1.,... . .,,..
1:•,•,
r •
1,,.
4 '
c7t):•:--, •';
z''"•'•
1
6. ..,....
i
44;
r
i •
r..•-)
B
0,,
if;,,%,;.,,,,.:-,,:,,
g,:'.:
11q,,
iri',.):
4•:::-.
A::-;.
4v,:,:•
s-,
A.'.'
slitti.
ki .:-,•
1.,;,'..,
e,
v,'"
4.,:.-:,-:?,,,...
ie..
r3.
7.•;•:
s!.4)'.'•
1/-
1:!
9;
14••''
t.,. , „
o. .. :.'. .
t
y..••
11-.- •*,.,
f,..•••••-••;,
e-,-
E
CO •G••")
g
ik .. ;'
f'
A.;
N.,
4
g
wAi;
i:
4,,,
tet,
t
I,
Ar:,,,$,
A.:‘,.
i,...,,,
si-:.
0,
4
I.
re ....
S1'
sr,,
t-
4.
4:,
4.
74174
4:
itsvc1.
34.',
ixt - ,:,
I,...,,
e!
tA
1
t.,.,,......,,.,..,... ..,_.
0c•
t ,,• ".•
h
s: .
r .. (-
NJ. .
1......,.: :.....-
PP' \ '
A "‘
1.„„,.-
4V..,:
it-‘
444
tre,
C:
g • -•. .. ..: ,•
1.,
si., • :,..,•
i•....:.-.:. ., ;.
44 . - ..•
V4: .:
3
k•
14
VOrilhi: ' :
At ''
N••"
P • •
1
i.!-
A:
lit.
1,
r° '`.,
i,
Allti`i'-\
1,
11.
k4,..
i
4.
1i. .
r.-
Itfit-§
k''','•
i•:-. ...;‘,,
9
h .
t..., ,
1,
1,,...
Lir
Ny..,
4„....,
i,„.
47,,,,
lt.,,:
1,.„.
1.,
ryti.,:..... ..
4„ • •
set --.
1
Ir•
1 ,..,-, ‘,
ki; ,
41:
f,..,
ik-
evo..
ril ...
oi4:,....
44.§-
r .,
i....,. ....,, -,
4t.,.,,
I,.„:„.., ;,,,,,,,.
V.' '‘
4.:•...
4.
A,, -
el .
4
i; :......- • .
4. •:'--.
1`..'-'
1/4' ... :'"•':' -:
4- '•:,.. -.
40..
IN,‘,
N :-...,..-,•-.-.„
1.;',
0.
TA;•,...-:,-
I.,
I.... :-....-,
F:
ii.
t.
i •. .
j • .. : ... •.
b' '''''
7 .• •-,..
k•
N'
1,-,
V. ', `,.,•••,•••• •,-. * ,,,....• ,-...
4, ,
i
TZWi•'•••
4‘‘
4.
41,•.*
le
Via;
V•'.:,:\
4t';
A
Ylltis.
F.::',-:•••
Vt;',
lit
g
i
ip
g
W '.
4*--
j • -
T... ,
41.
1-.
14,
4.
Lid4-
4,$!:-.,
04.,
sz„„
1..-
3
V3
J
P4
L.
L_-_,..
m‘.„
4,..,.•
r•,,,,,
L1,-. ,• -,-,.
3?,••
1.-
A'',.
1.
1i:•'
4.`.'
iQ(
44,
t•
I
Nt
It
1
1
1
A., ,!
s,
i• -
sr '. ',
A ;
4:-.,.'
4'
1 •••••.
1,
1"
4
4,, ...: •
lr
r•
rm..
A. ` ,, ...,:.•
A.. .., ...
7, .,•,••••
3'.)'
N.,•
7''":''',•• ':.
44'.,
f....•
w ..
1..
s ..,:
lt.,,,,-:-,,,,,,
4*
446#
11;
Iv:.., •.,.: *.
s: . .•,,‘, ,,, :,
1, .. -...,„ .
r :
yo.
it
5 '
s .
1".
7'
14f:
4'
1 .; .
rl '
41'
47,,. '''.. '
411,.
W4.,,, ,:.'
1;,
k."":
1 .,,?,,
f‘,:\,,
ri
r .
6 -
4•-.•
ir
x
4, :- -
E- . • .•-- *
hi...!
I :.
1
e..---, , .•-• .- - :, '',.• , . ,, , • ..,•• •',-•.••:'. ,
7,!,'
i.,..":-...
q.....,,,,
0..-(
14 .. ;.
441,
ii.,,,,,„,,,,17,‘
er
4,_,,
k,
i,
P,I, '',--
1v
V
ILI
0 :•
4 ,
prly,,,,:,.-
f•
1.:,. .:•••,.
t.,- . '. .- : ..::•:.: --,_:?.. ;,
114
9(
a • •••'• ''''•''' •
v
i
4 .
4,
444.•,....;
w
1. • •',..,:... • • ''• • : ..."'" :
A ' ' '' ' ••
i • • .-
L' ';'•'.•
z%.
0 ''. -
1:;;-
t-,• - •
T
i
1
ig
4'
1
CR-.... ' ''',...,. -
1.'• • : • .. • ' • '
s--. .
3,•-• -
v••,,. •
A.'"-.
4
ik4-
4,'
i,.,/,,,.,..,
to
5,. ...
t. ..
11.
2
Z
i''- '-"
1..... .
i.• ...' ‘
117.
rim :-.:
6 < .',. . . ......
4''''*
1 . •. ''. /
P... .` • !,,,.,•' ,.••...,
4?:,
ril •
y;., , ..
1)-
4,
fk. ...-
Ro..
1,--•
it- •-'. .,,
if: ':,..• .
6.
x '.
1:, • • .•".......'...,..
5
eaC•
4
P'. .--
77717"
c". ..:-- '
ti.
1
El
fir",
a
1,,,
6-
14.- - - . . - •
i
2 .
u.
15••, ,- -
t-
0•••••. -,
i , •
4 '
i ..'' ''-
4. ,.' ' - -
1 -;-*-
4.•
144
e16.
1:
1-
gr.„
4.
t•
Atl'
Allikki`•- . '.
Ifilket '
4"!",,
P;
ti-::: ' :
etItt,:
ki ,'," '' .'.?,.?..
2
Z.;,, .--
4.:
v1,
4,,,,,..„
0"; .
tti,...-- .
ii•,-,,-,,
f, . ..
144.
N,•
V•'''.%, ''' ''.
t ,
g •• %
C:'.
1.• ••.....:•,,
S..;
1,
7•
i•••.;'
it-
1•
V'
4-
t. •
k . ., :.
1:•,,
i•*.;, .•
Lt%, ,-.
dt-', •••‘* ..,--. .
2,',
III
0-,
01*
beVrAf\
i)*•-•.,._.
i••
I. . - • . •
4r,',.;•, •
4,,. • •,,,..
v44.-
1,,,,. ',-&•,,,,,,
A.. .,.,--,‘:.-
ts-, -.. --,:.• •
1,.
i-
Xrl '.
e .,.'. ,
i;::.-
4-,
r,:_,:- ' . • •
s•
4;
b:
i*, -
k.' .. ...
2
8-
4".•_:...: ,. •,
0,..- .
4
e; . • .-
ie. .-:. " "
I.
A.,,,..' •-
5,
o'
t4
IS. '''?--.' '
2• . -....:'.'
7'. .‘.,'•
Rug
1 -^* •, ' ,
046 '
Wan ,;',
1', . '• .... ''';''' ;;-:•.•
11.,.;
1,:-..-
8. .:
7:
4,$
P.:.-
1-.
s-
s',.;,..
ii,,...
t - ...
le.,,
k!.. --.-.;!,..,-''.'
4.,,:,'...,.'•.•',:•,
ii.,:.,
4a'.•°.
1.'
4,
14,
40 ',.-..-
4..;.::...,.
6-•,:-.•: ,: -:.
t.
4-
1,..., .?,-;..
i.... '
LLA ,.,...;.*-:;',.,:.-..,-.. • -••.:
9-
1,
1..-•‘.-:-.: :
ii.,... .-
7.•.
c
z.„. :;;.
1..... •-,.. -
o.-
z ''',!`,.--:
r.:
5;.. •.... -..
g'-.
1•• ..,...,]:- :
vA.. ...,..
4.',„. :
4. •,•,,
m,, ......--:.•: .
0, .#
o-,,, .•
iltr
4Y.'.'•,.•:"
i;',.
11.,,
MI •••
1'--" '
ti ., ••-. • •,•
1 . • . • • .
7••-
it•••'....'.
4- ••
It• • . ...:. ....
L.C....,
4", '
11-
pl.'
A
V. . „ „ ••
v.,'
VV..;
1
f."
a •..,
s•- .. '.•?'
4....,,.,'
1.
4..
t., •... . -.- .-''''' • '••
5,-..
t...
e"),,,._'."•-•..
12,
1
i,
I
hi,.
c •.. ..':
imevratimwm .'';
x•
ii.?.; •,:•:.........;,.
i'
llif;?:`'-
t
te
2-
44,• •'''• , '-'
1'.•:';' . ..
it',
0!-:,,,
3„.'...:
54-':
ri'!•.•,•
iiNiC
N .•
1111...:•• :..;•.'...: . .. :•..-.
01,
t`,
t•.•'
r>,:
4. ..,,
k, :,
1,„•,‘'
71....,
424,,;*.. ,,),..:-
4, •,,,,-,, '. . '
1. .. ',..,,.:, -:-,..-
vo,-,,,..
i , ...,„,-
i, -
0,,,
i,
o,
z,,,,:
i:
i.
k..-,,,,
vtni,
i ..
4-'. ;
i.,•- '.,-.,
4,- .,• .,•..,,,„,,,.: . . ... ;,•,-
4, ;-?...
44.
1;.;
4,-
L.,
o,
1.,%,
y.
11
1..
1.:.• ...
r.
r,:.• -•-•
1.
1
VII;
Air. ..,.
01
t.;.,,-
4:-.'!;.! .-•"/,•
1 ;,
ts•
aix •
1,
2,
11-:,-,.:
a/
ow,
ma...,,..-
14.
6%.. -.
1.
1,,,,,,!, „,-;;;,.,
i,.!,......
mair,
oil
F:'.:','.. • ....."• ..:'
i';•.:.•• .
1.%,
Tt
tcolti
lt,:.,;;:-. : .,, .
e...,.:
4,-,,
syti,,
t_
h:
t.,
4,
q,
E1,‘ ,
s' .-.
t'.
411.
1.,
k
1.-:'!:::•"•'''
VV..:
f'
qs.,
4.,
d,!-..:
i.
si. '• ."'-,..! .-.• •, .'•,..'
v,..
4'
4
4,..*...
ET
lirkfi.
ts,"•:':.„
4
LI'
4.
4.:,",
S
t,',.,,
f,„
v‘;
7•
61;-:,,
j
tq.
I : :"
LA,' •
iiti,
10.¢',%- ,':
1/4
4.
7-
VVI. '
11
v: ::
4,...
i'•';".' ."• "
1/4 • : --. ,.• :• :‘, , ,
v.,
I
v.• '
i.,
4..";-
i'
f'
1.:.• ,,,,
r.•,. ..,-.,.. ;..
r.
ti,...„, ...,...•
g.
32.
i
fr. ,..,.,..,
T,
14.),.. ..:,
ka.,,,
T,.... ,,,:•:.
i .
5
i''.
4,..:.;-
t,,--
J .
tetP...• . ',
034....
INO!,,..,..,..... ..., •=.. ., . . : . . - , . •,,
4t.
t ,
k '..
f. .;.
5
A•. ,
01. •,•....
42:',
05•
Y•
I'
rTii-
A-)
t• -;,!
ti';•'-:
itt'.
i ..'
r..--.•,....
1.-_,
U,,:,.•
i,:.:
fi.::'.,. ;',_...::•-
re,..,;:.. ).
kl
kl..
1",. :,'•
t•••,..' ..-• '"
a'-•.-'
1 —•••
4ffi-, ,-,
1-... - .
Q
k....)... ..,,,,.,„
1_,
A...
N.&..
47.
114.
1j
7...
4s,'.:,.;:?. '.‘.
3,::•-•.(_
y'.)
ab ••
C "
P"‘;',-..• •••••
SMOIIH.'-'.:' :.""
1"
i''-.
1 %.''''
t...... ':;.•'''
1.^. .
it' .....'-'''
f•".:• .:': '''''';`
r.'..' '': •-••'''“ .: • ,
Itt•• '''''''§ ,'-'• '
q''.'
7,
1t1';
Pt'
i ,
IV, .....
1,
1
C .• . , •
c.:•''
1•• '•,••
r-
1...
1. •:!••••••••!•%•,,,,,, •,- ••., . •'•-• .•••- ••
fr!...
1111i,%.''.:
i.:.
1:.:,•:,,‘"
l;'.. ''.:.,. .?..;%
1N;:' :'..
11('''..:• :•
1
t:',...;.•'.'
1..‘!':
1„:;,•".'•''.. .:.
i;'''..,:: , ...-. .:
1,..:'.:
C....::-..... . (
4‘-•.:,.„."...:......
1,'
44. "'•: ''';
1.:,•••,•.:.
1,‘
I•41'‘',:....
401'' '''•
71't.....
i
1:
2'..‘
ka'''''..
411•
F' : . .
or
1171:
A. ...
CI,
1
rig
4,.`.. -
lilt
4,.
s
r ..; : ,• .
u ....,.-••:. ,..',.,,..
L,..-.-:
i..1.-• • . •
c...
s. ••:• :.•••••
I
1,
fk::.-
1,
0'..,
3,....... ...
s.,.-.•,-,••-
5.,..:,. ,..:.,!;.
11:-.
i,
1,..,
I,-... •-
7,
77 •,,,.
y,..: -.: -• .,,,.. ..,,,..,
rohl., ....,.....,...
3., ;,:. .
r„ •!...,'
4,
t, ,.„,,
ir,.. .. ,.
4
4,.. ‘,., ,.: •
F,.....:
1,,,,,•• !..`:
v.
f:
4
5 .... .,.• --.,
r.-:• :.•••;:-.-....-
i•••
Yr•
r-..
10,
1....,•
V-
4.
3:::-.
f..
f.' .„,
w,
ftpti.
k.;%. ,•
t•-
i, •••,•;;:••••
iaiir
r• - •:,. .: •,;••;::,‘
T,-..,
0, ,...:-.- ., .. .,.. •, .
r...
4,,,,„.. „
i'",.
11
i••
11; ,
1,,,• ' -'
C,
Y7.
1.
H.' ••.
4.,:'"'•
V•
Eliit` •,,..,.‘
c,• ,,•-
o, ':','
i :..
1,.-... ",•,;
t• '- '•
4'
7 • '''''' '
A.
Pft-
it.
3 :
1/4: ' ` -.(''':: ...
vv.. •:•!
i:' '• ••• ,:.
i:''`°'', ,'.
i'
r", ''•:-
A'•'." •''.:"...-
i :'; '-;
v:-"
I" '
4:
4:" '::':: ' : "
t ` ' '
1.
4/ • .
1'''
lc•:4
IA' '
AA:- -
Z!,'.!:'.
A":. '
i.
t.
V
4.
1.-::,;:-
1:
i'''.' .`• " • •!...• ,,!':. ••.'":. '
l'`:-•'
i'''`'
AIV •
1,‘;
littOt•
t:
1 .
4.'
3
t. '
4''
4r ' '''' .
4'
i-
I •
1
1 •
3
1
itp • •,..*, ,...,-.
4.--,
f.
2,....-.....,- .,-.-,--
1..,•,-
1,
E,. .
1.
1*
Iv.
4,'• .
4-:••••
J:
Pi .:
fr
It2.;?&•
Ait'
v..;.,. '
n• •
z• .:
jt....,!.....
i,
4....-
4?..,;.....
Ir)
44,e,
1:.,..!,,,,
r,g::::
41...
ik.
i.,.,:
i; .!!..
t....
7:.,...
41/4.....01,....
3:'''. ' • ...:':'
11':,;
kk:'::
k\
fi'':',.
L.q/
1.
k...
i.'"-!.'
1'. :'
C
0..
4 . .
6... ,
J;
g1, ..
Ai.
i • , , ,.,
1 , •,
1
ft'
s
4. ' '
F:'
A,..•
velj
Vt.:
A
l'
en:"'-.
1- •:.".:•.• '....
4,
i••• , :••
v, •.•......•, .-' ''.• •
1,, .- .. --
if
1 • ,',.?: ,,,
71 .• .:;
I.,
Fti.
lio•-.-;;.,',
1., .
7,
fit.
i:, ..
4-,,, ••
1,•-
s•-,....
t. -..,..•...-:,•,.. .
4-
4.,..• ..•:•.
r:
1,-. `, ,• -. . : •,... ..,
1..„,`.
h•.:
n.
t.,?.,....„
2.
4,..,.;•,,:
oy
li,,,,,,,,,,,,..
tt,„*,
1... .
1
11
4„
cti:...:
0.
1,' ..,:
vt„
1.,-. , '...
J.,,,- ; .:.:, , •...-
T,..- •.• ,::-,.. . ..,
i•„. • . . • ..•
xr --•:
k'''. •'
1;'.. .,-...
5,--
t
i'',••‘
gth\
t,
NI..
1-- . ...:.
7.,"....-
4,•.•::•
z .,,,•...,
f,
2..
g. _. .• (:);.'.
51 .-?.,-.-.,::., -..:,...,.. .
1,-
N.,' •,.,,,,," •
14,.•• ...•(;,"',
0,
i.
4,
F;
r••••• . • ,,,.••.. •--•-: •• • •• ; • '
C
4,' •,,,,'•
4•••., .....'
r ,,.
i'.' :.:
1'.`
g'.
14t? , :
f.:',:-.
1,....
i.
v„.
th,..
ri•,
44.;!•.._ :,. ,
1' . -:-. •
i“.
1,
t.
t
vIt'-,. ' /
Li- ' '
L, .:
WI,' • •
t- •
k
V.?'
i •••••,':„ ."-
441risi •••‘
47,
1•
2
e
2.-
1••,!( -.•.••• •
g •,•
s
4•••,
4•',%‘',
47i '''','••
13.‘•
1.''
1''':•
t'
l :
t''
z'
tli ,:
54::
a'
riO
a
DO
i - ',. .
Ictl. .
4..:,.• ..):. .....:,
w.• • • ..
4.,:. ,
y, .....
1 - .-.;•.:-. '..
L.-. .-,--. :-.
4:. .•
w
1,..:
rex., ,,,.
t.,.
11,
4.. ,):
1,....,,„„,' •.,
1.:„ ..''''
w.:':,
ta:‘;;!;
q4.
0.- .
7.:
i • •
1 ;
T‘...
1,...., ;.. . .. ,
2, -.••-••-• .....,•,.. ,....:
1-.!. . ,..,,„
4741,
cr"'
14•'' •,..-'
IV,
i •,
011•••,,....
1/
0.:
t
tir
U
1
1
44 • ...:;
Iri
i.:-
1;%::.$'
it-' .-:
Ii!......?.
4:
AN, •:,
2.,,..
Lis% .,....
f.
wIt.,,
s....
i ,..;
1/4'
i "
rille,
f.:.:
9._ :..:::::,....
oce-z.
1.
19:'
I..-..?
1:,:....=;::.
a...:
E:.-‘.... ',.;'.,:•''.-.::'.
II-
0 •
e.
24.„,
4 ,,'
2".
1
5'..:•
j•:.," ....
3P
I-•
i*
1,
1f4041‘
ICI •
i:+
1.
3
4,
r„
i.
v.,:„ ,..:-..
ix,•-%.,,•,,, .
6
4
yq•'. ,'
iv.
1
v.''' ,' ....
S.":•-..,•,,
I,
a,•.'.
IV.
E?,..-,•,%,,,,,,',-
7t1,
4,.,.
5,•
W'
9
I.•
Alr,?
0,
t? •
t'../
1/4,,
2,
t`.
4
Z
1 • ,;'
U • .
4: , ,
ri.'
4,-
At;?•
t,-,,' .
14-.
1z4p-,,
41.
I., '!?..:
1
ii„..,
47 •
c,, :.,... ,,•..•
0
1
4
al
g''' '. ""• - :
4 . •
4,
E . '::
sF;
ve.,$,
15,..
k..
41-:),.... ...-.;-: ..
f..:!,
V.-'',.:. ,.-:.
114'.
v,,-. •..
v
v•
v
it ..,-,
1/4
t'....„.,-
i
vi,„..,
tt
l'
I-
31'
CI'•,'
Oi',;,'''''..=.?•'
IN...,.
41*
4.
ki,
i;::••„
4'''"'
Clc'•
0
0 '''•
z - ....-•
6.,••.:'.,;,-..
J‘:-.,•.•
k,.. ,
1•
1,,:-.'
3,
k.,,
3!.,,, •..
3..,
3.
r.,,,,
w.,
m•,,,,;,
Li
i", "
ki.
kr..• .
e
0:
1,
4
4
I-
441tiA.,
1 •°,,
t4;.•
Zi,"
4•
C•
Ai;
01W..(
412:)].••
14:
0A:
43;
4-' ', -' . '
4
B
1 .
63 . •
c
1 : .
i
t:-..
z, ,
e
3 •
6
4,-<,,•
4.,
t- .-,•.,: ,• <
44,,..,.:•-•,,
04.
4b-.<
kl. •
T'
s4
tit
r):::
6''''''',
1'.
4.,
7;
1;'.
1...
0
e:.
11).
1'.$'
s '
f'',
11,
11•
1,'!:,
101rki,',
9•
i,.'.:
t$
11."••,!
i.•'
a.
11
1
0
5•
1••••
11-'-'•'• ‘:-
V!-:',.':.'
ii'.;.;'-'
1.
114r
IC''''
ZO •
r
6
12
4
R
1
d
i,:, ....,,,
c‘
e
f,,
es...
p,
I
1
1
T
6
t
sex
4 ',.,-."...''.
1•;•'
1 -:'•-, •• •' • •• - - - — • ."••
X
t•-
f.
b.•.
i..>,„,... ,'",,)
4, •".••
f.!;,. •
00.
0
i
1
w,,
to•-,:'•...••
i••.
1.:.:•:/.. .:.'••.:
i$::::::::::7;:-•:••.".•:•:••.•:•...•-.-.-- ••
i::: I__'____:_,
7---. I— HOLMES
s•
SEATTLE
I
f1 4- - L , 1
ILI LLJ
I 1_,..
10 4Plt 1::. • .4 d c
go• p 1 4 e-,f_- pi2 o p i y11z0LUMBER
i I • _ DAVE & SWEDES .., 1 ,0 LLI
AU TOMOT1 y E—2 z
LLJ
1 1 . .I( U) k
cc , ____
4•.•::•:;;;;:f0:;.:2;e: ::.:.:g,,.•••••."-- f7..x.:•:•:,x-77•7•;57:7:•n ::3::::::::::::::::::7::::!7::::::37'7.::•:::::::::;.::::::•:....... -- "
n'57•21:::!:7:7:::Z::::•M:
ii 1.a
961 1 ,. __ ___
A• '.1 •;;4'. •'>,•.'. '. ;•
4'..,'•;4' ,•.). - '
40 499'41314.. ',', ' '4 ' '; °• ° .2.,••'. ' '''.',, 1,-' I, 1.,'&7•1:',•°, 'C''''''''.1.',.1.*‘/.1 ••':•-- '1,,+‘l'•11'`'.."..-
t;'"''''71:7-:::::'' , ', ,v.,:,
7?.....'•-•`.(
0.,,k„.- ',.,,,4 ,.
1,,,..•;,..
r,,s.,.• •5Y. ..,',,,...:„,:..:„;.•=.:,',,t,,>•••;:',,,,...)::'!,-.3, .,'N'!.... •-•",''.,'•• •.•... ,',.i,..J :: ',.,,.,•---...,,ePiltLc,,i4/'''''5V,je`‘‘Y.,,q,,,''':'.'4.,c-21^%°#;Cit;11';-
c-i',.:ti:'''•J:;;%Zi°4,) '''''t'.:1 i't;t ;„1:4' , ,-;,,./ :',f.:, , ,,,,,-,,,',;%,,:• :,,,,;
41. .0'.4,44•7•M:4K201•;7":4*ii:,;'%V:46-"k l'e•Y';'..`''':',1•4'1'';'‘ii:7..V01;••,''. '%I'.i'',:s'.;!, 11;.:;.' ,.k,,' ,,yi•I''',,t%',T,i't.c:,PUGET POWER 7---Hj
7,1p.,, ...,i,2,1•,,,,-„, ,,t,.....,•,„... c.,,,...,,,,,,.,sm„.,,,,,..,,..„,.- ,-../,A../.11.1.,7., c .•zr;;lei?.•'.,,,.7,14., ,...1'i:•,.i:% , ' %'%'0-`
s)..'t 'I'•'kke .`•.••." -`1“'") 't'' ...r.4-v.e, . .e i''e A . ': - A • 't,'.4r A'`;'•• '.sfelii'•:•
tt'',...444''1'..'..:Mr.. ' AA4.4.,, •4.''' '
4',.. •'.!, ..44 4..,•0 0:11,,c.,.! ,,-ik !IAA,.',....4 tit. ,,,••:, ••,,••', 045ACRES7.
771(-- ilws,7•
f,4,-......,,,,,,.. ,..4,,,,,,,.,-,,s,,,,,,,,„-i.,
1:•,,yr.,,,,;,. ,.„,,...ni,,,,4• .'is ..°;.%*1..,,L,,••••••,',',:',.••y•*•..r^.4 IV,,1.1.4t,{14''';'.1'; L'E''
0.•• : A4` ;Vt.,,‘- .-.,.,1 Ir',.:,44‘' •1''4'. !,:f.,4,0 k..c•r• 1• .."„ itt,, -,; t10It.10.1' 1 Oi•;;;; N'',"IiiL.,itt-'4.4:Pl.':' .44't'
t`'''''"4.4,- • ,
ir -
144";:tV44e.'t " ' '.."i''", ..S$'.4".'
i l''''4.-...' -,.to'
t. °, :. :,
trc„II 'tz; ii••i . •,,v73
1—1 ;• 12444'Ve:''''t';,,Ilil'''''.'"14r!•7:`.1,,.,:i• .t; ),7,,i°,'•41,4".•1
rt'' t,' '.4.'t`r •'•t.! ••' ''' • ‘. '"
t‘,t k''•-'1:' 't74 454-.2 Of't"••':11*-...N1;4%.,',,ei,t't.'4'.
1::Pi4‘'...-",4'•N•4n1'`'r":-4` '',',41":,.• - ;;t, f;••• ', r.
4.}`,CA,1,,. . •
IN) I t..1,-_
1''::4'.'74.4.03‘'. .:-ir..,,r..:::,:,1'...,;'.:0-...,-,,,.',,..:.4.;;:i.::±.,:q:..,A.;,..,.•‘r, ••,;.-.(z.,:,'::.,,,, ..: ••• l',.: ' •.'
l''',1',.!4:'!,'4,,I:ftI101 :st, :-, 1'''',';‘' 1:'''''-°'',444•;Alt.-11.';'.'1',.
1-•/...":
4'%"'":"4 4:,.-{r4•21A; t.V 4,'':4, "42..Z,'`,', '','. •,,ct•...el?r f:14:,:', -f,•°e::'!11';..4.1 ____=__44t.;-,k,?i,er-,;, ,,.:,..%..,.;;-:,,,ift'cr;‘ii,:',..7...-'4,-1.•.''''''' '',.!... ''./.' '.
r'.'''''.4 ;''.... : ..t".'.1ro11=.- !I 1.i 1;,,t,,'r,1%.1,,,,_)/.'Ves',.4)..5......4.,`4'' ''4'.e•-,,. ...',':&.A.,•1.4,.! ',, 1:', •,,'.;''....-`••• :,:',:s.:,,..:•„,. ,.;!..,;•.-f-,.;;,...:Y.,;-',........1'e-,-
t--.-9.,1••••-',,,..•.,,o;•.,.,..v.., .,,,,,..,••-,'., •,..i. .A...A :,, -xi.,-: .. .; •-%.,,- ,. , ....,., „,•;.,.,, - j I1--% 9- i•-:•:_r•,, ...4;"!....„•(..$,, ,)..„.., .i,€, .. ::,,-,, ;.
r.• 'l
t•tl A..'V ul'''''4 'I.'''.'''•' • '74,..••'''',` '•'' •• ''..-'•''> ' CVV.+7% !,,,,e,.,rl, .,-,...i rs,,•,,;.„4.„,,,,,,o,, , ,, .„,,,i
k,,, .,•. , : ",-,,,),•,,,..-, ,,/,,,...,,,..:,•,,,,,,:,, ;,.., ,
cAFz.g.,,.-7),..?..,,,...1.,',•.'.,' •'4x'R iP;..,1 4'•, s, •,' .C., ;;', • , . '°' •;'''''"4 1'°;'•
1'CO - Eilu.i tg!,..,,,,4.4:.,-,:fiv.?,:,,f.,!,;f.,..,'. .:,,,
I.".,..,:
l.,,ki.‘,1',..-.!•,,„.;,;,,,...4.:..rte„:;....:,•ii.',i-,,I;i :,.:.:-...s,;,,,f-...-....,41,,,,.,....,..:,v,..,,, ,,‘„
l 1 j;414.4''
1_
1•4:(-.1.,T4i"t•t!'**: `",';14,‘!t:'k;i :
c.';;.
rIt',114,-;:tr'..,,I.7-•t.i.:':''iel.kt'•••,;',5%,';''';g:..s.';',.,',
L.';'1!'';zi•,,,.44N,I,4,..d*Y14, ,k, .!,1,'..1,:,,i,,„,,y''',4-t J.,=4,r;•,•4:7•‘:';1.%.,.1‘. .,.k.,,:‘,,;.•••, ,,..,,•,•:•., .314''4 . t . , •, ,,,, l'r 1,,,;%:' •,, ,••'
i "I':".'i'''''1':'',‘',...".,''';,,'''';''4'1'
4'.'Z'IC..'•::.l'''t'i''•'•••.•'',/.4?Cjs
M ETF )4t,.,i'
1,'
4'
t'.
11f;.7.,.),.,.,
44.,'
0p4f1r'.'••
1tc.-.°...4I;cr‘vk,
s:
f,
L,
r;,•
I•••,',:ya•,.'-,.,.....-,.cI.
t,
4,
t,
ckt;
t2i,,.i1,.
V•,
1.,,
4,tp':
i4t,
1,
t'
4);
t„,'.".?„•;
15t,.'
V,,'"/„,,'
P.,:
1'
4,1,,.',•:•.94,"”•.,N••,'•?',:,
t1,,:'.".,.'4"'?"`'
N,-•'s'.!-
4'','' ','.•'..'
g,''.;..
1,•`
A'. ;
2 ACRES±
I
i'',.'",,.••'.•',,-'',
1
4'
C,;••:'••'
1,\.
i4'''4tc-',%',.'
4....'.:'•.'•''•itt,4Ti";
1;,'
I'
t
t„•'
i••'
e'.,:,
S'
1ti
i,
75.',,:
1',)).
k'•:,'`,,-'.'..,',,,',
f','ir"',•'t^i*
I•,'t,''',''.c.'..'
4..,
O
1',,'^':•
r."•.
tF0.,,,-.t,.'.,
t
1:
44,.1';,
1.,,.';
1,.
1'-
t,•'•
t•\•.,
I,,'
12.
12,,,,.
c.,.....i,-, '
al,,,'*;•rfs k,f,J O..,i,:,\:
11'1 lop1. ,,,,,,,..),,,,,,
t-il,,:?;,,,:i..,,,,,-,-,,:i.,,,,y,dy:.4-.,,,,,,,;;4,,.‘,.,34.0,1 i• ..., „ ,,,,,,i- i<.,,.. '4 .. 00.. .,,, -,.}.:‘., ,... ,.vo. 4-,,-Ai.,. .4., ;,•11 ,-i ... •••••..,‘J.. •ui 1 -
of
1.,4c 0.•-•,--t•-,,,t,- -. "''''''). .7"•-' '..:- . •,.. ,•••, -• -•
e. '-..'' ZI CO 15. ---17-7-C`,1714— 75-74 L._ (-,-1,. / ,r;E .PC A c ---."_} to) ' ,,,.*.r., d'.;4117
lest,.7.•0,..,A,.",'.4 2.''', l• ; 1,..; :....,„,, 1 .,,,,,,,. • S" ...,,• ,.-1.?,,;• ,..',.1.-,1 ,•, "1 --I ,.., 14..'"*,;'•'•'4‘'0 It-, •••• ;?.,`"",
c( • '',;,ti 4. '''••••'t 44°. 4'tt', 4 F .-: '' s'''"c-,'ss' ...1
s,‘4,' , •;;t4"4.t.''1
e"ig ‹.:/- C.- 141'4(-.1---: el/----- ---'/.?,_,:.'0.-.--7z77--- rc, r vr,,4,,i4,„•-•j,.:0 44-.4'••.'....., , -4,'
4,. c:f •4v•••,,,". ':1,•'.t•.• t :' 4 t•:,t' '',. :''. " :' ,-'1,,....;.,,"44,,„rr',,,',.N.A.,," ty,„ i7.• ••\• - ..,,' :,cs'',,,4.
1/,',
1 •-!;-,.., .. • .. r•,, t r
4„4`. :, ..,f„., •
ri.,'
14 ••,,,pi,„4.',.
1.•
Z
q ''';•;;.‘,4- ,A.' '.; 4 .'',,4••, ''•••,'..'Al.'''.•1".;',,' I,k ,•,.., .,7:,•,, r. -•..-- .:-. ,.. , . ,,...-,. , -, , ,.,,.,,.. -0 04,- , ,....,,...•I 5,,4,,":41,hy,...•• .1 J.-:„•,,•••••.t!ii.,., ...-."• A', .. ,,..•)0,',A i 4, ..,',..^t-,..-,..,.,;...C•-' / • ' / / P-7,-4 r7 - •-•• A:140;$411'.;tA5'..i.E, , 14 :.4,f1 e*41 4':-,4•,...,- :-•:,1.,.:..i. .':.% • : ,...,,-., -,..t..,.. .• -•%,4,., ••• .••••••.„,„,:-L).-4--,k4(2,,,...',- /(' > rc/P - -./ _ ..._ ,,, „ ( , _.,A•*,,,r'.':"..,,I'Ll);1,,
c....4',"•,*k!,1",,r, i•-.i,t';.!....;!'.1 v". s, -,!-',e;•?".„;,'.,,:,.:,:,",.,,- .,..,. .., „.
4,,,,,..-‘4'.".•.'"••,t.V-4•••'%;44''''-,,Z.';'4'C..) r A.%.,'N•r 1,,,•"A,, • -,. r.• '.'...,.1.,- /..;-.I'...•:.,s•,..:j .-.e^,', •••• 'yr,4 ,, '1'....".rp.,,,;.i'.1%•,.• ,m... . - • ,, - • , ,,
r. i • - •,) .. -W
cn
70 5 tio c 1-7-1.17r A-7.1 0-,._)-e q... •/1_7-(7-:t....*,*,,,,',.N.,,,,,.•tY,,,,,,.iit,....,,)y...1.,1.it.;,,...:5,...-4.),-,!i.sa-, ,;,,,*eqt• k„, ....4„t..;
t5 t;,';','4` ,f7:c4 ,''. ',,v,!.t"..24,
y— - ,1 1.'— ' 13E /c --
t'v"i,
t -..'"'1.3‘. n'
t,,' '' 4-",,•• -•` 07•-••,i•)"','"''''••••4 1° '• ....
1.
7',•V' `,.•1,),.I.,ar i,•• .,,, ;•,..• ,, -• 0r-',.'.,..,',;,,-.
2...;.C„c,
4 •N ''',•
s
1..*kf.1/4'*?A'r•••:4",",":"T'',:°kir,,,'''4'4 '•• •••'.',•"‘1 , 4',•"';"•••"t',. ••••,,, 'a,,.,' .
c7: 7et• IAv,
A14,.•
4„
4',.
v.:AOco$4t;•.:t.•;'.';,P,
l'-'c'b.,.,
c'..
t.,c,;f•444,,•-,:',]4'
4;'
2"
4/
411-,*.::
4''.);?::•
t4,:4'•4:.
i..../..(4.
1^-7,tJ;„•:44„;N1:'4
1•.'
4
1.:.V,.•1•..'.'t,..":,
4..
z•.
L,,
fr44'°,,,f-.'
7'
s,-
4',';.'':
r,,;'•?(..
i1;4i7.fi.:,rL..'t''.'z.',
C,.)
10 /3g , r 11 rP Ff?( rk 7 01 4
s,
A,;
y.
t.
I,r02':,i,,:,f.'.;..;
4,
a•.•
I...
4!
J,'.‘..
i,.
t:.
0g".k'•'',.i..,l).k..
i
I 7- 1-f€ 1pn5 sx E <7 30•••'"•:.t.:
4.-.4i',:.•'',.1'';.
4:'..'/•..,.;....
C,,''•-„•:'r•
t.:
a"•l.It‘.N
4;,
1,'
i.,)
4'?',,,,,:)
1t•,%'
1-.,,,•.',•I
rTf".•:.'•),i,:e.'•
t'o.•.-•.'.u.
e•';-•.•+t,;-
4.,,
q ,1'4.1.11,17...0,,o'•44,-,-''':',441"/;,V'),1',
1."1.',`',$.1?Zit',.,;,,i'','Ai'L'`ii',,', ....,::.e.--,id?,ri..,.:,:. .,,,' c,,,iL'.'s,.., :.••,‘,,. ,I \ PS.il•...:4i.a...
4.
1,414;:::41A,I.,,niA.!,,,,FN.,?'2,,,A•
A•i.:,. ,.1 )...IA; 1 . V: AI,,
4,•'. ,r,t•••,:'. .k...,‘,1 4, '',..4',a)1.„,4',.;„4 •+,..1.., e7Ni1-)e k. <",--I? I(e."? 17' '414 enc-<-A-1-)17-1.-1-),•:.,-.:_---t4.1..,.?...0:0•ON.1:;4241.,1,•;,,,k4mA.....,it ikrirnt.'''.',.,1;0:c...t, ,,,i c 1,..4,n'i,,t,'1.k&e.i...' 'AI..?,,'
f`..` ',..,.%}_••
Z:••c't4).rt.t,'4''i'l•' . :Vi ,t
ii'.
1,
t4.' kki.k''''1 1.' 'ik., .' k ik'..i.. 'k'kik•..".l''.''
4 A'' 1. '1'V'''' 1 t:4' "1,,,t,'P'4 411k t'.."-.
1°;•'•;•,1°,t. tri- t., ' .:,,,c
c..14101:k.4.,j‘.7•
1-1'44.kt<tki'''..Ve.:!''‘'IC if f't
4...S".''3 '1..'i.t'4,''',4',fi'''.t''..r....?t4 41'.'•:',41,',. .i‘.11.rts.'!i,',-44%•-•,.'1,', 'it::1•.tj'''t1.1"t--,i --; )7c-%e-7/'t 1 1-)c-1 11..7 .g.,o.:,,,,,L,:-,.0/A.;:c,.4:.rt,6 1.:,,,24 t'efttl: 'r '' ",°.,K,,.!`I, •k, ',,.:1.,,,,4,,• ;,:l. .;.°'...;•:. .: .4'• .•••• ; .....e4;,-•,.';410 11,..C,', ,ele 04.4•• '4.;f .,...t•.•7 4;,4••4.,,til.)",,',, •.• •••)4 ',R. ,,' A'. r, •' ., ' ,•s. ,Iti• ; •,• , 1"..,, • :,-4k.,....... ,,, qi A t••••.•,411,,,',I'-,
11,4'Z.-1 414,:k., ;),.''''‘,41'r,'A..."'U.•••:...„..) ,• • , ,,, ,(41 A t'''. '.. ,'. •..t..'', '';',, • A
II I
1{."1,,}x,,,,,„tei,,,1,,,;....,..t,i7.', ,c.:.‘,..,. , .1+:4.,•t. •:...,,r,;•','.,•,,,,•• I...'. .•,'I
4
4,. , . • ,. 4,
V.,'4,,7 I; .••••ti,..c • ; •.:,' , '• • '
t
I i
1.
FORM #151
BUILDING DIVISION
CITY OF RENTON, WASHINGTON
APPLICATION FOR•'GRADING LICENSE
PR 2 1983
TO BE FILLED OUT IN DETAIL BY APPLICANT OR LICENSE CANNOT BE ISSUED
Paul S. Chiado, An Officer of Between East Valley Rd. and Lind Ave.
Owner: Metro Industrial District JOB Address and Between S.W. 16 St. and S.W. 19
Address 800 S.W. 16th Street Legal: Block 19, 20, and 23 of C. D. Hillman's
Renton, Washington 98055 Earlington Gardens Addition to City of
Telephone: (206) 226-8800 Seattle Div. No.1 less lots 8, 9, 10. 49,
50, and 51 of Block 19
Cubic Yards Involved 307,500 CY Plus
Estimated Value of Work $460,000.00
Description of Work Fill and grade site to grades as shown on drawings Y-2 and Y-3
Contractor: The Austin Company State License No. AU-ST-IC-T377N3
Address: 800 S. W. 16th Street Renton Bus. Lic. No. G-831 Telephone (206) 226-880(
Renton, Washington 98055
Civil.Engineer: The Austin Company Starting Date May 1979
Address: 800 S. W. 16th Street, Renton, WA Completion Date April, 1983
Telephone: (206) 226-8800
1) This application does not constitute a license to work. Work is not to' coranence until
grading license is posted on premises where work is to be performed.
2) Certification is hereby rendered that no work is to be done except as described and
that all work shall conform to the applicable codes.
3) Work in public right-of-way and/or utility easements is not authorized under this
application.
Total Fee Enclosed $ 2 0 3. oe Signature C Date May 10, 1979
NOTE: Make check payable to City of Renton. Northwest D "rIrr
Accounting Manager
ii
a. 1 f• tom` ` a a^..:,,
Y. ;. Fl .; ,..z
i.;....„...,. ._
FILE
i.:.i
a
0
i.:1
4.,.,
yr„,
i,
0. 6.
a-
1'., • ,..
4
L.'.•i y Li 1S i 1`yyh Key lJliy Mh.:1: 7 4'1 ••i
0. P' 1 . -Sy r T. 1 ''
Ts e•.`` it +,s-vi 4
t •
C.
t -•
J,, Hf ,v
7 tR.
t
J. W .
1 M1r 4•11 t.
ryv-
1