Loading...
HomeMy WebLinkAboutFinal Agenda Packet CITY OF RENTON AGENDA - City Council Regular Meeting 7:00 PM - Monday, October 28, 2024 Council Chambers, 7th Floor, City Hall – 1055 S. Grady Way Please note that this regular meeting of the Renton City Council is being offered as a hybrid meeting and can be attended in person at the Council Chambers, 7th floor of City Hall, 1055 S Grady Way, Renton, 98057 or remotely through Zoom. For those wishing to attend by Zoom: Please (1) click this link https://us02web.zoom.us/j/84938072917?pwd=TUNCcnppbjNjbjNRMWpZaXk2bjJnZz09 (or copy/paste the URL into a web browser) or (2) call-in to the Zoom meeting by dialing 253- 215-8782 and entering 849 3807 2917 Passcode 156708, or (3) call 425-430-6501 by 5 p.m. on the day of the meeting to request an invite with a link to the meeting. Registration for Audience Comment: Registration will be open at all times, but speakers must register by 5 p.m. on the day of a Council meeting in order to be called upon. Anyone who registers after 5 p.m. on the day of the Council meeting will not be called upon to speak and will be required to re-register for the next Council meeting if they wish to speak at that next meeting.  Request to Speak Registration Form: o Click the link or copy/paste the following URL into your browser: https://forms.office.com/g/bTJUj6NrEE  You may also call 425-430-6501 or email jsubia@rentonwa.gov or cityclerk@rentonwa.gov to register. Please provide your full name, city of residence, email address and/or phone number, and topic in your message.  A sign-in sheet is also available for those who attend in person. Video on Demand: Please click the following link to stream Council meetings live as they occur, or to select previously recorded meetings: Renton Channel 21 Video on Demand 1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE 2. ROLL CALL 3. SPECIAL PRESENTATION a) Governor’s Smart Communities Award Presentation 4. ADMINISTRATIVE REPORT a) Administrative Report 5. AUDIENCE COMMENTS  All remarks must be addressed to the Council as a whole, if a response is requested please provide your name and address, including email address, to the City Clerk to allow for follow‐up.  Speakers must sign-up prior to the Council meeting.  Each speaker is allowed three minutes.  When recognized, please state your name & city of residence for the record. NOTICE to all participants: Pursuant to state law, RCW 42.17A.555, campaigning for or against any ballot measure or candidate in City Hall and/or during any portion of the council meeting, including the audience comment portion of the meeting, is PROHIBITED. 6. CONSENT AGENDA The following items are distributed to Councilmembers in advance for study and review, and the recommended actions will be accepted in a single motion. Any item may be removed for further discussion if requested by a Councilmember. a) Approval of Council Meeting minutes of October 21, 2024. Council Concur b) AB - 3696 City Clerk reports submission of a street vacation petition, VAC-24-001, petitioner Quang Tuyen Do, for a 30-foot portion of unopened Lyons Ave NE south of NE 4th St, and recommends adopting a resolution setting a public hearing on November 18, 2024 to consider the matter. Council Concur; Set Public Hearing on 11/18/2024 c) AB - 3697 Parks & Recreation Department recommends execution of an agreement with Renova Exteriors, LLC in the amount of $157,757.87 for exterior illumination services at Gene Coulon Memorial Beach Park and downtown. Council Concur d) AB - 3694 Public Works Utility Systems Division recommends execution of a temporary construction easement with United Christian Church, with compensation to the city at $59,100. This temporary construction easement is needed for the installation of a sanitary sewer system and storm drainage system to serve the proposed Harmony Ridge Plat development. Refer to Utilities Committee 7. UNFINISHED BUSINESS Topics listed below were discussed in Council committees during the past week. Those topics marked with an asterisk (*) may include legislation. Committee reports on any topics may be held by the Chair if further review is necessary. a) Committee of the Whole: 1) 2025/2026 Biennium Budget b) Community Services Committee: 1) Resolution to Adopt Northeast Renton Park Master Plan* c) Finance Committee: 1) Vouchers; 2) Amendment 6 to 2020 Washington State Department of Health SNAP Incentive Agreement; 3) Department of Commerce Grant - Renton Public Square; 4) 2024 Emergency Management Performance Grant (EMPG) Contract; 5) Interagency Agreement between Renton Police Department and the Washington Traffic Safety Commission; 6) WA State Criminal Justice Training Commission Wellness Grant d) Public Safety Committee: 1) Interagency Agreement between the Washington State Internet Crimes Against Children Task Force and the Renton Police Department;* 2) Interlocal Agreement - RPD providing special event extra-duty services to City of Bellevue* e) Utilities Committee: 1) 2025-2026 Solid Waste Utility Rates* 8. LEGISLATION Resolutions: a) Resolution No. 4538: Authorize Washington State Internet Crimes Against Children Task Force "ICAC" Interlocal Agreement (See Item 7.d) b) Resolution No. 4539: Adopt NE Renton Master Park Plan (See Item 7.b) c) Resolution No. 4540: Assist Bellevue with Snowflake Lane Event (See Item 7.d) d) Resolution No. 4541: Setting a Public Hearing on Petition to Vacate ROW (Lyons Ave NE) (Do Street Vacation Petition VAC-24-001) (See Item 6.b) Ordinance for first reading: e) Ordinance No. 6142: 2025-2026 Solid Waste Utility Rates (See Item 7.e) Ordinance for second and final reading: f) Ordinance No. 6141: Extend Cingular Wireless (AT&T) Utility Franchise (First Reading 10/22/2024) 9. NEW BUSINESS (Includes Council Committee agenda topics; visit rentonwa.gov/cityclerk for more information.) 10. ADJOURNMENT COMMITTEE OF THE WHOLE MEETING AGENDA (Preceding Council Meeting) 4:45 p.m. - 7th Floor - Council Chambers / Videoconference Hearing assistance devices for use in the Council Chambers are available upon request to the City Clerk CITY COUNCIL MEETINGS ARE TELEVISED LIVE ON GOVERNMENT ACCESS CHANNEL 21 To view Council Meetings online, please visit rentonwa.gov/councilmeetings Mayor’s Office Memorandum DATE: October 23, 2024 TO: Ed Prince, Council President Members of the Renton City Council FROM: Armondo Pavone, Mayor Ed VanValey, Chief Administrative Officer SUBJECT: Administrative Report • The Renton Police Department, in partnership with other valley agencies, will be hosting the Diversity in Law Enforcement Career Workshop, Saturday, November 2 from 9 a.m.-2 p.m. in Renton. Participants must be 18 and over. Discover how to navigate the challenges of pursuing a law enforcement career, including the hiring process, background checks, testing, and officer wellness. RSVP and workshop pre-registration are required and may be completed by visiting rentonwa.gov/valleypolicecareers. • The Landing Parking Garage is tentatively scheduled to be closed October 29 and October 30 for concrete repairs. Surface street parking lots and street parking will remain available during the garage closure. • Information about preventative street maintenance, traffic impact projects, and road closures happening this week can be found at http://rentonwa.gov/traffic. All projects are weather permitting and unless otherwise noted, streets will always remain open.  Monday, October 28 through Friday, November 1, 9:00am-4:00pm. Westbound lane closure on NE 4th St near Monroe Ave NE for utility work. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Casey Grant, 206-532-4380.  Monday, October 28 through Friday, November 1, 8:00am-3:00pm. Intermittent lane closure on NE Sunset Blvd between Edmonds Ave NE and Kirkland Ave NE for construction work. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Brad Stocco, 425-282-2373.  Monday, October 28 through Friday, November 1, 8:00am-3:00pm. Shifting lane closures both east and west on NE Sunset Blvd between Redmond Pl NE to Union Ave NE for utility installation and frontage improvements. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Brad Stocco, 425- 282-2373.  Monday, October 28 through Friday, November 1, 8:00am-3:00pm. Intermittent lane closure on Williams Ave S between Cedar River and S 3rd St for construction work. Approved traffic control plans were issued for all work and will be followed. Questions can be directed to Rob Blackburn, 206-379-1489. AGENDA ITEM #4. a) October 21, 2024 REGULAR COUNCIL MEETING MINUTES CITY OF RENTON MINUTES - City Council Regular Meeting 7:00 PM - Monday, October 21, 2024 Council Chambers, 7th Floor, City Hall – 1055 S. Grady Way CALL TO ORDER AND PLEDGE OF ALLEGIANCE Mayor Pavone called the meeting of the Renton City Council to order at 7:00 PM and led the Pledge of Allegiance. ROLL CALL Councilmembers Present: Ed Prince, Council President James Alberson, Jr., Council Position No. 1 Carmen Rivera, Council Position No. 2 Valerie O'Halloran, Council Position No. 3 Ryan McIrvin, Council Position No. 4 Ruth Pérez, Council Position No. 6 Kim-Khánh Vǎn, Council Position No. 7 Councilmembers Absent: ADMINISTRATIVE STAFF PRESENT Armondo Pavone, Mayor Ed VanValey, Chief Administrative Officer Cheryl Beyer, Senior Assistant City Attorney Jason Seth, City Clerk Kristi Rowland, Deputy CAO Kari Roller, Finance Department Administrator Maryjane Van Cleave, Parks & Recreation Department Administrator Deb Needham, Emergency Management Director Laura Pettitt, Communications & Engagement Director Brianne Bannwarth, Development Engineering Director Amanda Free, Economic Development Assistant Director Commander Susan Hassinger, Police Department Attended Remotely: Judith Subia, Chief of Staff Kim Gilman, Interim Human Resources / Risk Management Administrator AGENDA ITEM #6. a) October 21, 2024 REGULAR COUNCIL MEETING MINUTES Martin Pastucha, Public Works Administrator Ron Straka, Public Works Utility Systems Director PROCLAMATION Filipino American History Month - October 2024: A proclamation by Mayor Pavone was read declaring October 2024 as Filipino American History Month in the City of Renton and encouraging everyone all residents to join in this special observance. Violet Aesquivel read a version of the proclamation in Tagalog, and she and Arturo "Rolly" Polintan accepted the proclamation with appreciation. MOVED BY VǍN, SECONDED BY PRINCE, COUNCIL CONCUR IN THE PROCLAMATION. CARRIED. PUBLIC HEARING Proposed 2025-2026 Biennial Budget - 3rd Hearing: This being the date set, and proper notices having been posted and published in accordance with local and State laws, Mayor Pavone opened the public hearing to consider the Proposed 2025-2026 Biennial Budget. Finance Administrator Kari Roller reported that this is the third and final public hearing on the proposed 2025-2026 biennial budget. She reported that city-wide revenue for the 2025-2026 Biennial Budget is $645 million, and the preliminary expenditures are $648.4 million. She also reported that the 2025 property tax levy is estimated to be $26,336,305 which equates to an increase of $13.73 per Renton household on average. Concluding, Ms. Roller stated that the purpose of the hearing is to solicit input from the public. There being no correspondence or public comments, it was MOVED BY O'HALLORAN, SECONDED BY PÉREZ, COUNCIL CLOSE THE PUBLIC HEARING. CARRIED. ADMINISTRATIVE REPORT CAO Ed VanValey reviewed a written administrative report summarizing the City’s recent progress towards goals and work programs adopted as part of its business plan for 2024 and beyond. Items noted were: • The Renton Police Department, in partnership with other valley agencies, will be hosting the Diversity in Law Enforcement Career Workshop, Saturday, November 2 from 9 a.m.-2 p.m. in Renton. Participants must be 18 and over. Discover how to navigate the challenges of pursuing a law enforcement career, including the hiring process, background checks, testing, and officer wellness. RSVP and workshop pre- registration are required and may be completed by visiting rentonwa.gov/valleypolicecareers. • The Landing Parking Garage is tentatively scheduled to be closed October 29 and October 30 for concrete repairs. Surface street parking lots and street parking will remain available during the garage closure. AGENDA ITEM #6. a) October 21, 2024 REGULAR COUNCIL MEETING MINUTES • Preventative street maintenance will continue to impact traffic and result in occasional street closures. AUDIENCE COMMENTS • Danny Ing, Tacoma, expressed concern about the proposed use of eminent domain by King County Metro to add a RapidRide bus stop in front of the Chan family's home. He urged Council to speak to the King County Council about this issue. • Elaine Chan, Renton, voiced opposition to King County Metro's use of eminent domain to take a portion of her property to construct a RapidRide bus stop. She noted several safety concerns for using this location and asked Council to speak to the King County Council about this issue. • Sea Chan, Renton, urged Council to include his family when discussing the issue of the RapidRide bus stop King County Metro is building on his property. He provided his family's contact information. Mayor Pavone noted that staff contacted King County about this issue and are awaiting a response from them. • Marvin Rosete, Renton, thank city officials and staff for the Filipino American History Month proclamation. • Melanie Gonzalez, Renton, speaking on behalf of Kindering, thanked Council for their consideration providing funding to the organization through a Human Services grant. • Ruby Holland, Seattle, expressed support for the Chan family's issue regarding King County Metro's use of eminent domain to build a RapidRide bus stop on their property. CONSENT AGENDA The following items are distributed to Councilmembers in advance for study and review, and the recommended actions will be accepted in a single motion. Any item may be removed for further discussion if requested by a Councilmember. a) Approval of Council Meeting minutes of October 14, 2024. Council Concur. b) AB - 3690 Community & Economic Development Department recommended execution of a Memorandum of Understanding with several local agencies to show support of the establishment of the Kent Valley Air and Space Manufacturing Roundtable. Council Concur. c) AB - 3691 Community & Economic Development Department recommended execution of a grant agreement with the Washington State Department of Commerce to accept $1,440,450 in grant funds for the construction of the Public Square project in downtown Renton. Refer to Finance Committee. d) AB - 3692 Executive Services Department recommended execution of the 2024 Emergency Management Performance Grant (24EMPG) grant award contract with the Washington State Military Department, to accept $50,653 in grant funds to support emergency management operations. Refer to Finance Committee. e) AB - 3660 Parks & Recreation Department recommended adoption of a resolution approving and adopting the Northeast Renton Park Master Plan. Refer to Community Services Committee. AGENDA ITEM #6. a) October 21, 2024 REGULAR COUNCIL MEETING MINUTES f) AB - 3661 Police Department recommended execution of a Washington State Criminal Justice Training Commission (CJTC) grant to accept $34,200 of which $22,300 will be used to extend the Officer Wellness program through 2025 and $11,900 will be used to provide Police Department-wide financial wellness training. Refer to Finance Committee. g) AB - 3687 Police Department recommended execution of an interagency agreement with the Washington Traffic Safety Commission, to receive up to $18,500 in grant funds to conduct multi-jurisdictional, high visibility traffic safety emphasis patrols in support of Target Zero priorities of reducing traffic related deaths and serious injuries. Refer to Finance Committee. h) AB - 3688 Police Department recommended adoption of a resolution authorizing execution of a mutual aid agreement with the City of Bellevue for Renton police officers to assist and schedule extra-duty for the annual Snowflake Lane holiday event in Bellevue. The Kemper Development Company (the company who hosts the event) will reimburse Renton for this service. Refer to Public Safety Committee. i) AB - 3693 Public Works Administration recommended adoption of an ordinance establishing Solid Waste rates for 2025 and 2026. Refer to Utilities Committee. j) AB - 3685 Public Works Utility Systems Division submitted CAG-23-048, Thunder Hills Sewer Interceptor Rehabilitation project, contractor Laser Underground & Earthworks, Inc., and requests acceptance of the project and release of the retainage bond after 60 days once all required releases from the state have been obtained, and all liens are legally cleared. Council Concur. MOVED BY PRINCE, SECONDED BY ALBERSON, COUNCIL CONCUR TO APPROVE THE CONSENT AGENDA AS PUBLISHED CARRIED. UNFINISHED BUSINESS Topics listed below were discussed in Council committees during the past week. Those topics marked with an asterisk (*) may include legislation. Committee reports on any topics may be held by the Chair if further review is necessary. a) Utilities Committee: Chair Văn to grant a five (5) year extension to the franchise agreement defined in Ordinance 5396 with New Cingular Wireless PCS, LLC, operating as AT&T. This will extend the franchise agreement until November 13, 2029. The Committee further recommends the ordinance regarding this matter be presented for first reading. MOVED BY VǍN, SECONDED BY RIVERA, COUNCIL CONCUR IN THE COMMITTEE RECOMMENDATION. CARRIED. LEGISLATION Ordinance for first reading: a) Ordinance No. 6141: An ordinance of the City of Renton, Washington, granting to New Cingular Wireless PCS, LLC and its affiliates, successors and assigns, the right, privilege, authority, and nonexclusive franchise extension for five years, to construct, maintain, operate, replace and repair a telecommunications network for small cell technology in, across, over, along, under, through and below certain designated public rights-of-way of the City of Renton, Washington, providing for severability, and establishing an effective date. AGENDA ITEM #6. a) October 21, 2024 REGULAR COUNCIL MEETING MINUTES MOVED BY VǍN, SECONDED BY RIVERA, COUNCIL REFER THE ORDINANCE FOR SECOND AND FINAL READING AT THE NEXT COUNCIL MEETING. CARRIED. Ordinances for second and final reading: a) Ordinance No. 6139: An ordinance of the City of Renton, Washington, extending the Temporary Waiver of Parking Fees for parking for periods of up to 10 hours within the City’s City Center Parking Garage located at 655 South 2nd Street, providing for severability, and establishing an effective date. MOVED BY O'HALLORAN, SECONDED BY PÉREZ, COUNCIL ADOPT THE ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRIED. b) Ordinance No. 6140: An ordinance of the City of Renton, Washington, amending the City of Renton Fiscal Years 2023/2024 Biennial Budget, as last amended by Ordinance No. 6137, by increasing budgeted revenues and expenditures by $17,953,493 and $16,598,457 respectively; amending the 2024 City of Renton Salary Table as last amended by Ordinance No. 6138; providing for severability; and establishing an effective date. MOVED BY O'HALLORAN, SECONDED BY PÉREZ, COUNCIL ADOPT THE ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRIED. NEW BUSINESS (Includes Council Committee agenda topics; visit rentonwa.gov/cityclerk for more information.) ADJOURNMENT MOVED BY PRINCE, SECONDED BY ALBERSON, COUNCIL ADJOURN. CARRIED. TIME: 7:44 PM Jason A. Seth, MMC, City Clerk Jason Seth, Recorder 21 Oct 2024 AGENDA ITEM #6. a) Council Committee Meeting Calendar October 21, 2024 October 28, 2024 Monday 12:00 p.m. Utilities Committee, Chair Văn Location: Council Conference Room/Videoconference 1. 2025-2026 Solid Waste Utility Rates 12:45 p.m. Community Services Committee, Chair Alberson Location: Council Conference Room/Videoconference 1. Resolution to Adopt Northeast Renton Park Master Plan 2. Renton History Museum Update 3. Emerging Issues in Parks & Recreation 1:45 p.m. Finance Committee, Chair O’Halloran Location: Council Conference Room/Videoconference 1. Amendment 6 to 2020 Washington State Department of Health SNAP Incentive Agreement 2. Department of Commerce Grant - Renton Public Square 3. 2024 Emergency Management Performance Grant (EMPG) Contract 4. Interagency Agreement between Renton Police Department and the Washington Traffic Safety Commission 5. WA State Criminal Justice Training Commission Wellness Grant 6. Vouchers 7. Emerging Issues in Finance 2:45 p.m. Planning & Development Committee, Chair Pérez Location: Council Conference Room/Videoconference 1. Comprehensive Plan Update 2. Emerging Issues in CED 3:45 p.m. Public Safety Committee, Chair Rivera Location: Council Conference Room/Videoconference 1. Interagency Agreement between the Washington State Internet Crimes Against Children Task Force and the Renton Police Department 2. Interlocal Agreement - RPD providing special event extra-duty services to City of Bellevue 3. RRFA Briefing 4. Emerging Issues in Public Safety 4:45 p.m. Committee of the Whole, Chair Prince Location: Council Chambers/Videoconference 1. 2025/2026 Biennium Budget 6:00 p.m. Governor’s Smart Community Awards Reception Location: Conferencing Center No official Council action will be taken during this Reception. 7:00 p.m. Council Meeting Location: Council Chambers/Videoconference AGENDA ITEM #6. a) AB - 3696 City Council Regular Meeting - 28 Oct 2024 SUBJECT/TITLE: Street Vacation Request: Westerly 30 Feet of unopened Lyons Ave NE Right-of-Way, south of NE 4th St: Petitioner Do; VAC-24-001 RECOMMENDED ACTION: Council Concur; Set Public Hearing on XX/XX/XXXX DEPARTMENT: City Clerk STAFF CONTACT: Jason Seth, City Clerk EXT.: 6502 FISCAL IMPACT SUMMARY: N/A SUMMARY OF ACTION: On August 8, 2024, a finalized street vacation petition was submitted by Quang Tuyen Do (VAC-24-001). On the petition was verified as valid by the Community & Economic Development Department on October 22, 2024. The petitioner is requested that the westerly 30 feet of unopened Lyons Ave NE, just south of NE 4th St, be vacated for public safety reasons. CED is requesting a public hearing on this matter be set for November 18, 2024. A separate agenda bill will be submitted referring the item to the Transportation Committee after the public hearing if Council accepts the petition and directs the petitioner to submit an appraisal for the right-of-way being proposed for vacation. EXHIBITS: A. Petition B. Issue Paper C. CED Verification Memo D. Resolution Setting Public Hearing STAFF RECOMMENDATION: Adopt the resolution setting a public hearing on November 18, 2024 to consider the matter of vacating a portion of right-of-way (ROW) located near Lyons Ave NE south of NE 4th St. AGENDA ITEM #6. b) STREET VACATION PETITION PROCESS AND SUBMITTAL REQUIREMENTS SECTION V: PETITION CITY OF RENTON To the Honorable Mayor and JUL 08 2024 Members of the City Council City of Renton RECEIVED 1055 S Grady Way CITY CLERK'S OFFICE Renton,WA 98057 Dear Mayor and Council Members: We,the undersigned property owners abutting a certain portion of public right-away, respectfully request the vacation of the right-of-way as descrilzed on the attached"Exhibit A"and commonly known as: 1-yons AvE 1- /VE s -f-- RED- n Insert closest cross streets and reference the street name, i.e., NE Bog Street from Bicycle Alley to Slalom Avenue NE.) We request a time and place be fixed when this petition will be heard by the City Council. Of the property owners abutting the area of this petition, I %(2/3 or more required)of the lineal frontage have agreed and indicated their joining this petition with their signatures below: PROPERTY OWNERS PROPERTY IDENTIFICATION NUMBER: First 10 digits of your 12-•':it property tax account number) ( g i-1 7/d 60,01 6 SIGNATURE: NAME: ar1kk_16 72 ,W 7V L o PHONE: Z6-'cY3 9./ EMAIL: J 7 iSf4 J4 h 61-0 v ADDRESS: 2g5-0 pVV 4'/ ' ve PROPERTY OWNERS PROPERTY IDENTIFICATION NUMBER: First 10 digits of your 12-digit property tax account number) SIGNATURE: NAME: PHONE: EMAIL: ADDRESS: PETITIONER NAME: dj, - J 7-t-f po COMPANY(If applicable):1/•//H EMAIL: po-7J5/4@ PHONE: Z 2i- ley x3/ ADDRESS: 3,0 / rj/,9-L At'NE / 7.01V/ Wr9 as-7 rentonwa.gov/permitcenter I developmentengineering@rentonwa.gov 1425-430-7240 5/3/2023 I Page 4 of 7 AGENDA ITEM #6. b) STREET VACATION PETITION PROCESS AND SUBMITTAL REQUIREMENTS AFFIDAVIT OF AUTHORIZATION I, (Print Names(s) Q(//f1'\J TUff.:Ai Da. , declare that I am (please check one): The current owner of the property involved in this petition An authorized representative for the petitioners And that the foregoing statements and signatures herein contained and the information herewith are in all respects true a orrect to the best of my knowledge and belief. 1-7/ 1/Z oz Signature of 0 er/Representative)/Date Signature of Owner/Representative) /Date STATE OF WASHINGTON SS COUNTY OF KING Notary Public 4ziI certify that I know or have satisfactory evidence that State of Washington Q IGJ T. {gyp signed this CHELSEA GODFREY LICENSE#23012233 instrument and acknowledged it to be his/her/their MY COMMISSION EXPIRES free and voluntary act for the uses and purposesAPRIL18,202'7 mentioned in the instrument. 4,Jv Notary Public in and for the state of Washington: ChelseoLEadrivem Notary Print My appointment expires: L'!/rbIa1 Submit Petition and Filing Fee to: Renton City Hall, City Clerk's Office,7th Floor 1055 S Grady Way, Renton,WA 98057 rentonwa.gov/permitcenter I developmentengineering(a rentonwa.gov 1425-430-7240 5/3/2023 I Page 5 of 7 AGENDA ITEM #6. b) A Cit..' 114P Map Title a L I. rim. re h I ', It ri i°` 5637200210 s r 5637200210 365'' i, r. a rn 1 WV-- r o- fV s - f'„ j t I J1 EE,,, 4. 0847100020 0847100022 ct' kz - k' 0847100019 l 5637200215- I- 5637200215 a lik•1.4!:‘. c ft A,>, r a; r. ;:ikkallighl ' ':1 i x t,,, ' 0847100023 0847100026 5637200220 5637200220 i 1- i .' lk , 'ii, I v1 We n 4.. Notes Legend City and County Labels Public Utility Vault Addresses Private Utility Vault Parcels 4 Public Clean Out City and County Boundary Renton u-9 Private Clean Out III Public Unknown LI <all other values> f] Private Unknown Network Structures Pump Station 32 0 16 32 Feet Public Access Riser Eli Public Pump Station WGS_1984_Web_Mercator Auxiliary_Sphere Private Access Riser Ei Private Pump Station All data,information,and maps are provided"as is"without warranty or any representation of accuracy,timeliness of completeness.The burden for determining accuracy,completeness,timeliness,merchantability and fitness for or the appropriateness for use rests solely on the user. AGENDA ITEM #6. b) 6/25/24,4:38 PM King County Department of Assessments:eReal Property Reference Links: Residential Physics Inspection Areas ADVERTISEMENT King County Taxinc Districts Codes ant Levies(.PDF) New Search King ounty Tax Property Tax Bill Lin s Map This Property Glossary of Terms Lejok/Property Tax AdvisiAreaReport opertyDetail Washington State Dgpartment of DeSabfordel Revenue(External link) PARCEL Washington State Parcel Number 084710-0020 1 Board of Tax Appea Name link)DO QUANG T Board of Legal I BLACK LOAM FIVE-ACRE TRS E 68 FT OF NE 1/4 OF E 1/2 LESS CO RD AppealslEqualizatic tSl7fLuir4U Districts Report a rsYearBuilt Mao Total Square Footage r 4 Recorder's Office Number Of Bedrooms y"a9tr lt'Scanned images of Number Of Baths surveys and other Grade g ')f map documents Condition r 1 t Scanned images Lot Size 9860 plats Views No sG" Housing Availability Dashboard Waterfront TOTAL LEVY RATE DISTRIBUTION Tax Year:2024 Levy Code:2145 Total Levy Rate:$10.50414 Total Senior Rate:$5.39850 State School Fund,2.51751,23.97% County,1.33792,12.74% t Port,0.10470,1.00% 9.51 City,0.94839,9.03% School,3.53205,33.63% Fire,1.00000,9.52% Hospital,0.31254,2.98% Library,0.28875,2.75% EMS,0.22678,2.16%127 Flood,0.07067,0.67% 33.6% RST,0.16483,1.57% 55.20%Voter Approved Click here to see levy distribution comparison by year. TAX ROLL HISTORY ADVERTISEME https://blue.kingcounty.com/Assessor/eRealProperty/Dashboard.aspx?ParcelNbr=0847100020 1/2 AGENDA ITEM #6. b) Criteria an Map EEE Results 0 of 84 Checked 0 All • None • Page • OM , ) &Jump to Address I I Click any parcel for parcel details. 69 ft — a) 5333 U C O A 5501 5409 5502148f10107sgft146ft 55( 5403 5415 Parcel Disclaimer 359 Ruler Legend NE 3rd Ln Google 68 ft Map data©2024 Google 50 ft Status is 'Active' Sale Type is one of'MLS', 'FSBO or Other MLS', 'Seller Representation Agreement' State Or Province is 'Washington' Area is '340 - Renton/Benson Hill' 41‘.1° Status is not 'Incomplete' Ordered by Status, Area, Current Price Found 84 results in 0.14 seconds. AG E N D A I T E M # 6 . b ) L. bi5 + 4 9 dWAVOiv-f. Tax Owner Information Owner Name (LN FN): Do Quang T Tax Billing Zip: 98059 Mailing Address: 2350 Duvall Ave NE Tax Billing Zip+4: 3607 Z.Tax Billing City&State: Renton Wa Location Information Subdivision: Black Loam Five-Acre Trs Neighborhood Code: 032005 School District Name: Renton Zoning: R4 School District Code:Renton Range/Township/Section/Qtr: 05-23-15-NE Estimated Value RealAVMTM: 825,700 Value As Of: 06/17/2024 Estimated Value Range Low: $578,000 Confidence Score: 24 Estimated Value Range High: $1,073,400 Forecast Standard Deviation: 30 1)RealAVMT"is a CoreLogic®derived value and should not be used in lieu of an appraisal. 2)The Confidence Score is a measure of the extent to which sales data,property information,and comparable sales support the property valuation analysis process.The confidence score range is 60-100.Clear and consistent quality and quantity of data drive higher confidence scores while lower confidence scores indicate diversity in data,lower quality and quantity of data,and/or limited similarity of the subject property to comparable sales. 3)The FSD denotes confidence in an AVM estimate and uses a consistent scale and meaning to generate a standardized confidence metric.The FSD is a statistic that measures the likely range or dispersion an AVM estimate will fall within,based on the consistency of the information available to the AVM at the time of estimation.The FSD can be used to create confidence that the true value has a statistical degree of certainty. Tax Information eb be. Scri 1 46 1 Tax-ID: 084710-0020 Improved: 6p Alt. Tax-ID: 084710002001 Tax Area: 2145 0:, 1 . ' •Legal Book/Page: 101 Legal Description: BLACK LOAM FIVE-ACRE TRS E 68 FT OF NE 1/4 OF E 1/2 LESS CO RD PLAT BLOCK: PLAT LOT: 2 Assessment & Taxes 1)Assessment Year 2023 2022 2021 Assessed Value -Total 225,000 203,000 167,000 Assessed Value - Land 212,000 194,000 158,000 lij Assessed Value - Improved 13,000 9,000 9,000 Market Value -Total 225,000 203,000 167,000 Market Value - Land 212,000 194,000 158,000 P'' Market Value- Improved 13,000 9,000 9,000 YOY Assessed Change ($) 22,000 36,000 1(-)YOY Assessed Change (0/ 0) 11% 22% Tax Year 2024 2023 2022 Total Tax 2,494.66 2,106.99 2,009.97 Change ($) 388 97 Change(%) 18% 5% Characteristics Lot Acres: 0.226 County Land Use: Vacant(Single Family) Lot Size: 9,860 Sewer:Individual Land Use: Residential (Nec) Garage Capacity: 0 Last Market Sale Recording Date: 07/15/1994 Auditor No: 199407151147 Sale Date: 06/29/1994 Deed Type: Warranty Deed Sale Price: 128,000 Owner Name (LN FN): Do Quang T Cash Down: 0 Seller Name (LN FN): Casteel Nancy P AGENDA ITEM #6. b) 7/31/24,11:46 AM Yahoo Mail-Re:Street Vacation Petition Ft/ Re: Street Vacation Petition CITY OF RENTON From: ToSa Do (dotosa@yahoo.com) To: jseth@rentonwa.gov JUL 3 2024 Date: Wednesday,July 24, 2024 at 12:59 PM PDT RECEIVED CITY CLERK'S OFFICE Hi Mr. Jason Seth, The Professional Land Surveyor from DMP did the Exhibit "A" for me. Would you please attached it into my Street Vacation Petition for me. Thanks, Quang Do On Monday, July 15, 2024 at 01:19:45 PM PDT, Jason Seth <jseth@rentonwa.gov>wrote: Hello Mr. Do, I submitted your petition to our Property Services Specialist and received the following note back: We cannot accept the petition as submitted as it is missing the legal description of the vacation area, an exhibit of the vacation area, and the statement of public benefit. We recommend that a professional land surveyor prepare the legal description and exhibit of the vacation area" The submittal guidelines are at this link: https://edocs.rentonwa.gov/Documents/DocView.aspx? id=8464254&dbid=0&repo=CityofRenton Please review your submitted petition (attached), make the revisions as requested, and resubmit to me at your convenience. I've included a link to our Street Vacation submittal guidelines. Thank you, Jason Jason Seth, MMC City Clerk/Public Records Officer W: 425-430-6502 C: 206-635-6100 24360-L-PRLM-VACA-Vacation Exhibit 2024-07-22.pdf R47 1 kR AGENDA ITEM #6. b) STREET VACATION PETITION PROCESS AND SUBMITTAL REQUIREMENTS SECTION V: PETITION CITY OF RENTON To the Honorable Mayor and JUL 08 2024 Members of the City Council City of Renton RECEIVED 1055 S Grady Way CITY CLERKS OFFICE Renton,WA 98057 Dear Mayor and Council Members: We,the undersigned property owners abutting a certain portion of public right-away,respectfully request the vacation of the right-of-way as described on the attached"Exhibit A"and commonly known as: Insert closest cross streets and reference the street name, i.e., NE Bog Street from Bicycle Alley to Slalom Avenue NE.) We request a time and place be fixed when this petition will be heard by the City Council. Of the property owners abutting the area of this petition, I ` %(2/3 or more required)of the lineal frontage have agreed and indicated their joining this petition with their signatures below: PROPERTY OWNERS PROPERTY IDENTIFICATION NUMBER: First 10 digits of your 12- it property tax ac ount number) (} ,Ot[_{ 7/ Q 0, 6 1 SIGNATURE: I NAME: Qi,q-/.JC Th7 iV/ ,C)a PHONE: 2_(). -..y8.5 ^ / jam' V ---_.EMAIL: d CrTi-s/9 NC 2 . >/I ADDRESS: 2 35Z i)t'v' C '1ire /ye PROPERTY OWNERS PROPERTY IDENTIFICATION NUMBER: First 10 digits of your 12-digit property tax account number) SIGNATURE: NAME: PHONE: EMAIL: ADDRESS: PETITIONER NAME: at.„47,,, . COMPANY(If applicable):9•/ A I EMAIL: p0-264@ /ff-/i / Cif PHONE: 20(- 3 p'2- 73/ ADDRESS 2.357) pt1 VA-t , Ale /ei' V/ Pv wi9 rentonwa.gov/permitcenter I developmentengineering(Wrentonwa.gov 1425-430-7240 5/3/2023 I Page 4 of 7 AGENDA ITEM #6. b) STREET VACATION PETITION PROCESS AND SUBMITTAL REQUIREMENTS AFFIDAVIT OF AUTHORIZATION — I. (Print Names(s) &U - 7 I U)_ i' ,declare that I am(please check one): The current owner of the property involved in this petition An authorized representative for the petitioners And that the foregoing statements and signatures herein contained and the information herewith are in all respects true a orrect to the best of my knowledge and belief. Signature of 0 er/Representative)/Date Signature of Owner/Representative) /Date STATE OF WASHIINGTON SS COUNTY OF KING r--———Notary Public I certify that I know or have satisfactory evidence that State of Washington CHELSEA GODFREY QUGo6 Co signed this LICENSE#23012233 instrument and acknowledged it to be his/her/their 11 MY COMMISSION EXPIRES APRIL 18,2027 1 free and voluntary act for the uses and purposes mentioned in the instrument. eq1AT Notary Public in and for the state of Washington: Gie_Ise t. 6061fr> Notary Print My appointment expires: _ Il (PI al --- Submit Petition and Filing Fee to: Renton City Hall,City Clerk's Office, 7th Floor 1055 S Grady Way, Renton,WA 08057 rentonwa.gov/-pennitcenter I devetopmenten eering@rentonwa.gov 1425-430-7240 5/3/2023 I Page 5 of 7 AGENDA ITEM #6. b) EXHIBIT 'A' LEGAL DESCRIPTION BEING A PORTION OF THE NE 1/4, NE 1/4, SECTION 15, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M., CITY OF RENTON, KING COUNTY, WASHINGTON, MORE FULLY DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHWEST CORNER OF LOT 1, RENTON SHORT PLAT RECORDED UNDER RECORDING NO. 20020607900006, RECORDS OF KING COUNTY; THENCE S 00°14'47" W 144.62', ALONG THE WEST LINE OF SAID LOT 1,TO THE COMMON WESTERLY CORNER OF LOTS 2 & 3, SAID RENTON SHORT PLAT, SAME BEING THE NORTHEAST CORNER OF LOT 1, RENTON SHORT PLAT RECORDED UNDER RECORDING NO. 20060518900013; THENCE N 88°21'11" W 30.01'ALONG THE NORTH LINE OF SAID LOT 1,TO THE SOUTHEAST CORNER OF THE NORTHEAST QUARTER OF THE EAST HALF OF TRACT 2, BLACK LOAN FIVE ACRE TRACTS, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 12 OF PLATS, PAGE 101, RECORDS OF KING COUNTY; THENCE N 00°21'13" E 144.61', ALONG THE EAST LINE OF THE ABOVE EAST HALF OF TRACT 2, BLACK LOAN FIVE ACRE TRACTS,TO THE NORTHEAST CORNER OF SAID EAST HALF, SAID POINT BEING IN SAID SOUTH RIGHT-OF-WAY OF N.E. 4TH STREET; EXCEPT THE NORTH 12 FEET DEEDED TO KING COUNTY WASHINGTON FOR ROAD PURPOSES UNDER INSTRUMENT RECORDED UNDER RECORDING NUMBER 5823629; THENCE S 88°21'16" E 29.74', ALONG SAID SOUTH RIGHT-OF-WAY TO THE POINT OF BEGINNING. CONTAINING 4,319 SQ. FT., MORE OR LESS. V .-4 • i DRAWN: ETB DATE: 07/22/2024 24-360EX01.DWG SCALE: N/A i D .I —wive a wrr i vuu` u, n•... 74526 AUBURN WAY NORThs ., 1 T` Alni ioi ions incuini TnN 98002 i i + I r , I J ,PHONE: (253)333-2200 1 1 "--------:------r r' L_r1 L, .,,._.-, 1 07/22/2024 1 II en v".la I1.7 VV 'I v c rING I i AGENDA ITEM #6. b) EXHIBIT 'B' GRAPHIC DEPICTION N.E. 4TH STREET yS 88'21'16" E — 29.74' LOT1 co NI-Iv r- Z/co ZO w / P OP Off`4Y41119. AV 3 RI t • O F z /../T LOT2 o o VACATION AREA 4,319 SQ. FT. N 88 21 11 W, 14 30.01' LOT 3 LOT 2 P ' LOT 1 0: o • '. DRAWN: ETB DATE: 07/22/2024 24-360EX01.DWG SCALE: 1" = 40' 1: DALEY-MORROW-POBLETE, INC. 48745 726 AUBURN WAY NORTH PSI ,.•' AUBURN, WASHINGTON 98002 li1/4 a r f PHONE: (253)333-2200 07/22/2024 incorporated ENGINEERING - SURVEYING Page 2 of 2 LAND PLANNING AGENDA ITEM #6. b) EXHIBIT”A” LEGAL DESCRIPTION BEING A PORTION OF THE NE 1/4,NE 1/4,SECTION 15,TOWNSHIP 23 NORTH, RANGE 5 EAST,W.I\/|.,CITYOF RENTON,KING COUNTY,WASHINGTON,MORE FULLYDESCRIBEDAS FOLLOWS: BEGINNING AT THE NORTHWEST CORNER OF LOT 1,RENTON SHORT PLAT RECORDEDUNDER RECORDING NO.20020607900006,RECORDSOF KING COUNTY; THENCE 5 00°14'47"W 144.62',ALONG THE WEST LINEOF SAID LOT 1,TO THE COMMON WESTERLYCORNER OF LOTS 2 8:3,SAID RENTON SHORT PLAT,SAME BEING THE NORTHEAST CORNER OF LOT 1,RENTON SHORT PLAT RECORDED UNDER RECORDING NO.20060518900013; THENCE N 88°21'11"W 30.01'ALONG THE NORTH LINEOF SAID LOT 1,TO THE SOUTHEAST CORNER OF THE NORTHEASTQUARTEROF THE EAST HALFOF TRACT 2,BLACKLOAN FIVEACRE TRACTS,ACCORDING TO THE PLAT THEREOF RECORDEDIN VOLUME 12 OF PLATS,PAGE 101, RECORDSOF KING COUNTY; TI-|F|\I(‘F |\l ||l\|F Ilh M I‘vv hull-Ind huh—ITIV-I-IIILUI ‘UI II—I—IIJI I—I I—IVVI—I—IIJI I VI \IIUIBLACKLOANFIVEACRETRACTS,TO THE NORTHEASTCORNEROFSAIDEAST HALF,SAIDPOINT BEING IN SAID SOUTH RIGHT-OF-WAY OF N.E.4TH STREET; EXCEPTTHE NORTH 12 FEET DEEDEDTO KING COUNTY WASHINGTON FOR ROAD PURPOSES UNDER INSTRUMENT RECORDED UNDER RECORDING NUMBER 5823629; THENCE S 88°21'16"E 29.74',ALONG SAID SOUTH RIGHT-OF-WAY TO THE POINT OF BEGINNING. F?MTAIMIMC l\/I('\Dl: \\\\V////////////////////////, LUIV II‘\II\III\I\J hl',~)J.:l Ju-I 1I///////////////////A\\\\\\\\\\\\\\\\‘5‘:I ////A\\\\\\\\\\\\\\\\\\\\\\\v I.)IVIUI\L UI\LLJJ- DRAWN:ETB 7/18/24 24—360 SCALE:N/A DALEY-MORROW-POBLETE,INC. AUBUEQNfVT/A'SH'INCT'ON'"98002 PHONE:(253)333—2200 ENGINEERING -SURVEYING EXO1.DWG LAND PLANNING incorporated Page 1 of 3 g 3“/4 Z//////////////// AGENDA ITEM #6. b) EXHIBIT”B” GRAPHIC DEPICTION IV.I;.‘+IF1DI l'1l:l:I 42’ ivv S 88‘21'16”E 29.74' >NsAVENUENE. LOT1 ‘3 \«:5«?gv'? \—09"“o. B $007950 o U 3* z 5 *3i LOT2 o O (f) VACATION AREA 4,319 SQ.FT. /N 88°21’11”w_/§* ‘o?30.01’LOT3 , a}; yII//////////////////A\\\\\\\\\\\\\\\\P\\\y w T.5 IQ‘oi'l-Sa’q’p, \\\\V////////////////////////,’8''.4mi////A\\\\\\\\\\\\\\\\\\\\\\\v “i DRAWN:ETB 7/18/24 24—350 SCALE:1”40' |DALEY-MOHHOW-POBLETE,INC. 726 AUBURN NORTH AUBURN,WASHINGTON 98002 PHONE:(253)333—2200 ENGINEERING -SURVEYING EX01.DWG LAND PLANNING Incorporated08/07/2024 I3,3?x\\\\\\\\\\\\\\\\V///////////////////I I $\\\\\\\\\\\\\\\\7/l/l///////////// Page 2 of 3 AGENDA ITEM #6. b) EXHIBIT”C” PUBLIC BENEFITS THE VACATED PORTION IS CURRENTLYUNIMPROVED.THE AREA IS DANGEROUS TO WALK THROUGH DUE TO BUSHES AND JUNK PARTS.THE HOMEOWNER, WHEN GAINING OWNERSHIP,WILL CONTINUE TO MAINTAIN THE AREA.IT WILL BE AN EXTENSION OF THEIR YARD.THE AREA WILL BE CLEANEDAND SAFER. {3‘1I///////////////////A\\\\\\\\\\\\\\».’\N1, // T.I DRAWN:ETB 7/18/24 24—360 SCALE:N/A \\\\V//////////////////////////A\\\\\\\\\\\\\\\\\\\\\\\\ DALEY-MORROW-POBLETE,INC. AUBUEQNfVT/A'SH'INCT'ON'"98002 PHONE:(253)333—2200 ENGINEERING -SURVEYING EXO1.DWG LAND PLANNING incorporated Page 3 of 3 g g: “a Z//////////////// AGENDA ITEM #6. b) DEPARTMENT OF COMMUNITY  & ECONOMIC DEVELOPMENT    M   E   M   O   R   A   N   D   U   M       DATE: October 22, 2024     TO: Ed Prince, Council President  Members of Renton City Council     VIA: Armondo Pavone, Mayor     FROM: Gina Estep, CED Administrator     STAFF CONTACT: Amanda Free, Economic Development Acting Director     SUBJECT: Resolution Setting Public Hearing regarding Petition for  Street Vacation: Westerly 30’ of Unopened Lyons Ave NE  Right‐of‐Way, South of NE 4th St   Petitioner: Quang Tuyen Do  VAC‐24‐001       ISSUE:  Should Council set a public hearing to consider a petition for vacation of the westerly 30  feet of unopened Lyons Ave NE right‐of‐way, south of NE 4th St?    RECOMMENDATION:  Pass the resolution setting a public hearing on November 18, 2024 to consider the  petition for vacation.    BACKGROUND SUMMARY:  On or about August 8, 2024, Quang Tuyen Do filed a petition with the City Clerk  petitioning for the vacation of the westerly 30 feet of unopened Lyons Ave NE right‐of‐ way, south of NE 4th St.     CONCLUSION:  Pass the resolution setting a public hearing on November 18, 2024 to consider the right‐ of‐way vacation.    AGENDA ITEM #6. b) DEPARTMENT OF COMMUNITY   & ECONOMIC DEVELOPMENT    M   E   M   O   R   A   N   D   U   M       DATE: October 22, 2024     TO: Jason Seth, City Clerk     FROM: Stephanie Rary, Property Services Specialist     SUBJECT: Petition for Street Vacation: Westerly 30’ of Unopened  Lyons Ave NE Right‐of‐Way, South of NE 4th St   Petitioner: Quang Tuyen Do  VAC‐24‐001       We have received and reviewed the above reference petition and find it valid.     More than two‐thirds of the abutting property owners have signed the petition.  83% of the frontage is represented by those who have signed the petition.     The petitioner’s maps and legal description were provided.  City staff will provide  maps and legal description to be used for the recording document.     The petitioner’s explanation of public benefit was provided and will be used in  the public hearing.    Please request the City Council to set a resolution which fixes the time for a public  hearing (pursuant to Section 9‐14‐3 of the RMC).      Finally, please add the following Department File Number to your indexing information.  ___PRM‐25‐0075_____    AGENDA ITEM #6. b) 1 CITY OF RENTON, WASHINGTON RESOLUTION NO. _______ A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, SETTING A PUBLIC HEARING DATE REGARDING VACATION OF THE WESTERLY 30’ OF UNOPENED LYONS AVE NE RIGHT-OF-WAY, SOUTH OF NE 4TH ST (DO STREET VACATION PETITION VAC-24-00). WHEREAS, a petition was filed with the City Clerk on or about August 8, 2024, pursuant to the requirements of chapter 35.79 RCW and Renton Municipal Code 9-14-2, petitioning for the vacation of the westerly 30’ of unopened Lyons Ave NE right-of-way, south of NE 4th St, as hereinafter more particularly described, and the petition was signed by the owners of more than two-thirds (2/3) of the property abutting upon that portion of the right-of-way sought to be vacated, and same being described in Exhibit “A,” and depicted in Exhibit “B,” attached hereto and made a part hereof as if fully set forth herein; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: SECTION I. That the 18th day of November, 2024, at the hour of 7:00 P.M., is hereby fixed as the date and time for a public hearing to consider the above-mentioned petition for vacating the right-of-way; which hearing is not more than sixty (60) days nor less than twenty (20) days from the date of passage of this resolution. SECTION II. The City Clerk is hereby authorized and directed to give notice of the time and date of the public hearing as provided in RMC 9-14-3.A, including instructions on accessing the hearing via Zoom, if applicable, and/or providing comment, and any and/or all persons interested AGENDA ITEM #6. b) RESOLUTION NO. ________ 2 therein or objecting to said vacation may then appear and be heard, or they may file their written objections with the City Clerk at or prior to the time of public hearing on the vacation. SECTION III. After the close of the public hearing, the City Council shall determine whether the vacation of the right-of-way should be granted. If the City Council determines that the right- of-way should be vacated, the City reserves the right to retain an easement for public utilities and related purposes. SECTION IV. If the City Council determines that the right-of-way should be vacated, at a future date to be determined, the City Council shall determine the classification of the right-of- way to be vacated and, in accordance with the discretion provided in RCW 35.79.030, the amount of compensation, if any, to be paid by the petitioner-owner(s) to the City for such vacation. PASSED BY THE CITY COUNCIL the day of , 2024. ______________________________ Jason A. Seth, City Clerk APPROVED BY THE MAYOR this day of , 2024. ______________________________ Armondo Pavone, Mayor Approved as to form: Shane Moloney, City Attorney RES-24RES023:09/16/24 AGENDA ITEM #6. b) RESOLUTION NO. ________ 3 AGENDA ITEM #6. b) RESOLUTION NO. ________ 4 AGENDA ITEM #6. b) AB - 3697 City Council Regular Meeting - 28 Oct 2024 SUBJECT/TITLE: Agreement with Renova Exteriors, LLC for Exterior Illumination Services RECOMMENDED ACTION: Council Concur DEPARTMENT: Parks & Recreation Department STAFF CONTACT: Jennifer Spencer, Interim Recreation Director EXT.: 6716 FISCAL IMPACT SUMMARY: Contract amount: $155,757.87 plus applicable sales tax Budgeted amount: $155,757.87 LTAC Award: $10,000 CED portion: $57,025 plus applicable sales tax Parks & Recreation portion: $88,732.87 plus applicable sales SUMMARY OF ACTION: Staff has contracted with Renova Exteriors, LLC for Clam Lights and Piazza Park City Center holiday lighting services in the amount of $155,757.87. The lighting services includes: RGB Coulon Beach Park 2024 • (45) Interior side of sequoias south & north of Kidd Valley east of paved path in cascade draped in C9s (warm white) 45 @$618.70 = $27,841.50 Lift • (52) Candy Cane Light Poles from the South end (walkway ending with bollards near Boat Launch) to the North end roundabout (warm white/red) 52 @$409.36 = RGB $21,286.72 (WOC added 10 light poles to contract, same installation as 2023) • (4) Water walkway “Lil’ drummer boy” hand railings (multi color) $1,342.10 • (19) North & South of Ivar’s/Kidd Valley along east & west of walking path – medium tree wraps (warm white & colors) 19 @$721.87 = RGB $13,715.63 • (1) Light park-art Coulon Walkers (statues) wrapped in mini lights (multi-color) RGB $1,623.83 • (9) North Picnic Shelter area – large tree wraps (warm white & colors) 9 @$577.50 = $1010.63 = RGB $9,095.63 • North Picnic Shelter – rooftop ridge lines in blue and green. Roofline rims in warm white C9s $1,920.18 • Ivar’s $2538.17, Kidd Valley Restaurants $2,957.52, Galleria/Pavilion (covered picnic area) $3,443.08 and Pilothouse out on the water walk $1,324.26– rooftops ridge lines in colored lights and roofline rims in warm white C9s • Saturation of lights at interior of Belvedere, 2nd level of picnic area $2,140 • Support Ivar's team to connect “Clam Lights” (New request 2024) Ivars to provide lighted clams • Total: $91,565.34 + tax AGENDA ITEM #6. c) All colored lights to be on through January 2, 2025 All white lights to be on through February 28. 2025 COR: parks dept. to supply 16 spider boxes in Coulon Downtown 2024 • Parking Garage entrance & east/west awnings $1,680 • Rooflines on clocktower in C9s (multi-color) $1,245 • (2) 60" lit wreaths $912 • (41) Wrapping of light poles in white (power on 24/7) 41@$235.35 = $9,649.35 (WOC added 13 light poles) • Erasmus the Dragon wreaths, garland & C9s $1,280 • Renton Historic Museum: large tree in 60 @ 16" light burst spritzers = $9,660 (or C9s + Light Burst Spritzers $18,460) (New feature requested 2024) • Gravel lot: large trees wrapped in 5mm mini lights 15 @ $577.50 = $8,662.50 (New feature requested 2024) • Total: $51,006.03 plus tax All colored lights to be on through January 2, 2025. All white lights to be on through February 28. 2025 RCC • Lighting in all warm white of both front and back entrance ways including peaks; 2 large trees lights on until end of February 2025 $1907.50 Piazza Park 2024 • (1) Full coverage on large central tree in C9 multi color $2,733.50 (WOC: no minis, add 200' of C9s) • lift rental $1,500 • (20) Large deciduous trees (interior circle & outer perimeter of trees) in warm white 20@$577.50 = $11,550 (WOC, no lights in small trees, moved all lights in trees to 8' above street level) • total: $15,472.83 + tax • Lights on until January 2, 2025 • Maintenance and checking lights at Piazza Park: Lights checked daily when lights are already turned on (i.e. 5p-9p) • For lighting install: Contractor provides schedule in advance and City will have electrical already turned on Big 5 Lot Music/Light Show Experience 2024 • RGB 2.5" over head festoon lighting • 240' x 6' overhead festoon zig zag holiday pathway • 720' overhead Rgb pixel lighting • 6 color beam projectors along pathway • programmable music & light show on the hour • HQ cloud based controller • Razzle dazzle Custom music content • Outdoor audio equipment • 4 customer temporary treated wooden arbors • $57,025 plus tax COR parks: to provide 2 spider boxes for this installation EXHIBITS: A. Renova 2024 Professional Services Agreement APPROVED STAFF RECOMMENDATION: Approve the contract with Renova Exteriors, LLC, in the amount of $155,757.87, for exterior illumination services at downtown and Coulon Park. AGENDA ITEM #6. c) AGREEMENT FOR EXTERIOR ILLUMINATION SERVICES THIS AGREEMENT, dated for reference purposes only as September 27, 2024, is by and between the City of Renton (the “City”), a Washington municipal corporation, and Renova Exteriors LLC, dba Renova Holiday Lighting (“Consultant”), a limited liability company. The City and the Consultant are referred to collectively in this Agreement as the “Parties.” Once fully executed by the Parties, this Agreement is effective as of the last date signed by both parties. 1. Scope of Work: Consultant agrees to provide materials and labor necessary to perform work for the installation, maintenance and de-installation of Clam Lights, Outdoor Décor at Gene Coulon Memorial Beach Park, Piazza Park, City Center Parking Garage, Clock Tower, Gateway Park, light poles in downtown Renton, Renton Community Center, Renton History Museum, and/or other agreed upon locations within the City of Renton, as specified in Exhibit A, which is attached and incorporated herein and may hereinafter be referred to as the “Work.” 2. Changes in Scope of Work: The City, without invalidating this Agreement, may order changes to the Work consisting of additions, deletions or modifications. Any such changes to the Work shall be ordered by the City in writing and the Compensation shall be equitably adjusted consistent with the rates set forth in Exhibit A or as otherwise mutually agreed by the Parties. 3. Time of Performance: Consultant shall commence performance of the Agreement pursuant to the schedule(s) set forth in Exhibit A. All Work shall be performed by no later than March 31, 2025. 4. Compensation: A. Amount. Total compensation to Consultant for Work provided pursuant to this Agreement shall not exceed $155.757.87, plus any applicable state and local sales taxes. Compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit A. The Consultant agrees that any hourly or flat rate charged by it for its Work shall remain locked at the negotiated rate(s) unless otherwise agreed to in writing or provided in Exhibit A. Except as specifically provided herein, the Consultant shall be solely responsible for payment of any taxes imposed as a result of the performance and payment of this Agreement. AGENDA ITEM #6. c) PAGE 2 OF 13 B. Method of Payment. On a monthly or no less than quarterly basis during any quarter in which Work is performed, the Consultant shall submit a voucher or invoice in a form specified by the City, including a description of what Work has been performed, the name of the personnel performing such Work, and any hourly labor charge rate for such personnel. The Consultant shall also submit a final bill upon completion of all Work. Payment shall be made by the City for Work performed within thirty (30) calendar days after receipt and approval by the appropriate City representative of the voucher or invoice. If the Consultant’s performance does not meet the requirements of this Agreement, the Consultant will correct or modify its performance to comply with the Agreement. The City may withhold payment for work that does not meet the requirements of this Agreement. C. Effect of Payment. Payment for any part of the Work shall not constitute a waiver by the City of any remedies it may have against the Consultant for failure of the Consultant to perform the Work or for any breach of this Agreement by the Consultant. D. Non-Appropriation of Funds. If sufficient funds are not appropriated or allocated for payment under this Agreement for any future fiscal period, the City shall not be obligated to make payments for Work or amounts incurred after the end of the current fiscal period, and this Agreement will terminate upon the completion of all remaining Work for which funds are allocated. No penalty or expense shall accrue to the City in the event this provision applies. 5. Termination: A. The City reserves the right to terminate this Agreement at any time, with or without cause by giving ten (10) calendar days’ notice to the Consultant in writing. In the event of such termination or suspension, all finished or unfinished documents, data, studies, worksheets, models and reports, or other material prepared by the Consultant pursuant to this Agreement shall be submitted to the City, if any are required as part of the Work. B. In the event this Agreement is terminated by the City, the Consultant shall be entitled to payment for all hours worked to the effective date of termination, less all payments previously made. If the Agreement is terminated by the City after partial performance of Work for which the agreed compensation is a fixed fee, the City shall pay the Consultant an equitable share of the fixed fee. This provision shall not prevent the City from seeking any legal remedies it may have for the violation or nonperformance of any of the provisions of this Agreement and such charges due to the City shall be deducted from the final payment due the Consultant. No payment shall be made by the City for any expenses incurred or work done following the effective date of termination unless authorized in advance in writing by the City. AGENDA ITEM #6. c) PAGE 3 OF 13 6. Warranties And Right To Use Work Product: Consultant represents and warrants that Consultant will perform all Work identified in this Agreement in a professional and workmanlike manner and in accordance with all reasonable and professional standards and laws. Compliance with professional standards includes, as applicable, performing the Work in compliance with applicable City standards or guidelines (e.g. design criteria and Standard Plans for Road, Bridge and Municipal Construction). Professional engineers shall certify engineering plans, specifications, plats, and reports, as applicable, pursuant to RCW 18.43.070. Consultant further represents and warrants that all final work product created for and delivered to the City pursuant to this Agreement shall be the original work of the Consultant and free from any intellectual property encumbrance which would restrict the City from using the work product. Consultant grants to the City a non- exclusive, perpetual right and license to use, reproduce, distribute, adapt, modify, and display all final work product produced pursuant to this Agreement. The City’s or other’s adaptation, modification or use of the final work products other than for the purposes of this Agreement shall be without liability to the Consultant. The provisions of this section shall survive the expiration or termination of this Agreement. 7. Record Maintenance: The Consultant shall maintain accounts and records, which properly reflect all direct and indirect costs expended and Work provided in the performance of this Agreement and retain such records for as long as may be required by applicable Washington State records retention laws, but in any event no less than six years after the termination of this Agreement. The Consultant agrees to provide access to and copies of any records related to this Agreement as required by the City to audit expenditures and charges and/or to comply with the Washington State Public Records Act (Chapter 42.56 RCW). The provisions of this section shall survive the expiration or termination of this Agreement. 8. Public Records Compliance: To the full extent the City determines necessary to comply with the Washington State Public Records Act, Consultant shall make a due diligent search of all records in its possession or control relating to this Agreement and the Work, including, but not limited to, e-mail, correspondence, notes, saved telephone messages, recordings, photos, or drawings and provide them to the City for production. In the event Consultant believes said records need to be protected from disclosure, it may, at Consultant’s own expense, seek judicial protection. Consultant shall indemnify, defend, and hold harmless the City for all costs, including attorneys’ fees, attendant to any claim or litigation related to a Public Records Act request for which Consultant has responsive records and for which Consultant has withheld records or information contained therein, or not provided them to the City in a timely manner. Consultant shall produce for distribution any and all records responsive to the Public Records Act request in a timely manner, unless those records are protected by court order. The provisions of this section shall survive the expiration or termination of this Agreement. AGENDA ITEM #6. c) PAGE 4 OF 13 9. Independent Contractor Relationship: A. The Consultant is retained by the City only for the purposes and to the extent set forth in this Agreement. The nature of the relationship between the Consultant and the City during the period of the Work shall be that of an independent contractor, not employee. The Consultant, not the City, shall have the power to control and direct the details, manner or means of Work. Specifically, but not by means of limitation, the Consultant shall have no obligation to work any particular hours or particular schedule, unless otherwise indicated in the Scope of Work or where scheduling of attendance or performance is mutually arranged due to the nature of the Work. Consultant shall retain the right to designate the means of performing the Work covered by this agreement, and the Consultant shall be entitled to employ other workers at such compensation and such other conditions as it may deem proper, provided, however, that any contract so made by the Consultant is to be paid by it alone, and that employing such workers, it is acting individually and not as an agent for the City. B. The City shall not be responsible for withholding or otherwise deducting federal income tax or Social Security or contributing to the State Industrial Insurance Program, or otherwise assuming the duties of an employer with respect to Consultant or any employee of the Consultant. C. If the Consultant is a sole proprietorship or if this Agreement is with an individual, the Consultant agrees to notify the City and complete any required form if the Consultant retired under a State of Washington retirement system and agrees to indemnify any losses the City may sustain through the Consultant’s failure to do so. 10. Hold Harmless: The Consultant agrees to release, indemnify, defend, and hold harmless the City, elected officials, employees, officers, representatives, and volunteers from any and all claims, demands, actions, suits, causes of action, arbitrations, mediations, proceedings, judgments, awards, injuries, damages, liabilities, taxes, losses, fines, fees, penalties, expenses, attorney’s or attorneys’ fees, costs, and/or litigation expenses to or by any and all persons or entities, arising from, resulting from, or related to the negligent acts, errors or omissions of the Consultant in its performance of this Agreement or a breach of this Agreement by Consultant, except for that portion of the claims caused by the City’s sole negligence. Should a court of competent jurisdiction determine that this agreement is subject to RCW 4.24.115, (Validity of agreement to indemnify against liability for negligence relative to construction, alteration, improvement, etc., of structure or improvement attached to real estate…) then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the AGENDA ITEM #6. c) PAGE 5 OF 13 Consultant and the City, its officers, officials, employees and volunteers, Consultant’s liability shall be only to the extent of Consultant’s negligence. It is further specifically and expressly understood that the indemnification provided in this Agreement constitute Consultant’s waiver of immunity under the Industrial Insurance Act, RCW Title 51, solely for the purposes of this indemnification. The Parties have mutually negotiated and agreed to this waiver. The provisions of this section shall survive the expiration or termination of this Agreement. 11. Gifts and Conflicts: The City’s Code of Ethics and Washington State law prohibit City employees from soliciting, accepting, or receiving any gift, gratuity or favor from any person, firm or corporation involved in a contract or transaction. To ensure compliance with the City’s Code of Ethics and state law, the Consultant shall not give a gift of any kind to City employees or officials. Consultant also confirms that Consultant does not have a business interest or a close family relationship with any City officer or employee who was, is, or will be involved in selecting the Consultant, negotiating or administering this Agreement, or evaluating the Consultant’s performance of the Work. 12. City of Renton Business License: Unless exempted by the Renton Municipal Code, Consultant shall obtain a City of Renton Business License prior to performing any Work and maintain the business license in good standing throughout the term of this agreement with the City. Information regarding acquiring a city business license can be found at: https://www.rentonwa.gov/Tax Information regarding State business licensing requirements can be found at: https://dor.wa.gov/doing-business/register-my-business 13. Insurance: Consultant shall secure and maintain: A. Commercial general liability insurance in the minimum amounts of $1,000,000 for each occurrence/$2,000,000 aggregate for the Term of this Agreement. B. In the event that Work delivered pursuant to this Agreement either directly or indirectly involve or require Professional Services, Professional Liability, Errors and Omissions coverage shall be provided with minimum limits of $1,000,000 per occurrence. "Professional Services", for the purpose of this section, shall mean any Work provided by a licensed professional or Work that requires a professional standard of care. If such policy is written on a claims-made basis, its retroactive date, and that of all subsequent renewals, shall be no later than the date this Agreement takes effect. The policy shall state that coverage is claims-made and state the retroactive date. Claims-made form coverage shall be maintained by Consultant for AGENDA ITEM #6. c) PAGE 6 OF 13 a minimum of 36 months following the date all Work is completed or earlier termination of this Agreement, and the Consultant shall annually provide the City with proof of renewal. If renewal of the claims-made form of coverage becomes unavailable, or economically prohibitive, Consultant shall purchase an extended reporting period (e.g., “tail”) or execute another form of guarantee acceptable to the City to assure financial responsibility for liability for services performed. C. Workers’ compensation coverage, as required by the Industrial Insurance laws of the State of Washington, shall also be secured. D. Commercial Automobile Liability for owned, leased, hired or non-owned, leased, hired or non-owned, with minimum limits of $1,000,000 per occurrence combined single limit, if there will be any use of Consultant’s vehicles on the City’s Premises by or on behalf of the City, beyond normal commutes. E. Consultant shall name the City as an Additional Insured on its commercial general liability policy on a non-contributory primary basis. The City’s insurance policies shall not be a source for payment of any Consultant liability, nor shall the maintenance of any insurance required by this Agreement be construed to limit the liability of Consultant to the coverage provided by such insurance or otherwise limit the City’s recourse to any remedy available at law or in equity. F. Subject to the City’s review and acceptance, a certificate of insurance showing the proper endorsements, shall be delivered to the City before performing the Work. G. Consultant shall provide the City with written notice of any policy cancellation, within two (2) business days of their receipt of such notice. 14. Delays: Consultant is not responsible for delays caused by factors beyond the Consultant’s reasonable control. When such delays beyond the Consultant’s reasonable control occur, the City agrees the Consultant is not responsible for damages, nor shall the Consultant be deemed to be in default of the Agreement. 15. Successors and Assigns: Neither the City nor the Consultant shall assign, transfer or encumber any rights, duties or interests accruing from this Agreement without the written consent of the other. 16. Notices: Any notice required under this Agreement will be in writing, addressed to the appropriate party at the address which appears below (as modified in writing from time to time by such party), and given personally, by registered or certified mail, return receipt requested, or by nationally recognized overnight courier service. Time period for notices shall be deemed to have commenced upon the date of receipt. Email and telephone may AGENDA ITEM #6. c) PAGE 7 OF 13 be used for purposes of administering the Agreement, but should not be used to give any formal notice required by the Agreement. CITY OF RENTON Jennifer Spencer 1055 South Grady Way Renton, WA 98057 Phone: (425) 430-6716 jspencer@rentonwa.gov CONSULTANT Brett Farrington 1705 S 93rd Street, Ste F-8 Seattle, WA 98108 Phone: (206) 312-1916 brett@renovaexteriors.com 17. Discrimination Prohibited: Except to the extent permitted by a bona fide occupational qualification, the Consultant agrees as follows: A. Consultant, and Consultant’s agents, employees, representatives, and volunteers with regard to the Work performed or to be performed under this Agreement, shall not discriminate on the basis of race, color, sex, religion, nationality, creed, marital status, sexual orientation or preference, age (except minimum age and retirement provisions), honorably discharged veteran or military status, or the presence of any sensory, mental or physical handicap, unless based upon a bona fide occupational qualification in relationship to hiring and employment, in employment or application for employment, the administration of the delivery of Work or any other benefits under this Agreement, or procurement of materials or supplies. B. The Consultant will take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, creed, color, national origin, sex, age, sexual orientation, physical, sensory or mental handicaps, or marital status. Such action shall include, but not be limited to the following employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation and selection for training. C. If the Consultant fails to comply with any of this Agreement’s non-discrimination provisions, the City shall have the right, at its option, to cancel the Agreement in whole or in part. D. The Consultant is responsible to be aware of and in compliance with all federal, state and local laws and regulations that may affect the satisfactory completion of the project, which includes but is not limited to fair labor laws, worker's compensation, and Title VI of the Federal Civil Rights Act of 1964, and will comply with City of Renton Council Resolution Number 4085. 18. Miscellaneous: The parties hereby acknowledge: AGENDA ITEM #6. c) PAGE 8 OF 13 A. The City is not responsible to train or provide training for Consultant. B. Consultant will not be reimbursed for job related expenses except to the extent specifically agreed within the attached exhibits. C. Consultant shall furnish all tools and/or materials necessary to perform the Work except to the extent specifically agreed within the attached exhibits. D. In the event special training, licensing, or certification is required for Consultant to provide Work he/she will acquire or maintain such at his/her own expense and, if Consultant employs, sub-contracts, or otherwise assigns the responsibility to perform the Work, said employee/sub-contractor/assignee will acquire and or maintain such training, licensing, or certification. E. This is a non-exclusive agreement and Consultant is free to provide his/her Work to other entities, so long as there is no interruption or interference with the provision of Work called for in this Agreement. F. Consultant is responsible for his/her own insurance, including, but not limited to health insurance. G. Consultant is responsible for his/her own Worker’s Compensation coverage as well as that for any persons employed by the Consultant. 19. Other Provisions: A. Approval Authority. Each individual executing this Agreement on behalf of the City and Consultant represents and warrants that such individuals are duly authorized to execute and deliver this Agreement on behalf of the City or Consultant. B. General Administration and Management. The City’s project manager is Jennifer Spencer. In providing Work, Consultant shall coordinate with the City’s contract manager or his/her designee. C. Amendment and Modification. This Agreement may be amended only by an instrument in writing, duly executed by both Parties. D. Conflicts. In the event of any inconsistencies between Consultant proposals and this Agreement, the terms of this Agreement shall prevail. Any exhibits/attachments to this Agreement are incorporated by reference only to the extent of the purpose for which they are referenced within this Agreement. To the extent a Consultant prepared exhibit conflicts with the terms in the body of this Agreement or contains terms that are extraneous to the purpose for which it is referenced, the terms in the AGENDA ITEM #6. c) PAGE 9 OF 13 body of this Agreement shall prevail and the extraneous terms shall not be incorporated herein. E. Governing Law. This Agreement shall be made in and shall be governed by and interpreted in accordance with the laws of the State of Washington and the City of Renton. Consultant and all of the Consultant’s employees shall perform the Work in accordance with all applicable federal, state, county and city laws, codes and ordinances. F. Joint Drafting Effort. This Agreement shall be considered for all purposes as prepared by the joint efforts of the Parties and shall not be construed against one party or the other as a result of the preparation, substitution, submission or other event of negotiation, drafting or execution. G. Jurisdiction and Venue. Any lawsuit or legal action brought by any party to enforce or interpret this Agreement or any of its terms or covenants shall be brought in the King County Superior Court for the State of Washington at the Maleng Regional Justice Center in Kent, King County, Washington, or its replacement or successor. Consultant hereby expressly consents to the personal and exclusive jurisdiction and venue of such court even if Consultant is a foreign corporation not registered with the State of Washington. H. Severability. A court of competent jurisdiction’s determination that any provision or part of this Agreement is illegal or unenforceable shall not cancel or invalidate the remainder of this Agreement, which shall remain in full force and effect. I. Sole and Entire Agreement. This Agreement contains the entire agreement of the Parties and any representations or understandings, whether oral or written, not incorporated are excluded. J. Time is of the Essence. Time is of the essence of this Agreement and each and all of its provisions in which performance is a factor. Adherence to completion dates set forth in the description of the Work is essential to the Consultant’s performance of this Agreement. K. Third-Party Beneficiaries. Nothing in this Agreement is intended to, nor shall be construed to give any rights or benefits in the Agreement to anyone other than the Parties, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of the Parties and no one else. L. Binding Effect. The Parties each bind themselves, their partners, successors, assigns, and legal representatives to the other party to this Agreement, and to the partners, AGENDA ITEM #6. c) PAGE 10 OF 13 successors, assigns, and legal representatives of such other party with respect to all covenants of the Agreement. M. Waivers. All waivers shall be in writing and signed by the waiving party. Either party’s failure to enforce any provision of this Agreement shall not be a waiver and shall not prevent either the City or Consultant from enforcing that provision or any other provision of this Agreement in the future. Waiver of breach of any provision of this Agreement shall not be deemed to be a waiver of any prior or subsequent breach unless it is expressly waived in writing. N. Counterparts. The Parties may execute this Agreement in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF RENTON By:_____________________________ CONSULTANT By:____________________________ Armondo Pavone Mayor Brett Farrington Owner _____________________________ Date _____________________________ Date Attest _____________________________ Jason A. Seth City Clerk Approved as to Legal Form By: __________________________ Alex Tuttle Senior Assistant City Attorney Contract Template Updated 5/21/2021 OOTCA contract no. 3214 AGENDA ITEM #6. c) PAGE 11 OF 13 AGENDA ITEM #6. c) PAGE 12 OF 13 EXHIBIT A All below descriptions shall include any and all materials, manpower and equipment required for installation, maintenance, de-installation and/or removal and storage of the following decorations, unless otherwise specified as City of Renton responsibilities: RGB Coulon Beach Park 2024 • (45) Interior side of sequoias south & north of Kidd Valley east of paved path in cascade draped in C9s (warm white) 45 @$618.70 = $27,841.50 Lift • (52) Candy Cane Light Poles from the South end (walkway ending with bollards near Boat Launch) to the North end roundabout (warm white/red) 52 @$409.36 = RGB $21,286.72 (WOC added 10 light poles to contract, same installation as 2023) • (4) Water walkway “Lil’ drummer boy” hand railings (multi color) $1,342.10 • (19) North & South of Ivar’s/Kidd Valley along east & west of walking path – medium tree wraps (warm white & colors) 19 @$721.87 = RGB $13,715.63 • (1) Light park-art Coulon Walkers (statues) wrapped in mini lights (multi-color) RGB $1,623.83 • (9) North Picnic Shelter area – large tree wraps (warm white & colors) 9 @$577.50 = $1010.63 = RGB $9,095.63 • North Picnic Shelter – rooftop ridge lines in blue and green. Roofline rims in warm white C9s $1,920.18 • Ivar’s $2538.17, Kidd Valley Restaurants $2,957.52, Galleria/Pavilion (covered picnic area) $3,443.08 and Pilothouse out on the water walk $1,324.26– rooftops ridge lines in colored lights and roofline rims in warm white C9s • Saturation of lights at interior of Belvedere, 2nd level of picnic area $2,140 • Support Ivar's team to connect “Clam Lights” (New request 2024) Ivars to provide lighted clams • Total: $91,565.34 + tax All colored lights to be on through January 2, 2025 All white lights to be on through February 28. 2025 COR: parks dept. to supply 16 spider boxes in Coulon Downtown 2024 • Parking Garage entrance & east/west awnings $1,680 • Rooflines on clocktower in C9s (multi-color) $1,245 • (2) 60" lit wreaths $912 • (41) Wrapping of light poles in white (power on 24/7) 41@$235.35 = $9,649.35 (WOC added 13 light poles) • Erasmus the Dragon wreaths, garland & C9s $1,280 • Renton Historic Museum: large tree in 60 @ 16" light burst spritzers = $9,660 (or C9s + Light Burst Spritzers $18,460) (New feature requested 2024) AGENDA ITEM #6. c) PAGE 13 OF 13 • Gravel lot: large trees wrapped in 5mm mini lights 15 @ $577.50 = $8,662.50 (New feature requested 2024) • Total: $51,006.03 plus tax All colored lights to be on through January 2, 2025 All white lights to be on through February 28. 2025 RCC • Lighting in all warm white of both front and back entrance ways including peaks; 2 large trees lights on until end of February 2025 $1907.50 Piazza Park 2024 • (1) Full coverage on large central tree in C9 multi color $2,733.50 (WOC: no minis, add 200' of C9s) • lift rental $1,500 • (20) Large deciduous trees (interior circle & outer perimeter of trees) in warm white 20@$577.50 = $11,550 (WOC, no lights in small trees, moved all lights in trees to 8' above street level) • total: $15,472.83 + tax • Lights on until January 2, 2025 • Maintenance and checking lights at Piazza Park: Lights checked daily when lights are already turned on (i.e. 5p-9p) • For lighting install: Contractor provides schedule in advance and City will have electrical already turned on Big 5 Lot Music/Light Show Experience 2024 • RGB 2.5" over head festoon lighting • 240' x 6' overhead festoon zig zag holiday pathway • 720' overhead Rgb pixel lighting • 6 color beam projectors along pathway • programmable music & light show on the hour • HQ cloud based controller • Razzle dazzle Custom music content • Outdoor audio equipment • 4 customer temporary treated wooden arbors • $57,025 plus tax COR parks: to provide 2 spider boxes for this installation AGENDA ITEM #6. c) AB - 3694 City Council Regular Meeting - 28 Oct 2024 SUBJECT/TITLE: Temporary Construction Easement to United Christian Church for Harmony Ridge Development RECOMMENDED ACTION: Refer to Utilities Committee DEPARTMENT: Public Works Utility Systems Division STAFF CONTACT: Ron Straka, Utility Systems Director EXT.: 7239 FISCAL IMPACT SUMMARY: The total compensation to the city for the granting of a temporary construction easement to United Christian Church is $59,100. This includes the appraised value of the easement area, and the cost of the appraisal as specified in the easement. SUMMARY OF ACTION: The Public Works/Water Utility requests approval forthe granting of a temporary construction easement to United Christian Church across the southerly portion of the city’s Rolling Hills Reservoir property for the installation of a sanitary sewer system and storm drainage system neededto serve the proposed Harmony Ridge Plat development project (land use file no. LUA-23-000143). The Water Utility recommends that the city accept the payment of $59,100 from the church as compensation for the easement based on the appraisal. The city’s consultant Sova Consulting has performed an appraisal of the easement area of 31,051 square-feet and has determined the just compensation for the use of the property is $55,100. Sova Consulting’s contract amount to perform the appraisal is $4,000. The total compensation cost to the city for the temporary construction easement is $59,100, which will be included in the next quarterly budget adjustment. Ichijo USA Co., Ltd., the developer of the Harmony Ridge development has submitted a land use application for a preliminary plat (LUA-23-000143) which includes 21 lots intended for new single-family homes and 1 lot reserved for the existing church.The development proposes to construct a sanitary sewer system and stormwater system across the south portion of the adjacent city’s Rolling reservoir property to connect to the new on-site sanitary and storm systems to the existing systems in Puget Drive S.E. A temporary construction easement from the city is required for the developer to construct the new utilities across the city’s property. Upon the completion of construction of utilities, the site improvements, landscape restoration of the easement area per city-approved plans, and the sanitary sewer and storm drainage systems across the reservoir property will be conveyed to the city for operation and maintenance as public utilities. The temporary construction easement will be terminated after the completion of the roadway and utility improvements for the development and after the acceptance and recording of the final plat by the city, or by December 31, 2031, whichever is earlier. The City Attorney and the legal counsel for United Christian Church have approved the easement document and payment amount. EXHIBITS: A. Temporary Contruction Easement B. Project Location Map AGENDA ITEM #6. d) STAFF RECOMMENDATION: Authorize the Mayor and City Clerk to execute the temporary construction easement with United Christian Church and accept the compensation to the city for the easement in the amount of $59,100. AGENDA ITEM #6. d) Gr a n t o r ( s ) : Ci t y of Re n t o n , a Wa s h i n g t o n mu n i c i p a l co r p o r a t i o n Gr a n t e e ( s ) : Un i t e d Ch r i s t i a n Ch u r c h , a Wa s h i n g t o n no n p r o f i t co r p o r a t i o n Ab b r e v i a t e d Le g a l De s c r i p t i o n : PT N SE 1/ 4 of SE C . 20 , TW P . 23 N , R5 E , KI N G CO U N T Y , WA S H I N G T O N Fu l l Le g a l De s c r i p t i o n : Se e Ex h i b i t A of do c u m e n t As s e s s o r ’ s Ta x Pa r c e l Nu m b e r : 20 2 3 0 5 9 1 0 9 Re f e r e n c e Nu m b e r of Re l a t e d Do c u m e n t s : N/ A TE M P O R A R Y CO N S T R U C T I O N EA S E M E N T Ha r m o n y Ri d g e Pl a t Of f s i t e Sa n i t a r y Se w e r Sy s t e m an d St o r m Dr a i n a g e Sy s t e m Pr o j e c t (L U A 2 3 — 0 0 0 1 4 3 ) Th i s Te m p o r a r y Co n s t r u c t i o n Ea s e m e n t (t h e ”C o n s t r u c t i o n Ea s e m e n t ” ) , is ma d e an d en t e r e d in t o as of th e la s t si g n a t u r e da t e se t fo r t h be l o w , by an d be t w e e n th e Ci t y of Re n t o n , a Wa s h i n g t o n mu n i c i p a l co r p o r a t i o n (” C i t y ” or ”G r a n t o r ” ) an d Un i t e d Ch r i s t i a n Ch u r c h , a Wa s h i n g t o n no n p r o ? t co r p o r a t i o n (” G r a n t e e ” ) , an d it s su c c e s s o r s , as s i g n s , de v e l o p e r s , co n t r a c t o r s , an d ag e n t s , fo r th e Ea s e m e n t Pu r p o s e s (a s de f i n e d be l o w ) in co n n e c t i o n wi t h th e of f s i t e sa n i t a r y se w e r sy s t e m an d st o r m dr a i n a g e sy s t e m co n t e m p l a t e d un d e r th e Ha r m o n y Ri d g e Pl a t (L U A 2 3 - 0 0 0 1 4 3 ) (c o l l e c t i v e l y , th e ”S e w e r an d Dr a i n a g e Sy s t e m s ” ) on l y . Fo r Go o d an d Va l u a b l e Co n s i d e r a t i o n of FI F T Y — N I N E TH O U S A N D 10 0 DO L L A R S ($ 5 9 , 1 0 0 . 0 0 ) , su f f i c i e n c y an d re c e i p t of wh i c h ar e he r e b y ac k n o w l e d g e d , Gr a n t o r , as th e ow n e r of th a t ce r t a i n re a l pr o p e r t y , kn o w n as Ki n g Co u n t y Pa r c e l Nu m b e r 20 2 3 0 5 9 1 0 9 , le g a l l y de s c r i b e d on Ex h i b i t "A ” — En t i r e Pa r c e l (” P r o p e r t y ” ) , at t a c h e d he r e t o an d in c o r p o r a t e d by th i s re f e r e n c e , do e s he r e b y gr a n t to Gr a n t e e , a te m p o r a r y ea s e m e n t in , on , ov e r , th r o u g h an d ac r o s s th a t po r t i o n of th e Pr o p e r t y de s c r i b e d on Ex h i b i t ”B " (" E a s e m e n t Ar e a ” ) an d de p i c t e d on Ex h i b i t ”C ” , wh i c h ar e at t a c h e d he r e t o an d in c o r p o r a t e d by th i s re f e r e n c e (s u c h Ea s e m e n t Ar e a be i n g a 55 - f o o t wi d e by ap p r o x i m a t e l y Pa g e 1 of (9 ) Pa g e s Pa r c e l No . 20 2 3 0 5 9 1 0 9 Af t e r re c o r d i n g r e t u r n do c u me n t to : Ci t y of Re n t o n Ci t y Cl e r k ’ s Of f i c e 10 5 5 So u t h Gr a d y Re n t o n , WA 98 0 5 7 AGENDA ITEM #6. d) pu r p o s e s (c o l l e c t i v e l y , th e ”E a s e m e n t Pu r p o s e s ” ) : (i ) co n s t r u c t i n g th e Se w e r an d Dr a i n a g e Sy s t e m s in ac c o r d a n c e wi t h th e ap p r o v e d co n s t r u c t i o n pl a n s , in c l u d i n g re s t o r a t i o n ; (i i ) pr o t e c t i n g ex i s t i n g pu b l i c an d pr i v a t e im p r o v e m e n t s in th e im m e d i a t e vi c i n i t y of th e Ea s e m e n t Ar e a ; (i i i ) ac c e s s ; an d (i v ) re p a i r i n g , re s t o r i n g an d / o r re e s t a b l i s h i n g an y im p r o v e m e n t s or ot h e r Pr o p e r t y fe a t u r e s di s t u r b e d wh i l e un d e r t a k i n g th e ac t i v i t i e s de s c r i b e d ab o v e . Th e te m p o r a r y ri g h t s gr a n t e d in th i s Co n s t r u c t i o n Ea s e m e n t sh a l l be ef f e c t i v e up o n ex e c u t i o n of th i s Co n s t r u c t i o n Ea s e m e n t by th e pa r t i e s he r e t o . Ho w e v e r , th e co n s t r u c t i o n of th e Se w e r an d Dr a i n a g e Sy s t e m s sh a l l be co m m e n c e d on l y af t e r th e re q u i r e d co n s t r u c t i o n pe r m i t s an d ap p r o v a l s fo r th e Ha r m o n y Ri d g e Pl a t (L U A 2 3 — 0 0 0 1 4 3 ) ar e is s u e d by th e Ci t y . Th i s Co n s t r u c t i o n Ea s e m e n t is no n - t r a n s f e r r a b l e , ex c e p t th a t th e ri g h t s un d e r th i s Co n s t r u c t i o n Ea s e m e n t sh a l l in u r e to th e be n e f i t of , an d th e ob l i g a t i o n s un d e r th i s Co n s t r u c t i o n Ea s e m e n t sh a l l be bi n d i n g on , an y su c c e s s o r to Gr a n t e e as ow n e r / de v e l o p e r of th e Ha r m o n y Ri d g e Pl a t (L U A 2 3 - 0 0 0 1 4 3 ) . Gr a n t e e an d / o r it s co n t r a c t o r s / d e v e l o p e r s / a g e n t s sh a l l pr o v i d e no t le s s th a n fo r t y - e i g h t (4 8 ) ho u r s ’ no t i c e to th e Gr a n t o r of it s in t e n t to in i t i a l l y co m m e n c e th e ex e r c i s e of it s ri g h t s un d e r th i s Co n s t r u c t i o n Ea s e m e n t . Th e te m p o r a r y ri g h t s gr a n t e d to th e Gr a n t e e un d e r th i s Co n s t r u c t i o n Ea s e m e n t sh a l l au t o m a t i c a l l y te r m i n a t e an d be nu l l an d vo i d , at th e ea r l i e r of : (a ) up o n th e re c o r d i n g of th e Fi n a l Pl a t ma p fo r th e Ha r m o n y Ri d g e Pl a t (L U A 2 3 - 0 0 0 1 4 3 ) af t e r al l re q u i r e d im p r o v e m e n t s ha v e be e n co n s t r u c t e d (i n c l u d i n g th e co n s t r u c t i o n of th e Se w e r an d Dr a i n a g e Sy s t e m s ac r o s s th e Gr a n t o r ’ s pr o p e r t y ) , al l re q u i r e d re s t o r a t i o n ha s be e n co m p l e t e d , Gr a n t o r ha s ac c e p t e d a re c o r d e d bi l l of sa l e tr a n s f e r r i n g al l of Gr a n t e e ’ s ri g h t , ti t l e an d in t e r e s t in an d to th e Se w e r an d Dr a i n a g e Sy s t e m on th e Gr a n t o r ’ s pr o p e r t y to th e Ci t y , an d th e ow n e r / de v e l o p e r un d e r th e Ha r m o n y Ri d g e Pl a t (L U A 2 3 — 0 0 0 1 4 3 ) ha s po s t e d th e re q u i r e d 2- y e a r ma i n t e n a n c e - d e f e c t su r e t y wi t h re s p e c t to th e Se w e r an d Dr a i n a g e Sy s t e m , or or or Ha r m o n y (L U A 2 3 - 0 0 0 1 4 3 ) ap p l i c a t i o n , or (c ) De c e m b e r 31 , 20 3 1 . Th e Gr a n t e e ag r e e s to ho l d ha r m l e s s , in d e m n i f y an d de f e n d th e Gr a n t o r fr o m an d ag a i n s t an y an d al l cl a i m s , lo s s e s or li a b i l i t y , fo r in j u r i e s , si c k n e s s or de a t h of pe r s o n s , in c l u d i n g em p l o y e e s of th e Gr a n t e e , or da m a g e to pr o p e r t y , ar i s i n g ou t of th e ex e r c i s e of TE M P O R A R Y CO N S T R U C T I O N EA S E M E N T Pa g e 2 of 9 Pa g e s Pa r c e l No . 20 2 3 0 5 9 1 0 9 AGENDA ITEM #6. d) Gr a n t e e ' s ri g h t s un d e r th i s Co n s t r u c t i o n Ea s e m e n t or an y wi l l f u l mi s c o n d u c t or ne g l i g e n t ac t , er r o r , or om i s s i o n of th e Gr a n t e e , it s of f i c e r s , ag e n t s , co n t r a c t o r s , su b c o n t r a c t o r s , li c e n s e e s , or em p l o y e e s , in co n n e c t i o n wi t h th e Gr a n t e e ’ s ac t i v i t i e s au t h o r i z e d by th i s Co n s t r u c t i o n Ea s e m e n t , pr o v i d e d , ho w e v e r , th a t : (a ) Th e Gr a n t e e ’ s ob l i g a t i o n s to in d e m n i f y , de f e n d an d ho l d ha r m l e s s sh a l l no t ex t e n d to in j u r i e s , si c k n e s s , de a t h or da m a g e ca u s e d by or re s u l t i n g fr o m th e so l e wi l l f u l mi s c o n d u c t or so l e ne g l i g e n c e of th e Gr a n t o r ; an d (b ) Th e Gr a n t e e ’ s ob l i g a t i o n s to in d e m n i f y , de f e n d an d ho l d ha r m l e s s fo r in j u r i e s , si c k n e s s , de a t h or da m a g e ca u s e d by or re s u l t i n g fr o m th e co n c u r r e n t ne g l i g e n c e or wi l l f u l mi s c o n d u c t of th e Gr a n t e e an d th e Gr a n t o r , or of th e Gr a n t e e an d a th i r d pa r t y ot h e r th a n an of f i c e r , ag e n t , co n t r a c t o r or em p l o y e e of t h e Gr a n t e e , sh a l l ap p l y on l y to th e ex t e n t of t h e ne g l i g e n c e or wi l l f u l mi s c o n d u c t of t h e Gr a n t e e (i n c l u d i n g an of f i c e r , ag e n t , co n t r a c t o r , de v e l o p e r or em p l o y e e of th e Gr a n t e e ) . Gr a n t e e sh a l l , at it s so l e co s t an d up o n co m p l e t i o n of th e wo r k (t o be do n e in ac c o r d a n c e wi t h th e Ci t y of Re n t o n ap p r o v e d co n s t r u c t i o n pl a n s fo r th e Se w e r an d Dr a i n a g e Sy s t e m s ) wi t h i n th e Ea s e m e n t Ar e a , fu l l y re s t o r e th e su r f a c e an d su b s u r f a c e of th e Ea s e m e n t Ar e a an d an y pu b l i c or pr i v a t e im p r o v e m e n t s di s t u r b e d or de s t r o y e d by Gr a n t e e (a n d / o r it s of f i c e r s , ag e n t s , co n t r a c t o r s , su b c o n t r a c t o r s , li c e n s e e s , or em p l o y e e s ) du r i n g th e ex e c u t i o n of th e wo r k , to th e fi n a l co n d i t i o n s as sh o w n on th e Ci t y - a p p r o v e d co n s t r u c t i o n pl a n s fo r th e Ha r m o n y Ri d g e De v e l o p m e n t an d th e Se w e r an d Dr a i n a g e Sy s t e m s . It is th e in t e n t i o n of th e pa r t i e s th a t th i s Co n s t r u c t i o n Ea s e m e n t be st r i c t l y li m i t e d to an d fo r th e pu r p o s e s ex p r e s s e d . Th i s Co n s t r u c t i o n Ea s e m e n t an d co v e n a n t s he r e i n sh a l l be re c o r d e d wi t h th e Ki n g to pa r t i e s as s i g n s . Gr a n t o r co v e n a n t s th a t it is th e la w f u l ow n e r of th e ab o v e - d e s c r i b e d pr o p e r t y an d ha s au t h o r i t y to co n v e y su c h ea s e m e n t . An y la w s u i t or le g a l ac t i o n br o u g h t by an y pa r t y to en f o r c e or in t e r p r e t th i s Co n s t r u c t i o n Ea s e m e n t or an y of it s te r m s or co v e n a n t s sh a l l be br o u g h t in th e Ki n g Co u n t y T E M P O R A R Y CO N S T R U CT I O N EA S E M E N T Pa g e 3of 9 Pa g e s P ar c el No . 20 2 3 0 5 9 10 9 AGENDA ITEM #6. d) >£3 : 41 : 1 . . . E- r ' r ' l - r l l - -r - — - - . - - I | J - h . .r - I I I E E ? ' I _ . ha r ‘ r r h , n— p - I - a - w — t — I - h g l r a — 41 3 * ” ; 1, “ ; -" . I ' -" ': ‘ - " + . .E - ‘ - u - $ 1 - - _ - ' - L — - : ‘ I ' l l - l l ‘ - I l l 1 * - " ¥ -I -. % : I I I — " - I i l l Il d F H H — I t l — i ' d l a — I ' I l — u l p — l - ? .- TH . “ ?' - = . ' H Ir d n w - h r — I ' l I — ‘ q '? i - F I E - '? l ' :. - ' _ - - | . _ E' E L ' F : '- _' - l " EH ” : '- . : -_ 5 : _ '7 7 ! . Su p e r i o r Co u r t fo r t h eSt a t e ofWa s h i n g t o n at th eMa l e n g Re g i o n a l Ju s t i c e Ce n t e r inKe n t , Ki n g Co u n t y , Wa s hi n g to n , or it s re p l a c e m e n t or su c c e s s o r . It is un d e r s to o d an d ag r e e d th a t de l i v e r y of th i s Co n s t r u c t i o n Ea s e m e n t ishe r e b y te n d e r e d an d th a t tte r m s an d ob l i g a t i o n s he r e o f s h a l l no t be c o m e bi n d i n g up o n th e Ci t y of Re n t o n , un l e s s un t i l ac c e p t e d an d ap p r o v e d he r e o n inwr i t i n g by th e Ci t y ofRe n t o n . Da t e d : ,20 _ Gr a n t o r — Ci t y Re nt o n: Ar m o n d o Pa v on e , Ma y or , Ci t y ofRe n t o n Ja s o n A. Se t h Ci t y Cl e r k Ap p r o v e d a s t oLe g alFo r m T E M P O R A R Y CO N S T R U C TI O N EA S E M E N T Pa g e 4of9Pa g e s By : Sh a n e Ma lo n e Ci t y At t o r n ey Cl b 9- 5 - 2 4 (29 56 ) BY Ar m o n d o P av o ne It s Ma y or P a r c el No . 20 2 3 0 5 9 10 9 A tt AGENDA ITEM #6. d) ": - - ' - ' "F T " ar r “ ; — -' - \ . | , —- Js m ' m n - Tn ; u H. . I u : - . , g a . - 51 “ . “, 7 — 1 — .- | _ . _ i. - _ . Ac c e p t e d an d Ap p r o v e d Gr a n t e e o By : La n n e t t e Sa r g e n t It s Mo d e r a t o r Un i t ed Ch ri s ti a nCh u r c h Da t e : [0 ’ 06 T E M P O R A R Y CO N S T R U CT I O N EA S E M E N T Pa g e 5of9Pa g e s AGENDA ITEM #6. d) I' : - " ' E : 5- . 3- 5 . d— Ir , - ._ -- . ' - H . - .. . I . .I -. . . ._ . ?- u - h u l l é - L -' - - + . - 1'-. l - . - i : . - | - . | : . = I tr a n q u i l - l u l l ! -' - " {? n i t ? - r l - r - n -_ ' . i' : ' . - _ _. r ; _ . - _I - I - ' h+ - ; - — I - " — I - . iI H I ? T ‘ ih — F — u ‘ a ?i p — I - . r- l - I - I - l - h ' r I - i u - L I 1 H Ju l i - ' 1 . - m— l - I - " w ? ? J I - I - .. ”? - _. ?' l l — L l l l f l i ' h - q — _ I- h — .i — L — u ' 'l . - _ = _ ni l - I n — I I - I - I - Q F — J g ?b u l a - g u y : ST A T E OF WA S H I N G T O N ) SS CO U N T Y OF ’ ) On th i s da y of _ , 20 L , be f o r e m e, th eun d e r s ig n e d , aNo t a r y Pu b l i c in an d fo r th e St a t e of Wa s h i n g t o n , du l y co m m i s s i o n e d a n d sw o rn , pe r s o n a l l y ap p e a r e d AR M O N D O PA V O N E to me kn o w n to be th e pe r s o n ( s ) wh o si g n e d a s MA Y OR ofCI T Y OFRE N T O N , th e Wa s h i n g t o n mu n i c i p a l co r p o r a t i o n th a t ex e c u t e d th e wi t h i n an d fin s t r u m e n t , an d ac k n o w l e d g e d sa i d in s t r u m e n t to be hi s fr e e an d vo l u n t a r y ac t an d an d th e fr e e an d vo l u n t a r y ac t an d de e d of sa i d Wa s h i n g t o n mu n i c i p a l co r p o r a t i o n fo r th e us e s an d pu rp os es th e r e i n me n t i o n e d ; an d onoa t h st a t e d th a t he wa s au t h o r i z e d to ex e c u t e th e sa i d in s t r u m e n t on be h al f of sa i d Wa s h i n g t o nmu n i c i p a l co r p o r a t i o n . IN WI T N E S S WH E R E O F I ha v e he r e u n t o se t my ha n d an d of f i c i a l se a l tda y an d ye a r ?r s t ab o v e wr i t t e n . (S i g n a t u r e of (P r i n t or st a m p ofNo t a r y ) NO T A R Y PU B L IC inan d fo r th e St a t e ofWa s h i n g t o n , re s i d i n g at My Ap p o i n t m e n t Ex pi r es : T E M P O R A R Y CO N S T R U CT I O N EA S E M E N T Pa g e 6of9Pa g e s AGENDA ITEM #6. d) (4 J 4 ST A T E OF WA S H I N G T O N ) SS CO U N T Y OF 5 ’7 z ) . 52 % ,i — ... On th I s da y of 06 05 6 r 2, 0 l ’r ’ , be f o r e th e un d e r S I gn e d , aNo t a r y Pu b I I c In an d fo r th e St a t e of Wa s h i n g t o n , du l y co m m i s s i o n e d sw o r n, er s o n a l l y ap p e a r e d 1. MA C / V t 52 1 / *0 me kn o w n to be th e pe r s o n ( s ) wh o si g ne d ac h n n(54 f fo f ot / r n an Ad th e Wa s h i n g t o n mu n i c i p a l co r p o r a t i o n th atex e c u t e dth eWI t h i n an d fo r e g o m g in s t r u m e n t , an d ac k n o w l e d g e d sa i d in s t r u m e n t to be hi s/he r fr e e an d vo l u n t a r y ac t an d de e d an d th e fr e e an d vo l u n t a r y ac t an d de e d of sa i d Wa s h i n g t o n mu n i c i p a l fo r th e us e s an d pu r p o s e s th e r e i n me n t i o n e d ; an d on oa t h st a t e d th a t he / s h e wa s au t h o r i z e d tex e cu t eth e sa i d in s t r u m e n t on be h a l f of sa i d Wa s h i n g t o n mu n i c i p a l co r p o r a t i o n . IN WI T N E S S WH E R E O F I ha v e he r e u n t o se t my ha n d an d of f i c i a l se al th eda y an d ye a r ?r s t ab o v e wr i t t e n . Si na t u r e of LA V O N PE A C O C K ( No t a r y Pu b l i c 2a. V0 ” ‘K“M* St a t e «W a s h i n g t o n (P r i n t or st a m p n aofNo t a r y ) Co m m i s s i o n 3 20 1 0 3 6 8 9 NO T A R Y PU B LI C Inadfo r th e St a t e ofWa s h i n g t o n , My m' Ex p i r e s M" 23 ’ 2° 2 8 re s i d i n g at V? / fz “ ! My Ap p o i n t m en t Ex p ir e s :ma r 3go o l g T E M P O R A R Y CO N S T R U CT I O N EA S E M E N T Pa g e 7of9Pa g e s AGENDA ITEM #6. d) ?“ - * ' r r " . 2 7 r _ ' 1 " : . ' - . - = - - f . . : _ ‘ ' "I T - “ 1 7 ' ?u ; u 'I - r- ‘ ; : - . EX H I B I T ”A " EN T I R E PA R C E L LE G A L DE S C R I P T I O N Th a t po r t i o n of th e So u t h e a s t 1/ 4 of Se c t i o n 20 , To w n s h i p 23 No rt h , Ra ng e5Ea s t , W. M . de s c r i b e d as fo l l o w s : Be g i n n i n g at th e no r t h e a s t co m e r of sa i d su b d i v i s i o n ; th e n c e S 01 ° 5 0 ’ 3 8 ” W. al o n g th e ea s t e r l y li m i t s of sa i d su b d i v i s i on , adi s t a nc e of64 6 . 6 2 fe e t to th e tr u e po i n t of be g i n n i n g ; th e n c e N 88 ° 0 9 ’ 2 2 ” W, a di s t a n c e of 30 . 0 0 fe e t ; th e n c e S 46 ° 5 0 ’ 3 8 ” W, a di s t a n c e of 76 6 . 9 2 fe e t al o n g th e no r t h we s t e r ly ma r g i n of th e Fi r s t Ch r i s t i a n Ch u r c h pr o p e r t y as re c o r d e d un d e r Ki n g Co u n t y Fi l e No . 56 1 5 5 9 3 ; th e n c e N 43 °0 9 ’ 2 2 ” W, a di s t a n c e of 56 1 . 3 5 fe e t to a po i n t on th e ma r g i n of Pu g e t Dr i v e as re c o r d e d un d e r Ki n g Co u n t y Au d i t o r ’ s ?l e No . 58 01 09 6; th e n c e N 40 ° 0 0 ’ 0 5 ” E al o n g sa i d so u t h e a s t e r l y ma r g i n , a di s t a n c e 52 2.57 fe e t toapo i n t of cu r v e ; th e n c e co n t i n u i n g al o n g sa i d so u t h e a s t e r l y ma r g i n on a cu r v e to t h e ri g htha v i n g ara d i u s of 41 6 . 8 7 fe e t , an ar c di s t a n c e of 69 0 . 2 7 fe e t ; th e n c e co n t i n u i n g al o n g sa i d ma r g i n S 45 ° 0 7 ’ 3 5 ” E, a di s t a n c e of fe e t toapo i n t on th e ea s t e r l y li m i t s of sa i d su b d i v i s i o n ; th e n c e S 01 ° 5 0 ’ 3 8 ” W, a di s t a n c e of 28 0 . 8 8 fe e t al o n g sa i d ea s t e r ly li m it s toth e tr u e po i n t of be g i n n i n g . Co n t a i n i n g 12 . 9 7 ac r e s , mo r e or le s s . T E M P O R A R Y CO N S T R U CT I O N EA S E M E N T Pa g e 8of9Pa g e s AGENDA ITEM #6. d) EX H I B I T”B " TE M P O R A R Y CO NS TR UC TI ON EA S E M E N T LE G A L DE S C R I P T I O N An d EX H I B I T"C " GR AP HI C DE P I C T I O N onne x t 2pa g e s ) T E M P O R A R Y CO N S T R U CT I O N EA S E M E N T Pa g e 9of 9 Pa g e s P a r c el No . 20 2 3 0 5 9 10 9 AGENDA ITEM #6. d) TE M P O R A R Y CO N S T R U C T I O N EA S E M E N T LE G A L DE S C R I P T I O N TH E SO U T H W E S T 55 . 0 0 FE E T OF TH E FO L L O W I N G DE S C R I B E D PR O P E R T Y , LY I N G AD J A C E N T TO LO T S 11 3 , 11 4 , 11 5 , 12 2 , 12 3 AN D 12 4 OF TH E PL A T OF RO L L I N G HI L L S VI L L A G E No . 3, RE C O R D E D IN VO L U M E 81 , PA G E S 97 AN D 98 , RE C O R D S OF KI N G CO U N T Y , WA S H I N G T O N . TH A T PO R T I O N OF TH E SO U T H E A S T QU A R T E R OF SE C T I O N 20 , TO W N S H I P 23 NO R T H , RA N G E 5 EA S T , W. M . IN KI N G CO U N T Y WA S H I N G T O N , DE S C R I B E D AS FO L L O W S : CO M M E N C I N G AT TH E NO R T H E A S T CO R N E R OF SA I D SU B D I V I S I O N ; TH E N C E SO U T H 01 ° 5 0 ’ 3 8 " WE S T , AL O N G TH E EA S T MA R G I N OF SA I D SU B D I V I S I O N , 64 6 62 FE E T TO TH E TR U E PO I N T OF BE G I N N I N G ; TH E N C E NO R T H 88 ° 0 9 ' 2 2 " WE S T , 30 FE E T ; TH E N C E SO U T H 46 ° 5 0 ’ 3 8 " WE S T , 76 6 . 9 2 FE E T AL O N G TH E NO R T H W E S T E R L Y MA R G I N OF PR O P E R T Y DE E D E D TO TH E FI R S T CH R I S T I A N CH U R C H UN D E R RE C O R D I N G No . 56 1 5 5 9 3 ; TH E N C E NO R T H 43 ° 0 9 ' 2 2 " WE S T , 56 1 . 3 5 FE E T , MO R E OR LE S S , TO TH E SO U T H E A S T E R L Y MA R G I N OF PU G E T DR I V E SO U T H E A S T ; TH E N C E NO R T H 40 ° 0 0 ’ 0 5 " EA S T , AL O N G SA I D SO U T H E A S T E R L Y MA R G I N , 52 2 . 2 7 FE E T TO A PO I N T OF CU R V E ; TH E N C E CO N T I N U I N G AL O N G SA I D SO U T H E A S T E R L Y MA R G I N ON A CU R V E TO TH E RI G H T , HA V I N G A RA D I U S OF 41 6 . 8 7 FE E T , A DI S T A N C E OF 69 0 . 2 7 FE E T ; TH E N C E CO N T I N U I N G AL O N G SA I D MA R G I N , A DI S T A N C E OF 46 . 6 7 FE E T TO TH E EA S T E R L Y LI N E OF SA I D SU B D I V I S I O N ; TH E N C E SO U T H 01 ° 5 0 ’ 3 8 " WE S T , AL O N G SA I D EA S T E R L Y MA R G I N , 28 0 . 8 8 FE E T TO TH E TR U E PO I N T OF BE G I N N I N G . CO N T A I N I N G 31 , 0 5 1 SQ U A R E FE E T , OR 0. 7 1 AC R E S MO R E OR LE S S . III I / I ’ l l Il l / I I I , I I I / / / A \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ | 'I \\ \ \ \ ‘ Il l / I l l / I / 91 / 1 1 / 1 1 I / I / I / I / I / l / I / . \ \ \ \ \ w \\ \ \ x \ \ \ \ \\ \ \ \ \ \ \ \\ \V \\ \ \ \ VI I I / I l l ] ! ! ! \ ’1 . “ 1 ‘I \\ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ V I / I / I / I I / l l f ? ? l l l I 22 2 9 8 —H A RRI D G E 22 2 9 8 L .0 0 4 —RD L JU L Y 2 3 , 20 24 AGENDA ITEM #6. d) I[I I I / I I I II I / I ’ l l ! I f / I ’ A \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ | ' I \\ \ \ ‘ Vl / I / f / I l l / I / I / I l l l / I / ’I l / l l I / I I / l / l / I l l l l l l . \ \ \ \ \ \ V \\ \ \ x \ \ \ \ \ ‘\ ‘ \ Ir5, f f r5lg I’II, ,\ ‘ ‘\\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ ’ / I W ’ I / I / l / I / ? l f / J / I I l l ‘ /\ \ I I Fi l e : P : \ 2 2 0 0 0 5 \ 2 2 2 9 8 \ s u r v e y \ 2 2 2 9 8 e x h 0 1 - t e m p c o n s t . d w g Da t e / ‘ ? m e z 7 / 2 3 / 2 0 2 4 10 : 5 1 AM RY A N LE E . JO B NU M B E R HO R I Z O N T A L 1" = 1 o o ' VE R T I C A L N/ A HA R M O N Y 22 2 9 8 RI D G E Ba r g h a u s e n 22 2 9 8 L . 0 0 4 . D O C ' E ie e r s , l . Co n s u l t i n g ng n "c Tl t l e : SH E E T Li i i i v 2 2 § § 5 § ¥ e s ° m h OF F S I T E TE M P O R A R Y 42 5 . 2 5 1 . 6 2 2 2 ba r g n a u s e m m co n s m u c n o u EA S E M E N T 1 f1 DE S I G N E D DR A W N M CH E C K E D _ AP P R O V E D BD L DA T E 7 El i } . AGENDA ITEM #6. d) PROPOSED 55-WIDE TEMP. CONSTRUCTION EASEMENT PROPOSED HARMONY RIDGE DEVELOPMENT UNITED CHRISTIAN CHURCH ROLLING HILLS RESERVOIR PROPERTY TEMPORARY CONSTRUCTION EASEMENT FOR STORM DRAINAGE AND SANITARY SEWER SYSTEM FOR HARMONY RIDGE DEVELOPMENT AGENDA ITEM #6. d) 1 CITY OF RENTON, WASHINGTON RESOLUTION NO. _______ A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING THE MAYOR AND CITY CLERK TO ENTER INTO AN INTERLOCAL AGREEMENT WITH THE CITY OF SEATTLE FOR THE PURPOSE OF PARTICIPATING IN THE WASHINGTON STATE INTERNET CRIMES AGAINST CHILDREN TASK FORCE LED BY THE U.S. DEPARTMENT OF JUSTICE. WHEREAS, the City and The City of Seattle are authorized, pursuant to RCW Chapter 39.34, the Interlocal Cooperation Act, to enter into an interlocal government cooperative agreement; and WHEREAS, the United States Department of Justice (DOJ) Office of Juvenile Justice and Delinquency Prevention (OJJDP) has created the Internet Crimes Against Children (ICAC] Task Force Program to assist state, county and local law enforcement agencies in developing an effective response to technology-facilitated child sexual exploitation; and WHEREAS, the ICAC Task Force Program is a national network of 61 coordinated task forces representing more than 3,500 federal, state, and local law enforcement and prosecutorial agencies; and WHEREAS, the Seattle Police Department (SPD) has been designated by OJJDP as the “Lead Agency” to oversee the multi-jurisdictional Washington State Internet Crimes Against Children Task force (WA ICAC TF) intended to combat crimes related to the sexual exploitation, enticement and victimization of children through the internet, online communication systems, telecommunications technology and other computer technology; AGENDA ITEM # 8. a) RESOLUTION NO. _______ 2 NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: SECTION I. The Mayor and City Clerk are hereby authorized to enter into an interlocal agreement with The City of Seattle in order to participate The Washington State Internet Crimes Against Children Task Force, attached hereto as Exhibit “A” and incorporated by this reference. PASSED BY THE CITY COUNCIL the day of , 2024. Jason A. Seth, City Clerk APPROVED BY THE MAYOR this day of , 2024. Armondo Pavone, Mayor Approved as to form: Shane Moloney, City Attorney RES- PD:24RES024:10/02/2024 AGENDA ITEM # 8. a) RESOLUTION NO. _______ 3 EXHIBIT “A” INTERAGENCY AGREEMENT BETWEEN THE WASHINGTON STATE INTERNET CRIMES AGAINST CHILDREN TASK FORCE ACTING THROUGH THE CITY OF SEATTLE POLICE DEPARTMENT AND RENTON POLICE DEPARTMENT AGENDA ITEM # 8. a) AGENDA ITEM # 8. a) AGENDA ITEM # 8. a) AGENDA ITEM # 8. a) AGENDA ITEM # 8. a) AGENDA ITEM # 8. a) AGENDA ITEM # 8. a) 1 CITY OF RENTON, WASHINGTON RESOLUTION NO. _______ A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, ADOPTING THE NORTHEAST RENTON PARK MASTER PLAN WHEREAS, the City began the process of developing a plan for the Northeast Renton Park in the fall of 2023; and WHEREAS, much of the land comprising the Northeast Renton Park site was acquired with grants from the State Recreation and Conservation Office in the early 1990s, which require timely development of outdoor recreation facilities; and WHEREAS, the plan was developed with extensive public outreach and in conjunction with residents and other stakeholders; and WHEREAS, the plan identifies implementation strategies to facilitate the redevelopment of the site to support outdoor recreation; and WHEREAS, the plan aligns with the goals of the May Creek Basin Action Plan which aims to conserve and restore habitat and to provide passive trail access along the May Creek Greenway between Lake Washington and Coungar Mountain Wildlands Park; and WHEREAS, the plan aligns with the May Valley Urban Separator purpose and intent as further described in RMC 4-3-110; and WHEREAS, the plan is in alignment with the recommendations of the Parks, Recreation, and Natural Areas Plan adopted by City Council through Resolution No. 4398; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: AGENDA ITEM # 8. b) RESOLUTION NO. _______ 2 SECTION I. The above recitals are found to be true and correct in all respects. SECTION II. The Northeast Renton Park Master Plan, attached hereto as Exhibit A, is adopted by the City of Renton. PASSED BY THE CITY COUNCIL the day of , 2024. ______________________________ Jason A. Seth, City Clerk APPROVED BY THE MAYOR this day of , 2024. ______________________________ Armondo Pavone, Mayor Approved as to form: Shane Moloney, City Attorney RES- P&R:24RES020:08/28/2024 AGENDA ITEM # 8. b) RESOLUTION NO. _______ 3 EXHIBIT A Northeast Renton Park Master Plan AGENDA ITEM # 8. b) August 2024 Northeast Renton Park Master Plan AGENDA ITEM # 8. b) Northeast Renton Park Master Plan August 2024 ACKNOWLEDGEMENTS The City of Renton gratefully acknowledges the contributions of the following individuals and groups who have made this Master Plan possible: City of Renton Parks and Recreation Maryjane Van Cleave, Parks and Recreation Administrator Cailín Hunsaker, Parks and Trails Director Jennifer Spencer, Acting Recreation Director Jason Lederer, Parks Planning Manager and Project Manager Betsy Severtsen, Capital Project Coordinator Ian Gray, Urban Forestry and Natural Resources Manager Steve Brown, Parks Maintenance Manager Bryce Goldmann, Parks Maintenance Supervisor David Peterson, Parks Maintenance Supervisor Rhemy King, Neighborhood Programs Coordinator Gabriela Golzarian, Inspecting Arborist Mikaela Goodwin, Community Engagement Leader Claire Wilkinson, Community Engagement Leader Community and Economic Development Alex Morganroth, Principal Planner Nathan Janders, Development Engineering Manager Samuel Stolmeier, Construction Engineer Public Works Joe Farah, Surface Water Engineering Manager Joe Stowell, Wastewater Utility Manager Ellen Talbo, Transportation Planning Manager Executive Services Angel Laycock, Communications Manager Samuel Severson, Communications Specialist Master Planning Consultant Team Anchor QEA (Prime Consultant) Anna Spooner, Principal Landscape Architect and Project Manager Rachel Andersen, Landscape Architect Zheng Fang, Senior Graphic Designer Ann Costanza, Principal Planner Reid Farnsworth, Landscape Designer Cat Wallace, Technical Editor Colleen Burner, Technical Editor Clearway Environmental Chad Durand, Environmental Manager Rachel Crowley, Environmental Scientist Jim Hearsey, Environmental Scientist AGENDA ITEM # 8. b) Northeast Renton Park Master Plan i August 2024 EXECUTIVE SUMMARY Over the last 30 years, the City of Renton has acquired an 18.5-acre assemblage of parcels with the intent to develop a new park in Northeast Renton. Located along May Creek and within the May Valley Urban Separator, this new park will support the broader May Creek Greenway vision and action plan, which aims to conserve and restore habitat, and create a trail corridor extending from the mouth of May Creek at Lake Washington eastward to King County’s Cougar Mountain Regional Wildland Park. Situated within the City’s East Plateau planning area, this new park will fill a notable gap in a community currently underserved by parks, where many residents lack easy access to recreational spaces within a quarter-mile or even half-mile of their homes. The new Northeast Renton Park offers the City a unique opportunity to act on its mission to provide exceptional parks and recreational opportunities that enrich the health, wellness, and quality of life for all Renton residents while ensuring equitable access and the preservation of its natural resources and history. The master planning process, which initiated in the fall of 2023, was strategically timed following the recent acquisition of a new park parcel. Initial outreach and engagement efforts aimed to a refine a park vision and develop a design to meet a variety of goals and needs. The effort also aligned with both new and longstanding obligations, including those tied to grants from the Washington State AGENDA ITEM # 8. b) Northeast Renton Park Master Plan ii August 2024 Recreation and Conservation Office dating back to the early 1990s, which require timely development of outdoor recreation facilities. The master planning process also drew upon the 2020 Parks, Recreation, and Natural Areas Plan, which had outlined an early concept for the park featuring conserved forested upland, riparian, and wetland areas, winding trails, and a central amenity space. From fall of 2023 through spring of 2024, the City engaged stakeholders and the community to gather input on opportunities and design concepts for the new Northeast Renton Park. The result is a park Master Plan and concept design that honors the unique landscape and offers a blend of active and passive recreation, including a comprehensive trail network through restored and enhanced habitats. The Master Plan not only advances goals for habitat conservation and trail connectivity but also addresses the broader needs of the community and fulfills long-term grant obligations. Guided by Renton Parks and Recreation’s commitment to sustainability, the plan balances three core priorities: enhancing community health and wellness, fostering environmental resilience, and promoting social equity. These principles are woven into the park’s design and development, ensuring it meets today’s recreational needs while contributing to a sustainable and inclusive future for all Renton residents. Furthermore, it aligns with key goals from the 2020 Parks, Recreation, and Natural Area Plan, including Filling Gaps in Service, Creating a Connected System, and Protecting and Conserving Natural Resources. The design concept includes parking for vehicles, accessible pedestrians and cyclist access points, restrooms, picnic shelters and seating, and a large nature play area. A network of paths and trails – featuring paved, soft surface, and raised boardwalks – will guide visitors through diverse landscapes and habitat areas, including forested slopes, wetlands, and scenic viewpoints of May Creek. Future parcel acquisition may allow for additional amenities such as sports courts, an off-leash dog area, and environmental education opportunities. The estimated total project cost for the design, permitting, and implementation ranges between $5,200,000 and $6,700,000. The low-end cost reflects the installation of portable toilets with a custom enclosure structure and does not include park improvements on the future parcel. The high-end cost reflects the installation of a restroom with a sewer connection and a full build out of the future parcel. Trail concept at the Northeast Renton’s new park AGENDA ITEM # 8. b) Northeast Renton Park Master Plan iii August 2024 CONTENTS EXECUTIVE SUMMARY ...................................................................................................................... i INTRODUCTION ................................................................................................................................. 1 1 VISION .......................................................................................................................................... 5 2 ENGAGEMENT ............................................................................................................................ 7 2.1 Community and Stakeholder Groups .......................................................................................................... 7 2.2 Community Engagement ................................................................................................................................. 8 2.3 City Stakeholder Engagement ..................................................................................................................... 11 3 PARK ELEMENTS ...................................................................................................................... 13 3.1 Access ................................................................................................................................................................... 16 3.2 Trails, Boardwalks, and Nodes ..................................................................................................................... 17 3.3 Public Safety ....................................................................................................................................................... 21 3.4 Habitat Enhancement ..................................................................................................................................... 21 3.5 Recreation and Amenity Areas .................................................................................................................... 22 3.6 Additional Park Features ............................................................................................................................... 23 3.7 Future Potential Expansion Area ................................................................................................................ 25 4 COST SUMMARY ..................................................................................................................... 26 4.1 Construction Costs ........................................................................................................................................... 26 4.2 Design, Permit, and Management Fees ................................................................................................... 29 4.3 Cost Escalation .................................................................................................................................................. 29 5 IMPLEMENTATION .................................................................................................................. 31 5.1 Permit Feasibility .............................................................................................................................................. 31 5.2 Phasing Considerations ................................................................................................................................. 34 5.3 Funding Opportunities ................................................................................................................................... 35 6 REFERENCES ............................................................................................................................. 37 TABLES Table 1 Key Stakeholders, Community Groups, and Staff ......................................................................... 8 Table 2 Master Plan OPCC Summary ............................................................................................................... 27 Table 3 Park Development and Habitat Enhancement OPCC Summary ......................................... 27 AGENDA ITEM # 8. b) Northeast Renton Park Master Plan iv August 2024 Table 4 Design, Permit, and Management Fee Summary ...................................................................... 29 Table 5 Total Master Plan Cost with Escalation Summary ...................................................................... 30 Table 6 Environmental Permitting Requirements ...................................................................................... 32 Table 7 Potential Grant Funding Sources ....................................................................................................... 35 FIGURES Figure 1 Future Park Location .................................................................................................................................. 2 Figure 2 Park Planning Area Boundary and Adjacent Properties ............................................................. 3 Figure 3 Community Engagement Summary .................................................................................................... 9 Figure 4 Community Engagement Summary ................................................................................................. 10 Figure 5 Preferred Concept Plan .......................................................................................................................... 14 Figure 6 Preferred Concept Sections ................................................................................................................. 15 Figure 7 Trail Map ....................................................................................................................................................... 18 APPENDICES Appendix A Existing Information Summary Report Appendix B Conceptual Design Alternatives Appendix C Community Engagement Data Appendix D City Stakeholder Meeting Notes Appendix E Opinion of Probable Costs AGENDA ITEM # 8. b) Northeast Renton Park Master Plan v August 2024 ABBREVIATIONS ADA Americans with Disabilities Act City City of Renton CPTED Crime Prevention Through Environmental Design CWA Clean Water Act CZMA Coastal Zone Management Act DAHP Washington State Department of Archaeology and Historic Preservation Department City of Renton Parks and Recreation Department Ecology Washington State Department of Ecology EPA U.S. Environmental Protection Agency ESA Endangered Species Act FEMA Federal Emergency Management Agency Greenway May Creek Greenway JARPA Joint Aquatic Resources Permit Application LID Low-Impact Development Master Plan Northeast Renton Park Master Plan NEPA National Environmental Policy Act NFWF National Fish and Wildlife Foundation NMFS National Marine Fisheries Service NPDES National Pollutant Discharge Elimination System OPCC Opinion of Probable Construction Costs Park Northeast Renton Park PEM palustrine emergent marsh PFO palustrine forested wetland PSS palustrine scrub shrub RCO Recreation and Conservation Office RCW Revised Code of Washington SEPA State Environmental Policy Act USACE U.S. Army Corps of Engineers USFWS U.S. Fish and Wildlife Service WDFW Washington Department of Fish and Wildlife AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 1 August 2024 INTRODUCTION The City of Renton (City) intends to develop a new park in Northeast Renton. Led by the City’s Parks and Recreation Department (Department), which has facilitated acquisition of the land comprising the planning area since the early 1990s, the Northeast Renton Park (Park) Master Plan (Master Plan) is an early step to develop a vision and concept design for the future Park. Nestled between May Creek to the north, Duvall Avenue NE to the southwest, and Renton’s East Plateau neighborhood to the south and east (see Figure 1), the proposed Park presents a unique blend of landscapes—forests and clearings, wetlands and streams, two previously developed home sites, and rolling topography— and the Master Plan presents an opportunity to restore and enhance these landscapes while also expanding Northeast Renton’s recreation options. The City’s 1978 Comprehensive Park & Recreation Plan identified the May Creek Greenway (Greenway), extending from the mouth of May Creek at Lake Washington east to King County’s Cougar Mountain Regional Wildland Park. The Greenway includes May Creek and its adjacent riparian setback. Over the last nearly 40 years, the cities of Renton and Newcastle, as well as King County, have acquired lands along the Greenway with a vision to conserve and enhance the corridor’s ecological function, develop a pervious trail system to connect communities with nature and provide opportunities for Photograph 1 AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 2 August 2024 environmental access and education, and support the broader water quality and conservation goals of the May Creek Basin Action Plan. Portions of the Greenway’s trail have been developed, and there are plans to connect this trail to the to the Eastside Rail Corridor (City of Renton 2024). The Master Plan offers a distinct opportunity to support the Greenway vision in Renton with outdoor recreation and to create a stronger connection between the Renton community and the surrounding ecosystem. Notably, the future Park is located in an area of Renton that is currently underserved by parks and open space (City of Renton 2020), and the Master Plan provides the City the opportunity to support its growing and diverse population through the development of a new park. Figure 1 Future Park Location Immediately to the north and west of the Park and along Duvall Avenue NE and Coal Creek Parkway SE is the City of Newcastle boundary and its May Creek Park (Figure 2). This existing park encompasses 3,100 acres and includes a trail system within the Greenway. Both Newcastle’s May Creek Park and the planned City of Renton Park fall within the Lake Washington/Cedar River/Sammamish River watersheds and Water Resource Inventory Area 8. May Creek is the third largest tributary to Lake Washington, draining the area west of Issaquah Creek and north of Cedar River, flowing through both Newcastle and Renton. The Park is located approximately 4 miles from Lake Washington. AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 3 August 2024 The Master Plan considers the entire 18.5 acres identified for a future park. As shown in Figure 2, most of this area is owned by the City of Renton, with a 1.7-acre parcel in the northwest corner still in private ownership. The City is discussing a future acquisition with the current owner of the parcel. The City also owns the parcel to the northwest of the future Park. Managed by the City’s Surface Water department, this 6.4-acre parcel includes a stormwater pond, access road, and open space. Figure 2 Park Planning Area Boundary and Adjacent Properties Note: Map provided by the City of Renton This Master Plan defines the future Park’s vision (Section 2). Heavily informed by community and City stakeholder input (Section 3), the Master Plan describes proposed Park elements (Section 4); provides a comprehensive summary of the Park’s construction costs (Section 5); and outlines an implementation strategy including permit feasibility, phasing considerations, and funding opportunities (Section 6). The Master Plan is supported by five appendices capturing specific input and technical documentation, including the following: • Appendix A: Existing Information Summary Report summarizes the existing information gathered to inform the Master Plan and to identify data gaps. This includes data layers for the AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 4 August 2024 Park basemap at neighborhood and site scales, desktop geotechnical and cultural resource technical assessments, and a natural resource inventory. • Appendix B: Conceptual Design Alternatives provides an overview of the Park’s opportunities and constraints analysis and reviews, describes the design criteria matrix used for decision-making, and reviews two design alternatives considered during master planning. • Appendix C: Community Engagement Data summarizes methods used to reach out to the community to hear input on the future Park design. • Appendix D: City Stakeholder Meeting Notes provides a summary of the discussion between the Master Plan team and City stakeholders that informed decision-making and the ultimate design. • Appendix E: Opinion of Probable Costs provides a breakdown of the probable costs as shown on the current preferred design. AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 5 August 2024 1 VISION The planned new Park in Northeast Renton provides an opportunity to contribute to the Department’s vision to foster a vibrant, inclusive, and sustainable community through the enhancement of Renton's parks and recreational services, promoting history, health, equity, and environmental stewardship. Located within the defined Greenway and along May Creek’s riparian corridor, adjacent forest canopy, and wetland resources, there is a unique opportunity to harmoniously conserve, enhance, and steward these natural resources while thoughtfully balancing development of an accessible, inclusive, and safe park with defined recreation facilities and trails that provide a connection with nature for all Park goers. The future Park’s location in the East Plateau planning area is underserved by parks; residents do not have a park within a quarter mile or even half mile of their homes that is easily accessible (City of Renton 2020). Through a continuous engagement process focused on supporting design and programming for a new Park, the Department actively listened to stakeholders, partners, and, notably, Renton residents and future Park users, in support of the Department’s mission to provide exceptional parks and recreational opportunities that enrich the health, wellness, and quality Photograph 2 AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 6 August 2024 of life for all Renton residents while ensuring equitable access and the preservation of its natural resources and history. In addition to the new Park in Northeast Renton, the City is currently planning park expansion and renovation projects in other neighborhoods, including a new park in south Renton. The neighboring City of Newcastle is also considering new recreation amenities near its border with Renton, including a new recreational sport court facility and athletic fields along SE 95th Way, just a half mile from the Master Plan’s Park site. City Neighborhood Program coordinator, Rhemy King, presents design concepts to the community. Photograph 3 AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 7 August 2024 2 ENGAGEMENT During early stages of the master planning process, the City sought to develop a plan to equitably engage stakeholders, staff, and the community in order to incorporate feedback into the design process and inform the Park design. The City developed an adaptable communications framework for reaching stakeholders, staff, and community members who are invested in the Master Plan process. This section reviews the engagement strategy and summarizes what the City heard from the community and stakeholders. 2.1 Community and Stakeholder Groups The Master Plan team identified stakeholder and community groups who may be invested in the future Northeast Renton Park (Table 1). For each identified group, the City identified a method for outreach: stakeholder group meetings, community outreach through participation in local events and gatherings, and staff-to-staff engagement. Photograph 4 AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 8 August 2024 Table 1 Key Stakeholders, Community Groups, and Staff Group Stakeholder Engagement Community Outreach Staff-to-Staff Engagement City of Newcastle  King County Department of Natural Resources and Parks Funding  Local sporting groups  Environmental Science Center  Naturalist/environmental groups  Water Resource Inventory Area 8  Renton School District  Renton Senior Citizens Advisory Board  Renton Community Services Committee  Renton Parks Commission  Renton Adaptive Recreation Program  East Plateau neighborhood groups  Renton City Council members and Mayor  Coal Creek Utility District  Renton Urban Forestry and Natural Resource  Renton Public Works  Renton Community and Economic Development  Renton Police Department  Regional Fire Authority  The City then identified a three-touchpoint approach to structure the engagement. Each touchpoint is defined by a design milestone. At each touchpoint, the City planned to participate in community events, to attend a stakeholder meeting, and to engage with committees and groups to provide Master Plan information and review Master Plan developments. The three touchpoints included the following: • Touchpoint 1 – Review Site Analysis and Site Opportunities and Constraints – February 2024 • Touchpoint 2 – Review Conceptual Design Alternatives – March and April 2024 • Touchpoint 3 – Review Draft Preferred Design Concept – June 2024 2.2 Community Engagement To provide equitable engagement, the City utilized a multipronged approach to engage a wide and representative cross section of the community. All messaging directed the community to a dedicated project website serving as a central information sharing and community engagement platform with AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 9 August 2024 surveys, message boards, polls, and other tools to communicate directly with City project staff. As an initial engagement approach, direct mailings were sent to over 4,000 addresses within a quarter mile of the future Park site. The City identified key community events to attend and share Master Plan information. Master Plan representatives from the City set up tables and Master Plan information boards at local events. This included setting up at the Renton Community Center on Saturdays during Youth Basketball season and participating in Adaptive Recreation meetings on Thursdays at the Senior Center. The City was present on weekends at the Highland Neighborhood Center, set up a Master Plan booth at the City’s Sustainability Event, and was present at two farmers markets. Throughout the Master Plan, the City has also maintained a consistent online presence, posting updated Master Plan information such as conceptual design alternatives and polls for regular feedback on a dedicated project website, shared information in City newsletters and utility billings, and posted to City social media platforms. Figure 3 graphs the engagement over time, noting spikes during each touchpoint (a larger version of this figure is included in Appendix C). Between February 2023 and June 2024, the City’s project website received more than 7,000 page views (each time the website was visited including repeat views) and recorded over 3,000 unique visitors. Figure 3 Community Engagement Summary Community engagement during Touchpoint 2 presented two design options. Design Option 1 maximized ecological enhancements such as wetland and wetland buffer enhancements and provided trails and a central recreation node. Design Option 2 proposed more recreation including sport courts, more trails, and a larger central recreation area. During this Touchpoint, the City asked the community how much value they placed on a variety of Park elements, on a scale of “strongly agree” to “strongly disagree.” Figure 4 summarizes the feedback (a larger version of this figure is included in Appendix C). AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 10 August 2024 The public overwhelmingly supported additions such as trails and boardwalks, neighborhood and regional trail connections, access and views to May Creek, rain gardens and native plantings, and open lawn space. The responses were more neutral for elements such as an environmental education shelter, amphitheater, public art, cultural garden, and the addition of traditional park facilities. Responses were variable for elements such as tennis, pickleball, and basketball courts. Figure 4 Community Engagement Summary 2.2.1 Summary of Public Comments Throughout community engagement, participants commented on key themes. The following provides a high-level summary of the comments received. Appendix C provides a comprehensive summary of the engagement feedback. AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 11 August 2024 2.2.1.1 Nature and Trails Engagement results indicate the public overwhelmingly supports trails and access to nature as a focus of the Park. Participants commented on the desire for green spaces and natural areas to be preserved and for the development of walking trails and boardwalks connecting the new Park to City of Newcastle trails and other nearby trails. Participants also favorably commented on stewardship and environmental education, in the form of an environmental education center, outdoor classroom, and educational signs. This theme extended to a nature play area for children, as well. However, there was some concern expressed about the nearby stormwater pond attracting mosquitoes, built trails affecting wetlands, and some expressed concern that introducing lighting to the Park may disturb the existing wildlife along the adjacent Greenway corridor. 2.2.1.2 Recreation Facilities Engagement results yielded mixed opinions for what recreation facilities should be included in the Park. The public expressed that they would prefer a permanent restroom over portable toilets, picnic shelters, grills, outdoor exercise equipment, and public art. They also wanted a children’s nature play area with swings, rock climbing, and a zipline. Sports facilities, including pickleball and basketball courts, a skatepark, disc golf, pump track, and an open sports field were also requested. The idea of an off-leash dog park was met with both approval and concern, with some expressing that this was an important necessity and amenity for the community, and others were concerned about pet feces accumulating and the fear that a dog park would attract additional dogs to an otherwise sensitive natura area. 2.2.1.3 Parking and Access The public had some concerns about the proposed parking and access and requested additional parking spaces, as well as safe crossings along Coal Creek Parkway. They expressed the importance of being able to connect new Park trails to the existing network of trails east and west of the Park. Americans with Disabilities Act (ADA)-compliant trail access was an important element to the public, as well as public transit access and bicycle access including bicycle parking. 2.2.1.4 Safety Safety concerns were brought up frequently and were of high importance to the public. Concerns about vandalism and the potential for homeless encampments were expressed, as well as fear about car break-ins, graffiti, and other crime. The public had a strong desire to make sure the Park was welcoming, maintained, and safe for their families and children. 2.3 City Stakeholder Engagement As discussed previously in this section, the City created a stakeholder group and held a meeting at each touchpoint to review the Master Plan and seek input. Stakeholders included City representatives AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 12 August 2024 from Renton Parks and Recreation, Neighborhood Programs and Urban Forestry, Community and Economic Development, and Public Works. At each of the stakeholder group meetings, Anchor QEA led with a presentation including updates to the Park master planning process along with details on Park elements, programming, and design criteria and included a summary of collected data from community outreach events. A discussion followed with time for questions and concerns. Appendix D provides meetings notes summarizing each meeting and discussion. In addition to the City stakeholder meetings, there were also presentations to the Parks Commission and Community Services Committee throughout the Master Plan process. All meetings were open to the public. Parks Commission presentations occurred on October 17, 2023; March 12, 2024; and June 11, 2024. Community Services Committee presentations occurred on January 8, 2023, and June 10, 2024. AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 13 August 2024 3 PARK ELEMENTS The proposed Park conceptual design combines a large network of trails through forests, wetlands, and along view corridors, while being careful to minimize disturbances to wetland and stream buffers as much as possible. Future trail connections are identified to the east. Areas for habitat restoration and enhancement are called out along May Creek, throughout wetlands and buffers, and throughout forested and riparian areas. A large central area contains all active recreation, including a large nature play area, portable toilets, a picnic shelter, parking for 20 vehicles in a paved lot, along with up to 12 parallel-parking spaces along the Park access road. The current privately-owned parcel contains a potential off-leash dog park and an open space that could be developed with additional Park amenities in the future. The design also includes lighting in the parking area, public art, wayfinding, trailhead kiosks and educational signage, and rain gardens. The following sections provide an overview of the proposed design elements including specific design criteria for each element, an important tool for decision making during the master planning process. Refer to Appendix B for details on the design process that led to the proposed conceptual design. Photograph 5 AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 14 August 2024 Figure 5 Preferred Concept Plan AG E N D A I T E M # 8 . b ) Northeast Renton Park Master Plan 15 August 2024 Figure 6 Preferred Concept Sections Note: Figure shows section cuts. AG E N D A I T E M # 8 . b ) Northeast Renton Park Master Plan 16 August 2024 3.1 Access Future trail connections to the east and west are proposed as separate potential developments, with hope for access to Newcastle’s May Creek Park and associated trail network. This connection would likely consist of a trail connection to the west under the Coal Creek Parkway SE bridge. A trail connection to the east via a series of land tracts associated with the Langley Ridge subdivision, all having a 15-foot-wide easement specifically for the development of a public trail (refer to Langley Ridge at May Creek Plat – Recording No. 20080212000465), provides additional options for access and routes to the nearby King County trail network. These trail connections encourage regional access in alignment with the 2019 Renton Trails and Bicycle Master Plan (City of Renton 2019) by connecting the Park to the Greenway and offering users the opportunity to access trails that stretch from Lake Washington to Cougar Mountain. The Master Plan provides direct access to the neighborhood just south of the Park site, adjacent to Duvall Avenue NE using a walkable route from the dense residential area to the Park. In addition, the Master Plan identifies the need for a new safe crossing at 24th Street and Duvall Avenue NE to improve safety and allow pedestrians to access the existing sidewalk on the west side of Duvall Avenue NE as they walk north to the Park entry. Vehicular access is provided in the Master Plan through an improved access road and a new parking area with space for 20 vehicles, including two ADA stalls, and a firetruck turnaround. The access road includes a crushed gravel shoulder wide enough to accommodate 12 additional parallel-parking spots during peak visiting time. In addition, bike parking is provided near where the access road terminates near the Park’s proposed trailhead. Access Design Criteria • Connect to existing May Creek Greenway trails • Provide trail connections to Renton neighborhoods • Provide parking • Avoid impact to adjacent properties AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 17 August 2024 To treat stormwater generated within the Park, Low-Impact Development (LID) elements are proposed. Rain gardens and vegetated swales run along the proposed access road and the Park area to intercept, convey, and treat stormwater runoff from the proposed impervious surfaces. The LID features will also reduce flooding and erosion during large rain events. There is also the opportunity to use permeable paving such as permeable pavers or permeable asphalt as the surfacing for trails and the parking area. 3.2 Trails, Boardwalks, and Nodes In addition to increasing access to the Park, an extensive trail system is proposed within the Park. The trail system includes a mile of trail loops and segments with access to the site’s wetlands, riparian forest and down to the May Creek floodplain (Figure 7). Rain gardens along parking area Photograph 6 Trail Design Criteria • Maximize trail development within the Park • Consider permit feasibility AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 18 August 2024 Figure 7 Trail Map AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 19 August 2024 The Wetland Loop Trail is approximately 0.4 mile long. It begins near the active recreation area at the trailhead kiosk and loops along and through a series of wetland complexes. The trail alternates between a 5-foot-wide crushed gravel trail and a raised 5-foot-wide composite boardwalk in wetland areas, both ADA-accessible. The boardwalk would be built on enclosed floatation-filled recycled tires and treated timber sleepers and joists to minimize impacts to the sensitive habitat. The trail design is intended to maximize views of the wetland’s reeds, cattails, and native animals and birds. The May Creek Access Trail begins near the active recreation area and is approximately 0.08 mile long. This trail is a 5-foot-wide permeable gravel trail with sections of stairs where slopes are too steep to accommodate a gravel trail. The trail loops away from the active area along a section of historical roadway, alongside a steep slope, eventually declining into a flat floodplain of mossy trees, ferns, and skunk cabbage. The trail terminates at a large viewing area oriented toward May Creek. Though this trail is not ADA-accessible due to existing steep terrain, all efforts would be made to make it as user-friendly as possible. The Forest Trail starts at the alternative Park entrance at the southwest corner of the Park and ends at the main trailhead near the parking area. This trail is approximately 0.23 mile long with an elevation change of approximately 60 feet. This trail is also a 50-foot-wide gravel trail with sections of stairs. It loops through a forest of mixed deciduous and conifer trees with a native understory of ferns, salmonberry, and vine maple. Similar to the May Creek Access Trail, the Forest Trail is not ADA-accessible due to existing steep terrain; all efforts would be made to make it as user-friendly as possible. Paved Park trails provide ADA connections between the Park entry and parking area to all active areas including the play area, trailhead kiosk, picnic shelter, and future development area. These trails are hard-surface trails and 5 feet wide. Example of wetland boardwalk Example of permeable trail through a restored habitat Photograph 7 Photograph 8 AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 20 August 2024 Trail nodes are widened gathering spaces that have been placed at regular intervals and at intersections of the proposed trails. These nodes provide a place to rest on a bench, take in the views, reorient, or read through cultural or environmental information provided by interpretive signage. Nodes take the form of both surface-level, gravel spaces and elevated boardwalk viewing platforms. Trailhead and wayfinding signage will be placed strategically along the trail system. A large entry trailhead kiosk is proposed near the parking area. This kiosk may include a map of the Park with distances and directional information, along with relevant information about the history and ecology of the Park. Smaller trailhead portal post signs will be placed at the beginning of each trail loop or section and at junction points along the trails. These portal posts will provide wayfinding for visitors to use to orient themselves and select a walking route. Interpretive signage will be placed at nodes and viewpoints to give visitors a deeper understanding of and appreciation for the history and ecology of the site. All trails have been proposed to provide access to a variety of habitats and views while minimizing negative impacts to critical wetlands, streams, slopes, and buffers. This will also increase permit feasibility and decrease costs. In addition, all trails proposed within buffers are pervious or natural surfacing such as crushed stone or wood chips. Example of a trailhead kiosk Sketch of potential portal post in the Park Photograph 9 AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 21 August 2024 3.3 Public Safety Several safety elements are proposed including the use of Crime Prevention Through Environmental Design (CPTED). This concept is based in the idea that crime can be prevented through the use of strategic design of buildings and public spaces. It involves simple, preventive steps that designers can take to reduce crime in parks and neighborhoods. These steps include guiding how people enter and leave a space to decrease opportunities for criminal activity, natural surveillance and clear sight lines, defined property lines and clear distinctions between private and public spaces, regular maintenance to encourage the appearance that the Park is valued, and regular activity to keep the Park activated and in use (CPTED 2024). In addition to CPTED design integration, the design for the Park includes safety lighting and emergency beacons. Timed or motion-sensor light poles are placed in each of the eight corners of the parking area to discourage crime and increase safety. The lighting will be cast down to minimize light pollution impacts to neighbors and wildlife. Two solar-powered alert beacons are also proposed for high-traffic areas near the parking area. These beacons allow Park visitors to easily connect to emergency services. When someone presses the beacon’s large red button, the visitor is automatically connected to an emergency dispatch center. At the same time, the beacon’s strobe light activates, which helps emergency responders locate the visitor in need. 3.4 Habitat Enhancement In-stream and riparian enhancement and restoration is proposed along 280 linear feet of May Creek. In the early 2000s, as part of the May Creek Drainage and Restoration Plan recommendations, King County consulted with Anchor QEA to develop the May Creek Erosion Stabilization Report to identify conceptual stabilization actions within a portion of the ravine reach of May Creek between Coal Creek Parkway and 148th Avenue SE. The plan included a detailed site observation and evaluation to identify conceptual project sites and actions to reduce erosion and restore habitat (Anchor QEA 2010). Based off the recommendations made in this report, large woody debris will be placed along the creek edges to increase bank stability and create varied habitats within the creek for spawning Public Safety Design Criterion • Maximize public safety Habitat Enhancement Design Criteria • Maximize restoration and habitat enhancement • Maximize forest and habitat preservation AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 22 August 2024 salmon. Invasive species will be selectively removed and replaced with appropriate native riparian species such as willow, dogwood, and salmonberry. Nearly 7 acres of wetland and wetland buffer enhancement and restoration is proposed. This will take the form of invasive species removal and the installation of appropriate native species to improve habitat function and value. Habitat enhancement techniques and plantings will be informed by the types of wetlands including palustrine emergent marsh (PEM), palustrine scrub shrub (PSS), and palustrine forested wetland (PFO). Buffer plantings will include native shrubs, groundcovers, and trees. Approximately 6.1 acres of upland forest and understory enhancement and restoration is proposed along the site’s forested areas. Mature and desirable trees will be protected, and invasive species, primarily Himalayan blackberry and English ivy, will be removed. Native species will be installed to increase habitat and improve resiliency, including a diverse palette of deciduous and conifer trees and shrubs. 3.5 Recreation and Amenity Areas A proposed large nature play area will include play spaces to encourage exploration and adventure for a variety of ages. Climbing, swinging, and spinning equipment, along with a large zipline and sand pit, are proposed for a mix of activity types. Weather-resistant and easy to maintain materials such as metal, concrete, and robinia wood are proposed. The play area design also includes parent Example of nearby May Creek instream habitat Example of nearby May Creek trail naturalization Photograph 10 Photograph 11 Recreation and Amenity Area Design Criteria • Provide Park development for families • Provide Park facilities • Maximize open space for unprogrammed recreation • Consider value to cost AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 23 August 2024 seating around the perimeter. Engineered wood fiber surfacing will protect children from falls while a selection of trees placed around the playground will provide shade from the sun. A large picnic shelter with room for several picnic tables and ample gathering is proposed close to the play area and parking. This shelter will be designed with open walls and a rustic style to fit the intended natural Park aesthetic. Picnic tables and seating will be provided in and adjacent to the shelter along with grills and trash receptacles (see “Site Furnishings” in the next subsection). A large open lawn space is provided near the entry, parking, and play area. This unprogrammed space could be used for picnics, gathering, parties, frisbee, or just relaxing and exploring. It is relatively flat, with a perimeter of native trees and shrubs to provide shade and privacy from the neighborhood. Future active recreation has been considered and may take place on the adjacent parcel when it is acquired. This may be in the form of sports courts, including tennis, pickleball, and basketball courts. A cultural propagation garden or outdoor classroom were also considered. 3.6 Additional Park Features Example of nature play area Large rustic picnic shelter Photograph 12 Photograph 13 Design Criteria for Additional Park Features • Provide environmental education and stewardship • Provide public art and placemaking AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 24 August 2024 Durable environmental education and interpretive signage is proposed with a trailhead kiosk, interpretive and educational signage, and portal posts. Interpretive signage could speak to the area’s history and culture and placed in areas of historical significance. Educational signage on the plant and animal species found in the Park could be placed at nodes and viewing decks. These signs could include QR codes to find additional information online. Public art throughout the Park will add a sense of place. The City could commission local and Tribal artist to create site specific art work. Potential art themes could focus on the site’s long ecological, cultural, and historic timeline. There is a potential for an art walk program in the Park where permanent plinths provide a foundation for temporary sculptural displays. Site furnishings will be provided throughout the Park in a variety of settings. Benches made from durable, appropriate materials will be placed along trails and at nodes to allow for resting spots at regular intervals. Picnic tables and grills will be provided in and adjacent to the picnic shelter and open lawn space for gatherings and picnicking. Trash cans and dog waste receptacles will be provided at the parking area, trailheads, dog park enclosure, and at the picnic shelter to encourage disposal of waste and for the convenience of visitors. A proposed comfort station may take the form of two portable toilets within a toilet enclosure. Although this feature is not a fully plumbed restroom, it increases convenience and comfort for visitors, and the enclosure shields the toilets from view while improving the appearance with a sense of permanence. Example of Interpretive signage Public art Portable toilet with toilet enclosure Photograph 14 Photograph 15 Photograph 16 AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 25 August 2024 3.7 Future Potential Expansion Area A potential sewer connection and Portland Loo may take the place of a portable comfort station. This option would provide greater convenience for visitors but would require additional clearing of vegetated and forested areas (including the removal of mature trees) for the installation of a sewer line that would connect to the existing system south of the Park. A lateral line routed along the steep slope would provide an opportunity to provide a new permanent restroom facility. The Portland Loo is an easy to clean, stand-alone bathroom designed to prevent problems that are commonly experienced with public toilets. The design discourages crime with graffiti-proof wall panels and open grating. A 1/3-acre enclosed off-leash dog area is proposed for the site on the future acquisition parcel. This location was chosen to provide separation from other site programming and environmentally sensitive areas while still maintaining close proximity to the entry and parking lot. This location is also flat and previously disturbed, making it a preferred location within the planning area. Secure double gated entry and dog waste receptacles along with seating will be provided. Trees and shrubs will provide areas of shade and exploration while open grassy areas will be provided to allow access to large sunny areas for running. Sports courts are an amenity that could be included in the future expansion area. The public has expressed interest in tennis, pickleball, and basketball courts. These courts may be individual, but the pickleball and tennis courts could be a combined feature. They would be placed in a flat, previously developed area to avoid further disturbance to environmentally sensitive areas. AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 26 August 2024 4 COST SUMMARY The total project cost to implement the Master Plan ranges from $6,820,000 to $8,130,000 (rounded and in 2024 dollars). This total project cost includes the construction costs to implement the Master Plan vision and the fees to design, permit, and manage the work. The low end of the range assumes that a portable toilet enclosure is provided and a sewer connection is not installed. The low end of the range also assumes that proposed improvements on the future parcel are not included. The following provides additional details on the total project cost including a summary of the City’s escalation planning. 4.1 Construction Costs The Opinion of Probable Construction Costs (OPCC) provides rough order of magnitude costs for the construction of proposed Master Plan elements. Table 2 summarizes the costs based on the following categories: Park development and habitat enhancement costs are for all proposed design elements within the currently-owned City boundary; the custom toilet enclosure cost includes the cost to construct a structural enclosure to accommodate two portable toilets (and assumes there is no sewer connection); the sewer connection and restrooms costs assume that a new sewer DRAFT Photograph 20 Photograph 17 AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 27 August 2024 connection is provided to the Park site with a connection to the existing mainline south of the Park (it also includes the construction of a Portland Loo); finally, the Park expansion area presents a construction costs that accommodate future potential uses on this parcel as described in Section 4. See Appendix E for cost details. Table 2 Master Plan OPCC Summary Master Plan Design Elements OPCC 1 Park Development and Forest Enhancement $5,195,660 2. Potential Custom Toilet Enclosure $243,353 3. Potential Sewer Connection and Portland Loo $959,432 4. Future Potential Park Expansion Area $592,112 Total OPCC Low (Items 1 and 2) $5,439,013 Total OPCC High (Items 1, 3 and 4) $6,747,204 Table 3 provides a summary of the cost items included in the Park Development and Forest Enhancement OPCC. This does not include a restroom option (a custom toilet enclosure or Portland Loo). Table 3 Park Development and Habitat Enhancement OPCC Summary Element Cost Site Demolition and Clearing in Park Development Area $68,740 Temporary Facilities During Construction (e.g., Access, Fencing) $134,050 Earthwork $267,610 Utility Improvements (Stormwater, Electrical, Lighting and Communications) $343,920 Asphalt Paving and Pavement Markings $148,196 Trails, Bridges, and Viewing Areas $520,677 Site Furnishings and Signage $401,187 Play Area Surfacing and Equipment $229,982 Planting in Park Development Area $209,009 Irrigation in Park Development Area $165,000 In-Stream and Riparian Habitat Enhancement $105,084 Wetland and Wetland Buffer Enhancement $434,999 Forest Enhancement $85,914 Park Development and Habitat Enhancement Subtotal $3,114,367 Mobilization (10%)1 $311,437 Design Contingency (25%)2 $856,451 AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 28 August 2024 Element Cost Construction Contingency (10%)3 $428,225 Sales Tax (10.3%)4 $485,179 Total Park Development and Habitat Enhancement OPCC $5,195,660 Notes: 1. Mobilization is applied to the subtotal. 2. Design contingency is applied to the subtotal with mobilization. 3. Construction contingency is applied to the subtotal with mobilization and design contingency. 4. Sales tax is applied to the subtotal with mobilization, design contingency and construction contingency. The sales tax rate is the City of Renton’s 2024 sales tax rate. The OPCC for the Future Potential Park Expansion Area costs the multiple opportunities that could be constructed on the 1.7-acre parcel. This includes a new dog park, trail connection, open lawn area, and Park plantings, as well as two tennis courts (accommodating four pickleball courts). The ultimate cost for the Future Potential Park Expansion Area will depend on which Park amenities and features are included. The OPCC assumes 2024 dollars and does not include future inflation. The OPCC does include the following markups: • 10% Contractor mobilization • 25% design contingency • 10% construction contingency • 10.3% sales tax The design contingency reflects the early level of design and level of uncertainty. For example, a site survey has not yet been completed, and the design may need to be revised to adapt to actual site conditions based on a survey. These changes could result in additional construction costs. During design development and final design, the design contingency will go down. At the time of bidding, the design contingency will be at zero. The construction contingency reflects that certain changes or refinements to the design may need to be completed during construction to reflect new information identified by the Contractor in the field. For example, the Contractor could uncover buried debris that needs to be removed and hauled off site. It is recommended that the City retain sufficient budget as a construction contingency for the duration of the Master Plan’s design. The OPCC does not include costs related to design/engineering, design phase Master Plan management, survey, planning and design review, bidding, construction phase Master Plan management and administration, construction inspection, environmental permitting, permit related monitoring, and property purchase. These fees are summarized in the following Section 4.2. The current OPCC also does not include water connection utility connections, portable restroom toilet AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 29 August 2024 units, public art, signage design, demolition of the existing houses and accessory buildings, or demolition of existing foundations. The OPCC assumes no contamination is encountered on the site and does not include costs for environmental cleanup. In providing OPCCs, the Client (City of Renton) understands that the Consultant (Anchor QEA, Inc.) has no control over the cost or availability of labor, equipment, or materials, or over market condition or the Contractor's method of pricing, and the Consultant's opinions of probable construction costs are made on the basis of the Consultant's professional judgment and experience. The Consultant makes no warranty, expressed or implied, that the bids or the negotiated cost of the Work will not vary from the Consultant's opinion of probable construction cost. 4.2 Design, Permit, and Management Fees In order to develop the Master Plan to a bid-ready project, the City will need to design, permit, and manage the work. Table 4 summarizes the expected fees for planning purposes. Table 4 Design, Permit, and Management Fee Summary Service Estimated Fee Survey and Investigations $105,000 Design and Engineering $600,000 Environmental and Construction Permitting $200,000 Master Plan Management $150,000 Bidding and Construction Management $325,000 Total Fees $1,380,000 Note: Costs are rounded to nearest 1,000. 4.3 Cost Escalation As noted above, the total project cost is in 2024 dollars and does not account for future inflation. Inflation is variable based on external economic factors. Over the past 5 years, inflation has ranged considerably; between October 2022 and October 2023, inflation in the construction industry was 7.76% in the Seattle region (Basnet 2024). Since that time of high inflation, rates are more moderate, ranging between 4% and 5% (Minnick 2024). The City is budgeting for moderate cost escalation in the near term, with a 5% escalation rate per year to account for inflation. Table 5 applies a 5% escalation rate to the total project cost over the next 5 years. AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 30 August 2024 Table 5 Total Master Plan Cost with Escalation Summary Year Total Master Plan Cost with 5% Inflation per Year Low End High End 2024 $6,820,000 $8,130,000 2025 $7,160,000 $8,540,000 2026 $7,520,000 $8,970,000 2027 $7,900,000 $9,420,000 2028 $8,300,000 $9,890,000 Note: Costs are rounded to nearest 1,000. AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 31 August 2024 5 IMPLEMENTATION 5.1 Permit Feasibility This section summarizes anticipated Master Plan environmental permitting requirements. Table 6 lists environmental permits anticipated to be required, along with the trigger for each. In addition to the environmental permits, the Master Plan would need to go through the City’s Site Plan Review process, including a pre-application, application, and application review to identify required construction permits such as the following: • Building permits • Trade permits (i.e., electrical, plumbing, mechanical, or fire suppression) • Street use or right-of-way permits • Utility, demolition, or air quality permits • Permits for geotechnical, potholing, or excavation work that is performed in support of the design process prior to construction • Additional permits for off-site staging associated with the future Master Plan Photograph 18 AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 32 August 2024 Table 6 Environmental Permitting Requirements Permit or Approval and Lead Agency Trigger Estimated Permit Timeframe Notes SEPA Review City of Renton Any proposal that requires a state or local agency decision to license, fund, or undertake a project, or the proposed adoption of a policy, plan, or program can trigger environmental review under SEPA. Schematic Design (30% design) A SEPA checklist is anticipated to be prepared by the City for public review and comment. The checklist will include Master Plan background information and an evaluation of impacts to environmental elements including earth, air, water, plants, animals, energy and natural resources, environmental health, land and shoreline use, housing, aesthetics, light and glare, recreation, historical and cultural preservation, transportation, public services, and utilities. The SEPA checklist may need to be supported by additional technical reports and/or technical memoranda to address specific disciplines. NEPA Review Federal Funding Agency1 and USACE Projects that receive federal funding Schematic Design The Master Plan will likely meet requirements for a Documented Categorical Exclusion. It may potentially instead require an Environmental Assessment. Note that USACE will also complete their own internal NEPA review during the Section 404 Individual Permit process for elements of the Master Plan under their jurisdiction—for example, filling of waters of the United States (wetlands). The Categorical Exclusion form may need to be supported by additional technical reports and/or technical memoranda to address specific disciplines. National Historic Preservation Act Section 106 Compliance DAHP and Native American Tribes Activities that may affect archaeological, cultural, or historic resources or sites Concurrent with NEPA or CWA Section 404 review A qualified archaeologist will be required to prepare a cultural resources memorandum that will support NEPA documentation and be provided to USACE as part of the Section 404 permit package. Preparation of the memorandum will require a review of the Master Plan plans, areas, and depth/extent of ground-disturbing activities. ESA compliance NMFS and USFWS Section 7 review is required for federal actions (funding, permit, or approval) that may affect any ESA-listed species or their critical habitat. Concurrent with NEPA or CWA Section 404 review Federal funding or permits will require compliance with Section 7 of the ESA. ESA-listed aquatic species are known to use downstream portions of May Creek. The Master Plan will require either a no-effect letter or a biological evaluation. If the Master Plan has federal funding, the funding agency will be the lead agency for ESA compliance. If the Master Plan does not have federal funding, USACE would be the lead agency for ESA compliance if a CWA Section 404 permit is required. AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 33 August 2024 Permit or Approval and Lead Agency Trigger Estimated Permit Timeframe Notes Critical Areas Exemption and Other Permits City of Renton Alteration of a site with a critical area or buffer (RMC 4-3-050) Concurrent with SEPA review A Critical Areas Exemption authorizes work in streams, wetlands, and buffers. A Land Use Permit Master Application is submitted to City of Renton Community and Economic Development. The same application will also be used to obtain a Flood Hazard Permit. A completed tree retention work sheet must be included in the application. Note: The Master Plan is not within shoreline jurisdiction or aquifer protection areas. CWA Section 404 Individual Permit or Nationwide Permit USACE A discharge of dredged or fill material into waters of the United States, including wetlands Schematic Design If the Master Plan has 0.5 acre or less of fill in wetlands, it will likely require coverage under Nationwide Permit 42 Recreational Facilities. If a larger amount of fill in wetlands is required, a 404 Individual permit will be required. A JARPA form would be submitted to USACE. CWA Section 401 Water Quality Certification Ecology A 401 Water Quality Certification is required for all projects that require a USACE Section 404 permit. Schematic Design For work within federally regulated wetlands (i.e., adjacent to May Creek or within its floodplain), issuance of the 401 Water Quality Certification demonstrates that the Master Plan will comply with state water quality standards and other aquatic resource protection under Ecology’s regulatory authority. Procedurally, Ecology issues the 401 Certification before USACE can issue the Section 404 Individual Permit. Administrative Order Ecology An Administrative Order is required for work within non-federally regulated waters. Schematic Design For work within non-federally regulated wetlands (i.e., at wetlands not adjacent to May Creek and without a surface water connection to May Creek), an Administrative Order is required. Ecology determines whether the proposed work, as conditioned by the Administrative Order, will comply with the applicable provisions of 90.48 RCW and other applicable requirements of state law. CZMA Consistency Determination Ecology Triggered by projects that contain a federal nexus proposed within any of Washington's 15 coastal counties. Schematic Design Issuance of the CZMA Consistency Determination occurs as part of coordination with USACE and Ecology for the CWA Sections 404 and 401 processes described above. No separate application is required. AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 34 August 2024 Permit or Approval and Lead Agency Trigger Estimated Permit Timeframe Notes Section 402 NPDES Construction Stormwater General Permit Ecology Soil disturbance of 1 acre or more during construction Issued for Bid contract documents An NPDES Construction Stormwater General permit is required for construction activities with any soil disturbance of 1 acre or more of total land and have a discharge of stormwater into surface waters or into storm drainage systems that discharge to a surface water. The permit will trigger need for a construction stormwater pollution prevention plan with a Best Management Practices plan that is linked to erosion and sediment control drawings and specifications in the construction Contract Documents. Hydraulic Permit Approval WDFW Work that uses, diverts, obstructs, or changes the natural flow or bed of state waters (i.e., work waterward of the ordinary high water mark) 45 days from SEPA determination issuance Note: 1. Federal funding agency (if any) has not been determined yet. 5.2 Phasing Considerations The City has considered phasing strategies to implement the Master Plan. Based on current ownership, the City has identified proposed Park development on the currently privately-owned 1.7 acre parcel as a future phase. This allows the City flexibility in the design approach for that future parcel as well as the opportunity to phase design and construction costs. The comfort station could also be phased. The City could provide a lower cost portable toilet restroom facility to the public in the Park’s first phase and then plan a future sewer connection and Portland Loo construction project in order to phase design and construction costs. Within the proposed Park Development and Habitat Enhancement areas, there could be opportunities to phase implementation if needed. This could include: • Trail Development – develop a phased strategy to build out the trail network within the Park and connections beyond the Park boundary. • Habitat Enhancement – implement habitat mitigation to offset Master Plan impacts and then phase future habitat stewardship such as invasive vegetation removal, native planting, and streambank and in-stream enhancements. Stewardship activities could be implemented on a AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 35 August 2024 separate schedule by a local organization such as the Washington Conservation Corps or with volunteers. 5.3 Funding Opportunities The City utilized the State Recreation and Conservation Office (RCO; formerly the Interagency Committee for Outdoor Recreation) to acquire much of the land composing the future Park. The RCO administers numerous grant funding programs that may be appropriate for supporting future development and/or parcel acquisition within the Park boundary. The City has successfully utilized grant funding from the King County Conservation Futures grant program on nearby parcels elsewhere along the Greenway. This grant has funded the protection of nearly 100,000 acres of land in the county, including lands at Cougar Mountain Regional Wildlands Park. The City’s focus on restoring and protecting the sensitive stream, riparian, wetland, and buffer habitats while also providing passive-use recreation in an underserved community has been considered and maintained throughout the master planning process to be consistent with the funding source. Looking to the future, King County Parks Levy funding source may be an option for design and implementation funding. Additionally, the Master Plan’s unique opportunity to improve the environment while also improving public access to the outdoors and public health will position it well for other local, state, and federal funding. Table 7 outlines funding mechanisms that could be applicable to various aspects of the Master Plan design and implementation. Table 7 Potential Grant Funding Sources Agency and Grant Program Eligible Project Types and Summary of Program Local King County Cooperative Watershed Management Grant The grant supports projects targeting salmon recovery and watershed health that can be focused on restoration, research, or education and outreach. Conservation Futures This funding program could support site stabilization costs including fencing, signage, and structure demolition implemented shortly after acquisition. 2020–2025 Parks, Recreation, Trails and Open Space Levy The voter-approved program includes funding for capital and open space, open space and river corridors, and healthy communities funds. AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 36 August 2024 Agency and Grant Program Eligible Project Types and Summary of Program State RCO Aquatic Lands Enhancement Grants may be used for acquisition, improvement, conservation, and stewardship in Washington for protection of aquatic lands, natural areas, and wildlife habitats as well as promoting recreational opportunities for public purposes. Project types include conservation planning, habitat enhancement, shoreline restoration, water quality improvement, trail development, and stewardship opportunities. Land and Water Conservation Wildlife and Recreation Program Recreational Trails Program Salmon Recovery and Puget Sound Acquisition and Restoration Ecology Terry Husseman Account Grants support locally sponsored projects that restore or enhance the environment. Federal FEMA Building Resilient Infrastructure and Communities Program The program aims to shift funding to proactive investment in community resilience and pre-disaster mitigation activities. NFWF America the Beautiful Challenge The program supports expanding access to the outdoors, particularly in underserved communities, in conservation and resiliency projects. EPA Puget Sound Action Agenda – Climate Resilient Riparian Systems Lead The program supports protection and restoration of riparian areas, including those supporting salmon recovery, to promote climate resiliency. NFWF National Fish and Wildlife Foundation The program supports projects that sustain, restore and enhance our nation's fish, wildlife and plants, and their habitats. USFWS North American Wetlands Conservation Act The program supports projects that protect, restore and enhance wetlands and associated uplands habitats for the benefit of all wetlands-associated migratory birds. National Wildlife Federation WaterSMART Aquatic Ecosystem Restoration The program supports aquatic ecosystem restoration and protection projects west of the Mississippi River. AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 37 August 2024 6 REFERENCES Anchor QEA, 2010. May Creek Erosion Stabilization Draft Report. Prepared for King County. January 2010. Basnet, N., 2024. “Construction Costs in Seattle Outpace Rest of the Country.” Puget Sound Business Journal. January 17, 2024. Accessed August 7, 2024. Available at: https://www.bizjournals.com/seattle/news/2024/01/17/construction-costs-seattle.html. City of Renton, 2019, Renton Trails and Bicycle Master Plan. Adopted January 28, 2019. City of Renton, 2020. Renton Parks Recreation, and Natural Areas Plan. Adopted January 27, 2020. City of Renton, 2024. May Creek Greenway. City Website. Accessed July 2, 2024. Available at: https://www.rentonwa.gov/city_hall/parks_and_recreation/parks_and_trails/find_a_park_or_tra il/may_creek_greenway. CPTED (The International Crime Prevention Through Environmental Design Association), 2024. Primer in CPTED. Accessed July 8, 2024. Available at: https://www.cpted.net/Primer-in-CPTED. Photograph 19 AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 38 August 2024 King County and City of Renton, 2001. May Creek Basin Action Plan. Adopted April 2001. Minnick, B., 2024. “Skanska Shares Its Outlook on Construction Cost Escalation.” Daily Journal of Commerce. February 27, 2023. Accessed August 7, 2024. Available at: https://www.djc.com/news/co/12154881.html. AGENDA ITEM # 8. b) Northeast Renton Park Master Plan 39 August 2024 PHOTOGRAPHS Cover Photograph – Northeast Renton Park, summer 2023. Source: Anchor QEA. Photograph 1 – May Creek tributary, spring 2024. Source: Anchor QEA. Photograph 2 – Northeast Renton Park foliage, summer 2023. Source: Anchor QEA. Photograph 3 – Public engagement, spring 2024. Source: Jason Lederer. Photograph 4 – Public engagement, spring 2024. Source: Jason Lederer. Photograph 5 – May Creek, early spring 2024. Source: Jason Lederer. Photograph 6 – Rain gardens along parking area. Source: Anchor QEA. Photograph 7 – Example of wetland boardwalk. Source: Anchor QEA. Photograph 8 – Barbee Mill – May Creek Trail outfall to Lake Washington. Source: Jason Lederer. Photograph 9 – Example of trailhead kiosk. Source: Anchor QEA. Photograph 10 – Example of nearby May Creek instream habitat. Source: Jason Lederer. Photograph 11 – Example of nearby May Creek trail naturalization. Source: Jason Lederer. Photograph 12 – Philip Arnold Park in Renton, Washington. Source: Jason Lederer. Photograph 13 – Large rustic picnic shelter. Source: Anchor QEA. Photograph 14 – Example of interpretive signage. Source: South Australian History Network; https://www.flickr.com/photos/communityhistorysa/21271092130. Photograph 15 – Public art. Source: Anchor QEA. Photograph 16 – Portable toilet with toilet enclosure. Source: Anchor QEA. Photograph 17 – Northeast Renton Park, early spring 2024. Source: Clearway Environmental. Photograph 18 – May Creek, early spring 2024. Source: Jason Lederer. Photograph 19 – Northeast Renton Park foliage, summer 2023. Source: Anchor QEA. AGENDA ITEM # 8. b) APPENDIX A EXISTING INFORMATION SUMMARY REPORT AGENDA ITEM # 8. b) January 2024 May Creek Park Master Planning Project Existing Information Summary Prepared for City of Renton AGENDA ITEM # 8. b) January 2024 May Creek Park Master Planning Project Existing Information Summary Prepared for City of Renton 1055 South Grady Way, Renton, Washington 98057 Prepared by Anchor QEA, LLC 1201 3rd Avenue, Suite 2600 Seattle, Washington 98101 AGENDA ITEM # 8. b) Existing Information Summary i January 2024 TABLE OF CONTENTS 1 Introduction ................................................................................................................................ 1 2 Project Location ......................................................................................................................... 2 2.1 Basemap ................................................................................................................................................................. 4 2.2 May Creek Greenway ......................................................................................................................................... 6 3 Summary of Existing Documents ........................................................................................... 9 3.1 Ownership .............................................................................................................................................................. 9 3.2 Grant Funding ....................................................................................................................................................... 9 3.3 City Planning Documents .............................................................................................................................. 10 3.4 Regional Planning Documents .................................................................................................................... 15 4 Geotechnical Technical Assessment .................................................................................... 17 4.1 Existing Geological Conditions ................................................................................................................... 17 4.2 City Geological Critical Areas ....................................................................................................................... 17 5 Cultural Resources Technical Assessment ......................................................................... 19 5.1 Environmental and Cultural Context ......................................................................................................... 19 5.2 Archaeology ....................................................................................................................................................... 20 5.3 Historic Resources ............................................................................................................................................ 22 5.4 Traditional Cultural Properties and Cultural Landscapes .................................................................. 22 6 Site Reconnaissance and Natural Resource Inventory .................................................. 23 6.1 FLAT Assessment .............................................................................................................................................. 23 6.2 Wetland Reconnaissance .............................................................................................................................. 26 6.3 May Creek Conditions .................................................................................................................................... 27 6.4 Landmark Trees ................................................................................................................................................. 27 6.5 Land Cover and Site Features ...................................................................................................................... 28 7 Data Gaps .................................................................................................................................. 30 8 References ................................................................................................................................. 31 AGENDA ITEM # 8. b) Existing Information Summary ii January 2024 TABLES Table 1 Vicinity Map Data Sources ...................................................................................................................... 4 Table 2 Parcel Acquisitions ...................................................................................................................................... 9 Table 3 Critical Area Buffer Widths ................................................................................................................... 15 Table 4 Landmark Tree Inventory ...................................................................................................................... 28 FIGURES Figure 1 Project Location ........................................................................................................................................... 2 Figure 2 Project Vicinity Map ................................................................................................................................... 3 Figure 3 Project Basemap .......................................................................................................................................... 5 Figure 4 City of Newcastle’s May Creek Park and Trail................................................................................. 7 Figure 5 Trail Locations for Cougar Mountain Regional Wildlife Park................................................... 8 Figure 6 2020 Parks, Recreation, and Natural Areas Plan Concept ...................................................... 11 Figure 7 Comprehensive Plan Land Use Map ................................................................................................ 12 Figure 8 Statewide Predictive Model for Precontact Archaeological Potential .............................. 21 Figure 9 Forest Landscape Assessment Tool (FLAT) Analysis ................................................................. 24 Figure 10 Forest Landscape Assessment Tool (FLAT) Map ........................................................................ 25 APPENDIX Appendix A Site Photographs AGENDA ITEM # 8. b) Existing Information Summary 1 January 2024 1 Introduction This report summarizes existing information that will be used to support the May Creek Park Master Planning Project (Project). The Project is an initial step taken by the City of Renton (City) to develop a new neighborhood park. The information summarized in this report will be used to support site planning, the development of conceptual design alternatives, and the selection of a preferred conceptual design alternative. To inform a baseline understanding of the Project’s context and site conditions, the Project team has reviewed all existing documents provided by the City and known documents gathered from other publicly available sources, including a review of Project site ownership, grant funding, City planning documentation, and regional planning documentation. The report provides a narrative summary as well as a vicinity and site basemapping. As part of the existing information review, the Project team also conducted technical assessments to document geotechnical and cultural resources conditions and considerations. In addition, this report summarizes a site reconnaissance and natural resources inventory conducted in December 2023. The site reconnaissance focused on identifying and characterizing existing natural resources present at the sites including wetlands, May Creek, buffers, forest canopy, and other land covers. In addition to a narrative summary, the site reconnaissance findings are also presented in a site analysis and Project opportunities graphic. Finally, this report identifies data gaps that will need to be filled in future phases of May Creek Park design, permitting, and implementation. AGENDA ITEM # 8. b) Existing Information Summary 2 January 2024 2 Project Location May Creek Park (Park), located in Renton, King County, Washington, within the City’s East Plateau neighborhood, is an 18.5-acre assemblage of parcels acquired by the City over the last three decades (Figure 1). It is bordered by May Creek to the north, Duvall Avenue NE to the west, and residential neighborhoods to the south. To the northwest is the City’s Surface Water Utility Facility. The current Park boundary includes the most recently acquired property, a 1.8-acre parcel with an existing home, but does not include the adjacent 1.7-acre parcel with a single-family home that is immediately to the west. The City has plans to acquire the single-family home and property when it is available and to include that area within the future Park. Figure 1 Project Location Immediately to the north and west of the Park is the boundary of the City of Newcastle (Figure 2). Just across Coal Creek Parkway SE in Newcastle is a 3,100-acre park and trail system also called May Creek Park (City of Newcastle 2019). Both Newcastle’s May Creek Park and the new Park fall within the Lake Washington/Cedar/Sammamish Watershed and Water Resource Inventory Area (WRIA) 8. May Creek is the third largest tributary to Lake Washington, draining the area west of Issaquah Creek and north of Cedar River, flowing through both Newcastle and Renton. The Park is located approximately 4 miles from Lake Washington. Figure 2 maps the Park boundary and vicinity and is at the neighborhood scale. Following Figure 2, Table 1 provides the data sources for the Project vicinity map. AGENDA ITEM # 8. b) Existing Information Summary 3 January 2024 Figure 2 Project Vicinity Map Note: Map elements provided by the City of Renton. AG E N D A I T E M # 8 . b ) Existing Information Summary 4 January 2024 Table 1 Vicinity Map Data Sources Data Layer Data Source Aerial imagery Esri World Imagery (Bing Maps 2023) Parcels King County Parcel Viewer (King County 2023) Site boundary City of Renton COR Maps (City of Renton 2023a) City boundary Property Districts and boundaries Parks and Recreation Land Use and Zoning Critical Areas Telecommunications Transportation Elements Utilities Trees Erosion Hazard Floodway Regulated slopes Streams Wetlands Topography Site Survey Record of Survey for City of Renton (Pace 2023) 2.1 Basemap Figure 3 presents a Project basemap. The data compiled for this map were taken from Esri World Imagery (Bing Maps 2023), City COR Parcel Data, City COR Maps (City of Renton 2023a), the Record of Survey for City of Renton (Pace 2023), and many of the same data sources as summarized in Table 1. The map also includes the following data collected by Clearway Environmental (Clearway) during the site reconnaissance in December 2023 (Section 6): • Photo points • Wetland • Paved surfaces • Landscaped surfaces • Landmark trees • Trails • Invasive species threat (low, medium, high) • Tree composition (low, medium, high) • Tributaries and ditches • Points of interest The basemap will be used for master planning and conceptual design. In future phases of Project design and permitting, a site boundary and topography survey will need to be completed. Specific survey needs are noted as data gaps in Section 7. AGENDA ITEM # 8. b) Existing Information Summary 5 January 2024 Figure 3 Project Basemap Note: Map elements provided by the City of Renton. AG E N D A I T E M # 8 . b ) Existing Information Summary 6 January 2024 2.2 May Creek Greenway The 1978 Comprehensive Park and Recreation Plan recognized May Creek Greenway as a valuable natural corridor. This corridor stretches across 8 miles from Cougar Mountain Regional Wildland Park and west to creek mouth on Lake Washington. Beginning in 1980, the cities of Renton and Newcastle, along with King County, began to acquire land along the May Creek Corridor in hopes of eventually creating a multijurisdictional soft-surface trail system. The vision is to create a large greenway system with an uninterrupted network of pervious trails, interpretive and educational opportunities, and habitat for spawning salmon and other native species. The greenway would also serve as flood and slope protection (City of Renton 2023d; Washington Trails Association 2023). 2.2.1 City of Newcastle’s May Creek Park May Creek Trail is located in May Creek Park in the City of Newcastle immediately west of the Park. It stretches from I-405 to Coal Creek Parkway and will share a border with the future section of the Park. The parkland surrounding the trail spans more than 3,100 acres (Figure 4). May Creek Trail is a 3.5-mile, roundtrip, soft-surface trail winding through a historical woodland that was once the workplace of coalminers. The trail follows the historical footprint of the Seattle-Walla Walla Railroad. The trail follows along the northern bank of May Creek, falling and gaining more than 585 feet in elevation and occasionally looping through clearings, crossing bridges, and even passing by a vintage rusted out van, but primarily staying within dense wooded areas. Terrace Trail and a greenbelt network of other trails can be accessed by crossing Coal Creek Parkway from May Creek Trail, which allows hikers to continue into Cougar Mountain Park (City of Newcastle 2019; Washington Trails Association 2023). AGENDA ITEM # 8. b) Existing Information Summary 7 January 2024 Figure 4 City of Newcastle’s May Creek Park and Trail Source: https://data-newcastlewa.opendata.arcgis.com 2.2.2 Cougar Mountain Regional Wildlife Park The King County-owned, 3,000-plus acre Cougar Mountain Regional Wildlife Park is located in an area known as the Issaquah Alps in Renton. It is a short hike or bike ride from May Creek Park. Cougar Mountain Regional Wildlife Park is home to more than 35 miles of trails that wind through dense second-growth forests and wetlands, along streams, and include landmarks such as cliffs and caves. The park boundary and trail locations are identified in Figure 5. Many of the trails feature viewpoints of nearby lakes, mountain ranges, and city skylines, while others are deep in the wilderness with no hint of nearby urban living (King County 2023a). The trails closest to the Park are Terrace Trail and Newcastle Highlands Trail, the De Leo Wall Loop and De Leo Wall Trail, Indian Trail, and Ballybunion Trail (AllTrails 2023). Cougar Mountain Regional Wildlife Park is connected to Squak Mountain and Tiger Mountain, which adds up to more than 5,000 acres of protected public land. These trails and natural areas can be reached from May Creek Park by hiking or bicycling along the Crosstown Trail and Terrace Trail in conjunction with short distances on city streets. AGENDA ITEM # 8. b) Existing Information Summary 8 January 2024 Figure 5 Trail Locations for Cougar Mountain Regional Wildlife Park Source: AllTrails 2023 AGENDA ITEM # 8. b) Existing Information Summary 9 January 2024 3 Summary of Existing Documents The Project team reviewed relevant background materials provided by City staff, which are publicly available. This section provides a summary of these materials. 3.1 Ownership Table 2 summarizes parcels acquired by the City for the future Park. The list totals 18.22 acres of land currently acquired and a trail easement connecting to the parcel assemblage across privately owned adjacent parcels to the east. Table 2 Parcel Acquisitions Parcel Name Parcel/Recording Number Year Acquired Acreage McAskill Parcel 032305-9287 1994 10 Langley Ridge Trail Easement 20080212000465 2008 15-foot easement area undefined Property Exchange Conversion N/A 2012 0.06 Donated parcel 3424059164 2013 2.5 Donated parcel 0323059005 2015 4 2718 Duvall Avenue NE Parcel 032305-9164 2023 1.66 Note: N/A: not available 3.2 Grant Funding The City has applied for and won several grants to acquire land for and complete improvements to the Park. The following grants were awarded: • RCO Grant, 1991, May Creek Trail (RCO Project No. 91-259): $169,200 (50% of total cost) through the State of Washington for the acquisition of approximately 19 acres of land (six separate parcels) to adjoin the May Creek/Honey Creek Green Belt in North Renton (May Creek Trail 1991) • RCO Grant,1994, May Creek Trail (RCO Project No. 92-298): $90,573.96 (50% of total cost) through the State of Washington for the acquisition of 10 acres of land (six separate parcels) to adjoin the May Creek/Honey Creek Green Belt in North Renton (May Creek Trail 1994) These grants came with long-term obligations that the projects be completed in a timely manner and for outdoor recreation purposes (Washington State Recreation and Conservation Office 2023). For acquisition grants, property must be obtained within a required period of time. For recreation AGENDA ITEM # 8. b) Existing Information Summary 10 January 2024 projects, grant recipients must maintain public outdoor recreation opportunities in a safe and attractive manner and at reasonable hours and times of the year. 3.3 City Planning Documents 3.3.1 2020 Parks, Recreation, and Natural Areas Plan The City’s Parks, Recreation, and Natural Areas Plan is a 6-year plan, adopted in January 2020. This report is an update of the previous plan that was adopted in 2011. The purpose of the plan is to provide a long-term vision and goals for the City’s parks, recreation, and natural areas over the next 20 years. The plan lays out current and future needs and community interest for parks and recreation, identifies policies and strategies to enhance and sustain parks, provides a framework to guide priorities and funding sources, and responds to the needs of the community as well as state requirements for grant eligibility (Washington State Recreation and Conservation Office 2023). This plan ties in with the City’s Comprehensive Plan, the Trails and Bicycle Master Plan, and the Downtown Civic Core Vision and Action Plan. This document includes recommended park amenities that were created using community input regarding recreation and valuable natural areas. The draft plans were reviewed by the public, the Project Steering Committee, Parks Commission, Planning Commission, and the Council Committee of the Whole. These concept plans were well-received and are intended to be a vision of possibilities to use as a starting point and inspiration for future planning and design work. Specifically for the Park, this plan includes a concept that maintains much of the natural forested areas, with a long winding interpretive loop trail along the creek and through the wetlands, trail connections on both sides of the park, parking, play areas, and sports courts grouped into a cohesive active recreation area. This plan is based on the distinct identity and character of the surrounding community and considers existing recreation opportunities as well as natural features (City of Renton 2020). AGENDA ITEM # 8. b) Existing Information Summary 11 January 2024 Figure 6 2020 Parks, Recreation, and Natural Areas Plan Concept Source: City of Renton 2020 3.3.2 Comprehensive Plan The City’s Comprehensive Plan was adopted in 2015 and must be updated by 2024. This long-term plan focuses on goals for growth and development within the City of Renton. This plan is a guide for land use, transportation, housing, economic development, parks and recreation, community planning, utilities, capital facilities, environment, climate change, and resiliency. These are all requirements of Washington’s Growth Management Act. The updated plan will take into consideration feedback from all stakeholders, including residents, business owners, property owners, City staff, City Council, and the planning commission. This input will be essential to creating a plan that reflects the vision and needs of those who live in Renton. AGENDA ITEM # 8. b) Existing Information Summary 12 January 2024 3.3.2.1 Comprehensive Plan Land Use Map The Comprehensive Plan Land Use Map (Figure 7) shows that the Park falls within the designations for Residential Low Density (RLD) and Residential Medium Density (RMD). All adjacent properties to the north and south fall within these same designations (City of Renton 2018b). Figure 7 Comprehensive Plan Land Use Map Source: City of Renton 2018b 3.3.3 Trails and Bicycle Master Plan The 2019 Trails and Bicycle Master Plan was developed through a joint effort between Renton Parks and Recreation, the Parks Planning and Natural Resources Division, the Public Works Department, the Transportation Systems Division, the Community and Economic Development Department, and the Long Range Planning Division. This plan lays out a vision for a nonmotorized bike and walking path network for the next 20 years and is a requirement for grant funding eligibility. The plan includes a brief introduction describing the benefits of walking and cycling, the relationship to other plans, the planning process, and the master plan of trails. It then lays out a framework of how the final plan comes to be—from vision, goals, and objectives to community involvement, demand and needs analysis, guiding principles, plan elements, and implementation. Because the Park is intended to be part of this large network of soft-surface trails, this plan and the concepts within are relevant. AGENDA ITEM # 8. b) Existing Information Summary 13 January 2024 This plan is a framework that can help guide the City in establishing priorities during the planning and design process of the Project (City of Renton 2019). 3.3.4 Renton Downtown Civic Core Vision and Action Plan The City’s Downtown Civic Core Vision and Action Plan was adopted in January 2018. This plan provides a descriptive vision, with relevant photographs and graphics, of future opportunities for Renton’s downtown and civic core. Active civic core projects include The Renton Connector, Pavilion Market & Food Hall, Downtown Streetscapes, Arts & Culture Space, and Downtown Wayfinding. The plan includes an introduction of the downtown civic core and necessary context, followed by solutions and visions suggested by the community. The plan also includes themes, strategies, and ideas for implementation. Though May Creek is not part of the downtown civic core, the strategies and concepts for improving urban design and encouraging the use of urban outdoor spaces can be applied to this Project (City of Renton 2018A; MIG 2018). 3.3.5 Urban Forest Management Plan 2022-2033 Rooted in Renton is the City’s Urban Forest Management Plan (City of Renton 2022). The plan is a 10-year update to the previous plan and includes a brief introduction and description of the history and benefits of urban forests, followed by a description of the current state of Renton’s urban forests. The 10-year plan describes the City’s Urban Forestry Program, and the program’s current needs and challenges, as well as an implementation schedule. As the City grows and becomes denser, the importance of maintaining and enhancing tree canopy throughout the city limits becomes a greater priority. Established forests, such as those in the May Creek greenbelt, are a valuable asset, providing habitat, beauty, and physical and emotional wellbeing to residents. May Creek and the surrounding areas are a vital part of the City’s mission to proactively manage public trees, grow and expand a healthy tree canopy, maintain public safety, and optimize urban forest benefits (City of Renton 2022). 3.3.6 Development Regulations Renton Municipal Code (RMC) Title IV – Development Regulations is a set of compiled and revised City ordinances related to development regulations. It consists of 11 chapters, including Administration and Enforcement, Zoning Districts, Environmental Regulations, City-Wide Property Development Standards, Building and Fire Prevention Standards, Street and Utility Standards, Subdivision Regulations, Legal Nonconforming Structures, Uses and Lots, and Definitions (City of Renton 2023f). 3.3.6.1 City of Renton Critical Areas Regulations RMC 4-3-050 is the City’s chapter on Critical Areas Regulations. Its purpose is to protect riparian habitat, which in turn protects the stability of banks and channels and decreases erosion. It also addresses maintaining a clean water supply, flood storage, and sediment and pollutant filtering. AGENDA ITEM # 8. b) Existing Information Summary 14 January 2024 Other functions that are important to fish and wildlife, such as recruitment of woody debris and nutrients, shade, shelter, and other habitat elements, are discussed and provided for in this section (City of Renton 2023b). 3.3.7 Zoning The City zoning map shows that the Park falls primarily within zoning designation R-1, with the surrounding areas zoned R-4 and R-6 (City of Renton 2023g). According to the RMC, these zones are described as follows (City of Renton 2023e): • R-1 (Residential 1 DU/Acre): Established to provide and protect suitable environments for residential development of lands characterized by pervasive critical areas where limited residential development will not compromise critical areas. The R-1 zone designation provides for suburban estate single family and clustered single family residential dwellings at a maximum density of one dwelling unit per net acre and allows for small-scale farming associated with residential use. • R-4 (Residential 4 DU/Acre): Established to promote urban single family residential neighborhoods serviceable by urban utilities and containing open-space amenities. It is intended to implement the RLD Comprehensive Plan designation. The R-4 zone designation allows for a maximum density of four dwelling units per net acre and serves as a transition between rural designation zones and higher density residential zones. It is intended as an intermediate lower density residential zone. • R-6 (Residential 6 DU/Acre): Established for single family dwellings and is intended to implement the RMD Comprehensive Plan designation. The R-6 zone designation allows for a range of three to six dwelling units per net acre. Development in the R-6 zone is intended to be single family residential at moderate density. Preliminary review of the RMC shows that only wetlands of 1,000 square feet (sf) or less (and their buffers) may be exempt from impact mitigation and/or some permitting obligations if they meet certain conditions. The City follows the 2014 updated Washington State Department of Ecology wetland rating system. Under RMC 4-3-050-G.2, exempt activities permitted within wetlands and streams (and associated buffers) include construction of new trails and temporary wetland impacts (see Section 6 for wetland and buffer descriptions). For buffer analysis, it was presumed that the Project would be considered Low Intensity Land Use, which is defined in RMC 4-3-050G as: “unpaved trails, low intensity open space (hiking, bird-watching, preservation of natural resources, etc.) and utility corridor without a maintenance road and little or no vegetation management.” AGENDA ITEM # 8. b) Existing Information Summary 15 January 2024 Under RMC 4-3-050G.2, the following critical area buffer widths are defined (see Section 4 for descriptions of geologic critical areas). These areas are based on habitat function and low impact land uses: Table 3 Critical Area Buffer Widths Source: City of Renton 2023f In defining landmark trees for inventory, RMC 4-11-200 defines them as: “A tree with a caliper of twenty-four inches (24") or greater, except for big leaf maples, black cottonwoods, and red alder trees, which qualify as landmark trees with a caliper of thirty inches (30") or greater.” 3.4 Regional Planning Documents 3.4.1 2001 May Creek Action Plan The May Creek Action Plan is an outline and plan for the steps that can be taken to reduce and correct adverse conditions in the May Creek Basin resulting from urban growth and development in the surrounding areas. The outline includes background information on the historical conditions of the May Creek Basin, potential funding sources for improvements, and possible solutions for mitigation. These details are followed by a list of both near- and long-term recommendations for AGENDA ITEM # 8. b) Existing Information Summary 16 January 2024 four subareas of May Creek Basin. Because of the urban location of the creek, planning and recommendations focus on improving the quality of surface and groundwater, protecting habitat for salmon and other species, reducing flooding and flood damage, stabilizing banks and preventing erosion, and preventing existing problems from becoming worse (Shapiro and Associates, Inc. 2023). 3.4.2 May Creek Drainage and Restoration Plan King County Water and Land Resources Division and the Mid-Puget Sound Fisheries Enhancement Group completed the May Creek Drainage and Restoration Plan in 2008. In this plan, consultants GeoEngineers and OTAK developed a Conceptual Restoration Plan for the May Valley Subarea located within the May Creek Basin near Renton. The Conceptual Restoration Plan is a study of this long, narrow floodplain consisting of rural and agricultural land, which has been flooding more frequently and severely in recent years. This plan summarizes the past, current, and projected conditions of the May Creek Basin and provides 33 recommendations for conceptual projects to address flood control issues, degraded habitat, and other associated issues (King County 2023b). 3.4.3 May Creek Erosion Stabilization Report As part of the May Creek Drainage and Restoration Plan recommendations, King County consulted with Anchor QEA to develop the May Creek Erosion Stabilization Report to identify conceptual stabilization actions within a portion of the ravine reach of May Creek between Coal Creek Parkway and 148th Avenue SE. The Plan included a detailed site observation and evaluation to identify conceptual project sites and actions to reduce erosion and restore habitat. This report describes the site setting, approach, assessments, findings, and the resulting list of potential projects (Anchor QEA 2010). 3.4.4 Park at 95th Master Plan The Park at 95th Master Plan is a plan for a new park in Newcastle with a focus on athletic fields. It was prepared for the City of Newcastle in 2009 by a local landscape architecture firm and a team of subconsultants. The desire for new athletic fields was first recognized in the City of Newcastle Comprehensive Plan update adopted in 2003. The master plan seeks to guide future development in a 13.5-acre portion of Newcastle’s May Creek Park at SE 95th Way, which is three-quarters of a mile from the Park. The plan walks through the steps taken to determine a possible design solution, from describing existing conditions, opportunities, and constraints to developing a preliminary program and collecting results from public outreach. Four alternatives were worked through and revised, along with a cost estimate for each. The end result was a conceptual plan with a focus on soccer and baseball fields, a large natural area, parking, picnicking areas, restrooms, and viewpoints (MacLeod Reckord 2009). The future Park at 95th is in close proximity to the Park and has the potential to serve residents of both Newcastle and Renton. AGENDA ITEM # 8. b) Existing Information Summary 17 January 2024 4 Geotechnical Technical Assessment 4.1 Existing Geological Conditions The U.S. Department of Agriculture Natural Resources Conservation Service (USDA NRCS; 2003) classifies the surface soils in the site as Alderwood gravelly sandy loam with 8% to 30% slopes, along with a small portion of Everett very gravelly sandy loam with 8% to 15% slopes, likely silty sands, and silty gravels. The Washington Department of Natural Resources (WDNR) provides a classification of Pleistocene till and outwash clay, silt, sand, gravel, cobbles, and boulders deposited by or originating from continental glaciers locally and includes peat, nonglacial sediments, modified land, and artificial fill. No subsurface explorations were made available for analysis. 4.2 City Geological Critical Areas This section describes the Park’s mapped geologic hazards in accordance with the definitions provided in the RMC 4-3-050G. 4.2.1 Flood Hazard Assessment Flood hazard areas are defined as the land in the floodplain subject to a 1% or greater chance of flooding in any given year by the RMC. The northernmost portion of the Park site is located in an area mapped as a Zone AE FEMA regulatory floodway. By definition in the RMC, the portion of the site within the floodway is classified as a high flood hazard area. 4.2.2 Steep Slope Hazard Assessment The City of Renton Steep Slope Atlas displays both sensitive slopes and protected slopes on the Park site. Sensitive slopes (a slope defined as having an average slope lying between 25% and 40% or greater than 40% with a rise below 15 feet) lie on the southern edge of the site, adjacent to Duvall Avenue NE, and the northern portion of the site, surrounding the protected slope. The protected slope (defined as having an average slope of 40% or greater for a minimum vertical rise of 15 feet) is located on the northern portion of the site, south of May Creek. 4.2.3 Erosion Hazard Assessment All surface soils in the Project area are characterized by the USDA NRCS (2023) as having slight erosion potential; therefore, as defined by the RMC, the site is considered a low erosion hazard in areas where the slope grade is under 15%. Erosion control measures should be considered in areas where the slope grade is over 15%, including the areas surrounding the protected slope on the northern edge and the area adjacent to Duvall Avenue NE on the southern edge of the site. AGENDA ITEM # 8. b) Existing Information Summary 18 January 2024 4.2.4 Landslide Hazard Assessment The protected slope is in a high landslide hazard area. Sensitive slopes and surrounding areas are likely medium landslide hazards as they are anticipated to be underlain by competent soils. Geotechnical investigation of the site may reveal the sensitive slopes and surrounding areas to be high landslide hazard areas. Most of the site falls outside these two critical areas and is therefore classified as a low landslide hazard. There have been no historical landslides identified by WDNR (2023); therefore, no portion of the site should be classified as very high landslide hazard. If evidence of previous landslides is discovered in any future geological investigation, the landslide hazard assessment classification may change. 4.2.5 Seismic Hazard Assessment The Park is in a high seismic region. The seismic hazard analysis defined by the RMC is based on the International Building Code classification system. Based on available data, the site is expected to behave as a low seismic hazard area. Geotechnical investigation may potentially reveal less competent soils, resulting in a change to the site rating. 4.2.6 Coal Mine Hazard Assessment The Park has a low coal mine hazard designation by RMC definition. No mines have been identified by the WDNR (2023) in the Project area. Although no mines have been identified in the Project area, undocumented mining is known to have occurred. Any discovery of or evidence of a mine in or surrounding the site may affect the coal mine hazard rating. AGENDA ITEM # 8. b) Existing Information Summary 19 January 2024 5 Cultural Resources Technical Assessment Cultural resources are defined as archaeological, historic, and culturally meaningful sites, structures, objects, or districts, generally those that are eligible for listing on the National Register of Historic Places or state or local preservation registers. Inventory and evaluation of cultural resources, and assessment of impacts, is required by state and federal law. This section describes recorded and potential cultural resources in the Project area. 5.1 Environmental and Cultural Context The Park is located in the Puget Trough physiographic province, a valley system that extends from Puget Sound south through the Willamette Valley and separates the Olympic Mountains from the Western Cascades (Franklin and Dyrness 1988). During the last glacial advance, glaciers extended as far as Centralia. Glaciers began to recede about 15,000 years ago, leaving behind a rapidly changing landscape of proglacial lakes, meltwater streams, and other alluvial features. This process created the thick layer of Pleistocene glacial outwash underlying Holocene sediments across much of the Puget Sound region. Land formerly depressed by the weight of the ice began to rebound (Dragovich et al. 1994) forming the distinctive north-south trending hills and valleys of the Puget Trough physiographic province. Numerous sites have been identified across the region dating to the period after 5,000 BP. The planned Project area is in an upland that slopes to the north toward May Creek. The Park vicinity is in the traditional territory of the Sammamish (sćabábš) and Stkehlmish (sacakałəbš) Tribes that occupied the area around Lake Washington, Lake Sammamish, and the Sammamish River; and the Snohomish (sduhúbš) and Kwehtlmamish (dxwkwíỴəbabš) tribes, whose territory included the Snohomish and Pilchuck Rivers (Suttles and Lane 1990; Ruby and Brown 1986). The Tribes are Lutshootseed-speaking Southern Coast Salish peoples. At the time of Euroamerican contact, Southern Coast Salish tribes occupied the Puget Sound area from the Skagit River in the north to the Deschutes River near Olympia in the south, reaching inland to the Cascade Range crest. Salish peoples lived in winter villages of cedar plank houses and seasonally harvested shellfish and anadromous fish runs, supplemented by upland game hunting and plant gathering (Suttles and Lane 1990). The Washington Territory was organized in 1853 by its first governor, Isaac Stevens, who assisted with Euroamerican settlement and the creation of a Northern Pacific Railway route by displacing regional Native American tribes and relocating them to reservations under a series of treaties in 1855. Washington eventually achieved statehood on November 11, 1889 (Kirk and Alexander 1990). Stevens negotiated several treaties with Native American groups between 1854 and 1856. Upon the signing of the Point Elliott Treaty in 1855, tribes in the Lake Washington area were assigned to the Port Madison Reservation on the Kitsap Peninsula; however, many returned to their homeland. Some tribal members settled on the Muckleshoot Reservation, while others chose not to live on a reservation (Ruby and Brown 1986). Today their descendants belong to the Snoqualmie Tribe, Muckleshoot Indian Tribe, AGENDA ITEM # 8. b) Existing Information Summary 20 January 2024 Suquamish Tribe, and Tulalip Tribes, among others. Native American populations fell victim to epidemics of malaria, tuberculosis, and smallpox carried by Euroamericans in the late 1700s through the middle 1800s (Cole and Darling 1990). Shortly thereafter, settlers expanded across the Oregon Territory, spurred by the Donation Land Act of 1850. King County grew quickly after the passage of the Homestead Act in 1862, as Euroamericans began farming and logging. The discovery of coal at Newcastle in 1863 accelerated growth in the area east of Lake Washington (Lange 1998) and coal fields were located both north and south of May Creek. Mining and associated railroads joined logging as the region’s primary economic activities and drew workers from Europe and Asia. According to historical aerial photographs and maps, the park planning area was undeveloped until the early twentieth century and was probably logged several times. By 1907, maps show property owned by private individuals and lumber companies. In 1936, an aerial photograph shows two farmsteads just north of the park planning area in the area of current residential development. Associated cleared fields extend into the northern part of the Park planning area. Subdividing of the farmsteads appears to have begun in the 1960s. The two structures in the southwestern portion of the Park planning area were constructed at that time. The retention pond in the Park planning area was constructed in 2006. Most of the Park planning area has been undeveloped and forested throughout the historical and modern periods. Native vegetation in the vicinity consists of Douglas fir, Western red cedar, Western hemlock, red alder, and big-leaf maple, with an understory of bracken fern, sword fern, Oregon grape, salal, and berry vines (Franklin and Dyrness 1988). Historically, deer, elk, black bear, cougar, and coyote lived in the Project vicinity. Riverine and upland habitats in the vicinity also supported a diverse array of smaller mammals, fish, shellfish, and birds (Eder 2002). 5.2 Archaeology There are no recorded archaeological sites or isolates in the Park planning area. There are three sites within a mile, as follows: • 45KI821 is a historic cesspool structure located about 0.5-mile northwest of the Project planning area, along Coal Creek parkway. It has not been evaluated for listing on preservation registers. • 45KI1330 is a collapsed wood shelter and portable sawmill remains located about 0.7-mile west of the Project planning area, along an unnamed intermittent tributary to May Creek. It has been determined not eligible for listing on preservation registers. • 45KI1557 is the remains of a mobile home and garage located 0.9-mile south of the Project planning area, along Coal Creek Parkway. It has been determined not eligible for listing on preservation registers. AGENDA ITEM # 8. b) Existing Information Summary 21 January 2024 There has been one archaeological survey that included a portion of the Park planning area, for a roadway widening project along Coal Creek Parkway SE that constructed the existing retention pond (Chambers 2006). Subsurface tests conducted in the retention pond area revealed Alderwood soils over glacial till. The soils appeared to have been disturbed by logging and land-clearing. The Department of Archaeology and Historic Preservation’s statewide predictive model for precontact archaeological potential shows that the Project planning area contains Low Risk, Moderately Low Risk, and Moderate Risk areas for archaeological resources (Figure 8). In general, for planning purposes ground-disturbing work in the Moderate Risk area, closer to May Creek, should be considered more likely to impact archaeological resources. Any planned ground-disturbing work would likely require archaeological survey. Figure 8 Statewide Predictive Model for Precontact Archaeological Potential Source: Department of Archaeology and Historic Preservation AGENDA ITEM # 8. b) Existing Information Summary 22 January 2024 5.3 Historic Resources There are two structures older than 45 years in the Project planning area, both residences. A single family residence at 2718 Duvall Avenue NE was built in 1963 and a single family residence at 2712 Duvall Avenue NE was built in 1964. Neither has been evaluated for listing on preservation registers. None of the other Project parcels have structures listed in the King County Assessor’s records. There is one structure within a mile that has been determined eligible for preservation registers: the Red Barn/Colasurdo Barn (DAHP Resource ID 48530), which is located about 0.9-mile east of the Project planning area. 5.4 Traditional Cultural Properties and Cultural Landscapes There are no recorded Traditional Cultural Properties or Cultural Landscapes in the vicinity. Generally, the process of identifying and evaluating cultural resources requires consultation with Native American tribes and other consulting parties. AGENDA ITEM # 8. b) Existing Information Summary 23 January 2024 6 Site Reconnaissance and Natural Resource Inventory Anchor QEA’s partner, Clearway, conducted a site reconnaissance on December 14 and 15, 2023. Clearway completed a natural resource inventory documenting forested conditions using the Forest Landscape Assessment Tool (FLAT), potential wetland conditions and locations, stream conditions, landmark trees, land cover, and other site features including trails and ditches. The field crew documented field notes with site observations, captured photographs, and collected GIS data. Field data, including numbered photo points, are shown the basemap (Figure 3). The following provides a summary of the site reconnaissance. Site photographs are included as Appendix A. 6.1 FLAT Assessment A FLAT assessment was performed to characterize forest health based on the presence of native, coniferous, and deciduous trees (value) as well as the presence of invasive vegetation (threat). The FLAT is a tool used to assess landscape conditions (values and threats) that can help identify site-specific stewardship and restoration actions. Developed by Green Cities Research Alliance (in coordination with the U.S. Forest Service Pacific Northwest Research Station and in partnership with King County, Forterra, and the University of Washington), the FLAT provides a “rapid, systematic, flexible, and inexpensive environmental evaluation” (Ciecko et al. 2016). During the assessment, field staff identified forest values and threats, using the Green Seattle Partnership Tree-iage Matrix. As shown in Figure 9, the Tree-iage Matrix defines forest value by tree composition, including native canopy, conifer canopy, and opportunity for new canopy. Threats are defined by invasive vegetation cover. AGENDA ITEM # 8. b) Existing Information Summary 24 January 2024 Figure 9 Forest Landscape Assessment Tool (FLAT) Analysis Note: Original version was developed by Green Seattle Partnership showing City of Seattle acreages (Ciecko et al. 2016). Figure 10 maps the values and threats identified during the site reconnaissance. Tree composition value is based on native tree canopy cover, with emphasis on percent cover of conifers within the native canopy. The majority of the site was mapped as medium cover. Areas of high value were mapped where the topography changes and the site slopes up on the south side of the site and where it slopes down towards May Creek. The lawns of the two residential properties on site were mapped as low canopy cover. Threat is based on invasive cover and the areas of highest threat mostly overlapped with the medium tree composition cover in the middle of the site (Photographs 4 and 15). Invasive vegetation was composed primarily of Himalayan blackberry (Rubus armeniacus), with some cut-leaf blackberry (Rubus lacinatus). Reed canary grass (Phalaris arundinacea) was also present and most prominent in open wetland areas but did extend under the tree canopy at times. Areas of low invasive cover mostly overlapped with high and low tree composition value. AGENDA ITEM # 8. b) Existing Information Summary 25 January 2024 Figure 10 Forest Landscape Assessment Tool (FLAT) Map AG E N D A I T E M # 8 . b ) Existing Information Summary 26 January 2024 6.2 Wetland Reconnaissance Field staff identified three potential wetlands through visual assessment. Field staff did not collect soil or hydrology data. The following summarizes the potential wetlands (refer to Figure 3 for locations). Potential Wetland 1 Potential Wetland 1 is presumed to be a palustrine, forested, depressional wetland (Photographs 1 and 17). It is the only wetland collected in this field effort that is mapped in the City GIS data. Its boundary starts roughly in the middle of the site and continues eastward, out of the study area (Photograph 2) and connects to the larger wetland shown on the City’s GIS data. Within the study area, it is approximately 2.7 acres in size, and has a mix of open field and forested areas. Combined with portions of the City-mapped wetland outside of the study area, the total area of this wetland is roughly 6 to 8 acres. The preliminary rating is Category III, with a moderate habitat score of 7. With Low Impact Land Use, this wetland would be assigned a 75-foot buffer by RMC 4-3-050G.2. Within potential Wetland 1, near Photo Point 1, plant species identified included reed canary grass, creeping buttercup (Ranunculus repens), sedge (Carex species), small-fruited bulrush (Scirpus microcarpus), Himalayan blackberry, red alder (Alnus rubra), black cottonwood (Populus tricocarpa), and willow (Salix sp). Near Photo Point 2, salmonberry (Rubus spectabilis), American skunk cabbage (Lysichiton americanus), lady fern (Athyrium felix-femina), and horsetail (Equisetum species) were identified. No conifers were identified within the wetland near this location. One inch of surface ponding was noted. The soil had possible hydrogen sulfide odor. At the toe of slope on the southern side of the site, a patch of reduced iron at the surface was observed. Within the study area, near the wetland’s northern border, there is an excavated, artificial drainage ditch that drains the wetland, likely flowing to the east. Potential Wetland 2 Potential Wetland 2 is presumed to be a small, palustrine emergent, slope wetland, approximately 1,600 sf (0.04 acre) in size (Photograph 5). It is densely covered in reed canary grass, with some Himalayan blackberry. The soil showed strong, shallow redoximorphic features, indicative of a depleted matrix. Its preliminary rating is Category III, with a moderate habitat score of 5. With Low Impact Land Use, this wetland would be assigned a 75-foot buffer by RMC. The canopy directly above it and nearby is composed mostly of black cottonwood and big-leaf maple (Acer macrophyllum). Potential Wetland 3 Potential Wetland 3 is presumed to be an approximately 0.41-acre, palustrine emergent (PEM), depressional wetland. It is covered primarily in creeping buttercup and field grasses (Photographs 7 and 18), with salmonberry along its borders. Its preliminary rating is Category III, with a moderate AGENDA ITEM # 8. b) Existing Information Summary 27 January 2024 habitat score of 6. With Low Impact Land Use, this wetland would be assigned a 75-foot buffer by RMC. Several natural and artificial drainages and short bridges are situated throughout the wetland. 6.3 May Creek Conditions May Creek is Stream Type F. It has a 115-foot critical areas buffer width and a 15-foot structure setback beyond buffer. The northern lobe of the study area encompasses May Creek on both sides of the channel. Between the southern side of the creek and the slope up to the main area of the site lies a broad, relatively flat area (Photograph 11). It has abandoned, relic river channel features, such as oxbows and gravel deposits. It is lightly forested, with mature, second-growth, deciduous trees such as red alder, big-leaf maple, and black cottonwood, with an understory of salmonberry, sword fern, blackberry, and reed canary grass, and includes many downed trees. The topography is hummocky, and the underlying soil is mostly well-drained rock, gravel, and sand over clay. Riparian vegetation at the site does not provide much direct, low-lying cover, though the surrounding canopy provides adequate shade and leaf/organic detritus input. Within view of the study area, the channel is fairly well incised. At the western end, there is a sharp bend to river-right (Photographs 8 and 9), which has exposed a vertical, mostly clay, cliff face about 10 to 15 feet tall. To the north (across the creek) is a steep slope up to residences, mostly covered in Himalayan blackberry and English ivy (Hedera helix; Photograph 10). The gradient at the site is fairly constant and the creek has no large woody debris or large rocks within the study area. This may be the reason no pools have formed, and the creek within the site is mostly one long run. At lower flows, small pools may appear, particularly near the sharp right bend at the western end of the study area. Again, likely due to constant flow, little deposition appears to occur and when exposed, the shore shows only minor signs of erosion. When the creekbed or shore is exposed, it appears to be composed mostly of clay, which may be controlling erosion. The substrate is cobble and large gravel, with little to no fines or appropriately sized salmon spawning gravel. At the time of the field efforts, water depth in the thalweg upstream of the deeper section near the sharp bend appeared to average approximately 10 to 12 inches. 6.4 Landmark Trees While not intended to be a comprehensive survey, Clearway staff identified 21 landmark trees within the study area to help the City update its current landmark tree inventory of the site. Of these, 15 were coniferous and six were deciduous (Photograph 14). Table 1 provides tree data collected including common name, diameter at breast height (dbh), and general condition. AGENDA ITEM # 8. b) Existing Information Summary 28 January 2024 Table 4 Landmark Tree Inventory Tree No. Species Common Name DBH Condition Notes 1 Western red cedar 40 Good No ivy 2 Western red cedar 42 Good No ivy 3* Western red cedar 30 Good No ivy; *mislabeled as second Tree No. 4 4 Western red cedar 30 Good No ivy 5 Western red cedar 40* Good No ivy; *two stems about 30 inches dbh each 6 Western red cedar 26 Good No ivy 7 Douglas fir 31 Good No ivy 8 Western red cedar 35 Good No ivy 9 Western red cedar 29 Good No ivy 10 Douglas fir 32 Good No ivy 11 Big-leaf maple 34 Fair Dense moss on trunk 12 Big-leaf maple 30 Fair Dense moss on trunk 13 Douglas fir 37 Good No ivy 14 Douglas fir 30 Good No ivy 15 Douglas fir 34 Good No ivy 16 Big-leaf maple 33 Fair No ivy, dense moss on trunk 17 Big-leaf maple 67 Fair No ivy, dense moss on trunk 18 Big-leaf maple 82 Fair Moss on trunk, multistemmed 19 Douglas fir 48 Good No ivy 20 Western red cedar 40 Good No ivy 21 Big-leaf maple 45 Fair Dense moss on trunk 6.5 Land Cover and Site Features Vegetation Types Across the study area in general, the vegetation ranges from managed lawns near residences to the west (Photograph 19), and north across May Creek, to a mix of sparsely treed herbaceous patches (Photograph 16) and more densely forested areas in the more steeply sloped areas (Photograph 3). In general, most mature trees appear in good condition, except for big-leaf maple, which are generally performing poorly and are densely covered in moss. The most predominant invasive plant species identified on the site included cut-leaf and Himalayan blackberry, reed canary grass, English ivy, and English holly (Ilex aquifolium). English ivy was present on trees only on the north side of May Creek and holly was mostly confined to sloped areas at the south side of the site. AGENDA ITEM # 8. b) Existing Information Summary 29 January 2024 Hardscaping An approximately 6,800-sf (0.16-acre) area to the south of the driveway at 2718 Duvall Avenue NE (Photograph 5) has been mapped and contains compacted gravel under the duff layer, which is not obvious without close inspection. Removal of the gravel would help restore plant communities and natural hydrology. It may provide a location for staging during construction, reducing the need to create further compacted surfaces. Near the southeastern end of this relic gravel pad, there is a roughly 400-sf by 600-sf artificially excavated pit (Photograph 6), which displays some wetland indicators but would likely be exempt from City regulations due to its size and the fact that it may have been the gravel/fill source or a livestock watering hole. Existing Trails Trail 1 A wide, semi-maintained trail (Photograph 13) provides access east to west, roughly from the parking area of 2718 Duvall Avenue NE to the eastern end of the study area. It was fairly saturated during the site visit near its western terminus, and a large, downed tree obstructed the trail about one-third of the way eastward from 2718 Duvall Avenue NE. Several small bridges provide egress across the drainage ditch that runs along its southern edge. Their condition and safety vary. Trail 2 Leading northward from the adjacent residence at 2718 Duvall Avenue NE, starting near a fire pit, a wide, steep trail leads to the largest bridge on the site (footbridge No. 2; see Figure 3 for location). The bridge crosses a tributary flowing north to May Creek. This tributary becomes steeper and more incised until it reaches the flat area on the south side of the creek. The trail meanders eastward, mostly staying close to the top of the slope. It becomes less defined as it goes downhill (Photograph 12) and heads north, following contours down to the open, flat area adjacent to the south side of May Creek. It is mostly easy to follow and traverse, except for one short section that is very steep. Ditches Several artificially excavated ditches are located within the site. Often, the source, outlet, or continuous path was not observable. When accessible, the centerlines of visible ditches were mapped. AGENDA ITEM # 8. b) Existing Information Summary 30 January 2024 7 Data Gaps As discussed previously, the background information summarized in this report will inform the development of the Project’s master plan for the Park. The information will be used to develop and analyze alternatives and ultimately select a preferred alternative concept design. Following this master planning phase, there are multiple data gaps that will need to be closed prior to the development of a complete construction-ready and permit-approved design. The following provides a summary of identified data gaps. Other data gaps may be identified during the alternative analysis and preferred alternative selection. • Topography and Boundary Survey ‒ Survey in Washington State Plane coordinates ‒ Survey provided in international feet ‒ Boundary survey reflecting all City acquisitions and easements ‒ Site topography (1-foot contours) ‒ Utilities (surface and buried) ‒ Surface conditions (gravel, hardscape, soil) ‒ Vegetation limits and tree locations ‒ May Creek ordinary high water mark (OHWM) ‒ Wetland boundaries • Geotechnical investigation for work within geologically critical areas and to inform potential structural design elements such as footings and foundations • Wetland delineation with functional ratings and buffer analysis • OHWM delineation • Landmark tree survey AGENDA ITEM # 8. b) Existing Information Summary 31 January 2024 8 References AllTrails, 2023. Best Trails in Cougar Mountain Regional Wildland Park. Accessed December 22, 2023. Available at: www.alltrails.com/parks/us/washington/cougar-mountain-regional-wildland- park--2. Ames, K.M., and H.D.G. Maschner, 1999. Peoples of the Northwest Coast: Their Archaeology and Prehistory. London: Thames and Hudson Ltd. Anchor QEA, 2010. May Creek Erosion Stabilization Draft Report. Prepared for King County. January 2010. Bing Maps, 2023. World_imagery. Accessed December 22, 2023. Available at: https://services.arcgisonline.com/ArcGIS/rest/services/World_Imagery/MapServer. Ciecko, L., D. Kimmett, J. Saunders, R. Katz, K.L. Wolf, O. Bazinet, J. Richardson, W. Brinkley, and D.J. Blahna, 2016. Forest Landscape Assessment Tool (FLAT): Rapid Assessment for Land Management. U.S. Department of Agriculture. September 2016. City of Newcastle, 2019. Newcastle GIS Pedestrian Routes 2019. Accessed December 22, 2023. Available at: https://data-newcastlewa.opendata.arcgis.com/. City of Renton, 2018a. Civic Core Vision & Action Plan. Accessed December 18, 2023. Available at: https://rentondowntown.com/wp-content/uploads/Final-Renton-Plan-011718.pdf. City of Renton, 2018b. Comprehensive Plan Land Use Map. Accessed December 13, 2023. Available at: https://gismaps.rentonwa.gov/GISIMAGES/STATICMAPS/Comprehensive%20Landuse%20Pla n.pdf. City of Renton, 2019. Renton Trails and Bikeways Map. Accessed December 18, 2023. Available at: https://cdnsm5- hosted.civiclive.com/UserFiles/Servers/Server_7922657/File/City%20Hall/Community%20Servi ces/Parks%20Planning%20and%20Natural%20Resources/Trails%20and%20Bicycle%20Master %20Plan/Renton%20Trails%20Plan_may19.pdf. City of Renton, 2020. Parks, Recreation, and Natural Areas Plan. Accessed December 26, 2023. Available at: www.rentonwa.gov/city_hall/parks_and_recreation/parks_planning_and_development/parks__ recreation__and_natural_areas_plan. AGENDA ITEM # 8. b) Existing Information Summary 32 January 2024 City of Renton, 2022. Rooted in Renton Urban Forest Management Plan 2022–2032. January 2022. Accessed December 13, 2023. Available at: https://cdnsm5- hosted.civiclive.com/UserFiles/Servers/Server_7922657/File/City%20Hall/Community%20Servi ces/Parks%20Planning%20and%20Natural%20Resources/Urban%20Forestry/Urban%20Fores t%20Management%20Plan/Renton%20WA%20Urban%20Forest%20Management%20Plan%2 01-31-22.pdf. City of Renton, 2023a. City of Renton COR Maps. Accessed December 15, 2023. Available at: https://maps.rentonwa.gov/Html5viewer/Index.html?viewer=cormaps. City of Renton, 2023b. Critical Areas Regulations - Section 4-3-050. Accessed December 21, 2023. Available at: https://www.codepublishing.com/WA/Renton/html/Renton04/Renton0403/Renton0403050.h tml. City of Renton, 2023c. Maps & GIS Data. Accessed December 15, 2023. Available at: https://www.rentonwa.gov/city_hall/executive_services/Information_technology/maps___g_i_s_ data. City of Renton, 2023d. May Creek Greenway. Accessed December 18, 2023. Available at: www.rentonwa.gov/city_hall/parks_and_recreation/parks_and_trails/find_a_park_or_trail/may_ creek_greenway. City of Renton, 2023e. Section 4-2-020. Accessed December 22, 2023. Available at: www.codepublishing.com/WA/Renton/html/Renton04/Renton0402/Renton0402020.html. City of Renton, 2023f. Title IVDEVELOPMENT Regulations. Accessed December 21, 2023. Available at: https://www.codepublishing.com/WA/Renton/html/Renton04/Renton04.html. City of Renton, 2023g. Zoning Map. Accessed December 18, 2023. Available at: https://gismaps.rentonwa.gov/GISIMAGES/STATICMAPS/Zoning.pdf. Cole, D., and D. Darling, 1990. “History of the Early Period.” Chapter in Northwest Coast, Handbook of North American Indians, Vol. 7, edited by Wayne Suttles. Washington DC: Smithsonian Institution,119-134. Dragovich, J.D., P.T. Pringle, and T.J. Walsh, 1994. “Extent and Geometry of the Mid-Holocene Osceola Mudflow in the Puget Lowland-Implications for Holocene Sedimentation and Paleogeography.” Washington Geology 22(3):3-26. Eder, T., 2002. Mammals of Washington and Oregon. Edmonton: Lone Pine Publishing. AGENDA ITEM # 8. b) Existing Information Summary 33 January 2024 Ficken, R.E., and C.P. LeWarne, 1988. Washington: A Centennial History. Seattle: University of Washington Press. Franklin, J.F., and C.T. Dyrness, 1988. Natural Vegetation of Oregon and Washington. U.S. Department of Agriculture Forest Service, General Technical Report PNW-8. Galster, R.L., and W.T. Laprade, 1991. “Geology of Seattle, Washington, USA.” Bulletin of the Association of Engineering Geologists 28(3):235-302. Gustafson, C.E., and C. Manis, 1984. The Manis Mastodon Site: An Adventure in Prehistory. Sequim, Washington: Manis Enterprises. King County, 2023. King County Parcel Viewer, Accessed January 2, 2024. Available at: https://gismaps.kingcounty.gov/parcelviewer2/. King County, 2023a. Cougar Mountain Regional Wildland Park. Accessed December 20, 2023. Available at: https://kingcounty.gov/en/dept/dnrp/nature-recreation/parks-recreation/king- county-parks/parks/cougar-mountain. King County, Washington, 2023b. May Creek Sub-Basin Environment. Accessed January 3, 2024. Available at: https://kingcounty.gov/en/dept/dnrp/nature-recreation/environment-ecology- conservation/stormwater-surface-water-management/capital-services-unit/may- creek#:~:text=Plan%20adopted%20in%202001%20to,and%20wildlife%20habitat%20and%20 water. Kirk, R., and C. Alexander, 1990. Exploring Washington's Past. Seattle: University of Washington Press. Lange, G., 1998. Surveyors discover coal at Newcastle (east King County) in October 1863. Updated: November 3, 1998. Cited: March 2009. Available at: http://www.historylink.org/index.cfm?DisplayPage=output.cfm&file_id=149. MacLeod Reckord, 2009. Park at 95th Master Plan. Prepared for the City of Newcastle. MIG, 2018. Renton Downtown Civic Core Vision and Action Plan. Prepared for City of Renton. Accessed December 21, 2023. Available at: https://www.rentondowntown.com/wp- content/uploads/Final-Renton-Plan-011718.pdf . Pace, 2023. Record of Survey for City of Renton. Prepared for City of Renton. Portion of: NW Quarter Section 3, T23N, R5E & SW Quarter Section 34, T24N, R5E, W.M. Ruby, R.H., and J.A. Brown, 1986. A Guide to the Indian Tribes of the Pacific Northwest. Norman, Oklahoma: University of Oklahoma Press. AGENDA ITEM # 8. b) Existing Information Summary 34 January 2024 Shapiro and Associates, Inc., 2023. Proposed May Creek Basin Action Plan. Prepared for King County Department of Natural Resources, Water and Land Resources Division. Accessed December 21, 2023. Available at: https://your.kingcounty.gov/dnrp/library/2001/kcr726/Plan.pdf. Sletten, R.S., D. Snyder, L.C. Lee, D. Booth, and D.J. Marrett, 2008. Soils and Land Use in the Puget Sound Basin. Presentation at the American Society of Agronomy, Crop Science Society of America, Soil Science Society of 86th America Annual Meeting. Seattle. 1994. Suttles, W., and B. Lane, 1990. Southern Coast Salish. Chapter in Northwest Coast, Handbook of North American Indians, Vol. 7, edited by Wayne Suttles. Washington: Smithsonian Institution, 485-502. Washington State Recreation and Conservation Office, 2023. Grant Requirements. Accessed December 21, 2023. Available at: https://rco.wa.gov/recreation-and-conservation-office- grants/grant-requirements/. Washington Trails Association, 2023. May Creek Trail. Accessed December 21, 2023. Available at: https://www.wta.org/go-hiking/hikes/may-creek-trail. Wildlife Recreation and Coalition, 2023. May Creek Trail, 1991. Accessed December 21, 2023. Available at: https://wildliferecreation.org/projects/may-creek-trail-1991/. Wildlife Recreation and Coalition, 2023. May Creek Trail, 1994., Accessed December 21, 2023. Available at: https://wildliferecreation.org/projects/may-creek-trail-1994/. AGENDA ITEM # 8. b) Appendix A Site Photographs AGENDA ITEM # 8. b) Photograph 1 Potential Wetland 1, Facing West Photo Point 1: Toward potential Wetland 1. Creeping buttercup groundcover, approximately 1 inch of standing water. Source: Clearway Environmental Photograph 2 Potential Wetland 1, Facing East Photo Point 1a: Toward potential Wetland 1 and continuing off site to adjacent property to the east. Dense reed canary grass. Himalayan blackberry in foreground. Source: Clearway Environmental AGENDA ITEM # 8. b) Photograph 3 Forested Area, Facing North Photo Point 2: Positioned from upland forested area at southeast corner of site. Open area of Wetland 1 is visible downhill through brush. Low invasive cover in forested area. Source: Clearway Environmental Photograph 4 Forested Area, Facing South Photo Point 3: Typical habitat and vegetation for triangular area at west side of site. Dense Himalayan blackberry throughout. Some conifers toward Coal Creek Parkway at concrete wall. Source: Clearway Environmental AGENDA ITEM # 8. b) Photograph 5 Potential Wetland 2, Facing North Photo Point 4: Potential Wetland 2. Small emergent wetland with reed canary grass. Source: Clearway Environmental Photograph 6 Depression with Perched Water, Facing East Photo Point 5: At edge of vegetation-covered gravel pad area. Possible human-made depression with perched water, approximately 20 by 30 feet. Source: Clearway Environmental AGENDA ITEM # 8. b) Photograph 7 Potential Wetland 3, Facing East Photo Point 6: Looking toward potential Wetland 3 near parking area. Start of Trail 1 in background. Source: Clearway Environmental Photograph 8 May Creek, Facing East Photo Point 7: From overlook down to May Creek. At left side of photograph is a residential lawn on the north side of the creek. Source: Clearway Environmental AGENDA ITEM # 8. b) Photograph 9 May Creek, Facing West Photo Point 8: Looking from the left bank of May Creek. Erosion present at curve of creek. Source: Clearway Environmental Photograph 10 May Creek, Run Section, Facing North Photo Point 9: Looking across May Creek in “run” section of the creek. No large woody debris present. Source: Clearway Environmental AGENDA ITEM # 8. b) Photograph 11 May Creek Floodplain, Facing Northwest Photo Point 10: Representative of low area/floodplain on south side of May Creek. Some invasives such as Himalayan blackberry and reed canary grass throughout. Source: Clearway Environmental Photograph 12 Embankment, Trail 2, Facing South Photo Point 10a: From low area/floodplain looking uphill to landscape surrounding Trail 2. Source: Clearway Environmental AGENDA ITEM # 8. b) Photograph 13 Trail 1, Facing East Photo Point 11: Trail 1 is a semi-maintained trail running east to west from parking area to east border of study area. Source: Clearway Environmental Photograph 14 Landmark Tree Photo Point 12: Example of landmark tree – very large, big-leaf maple. Source: Clearway Environmental AGENDA ITEM # 8. b) Photograph 15 Medium Canopy Cover, Facing North Photo Point 13: Example of Forest Landscape Assessment Tool (FLAT) designation – medium canopy cover, high threat level. Source: Clearway Environmental Photograph 16 Potential Wetland 1, Facing West Photo Point 14: More open/emergent area of potential Wetland 1. Rushes, juncus species, small-fruited bullrush, alder saplings. Source: Clearway Environmental AGENDA ITEM # 8. b) Photograph 17 Potential Wetland 1, Facing North Photo Point 14a: Looking toward edge of potential Wetland 1. Red alder saplings and Himalayan blackberry on the border. Source: Clearway Environmental Photograph 18 Park Border, Trail 2, Facing Northeast Photo Point 15: Lawn/grass near 2718 Duvall Avenue NE property and parking area. Edge of potential Wetland 3. Trail 2 to May Creek past structure is seen on left side of photo. Source: Clearway Environmental AGENDA ITEM # 8. b) Photograph 19 Park Border 2, Facing West Photo Point 17: Lawn/grass in front of 2718 Duvall Avenue NE property. Source: Clearway Environmental AGENDA ITEM # 8. b) APPENDIX B CONCEPTUAL DESIGN ALTERNATIVES AGENDA ITEM # 8. b) Appendix B Conceptual Design Alternatives 1 July 2024 DESIGN PROCESS The Project team developed two conceptual design alternatives to communicate different approaches to developing the Park. The following sections provide a summary of the design process and the alternatives developed for the City of Renton’s (City) May Creek Park Master Plan Project (Project). First, the site was thoroughly explored and analyzed, both in person and through reviewing currently available literature, documentation, and GIS data. Project opportunities and constraints were identified, and a list of criteria was developed to support the alternative analysis and decision-making. Next, two preliminary alternatives were developed following this initial research and initial community and stakeholder feedback. The first alternative focused on passive recreation and limited access. The second alternative focused on park recreation and trail access. The two concepts were scored against each other and each Park element ranked on how well it met the criteria. Both conceptual design alternatives were presented to shareholders and at public events, received feedback, and were then honed to ultimately lead to a final preferred design. AGENDA ITEM # 8. b) Appendix B Conceptual Design Alternatives 2 July 2024 OPPORTUNITIES AND CONSTRAINTS The Project team developed identified the opportunities present on the site, and also any constraints. The site provides many opportunities, including access to nature and views, including May Creek, wetlands, and forested areas, which also allowed for restoration stewardship opportunities for the creek, wetlands, forests, and riparian habitats (Figure 1). The current habitats include a creek with stable banks that can support salmon migration and forests with an abundance of large, mature heritage trees. The site has existing access and safe crossings at the entrance, as well as nearby public transportation. It also has opportunities to connect in the future to nearby trails in Newcastle to the west and a network of neighborhood trails to the east, completing a connection of trails from lake Washington to Cougar Mountain. An additional parcel is potentially available in the future. Acquiring this parcel would provide the opportunity for additional upland open space that could be developed near the entrance of the Park. On the other hand, the site also comes with some challenges and constraining factors (Figure 2). The wetland and stream habitats, their buffers, and Federal Emergency Management Agency (FEMA) flood zones take up a large portion of the site, limiting development in these areas. Steep forested slopes also limit what can be developed and prevent easy access to large portions of the Park. A busy street and private property surround the Park, and sewer and other utility access is limited. Existing structures and old concrete pads, fences, and debris must be removed prior to development. AGENDA ITEM # 8. b) Appendix B Conceptual Design Alternatives 3 July 2024 Figure 1 Project Site Opportunities AG E N D A I T E M # 8 . b ) Appendix B Conceptual Design Alternatives 4 July 2024 Figure 2 Project Site Constraints AG E N D A I T E M # 8 . b ) Appendix B Conceptual Design Alternatives 5 July 2024 DESIGN CRITERIA The design criteria are based on the discussions with the City, stakeholders, and the community, as well as information gathered during the Project’s existing information review task. The following preliminary criteria were used to compare the alternatives and will guide the development of a preferred alternative. These criteria are preliminary and likely to be refined as the Project progresses. Maximize Trail Development Within the Park •Maximize trail connections to the diverse landscapes within the Park. •Maximize trail loops and opportunities for hiking/walking/running within the Park. •Provide a trail connection to May Creek. Connect to Existing May Creek Greenway Trails •Connect the Park to adjacent trail corridors along May Creek. Provide Trail Connections to Renton Neighborhoods •Connect the Park to adjacent neighborhoods with safe Duvall Avenue NE crossings and a safe route to the Park entrance. •Connect existing bus stops to the Park entrance with a safe route. •Provide bike pathways and bike parking in the Park. Provide Park Development for Families •Provide a play area. •Provide picnicking areas. •Provide sport courts (pickleball, tennis, and basketball courts). Provide Park Facilities •Provide a restroom facility. •Provide a heated restroom facility with sewer connection. •Provide drinking fountains (water bottle fill stations, dog drinking fountains). •Provide trash receptacles. Maximize Open Space for Unprogrammed Recreation •Maximize lawn space for picnicking, informal gathering, and unprogrammed play. AGENDA ITEM # 8. b) Appendix B Conceptual Design Alternatives 6 July 2024 Maximize Restoration and Habitat Enhancement •Remove invasive vegetation. •Install appropriate native vegetation. •Maximize improvements to May Creek riparian area. •Improve May Creek stream habitat with the placement of wood to provide interstitial habitat niches for migrating salmon use. •Restore wetland and wetland buffer habitat function. Maximize Forest and Habitat Preservation •Protect existing landmark trees. •Protect existing canopy. •Protect existing wetland habitat. Provide Environmental Education and Stewardship •Provide areas to assist with future stewardship programs (trails, gathering areas, signage). •Provide an indoor gathering area for a larger environmental education facility. •Provide interpretive signs and kiosks. •Provide a native plant nursery for hands on education opportunities. Provide Public Art and Placemaking •Identify prominent areas to integrate public art. •Provide trailhead kiosk for Renton’s May Creek Greenway. •Locate entry signage at key location to identify Park location and entry prominent. Provide Parking •Provide sufficient parking for visitors. Avoid Impacts to Neighbors •Avoid locating high-use area directly adjacent to residential neighbors. •Protect secured access point for City to access the stormwater pond. •Maintain offset from the stormwater pond fence to deter users from trying to access the pond. Maximize Safety and Accessibility •Provide open sightlines between all Park development areas. •Maximize Americans with Disabilities Act (ADA) access to Park development areas. AGENDA ITEM # 8. b) Appendix B Conceptual Design Alternatives 7 July 2024 Consider Value to Cost •Maximize value gained for construction cost. Consider Permit Feasibility •Avoid impacts to regulated wetland, stream, and buffer habitats. •Avoid code variances for proposed work. •Design a self-mitigating project with overall net ecological benefit. AGENDA ITEM # 8. b) Appendix B Conceptual Design Alternatives 8 July 2024 DESIGN PROGRAM This preliminary design program is the starting point for the Project design and consists of a list of the design assumptions and elements and that are included in the Project’s alternative designs. Park Development Facilities •Restroom (indoor plumbed or portable toilet enclosure) •Environmental education center (building) •Play area •Sport courts •Open lawn Trails •Pervious trails •Impervious trails Recreation Amenities •Drinking fountain •Outdoor water filling station •Interpretive signage •Benches •Picnic tables •Trash and recycling receptacles in the Project area Art and Placemaking •Environmental education signage and kiosks •Public art integration •Entry signage Parking and Access •Vehicle parking •Bike parking •Fire truck access and turnaround •Gate for secured stormwater pond access AGENDA ITEM # 8. b) Appendix B Conceptual Design Alternatives 9 July 2024 Utilities •Water •Electrical •Sewer •Stormwater Restoration and Habitat Enhancement •Invasive plant removal •Native planting •In-stream wood placement Forest and Habitat Preservation •Tree protection •Understory planting (for diversity, vegetated strata, habitat) Design Considerations •50-year design life •Potential future acquisition property to the west is likely. AGENDA ITEM # 8. b) Appendix B Conceptual Design Alternatives 10 July 2024 SUMMARY OF CONCEPTUAL ALTERNATIVES Alternative 1 Alternative 1 has a focus on passive recreation and limited access. This design includes just a few traditional park elements; a small footprint for active recreation, and a large area dedicated to habitat protection, restoration, and enhancement activities. The existing access driveway has been used and improved upon, with a parking lot at the end for 18 cars. A small comfort station and trailhead kiosk are included along with a large natural play area and open lawn. A small picnic shelter is included as well as a small amphitheater/stage on the future parcel. The trail corridors for this alternative are simplistic, allowing for many areas to remain protected. Pervious trails loop from the active recreation area through wilder parts of the Park, providing views of May Creek and wetlands while minimizing disturbances to creek and wetland buffers. Access to future trail connections exist on the east side of the Park, as well as areas for interpretive signage along the trails, public art, and opportunities for placemaking. This alternative includes a crosswalk south of the Park at NE 24th Street and Duvall Avenue NE to increase foot traffic to the Park as well as safety. See Figure 3 for plan graphic. AGENDA ITEM # 8. b) Appendix B Conceptual Design Alternatives 11 July 2024 Figure 3 Alternative 1 – Focus on Passive Recreation and Limited Access AG E N D A I T E M # 8 . b ) Appendix B Conceptual Design Alternatives 12 July 2024 Alternative 2 Alternative 2 has a focus on park recreation and trail access. The existing access was used and expanded upon. Various Park amenities are centralized in an existing flat, clear opening outside of wetland buffers and wooded areas. Because a portion of this area is currently privately owned, this alternative design may need to take place in phases, with a second development phase starting when the additional parcel is acquired by the City. At the end of the access road is a parking lot with space for 24 cars, as well as an additional small lot with 4 ADA parking stalls off the large environmental education building (open air rustic shelter). Nearby is a small comfort station and trail head, along with a picnic shelter, seating, and a natural play space. In addition to these features, a basketball court and tennis/pickleball court are part of this alternative, along with a native propagation nursery area and a small, enclosed dog park. This design also includes two large open lawn spaces and a pervious trail network connecting all active recreation and amenities with the wilder areas of the Park. These pathways wind through woods and wetlands to viewpoints and to the creek. At trail intersections, wide nodes accommodate benches for resting and interpretive signage. A switchback trail leads up the hill to the nearby neighborhood to the south and another leads down the hill to provide creek access to the north. These trails would be as accessible as possible and may include stairs but would not likely be ADA-accessible. An opportunity exists for stormwater treatment from the parking lot in the form of raingardens, and there is an ongoing need for invasive species removal and stewardship throughout the park. A crosswalk south of the Park at NE 24th Street and Duvall Avenue NE is recommended for this alternative to allow for safer neighborhood access to the trailheads. See Figure 4 for plan graphic. AGENDA ITEM # 8. b) Appendix B Conceptual Design Alternatives 13 July 2024 Figure 4 Alternative 2 – Focus on Park Recreation and Trail Access AG E N D A I T E M # 8 . b ) Appendix B Conceptual Design Alternatives 14 July 2024 DESIGN CRITERIA COMPARISON MATRIX The below matrix ranks each criterion on a scale of low to high for each alternative, with “low” meaning that the alternative least meets the criterion and “high” meaning that it most meets the criterion. High Most meets criterion Medium Moderately meets criterion Low Least meets criterion Criterion Alternative 1 Alternative 2 Maximize Trail Development Within the Park Low High Connect to Existing May Creek Greenway Trails Medium High Provide Trail Connections to Renton Neighborhoods Medium High Provide Park Development for Families Medium High Provide Park Facilities Medium High Maximize Open Space for Unprogrammed Recreation Medium High Maximize Restoration and Habitat Enhancement High Medium Maximize Forest and Habitat Preservation High Medium Provide Environmental Education and Stewardship Medium High Provide Public Art and Placemaking High Low Provide Parking Low High Avoid Impacts to Neighbors High Medium Maximize Safety and Accessibility Medium High Consider Value to Cost High Medium Consider Permit Feasibility High Medium AGENDA ITEM # 8. b) APPENDIX C COMMUNITY ENGAGEMENT DATA AGENDA ITEM # 8. b) 1 City of Renton Northeast Renton Park Master Plan Community Engagement Results AG E N D A I T E M # 8 . b ) 2 •Touchpoint #1 February 2024 Input on site opportunities and constraints •Touchpoint #2 March to April 2024 Input on design concepts •Touchpoint #3 June 2024 Input on draft preferred design Engagement Results AG E N D A I T E M # 8 . b ) Community Engagement – Touchpoint #1 February 2024 AG E N D A I T E M # 8 . b ) 44 Community Outreach Postcard Mailer – Sent over 4,000 postcards to all mailing addresses within 1/2 mile of site (Feb. 20, 2024) Display Boards – Posted community engagement boards on rotation at Renton Facilities (Feb. 16, 2024 – present) City Newsletter – Distributed project information in “This Week in Renton” Newsletter (Feb. 28, 2024) Utility Billings – Distributed project information in monthly utility bill mailings (Feb. 2024) Social Media – Posted project information on City social media (Feb. 2024 – present) Website – Created a website to serve as a central engagement hub to share information and gather feedback (Feb. 2024) AG E N D A I T E M # 8 . b ) 5 Community Outreach: Online Engagement AG E N D A I T E M # 8 . b ) 6 What Kinds of New Features/Facilities Do You Want? Here’s What We Heard: Sports Facilities Requests for pickleball courts, including dedicated courts, multiple courts, permanent nets, and lighting Desire for basketball and tennis courts Suggestion for a disc golf course Mention of turf sports fields with lights Nature Preservation Concerns and requests to protect wildlife habitats and May Creek Desire for walking trails through forested areas Suggestions to eradicate invasive plants and preserve surrounding environment Playground and Amenities Requests for a revamped playground with facilities for various age groups Desire for covered bench seating, restrooms, a paved walking loop, and parking Mention of an obstacle course, RC course, and water activities Connection to Trail Networks Requests for sidewalks and infrastructure improvements to enhance access to the new park Dog Park Requests for an off-leash dog park Suggestions for a dedicated area for dogs AG E N D A I T E M # 8 . b ) Community Engagement – Touchpoint #2 March and April 2024 AG E N D A I T E M # 8 . b ) 9 Community Outreach: Online Engagement AG E N D A I T E M # 8 . b ) 10 Community Outreach: In-Person Engagement AG E N D A I T E M # 8 . b ) 11 Community Outreach: Online Engagement OFF-LEASH DOG AREA? AG E N D A I T E M # 8 . b ) 12 Open Ideas AG E N D A I T E M # 8 . b ) 13 We need a splash park or water park for kids to run through! -Shannon I want to make sure this park is ADA accessible. Disabled people deserve to enjoy the outdoors and be a part of the experience as well. Especially disabled children. I hope all walkways, playgrounds, and amenities are wheelchair accessible. -Manisha I'm concerned with the access to the park, along with pedestrian safety. That curve on Coal Creek Parkway that the park is proposed to sit adjacent to is a known danger zone, where speeds routinely exceed 45-50 mph, and accidents are common. By what method are pedestrians to safely cross Coal Creek Pkwy to access the trail connection on the west side of the road? -BL great space to build a park and allow the public to access a green space area. My hope is that it is a park that reflects and retains the natural space while also providing the aspects of a park where people can gather and play in nature. -JS Beautiful location and I really LOVE the idea of the trail connection to sidwalk near the adjacent neighborhood. I am disappointed that the sport courts (pickleball specifically) did not make it into this design. I am disappointed that there is not a plan to include the connection to the Newcastle trail network from the outset. I have concerns about traffic and safety at the sidwalk connection to the Newcastle trail network instead. Coal Creek Parkway was originally a county road and had a speed limit of 50mph. Since the City of Renton has had the road, it's speed limit has been reduced to 35mph, but no design elements of the road were changed to reflect that. The road still feels like one you can go 50mph on and people do + much faster. Right now, almost no one uses that intersection crosswalk on foot and that is good because the folks ripping down Coal Creek Pkwy approaching from the south are coming around a nearly blind curve. If the park results in increased foot traffic at that intersection, I have serious concerns about folks getting hit by these cars as well as the affect that will have on North/South traffic. That section of Coal Creek Pkwy already backs up significantly at certain times of day. Adding delays to the movement of N/S traffic (longer and more frequent red lights due to foot traffic between new park and Newcastle trail network) may significantly worsen the problem. Could we not include the connector trail from the outset of the project and/or design the part of the connect that crosses Coal Creek as an underground passage or overhead walkway (my strong preference being the underground option). This concept includes a future outdoor environmental education area. Without a specific plan for its use, I worry that it will go unused. I have seen those structures sit mostly unused in many parks. I would much prefer to have a sport court of some kind over this. Please engage the Langley Ridge Community about the potential use of the trail easement on the tracts north of their development. I am sure residents there will be keen to understand the likelihood that the easement will be used and what measures will be taken to ensure that those using them do not venture off the trails and onto their properties. I'd love to see at least one bike rack incorporated into the parking lot or elsewhere. There are a lot of neighborhoods at a medium distance from the park and I could easily imagine folks wanting to have the option to ride their bikes there instead of walking or driving. -Stephen LaPlante I see deer and bobcats in this area frequently. How does this project ensure that these animals will continue to have sufficient habitat to survive? -Stephen LaPlante Why in the world would we put in portable toilets? -Bourbonisgood The image shows side walk on the west side of coalcreek as "existing"; that sidewalk doesn't exist today. As a lot of people point out, there needs to be imporovements on being able to access this Park. People do like to speed down Duvall, there needs to be safe side walks. I have seen atleast a dozen accidents. -Dags Hi! Please leave park bathrooms open year round! Child and senior residents need them. It was a challenge with them closed 2023- 2024. Revise your toileting plan! It's tacky at best to close them. They are an essential service. -DMR Provide trail access from the south or east for people and kids in Summerwind and Newcastle terrace. -Ryan Please add a dog park, pickleball, and basketball. -Tony The radio control hobby has grown immensely. My son and I have gotten involved with this fun past time in the rock crawling part of it, but it has been difficult to find courses. We live very close to where this park will be developed and would love for it to include a 1/10th scale rc crawler course with varying terrain, bridges, ramps, off camber obstacles and the like. The closest course I know of is at Remote Control Hobbies in Covington. Please consider this as part of the development. My son and I would greatly appreciate it. Renton citizen since 1996. -Patrick AG E N D A I T E M # 8 . b ) 14 Hello, Me and several friends would love to see that or part of that be a disc golf course. It’s so much fun and afterward we usually go out somewhere to eat. I hope you would consider making it a disc golf course because I know there would be a lot of people that would use it and enjoy it. Thank you, Maxine Nagel -Maxine 1. Would love to see dedicated pickleball courts with lights for the evening time. The demand is very, very high and the number of public courts in Renton is few. 2. An off leash dog park is a much needed space that Renton also doesn't have very many of. 3. Walking trails through shaded forest areas to connect with nature. The PB courts and dog park can be further away from housing and the creek, closer to the road. -PhilT Lit up tennis courts please! Coulon Park and Liberty Park fill up so quickly on nice days. -Maria Please do not allow access to May Creek. Foot traffic would disrupt both the residents and wildlife. Also, there were numerous bear sightings last year. Have you considered the potential encounters between wildlife and people/dogs if you add trails? -Karissa_alana I feel it would be a great place for a disc golf course. It’s a fun sport that will bring a lot of people to this area to play and to visit local restaurants and stores. It will also help keep people who live here playing here and not having to travel 15 plus miles to spend money in other areas. Renton deserves the economical boost from this park. Being a resident who lives in the near the park site. I would love to see a place for our community members to congregate and play and have fun. -WoodyB The idea of open spaces are needed but worry about tax dollars being spent on outlay and upkeep. Where is funding coming from? -Connected Neighbor Lighted pickleball courts in this neighborhood park? I do not think so. Play area for kids? YES Sheltered picnic area? YES. Soft trails? YES. Pickleball? NO! It's a semi-rural area; part of the May creek Greenway; home to loads of wildlife. Which means subdued & minimal lighting. -MB I think a new park is a nice idea. Parks are important. But what about finishing the sidewalk refresh project in Maplewood Glen? Our driveway entrances are sunken and get flooded everytime it rains. But 2 doors down is fresh, new, non -flooding. -Astreiss No off leash dog area. There is enough noise in this area already. There are deer and bear who frequent the area and it would not be good for them. -Sue Basketball court Obstacle course Soccer field -Ali Gil Maybe a dog park would be good. -MA The city of Renton needs to put in turf sports fields with lights.-Thersident More trails that are NOT paved! Soft surface! Hiking/jogging forested –Shannon Gifford We need pickleball courts with lights please! As many courts as possible ! There is a huge demand in Renton -Scott More pickleball courts please. At least 6 -Joy Basketball and tennis courts dog park walking trails are what are needed inthis area -Yasmin Ali Please don't allow physical access to may Creek. -Sue Please include access to creek and some water activities. -MA Having a basketball court is a must. -MA Pickle ball court with lights. Disc golf baskets. -Hellopeanutpoms Pickleball courts with lights -Susan Pickleball! Four courts would be awesome. These tennis courts get built and get no use. We play year round and there's a huge community of players -SeyiA91 Please install dedicated pickleball courts with lights -David AG E N D A I T E M # 8 . b ) 15 Renton desperately needs PICKLEBALL courts!! There are times where the wait is HOURS to play at the current parks. A great option is to build tennis court with pickleball lines so community members can bring their own nets or for the city to provide nets (similar to Seattle). -hellorosiedoodle Please add at least 3 Pickleball courts. Currently we have 250 pickleball players for one court. Thank you -Fernando Can we please get tennis and basketball courts here? :) -Joyce What is your plan to protect the wildlife that currently frequents those properties? Their current habitat has already been shrunk significantly by housing projects. -Karen I would love to have more pickleball courts with permanent nets & lights so we can play after work. I see many empty tennis courts that are not being used. Please create more pickleball courts for us. Thank you! -PBFanatic I’d love to see more pickleball courts with decent lighting for the evenings. -PD 3 more dedicated pickleball courts -Kofucious Please have lots of covered bench seating, and a play area that can be used for many different age groups of children, restrooms, a paved walking loop, and a parking lot. -Blackberry Pickleball courts would be so appreciated. Please consider putting in several courts as there is a shortage in the Renton highlands. -Joyful It would be great to have a disc golf course. -Beelaroo This is an incredibly exciting project! We live closer to Jay Berrys and there are hardly any sidewalks or good biking trails. Quality parks are needed in this community. Selfishly, I would love to see pickleball courts. However, I know wildlife continues to be pushed out as humans develop more. In an ideal world, it would be great to have the majority of this area used for nature trails, preserve the surrounding environment for plants and animals, eradicate invasive plants like blackberries, and maybe squeeze some pickleball courts in closer to the road where human impact already exists. I would be open to volunteer opportunities to help. I am hesitant about allowing dogs due to their potential impact on wildlife, and irresponsible owners who may not clean up after them. –ewebbwilson Wonderful to hear about this park!! We are right across Duvall Ave., but don’t have a sidewalk on our side of the Duvall Ave bend to get safely to the new crosswalk for the park, please add one!! Also +1 to off leash dog park! -Laura May Creek is an important wildlife corridor. Please save as much of the trees/vegetation as possible. A viewpoint would be nice, so we can see May Creek down below. -Maria Wolcott It would be great if there was an off leash dog park included. The nearest one is downtown (I only went once because it was dismal) and the nearest good dog park is on Mercer Island. In contrast, the nearest park with a play area and sport courts is at Lske Boren, a couple miles down the road. -MuttsRule I would love to see New PICKLEBALL COURTS on this community with Renton have very few areas to play I think it would really build the community and help develop strong relationships. Also a revamped playground with fun for kids. My family is walking distance to this park and would to see it be followed through! -Jrichartz14 Connecting to the Terrace and Highland trains will be a fantastic feature!. -eytrenton Dedicated pickleball courts would be amazing to have and an efficient use of space since you can fit 4 in the same space as 1 tennis court. Nearby Lake Boren Park has blended courts that are poor for pickleball because the net is a different height for tennis and the courts have faint red lines for pickleball on a green surface that are difficult to see even for non-colorblind people. An area of the park sectioned off for an off- leash dog area would also be welcome. -PicklelessinRenton AG E N D A I T E M # 8 . b ) 16 Ideas Votes A lot of parking spots in Concept #1 0 Make parking space sizes generous in size so cars can fit well 0 More parking is better - Definitely ADA 0 A structure to picnic or gather, a paved loop or boardwalk to walk. No pool, no art work it will just get tagged, pls working bathrooms 0 Keep it simple 0 ADA Accessible trails/bridges (and they don't need to be paved)2 Art installations throughout the park - use natural or plants to create beautiful moments along trail 0 Public Art is great ideas 0 Big playground 3 Little house for baby and kid and a big house for older kids 0 Metal slide so people don't get electric charge 0 Play house 0 Seesaw / Swing / Soccerfield 0 Slide 0 Tube Slide 0 Two swings 0 Yes, playground 0 Zipline, Swing, Garden 0 Climbing Wall 5 Climbing wall with various difficulties and ability to use ropes and protection.5 Great idea!0 Ideas Votes Pool 1 Dog park area 0 The closest true fenced in dog park is in downtown Renton. So many people end up going to the baseball field at Honey Dew elementary to run their dogs. Would be nice to have a dog area. 0 Emergency/safety pillars or some alert in the park to ensure safety of visitors 3 Emergency alert pillars - see Bellevue Park trails 0 Security & safety gate keeping cars out & drug users 0 Signage needs to be by the road & visible when people drive by 0 Signs of what to do if you see a bear, unhoused, other animals, etc 0 It would be great to add some open paved spaces embedded throughout the park for rollerskating 0 It’s a great activity for kids & adults both, but a learning curve. So having paved areas in open space is nice. People use tennis courts to learn but we don’t want to ruin those courts. There’s indoor courts but people get nervous about learning with more experienced skaters :) 0 Large playground, with covered area and splash pool. Both examples do not look like there is enough interaction for children and families 1 More areas for families 1 More trails - the better 0 Ideas Votes Concept #2 is the version that seems to invite more interaction!1 Love this. Can be used by any age group 0 Move some trail connections & loops from concept 2 to concept 1 and boardwalk 0 Combine the Viewshed Loop w/the access to creek 0 I really like #2 for the trails (seems to be more than #1) Also - future connection to Newcastle trail network. I love that! 0 Need access from Glencoe neighborhood to park without having to backtrack on sidewalks & crosswalks @ 24th & Duvall 2 Crosswalks w/light on Duvall 0 Need crosswalk @ 24th & Duvall | Sidewalks!0 Off leash dog area, and dog leash walking trails please!4 A big dog park 0 Cat park/Dog park/ Nature trail/ ziplines / Thanks!0 Dog Park 0 Yes Dog Park!0 Outside class 0 Education center w/outdoor classroom (example, Tiny Trees outdoor preschool)0 Nature club, meets on Saturdays at 1pm for wild animals and plants to help the environment 0 Wi-Fi 0 Please visit the Lewis & Creek park in Newcastle area Bellevue. That park has wetlands, steep areas and it’s got trails. Emulate that park. 0 May I suggest the perfect park? 0 AG E N D A I T E M # 8 . b ) 17 Ideas Sum of Votes We need an amazing destination playground. Water features for splash play. Bouncy flooring not wood chips. Covered picnic area. 3 Playground ideas 3 Yes to bouncy flooring!0 Working telescope 0 Yes! Love telescope! Goes along with Darksky.org principles and keeping a natural space 0 Zipline 3 Yes, zipline 0 Zipline!0 Grand Total 40 Ideas Sum of Votes Provide some covered play area (like in NM for example)7 Covered play areas are so important - Kids can use in rain & when really hot too!0 Kids need a place to play in the rain and very hot weather. Something that works with the log play ground idea. Thanks! 7 Sand pit / digging area.0 There is a sand pit at the Lake Sammamish park and also one in a park in capitol hill. Really huge. Kids love to dig and it would be great to have an area where they can just go do that. 0 Skate park / Face painting 0 Ball pit 0 Skate park!0 Snack area, tent for sunny days 1 A nice bbq place 0 A picnic area where the sun hits 0 A place to do birthday parties 0 Sport general running, soccer 1 I like concept 2 WITHOUT sport fields 0 No pickleball we have in other parks. No to basketball.0 No playing field. For wild animals and plants 0 Soccer field / basketball court / Garden 0 Sunset viewing opportunities 1 Trails that connect under the bridge from May Valley to Newcastle Highlands 2 One long trail system!2 AG E N D A I T E M # 8 . b ) Community Engagement – Touchpoint #3 June 2024 AG E N D A I T E M # 8 . b ) 19 https://intheloop.rentonwa.gov/northeastrentonpark? tool=guest_book#tool_tab AG E N D A I T E M # 8 . b ) 20 https://intheloop.rentonwa.gov/northeastrentonpark?to ol=guest_book#tool_tab AG E N D A I T E M # 8 . b ) 21 https://intheloop.rentonwa.gov/northeastrenton park?tool=guest_book#tool_tab AG E N D A I T E M # 8 . b ) 22 Community Engagement Summary Community Touchpoint 1 Community Touchpoint 2 Community Touchpoint 3 AG E N D A I T E M # 8 . b ) 23 Survey Results AG E N D A I T E M # 8 . b ) 24 Survey Results – How does the Preliminary Final Park Design make you feel? Ranking Bellevue Issaquah Kent Renton Seattle Grand Total980069802798030980559805698057980589805998116981789818898198 Very Happy 1 1 1 4 13 5 3 11 1 1 1 42 Happy 8 8 10 4 15 1 46 Neutral 1 2 1 1 9 14 Unhappy 2 1 2 10 15 Very Unhappy 1 1 1 3 6 Grand Total 1 1 1 14 26 18 10 48 1 1 1 1 123 Survey Results: How Does the Preliminary Final Park Design Make You Feel? AG E N D A I T E M # 8 . b ) 25 Nature and Trails •Beautiful boardwalks, views, green and natural spaces, and environmental stewardship •Desire for environmental education and clear signage •Some concerns about mosquitos in stormwater ponds; suggestion for bat houses/natural repellent Recreation Facilities •Desire for dog parks (potentially off-leash); playgrounds with a variety of activities; sports facilities such as skateparks, disc golf course, and volleyball; and picnic and exercise areas with public art displays Parking and Accessibility •More parking spaces •Provide access including ADA-accessible pathways and transit access •Need for pedestrian bridge or tunnel across Coal Creek Parkway Community and Safety •Desire for the park to be a welcoming and safe place for families and kids •Concerns about vandalism and the potential for parks becoming homeless encampments General Feedback •Excitement about a new park •Appreciation for features like picnic areas, emergency beacons, and trailhead kiosks with wayfinding •Maintain natural landscape: balance natural areas with new access Summary of Favorite Things AG E N D A I T E M # 8 . b ) 26 Nature and Trails •Concerns on trails affecting existing wetlands •Opposition to park lightning that may disrupt wildlife •Uncertainty on how stormwater ponds will affect mosquitos Recreation Facilities •Disappointment that pickleball courts were removed •Feel there is a lack of sports courts •Desire for playgrounds, splash parks, and permanent restrooms •Suggestion for sports facilities and a pump track for bikes Parking and Accessibility •Concerns about car break-ins and increase in crime •Site is difficult to access without car •Need additional parking due to potential park expansion •Suggestion of adding bike racks •Concerns for safe crossing across Coal Creek Parkway •Important to connect to other trailsCommunity and Safety •Concerns about vandalism and the potential for parks becoming homeless encampments •Concerns about park to becoming an attractive nuisance Dog Park Specific •Mixed opinions on including an off-leash dog area •Concerns on pet feces •Requests for a larger (separate?) dog park for pet owners rather than in the park Summary of Least Favorite Things AG E N D A I T E M # 8 . b ) 27 •“An exciting concept for the new Northeast Renton Park. Numerous opportunities for recreation proposed for the new park.Congratulations to the Renton Parks and Recreation, consultants, stakeholders, and the public for an amazing new park for the Renton community.”—Alan Wyatt •“How about fixing what's broken, and paying off some debt before buying a new set of rims for our car?”—Robert Henderson •“How about some nice soccer fields in Renton or fixing up the horrible ones at Ron Regis.”—Julie K. •“Looks great. What address is this near” Response was provided “The city re built the Kiwanis park next to Honeydew elem. It's beautifully done. The ball field behind Honeydew was relandscaped nicely and gets a lot of use. When will the huge new Sunset project apts open? I hope Joannes will stay open. And who will move in the old Dicks bldg? We want trader Joes! Renton rocks!”—Nora Williams Cottrill Reply to above: “In talking with the mayor of another city, I learned it's the stores/company people need to talk to when they want a store in a certain area if they hear a lot of voices saying they want their brand in a certain spot, they're more likely to want to move there.”—Angela Noon Social Media Comments: June 16, 2024 AG E N D A I T E M # 8 . b ) 28 Social Media Comments, June 23, 2024 AG E N D A I T E M # 8 . b ) 29 Social Media Comments: June 23, 2024 (cont.) Overall, public opinion was very positive, especially about keeping the forested and natural aspects of the site •Liked paths, especially ADA paths •Liked signage, interpretive information •How many miles of pathways will there be? •Will unleashed dogs be allowed on the paths? •Will there be garbage and recycling cans on paths and educational signs? •Liked preserving heritage trees •Liked erosion and lighting mitigation •Do want good lighting on paths •Liked plan to connect to other existing trails outside the park •The kids’ play area was also well received •Liked zip line •What about a splash pad? •Would like baby swings •Liked more natural climbing structures— like the ones that look like logs •Monkey bars AG E N D A I T E M # 8 . b ) 30 Social Media Comments: June 23, 2024 (cont.) One of the most popular features was the dog park—lots of excitement about that! •Want to make sure it is enclosed •How will rules be enforced? Infrastructure questions •Plumbed bathrooms vs. porta-potties? •Picnic benches in the shelter? •Fireplace in the shelter? Community gardens were popular •Covered classroom area? Picnic shelter as option? •Just demonstration or also available for residents to rent garden plots? Safety issues •Really busy road with lots of speeders •Dangerous to cross •Parking is not visible from street AG E N D A I T E M # 8 . b ) 31*This information has been added to slide 5 as well Social Media Comments: June 23, 2024 (cont.) •“Dog park would be great. Boardwalks and viewpoints are beautiful.” •“More parking! Connection to nearby neighborhoods. Love nature.” •“Bathrooms or access to are needed” •“[Smiley face]” •“Outdoor exercise equipment (stretching, etc)” •“Public art displays. Educational signs about nature during walk.” •“Love the trails. More enviro areas.” •“Love the dog park – not enough in Renton. Trails [checkmark]” •“Keep it natural, excited to see more parks in Renton” •“Always love parks” •“Skatepark” •“Nature [smiley face]” •“Love the trails/nature. Too many parks/places are concrete.” •“It seems like a nice addition to the nearby neighborhoods. Since it is a wetland area, what is the mosquito population like? It’s hard to enjoy the park if you’re too busy slapping at them. Maybe an addition of bat houses in the trees or natural spray or plants to ward off mosquitos, no-see-ums, etc.” •“Feedback from kid: Rock climbing, swings” AG E N D A I T E M # 8 . b ) APPENDIX D CITY STAKEHOLDER MEETING NOTES AGENDA ITEM # 8. b) Meeting Notes Stakeholder Meeting #1, Community Outreach Series 1 Northeast Renton Park Master Planning Project 2:00 to 3:00 p.m., January 24, 2024, Renton City Hall Attendees Name Organization Title Jason Lederer Renton Parks and Recreation Parks Planning Manager Anna Spooner Anchor QEA Project Manager Rachel Andersen Anchor QEA Landscape Architect Betsy Severtsen Renton Parks and Recreation Capital Projects Coordinator Samuel Stolmeier City of Renton Water System Engineer Joe Stowell City of Renton Wastewater Utility Manager Ellen Talbo City of Renton Transportation Planning Manager Alex Morganroth City of Renton City Planner Joe Farah City of Renton Surface Water Engineering Manager Meeting Notes Representatives from the City of Renton (City) and Anchor QEA gathered on Wednesday, January 24, 2024, for the first of a series of stakeholder meetings for the Northeast Renton Park (Park) Master Planning Project (Project). Anna Spooner, Anchor QEA Project Manager, provided a short presentation to review the findings of the site inventory and analysis and to present known opportunities and constraints. The meeting participants then had an open forum to discuss the Project and to review additional opportunities and constraints relevant to the Project. The participants discussed how the design concepts could address these items in the next stages of Project development. The following provides a summary of the meeting discussion. Neighborhood Park Through a Natural Lens The discussion started with the Parks Planning Manager emphasizing that we would like to approach the design of this Park as a neighborhood park but through a natural lens, integrating access to nature and restoration and working with the constraints of the site. AGENDA ITEM # 8. b) Meeting Notes January 24, 2024 Page 2 Urban Separator Overlay Alex Morganroth brought to the attention of the group that a portion of the Project site is within an area with Urban Separator Overlay Regulations. This designation provides a distinction between permanent low-density lands that protect resources and environmentally sensitive areas and the surrounding communities. Details on this can be found here: https://www.codepublishing.com/WA/ Renton/#!/Renton04/Renton0403/Renton0403110.html. Wetland and Stream Buffers Alex Morganroth also discussed with the group how the Park wetland and stream buffers, though serving an important role in protecting critical habitats, generally allow for passive recreation and pathways. He offered his assistance with permitting for these types of additions when the time comes. Meeting Sewer Requirements During the presentation, one of the constraints listed was the lack of sewer services to the site, which would be necessary in the future if the Project includes restroom facilities. Joe Stowell, Wastewater Utility Manager, led an in-depth conversation on the complexities of bringing City sewer lines to the site, with the assumption that King County would not allow a septic system to be used as an alternative. He presented two potential options: 1. The first would be to extend the City sewer line to the most suitable location in the Park, which would require that it extend the full frontage of the Park and travel a long distance uphill. This would require a grinder system with a pump. 2. A second solution would be to tie into the sewer lines at the subdivision, Crystal Ridge, just south of the Park; however, this system was installed with a temporary sewer agreement with Coal Creek. The City would need to modify that service agreement with Coal Creek. Jason Lederer suggested a third possibility: to phase the sewer connection, waiting to take on that work when the adjacent private property potentially becomes available. Other options would be to not include restroom facilities at the site at all or to consider portable restrooms. Park Access The discussion then turned to the subject of access, led by Ellen Talbo. She pointed out that the intersection at SE 95th Way and Coal Creek Parkway is within the City of Newcastle. It is owned by King County with a contract with Newcastle, who maintains it. The City of Renton owns and maintains the lighting on Coal Creek Parkway/Duvall Avenue starting at the City’s sign. There may be a maintenance agreement between the Cities of Newcastle and Renton. When the Project gets underway, signal modifications may be necessary. The protected left turns on Duvall Avenue will improve safety and be a desirable feature at the entrance of the Park, as well as planned/striped bike lanes. However, the bike lane on Duvall Avenue is currently just a narrow AGENDA ITEM # 8. b) Meeting Notes January 24, 2024 Page 3 shoulder as Duvall Avenue travels southbound. Moving south toward NE 24th Street, the shoulder becomes narrower on the west side of Duvall Avenue. There is no sidewalk on the west side of Duvall Avenue at this location. Improving these bike lanes sooner may be a nice addition to the plan. The topic of site entry prompted Anna Spooner to describe the reasons why the intersection it Duvall Ave NE and SE 95th Way would make a desirable main entry, including its proximity to the intersection, relatively flat topography, open clearing with few trees, existing gravel driveway, and lack of critical/protected spaces. Secondary Access Both the discussion on restrooms and access prompted the question of whether a secondary access point, presumably at the southwest corner of the Park, would be desirable. This would reduce the distance that sewer lines would be required to travel and offer an additional access point for users. However, this corner of the site includes surface water facilities and is surrounded by steep slopes and wetland buffers, separating it from the rest of the Park. It would be a challenging place for a Park entry or Park development including a restroom. However, this is a possibility that may be considered the concept development phase of the Project. Adjacent Stormwater Facility The next topic was led by Joe Farah, Surface Water Engineering Manager. The group posed questions on how the adjacent stormwater facility could potentially be used or incorporated into the Project, if at all. Joe emphasized that the preference would be for this facility to be off-limits and avoided by Park users. It will remain fenced for safety; however, the main drive could potentially serve as a dual entrance into the Park. Screening the stormwater facility from the Park could be a possibility, but any other use or access would be unlikely. Attempting to treat the water from the stormwater facilities by introducing it into the wetlands would not be a possibility. Self-Mitigating The discussion moved on to the topic of mitigation and treating other stormwater and runoff. The discussion revolved around the benefits of the Project being self-mitigating and how the treatment of on-site stormwater may offset the installation of any impervious surfaces or other low-impact development. Restoring and enhancing the site’s natural resources, specifically wetlands and buffers, may also provide an opportunity for banking credits. Other Considerations Betsy Severtsen mentioned that she has seen school buses stopping near the Park recently and mentioned that as a consideration because of the possibility of parents wanting to use the future parking lot as a pick-up area. AGENDA ITEM # 8. b) Meeting Notes January 24, 2024 Page 4 Ellen Talbo followed up by email expressing an interest in potentially incorporating educational or demonstrative areas throughout the Park, such as a native medicinal garden or native foraging gardens, that could possibly be managed by local scouts or community groups. Closing The meeting ended with an overview of the next steps, including the plan for completing and presenting initial concept alternatives in March. AGENDA ITEM # 8. b) Meeting Notes Stakeholder Meeting #2, Community Outreach Series 2 Northeast Renton Park Master Planning Project 3:00 to 4:00 p.m., March 12, 2024, Renton City Hall Attendees Name Organization Title Jason Lederer Renton Parks and Recreation Parks Planning Manager Ian Gray Renton Parks and Recreation Urban Forestry and Natural Resources Manager Rhemy King Renton Parks and Recreation Neighborhood Programs Coordinator Steve Brown Renton Parks and Recreation Parks Maintenance Manager Samuel Stolmeier Community and Economic Development Civil Engineer Alex Morganroth Community and Economic Development Senior Planner Ellen Talbo Public Works Transportation Planning Manager Joe Farrah Public Works Surface Water Engineering Manager Anna Spooner Anchor QEA Project Manager Rachel Andersen Anchor QEA Landscape Architect Meeting Notes Representatives from the City of Renton (City) and Anchor QEA gathered on Tuesday, March 12, 2024, for the second of a series of stakeholder meetings for the Northeast Renton Park (Park) Master Planning Project (Project). Jason Lederer and Rhemy King provided an overview on the community outreach results, and Anna Spooner provided a PowerPoint presentation to go over the two alternative designs and their features, as well as the criteria used to guide the designs. The meeting participants then had an open forum to discuss the alternatives and ask questions. The following provides a summary of the meeting discussion. Community Outreach The discussion started with the Neighborhood Programs Coordinator, Rhemy King, emphasizing how well the public outreach process worked and how much feedback and information had been provided by those who participated. She gave a brief description of the online engagement app, multiple widgets, a video introducing the Project, maps, photographs, a timeline for the Project, and an option to subscribe to receive additional information on the Project in the future. All of these items were meant to familiarize the public with the Project and encourage their involvement. AGENDA ITEM # 8. b) Meeting Notes March 12, 2024 Page 2 Jason Lederer, the Parks Planning Manager, went on to describe the large postcard mailer that went out and how it drove a tremendous amount of traffic to the website. In addition, the City’s social media post was shared on the “I Love Renton” Facebook page, which also increased traffic to the Project website. He described how the display boards were posted in community centers and the senior center for community members to view in person, as well as in the Highlands Neighborhood Center during basketball weekend and after-school events. All of these boards and interaction opportunities directed viewers to the website and an online poll. Design Criteria Anna Spooner, Anchor QEA Project Manager, started the discussion on design criteria by reiterating that community feedback consistently pointed to an interest in environmental restoration, interpretive and nature trails, and recreation development. This feedback helped to develop the following list of criteria: 1. Maximize trail development within the Park. 2. Connect to existing May Creek Greenway trails. 3. Provide trail connections to Renton neighborhoods. 4. Provide Park development for families. 5. Provide Park facilities. 6. Maximize open space for unprogrammed recreation. 7. Maximize restoration and habitat enhancement. 8. Maximize forest and habitat preservation. 9. Provide environmental education and stewardship. 10. Provide public art and placemaking. 11. Provide parking. 12. Avoid impacts to neighbors. 13. Maximize access. 14. Consider value to cost. 15. Consider permit feasibility. Conceptual Plan Alternatives The discussion then moved on to a slideshow of the alternatives, with Anna Spooner presenting. Two alternatives were presented, with the first one focusing on recreation and Park development and the second focusing on natural resource protection, restoration, and enhancement. Anna pointed out AGENDA ITEM # 8. b) Meeting Notes March 12, 2024 Page 3 that they both had overlapping program elements despite these very different themes and that the final design would likely be a combination of elements for both alternatives. She went on to present the alternatives, as follows: Alternative 1 Alternative 1 had a focus on recreation development. The existing access was used and expanded upon. Various Park amenities were centralized in an existing, flat, clear opening outside of wetland buffers and wooded areas. Because a portion of this area is currently privately owned, she pointed out how the design may need to take place in phases, with a second development phase taking place when the additional parcel is acquired by the City. At the end of the access road was a parking lot with space for 24 cars, as well as an additional small lot with four Americans with Disabilities Act (ADA)-accessible parking stalls off the large environmental education building (open air rustic shelter). Nearby would be a small comfort station and trail head, along with a picnic shelter, seating, and a natural play space. In addition to these features, a basketball court and tennis/pickleball court were part of this alternative, along with a native propagation nursery area and a small, enclosed dog park. The design also included two large open lawn spaces and a pervious trail network connecting all active recreation and amenities with more wild areas of the Park. These trails winded through the woods and wetlands to viewpoints and to the creek. At trail intersections, wide nodes accommodated benches for resting and interpretive signage. A switchback trail led up the hill to the nearby neighborhood to the south, and another led down the hill to provide creek access to the north. These trails would be as accessible as possible and may include stairs but would not likely be ADA-accessible. Anna also discussed the opportunity for stormwater treatment from the parking lot in the form of raingardens and the need for ongoing invasive species removal and stewardship throughout the Park. A crosswalk south of the Park at NE 24th Street and Duvall Avenue was also recommended to allow for safer neighborhood access to the trailheads. Alternative 2 Alternative 2 had a focus on restoration, habitat enhancement, and protection. This design included fewer traditional park elements, a smaller footprint for active recreation, and more square footage of protection, restoration, and enhancement activities. The same access driveway was used and improved upon, with a parking lot at the end for 18 cars. A small comfort station and trailhead kiosk were included along with a large natural play area and open lawn. A picnic shelter was included, as well as a small amphitheater/stage on the future parcel. The trail corridors for this alternative were more simplistic, allowing for more areas to remain protected. Pervious trails looped from the active recreation area through wilder parts of the Park, providing views of May Creek and wetlands while minimizing disturbances to creek and wetland buffers. Access to future trail connections on the east were discussed, as well as areas for interpretive signage along the trails, public art, and opportunities AGENDA ITEM # 8. b) Meeting Notes March 12, 2024 Page 4 for placemaking. This alternative also included a crosswalk south of the Park at NE 24th Street and Duvall Avenue to increase foot traffic to the Park as well as safety. Comparison Matrix Anna reminded the group of the list of 15 criteria items and presented a matrix, which ranked each criteria item (low, medium, high) for each alternative side by side to use as a comparison. The end goal would be to develop a final design where every criterion was met. Alternative 1 scored higher for trail development, connections to existing trails, neighborhood access, Park development, Park facilities, lighting, open space, environmental education and stewardship, parking, and access. Alternative 2 scored higher for maximizing restoration and habitat enhancement, maximizing forest and habitat preservation, public art and placemaking, avoidance of impact to neighbors, cost efficiency, and permit feasibility. Next Steps Anna reminded the group of where we were on the process, with site inventory and analysis and opportunities and constraints completed and community outreach ongoing. The next step of the process will be crafting a preferred alternative to present in April and then moving on to the final master plan in the summer. Group Discussion Following the presentation, there was an open group discussion. The following summarizes key topics discussed: • A question was asked on how the value was determined, and Anna responded that a holistic approach was used, based off of the perceived value of each element by the community, rather than a quantified approach. Anna added that a rough order of magnitude costs would be developed later in the process. • The discussion moved on to how to balance pleasing the greatest number of community members while balancing the cost of maintenance, system gaps, utilities, and stormwater. Jason pointed out that the uncertainty of whether water would be able to be brought to the site limited being able to offer restrooms and drinking fountains. Portable toilets might be the best option. Anna pointed out that these could include an enclosure to make them more appealing. • Jason questioned whether we should utilize existing trails and potentially historic access roads for future trail systems. • The group discussed taking another trip to the site to walk along existing paths and slopes to determine the most appropriate trail alignment and location for some of the Park features. • Another attendee brought up a concern with lighting, stating that we should be very careful about how we approach lighting to prevent light pollution. AGENDA ITEM # 8. b) Meeting Notes March 12, 2024 Page 5 • The interpretive shelter was the next item of discussion. The group talked about what this might look like, how large it might be, and if it would have walls or just a roof. Options for precedents were discussed, such as the shelters at Seward Park and Lincoln Park in Seattle. • This was followed by questions about the amphitheater and if it was an item that the City and community members valued and would use. It was agreed that it would be unlikely that this would be a suitable location for large events like weddings, but a smaller informal stage might be useful for smaller informal gatherings or educational opportunities. • The attendees were in favor of keeping the sports courts in the design for the moment to attract a variety of visitors, and one attendee mentioned that if there was limited space, pickleball might be the best option since it required less room. It was pointed out by another attendee that a combination court that allowed for pickleball and tennis might be a good option. • Another group member threw out the idea of having an environmental science center on the site. The stewardship garden was discussed as well, including questions on what type of garden this would be (a P-patch, demonstration garden, foraging garden, cultural garden, medicinal garden, or something else). Anna clarified that the intent was for it to be demonstration or native plant propagation garden, with opportunities for signage or education. In the future, it may also be possible to use these native species elsewhere in the Park for restoration work. • One attendee expressed surprise that Alternative 2, which focused on a more natural approach and restoration efforts, did not have a more expansive trail network, and they would appreciate the more natural approach but with more trail opportunities. • A comment was made on the crosswalk and how it would probably need to be a signalized crosswalk with potentially a median refuge, but this could be discussed at a later date. • Lastly, Jason pointed out that we needed to remember how this future Park was part of a trail network and consider how it would fit into the rest of the system but also how it could be used to provide Park elements that were not easily found elsewhere in Renton. It was decided on that the group should take a while to consider the designs and provide additional feedback or questions at their leisure. Next Steps and Closing The meeting ended with an overview of the next steps, including the plan for completing and presenting the preferred alternative in April. AGENDA ITEM # 8. b) Meeting Notes Stakeholder Meeting #3, Community Outreach Series 3 Northeast Renton Park Master Planning Project 1:00 to 2:00 p.m., May 21, 2024, Renton City Hall Attendees Name Organization Title Jason Lederer Renton Parks and Recreation Parks Planning Manager Rhemy King Renton Parks and Recreation Neighborhood Programs Coordinator Ian Gray Renton Parks and Recreation Urban Forestry and Natural Resources Manager Cailín Hunsaker Renton Parks and Recreation Parks and Trails Director Betsy Severtsen Renton Parks and Recreation Acting Capital Project Manager Steve Brown Renton Parks and Recreation Parks Maintenance Manager Alex Morganroth Community and Economic Development Senior Planner Anna Spooner Anchor QEA Project Manager Rachel Andersen Anchor QEA Landscape Architect Meeting Notes Representatives from the City of Renton (City) and Anchor QEA gathered on Tuesday, May 21, 2024, for the third of a series of stakeholder meetings for the Northeast Renton Park (Park) Master Planning Project (Project). Jason Lederer and Rhemy King provided an overview on the community outreach results, and Anna Spooner provided a PowerPoint presentation to go over the preliminary Draft Preferred Concept design and its features. The meeting participants then had an open forum to discuss the design and ask questions. The following provides a summary of the meeting discussion. Community Outreach The meeting started with Anna Spooner presenting an overview of community outreach efforts, along with a timeline of public events and traffic surges to the Project website. She also presented a series of succinct visuals of the results of all public outreach up to date, showing that the public was most interested in new Park facilities, followed by biking and walking trails and access to wetlands, trees, and forests. Environmental education, art and culture, and sports courts received less interest, and people were generally neutral when it came to an off-leash dog park. She followed with a brief overview of the previous two alternatives. AGENDA ITEM # 8. b) Meeting Notes May 21, 2024 Page 2 Preliminary Design Program Anna presented the following list of design program features and relevant details: • Trails ‒ Loops through diverse habitats ‒ Boardwalks and viewing areas ‒ Access to May Creek corridor ‒ Connections outside of Park ‒ Trailhead kiosk • Open lawn space • Play area with the following: ‒ Climbing structure ‒ Swings ‒ Shelter • Large shelter for environmental education and outdoor classroom • Ecological restoration areas • Rain gardens • Public art • Stewardship/cultural gardens • Environmental educational and wayfinding signage • Sport courts ‒ Pickleball ‒ Tennis ‒ Basketball • Park infrastructure ‒ Access road and parking ‒ Fire turnaround ‒ Portable toilet enclosure ‒ Lighting • Park maintenance facility/storage AGENDA ITEM # 8. b) Meeting Notes May 21, 2024 Page 3 Preliminary Draft Preferred Concept Anna continued on to present the preliminary Draft Preferred Concept. This concept was a combination of the previous two design alternatives, edited to reflect the needs and wants of the community. It combined a large network of paths through forests and wetlands and along view corridors, while being careful to minimize disturbances to buffers as much as possible. Future trail connections were highlighted to the east and west and adjacent to neighborhoods. Areas for restoration and habitat enhancement were called out along May Creek throughout wetlands and buffers and throughout forested and riparian areas. A large central area contained all active recreation, including a large nature play area, stewardship and cultural gardens, a covered outdoor classroom, portable toilets, a picnic shelter, and parking for 20 vehicles. The private parcel contained potential Phase 2 amenities, including an off-leash dog park, a City maintenance shed, and sports courts. This option also included minimal lighting, public art, wayfinding, trailhead kiosks and signage, and swales/raingardens around the parking lot. Three section graphics followed, depicting a more detailed view of the active recreation area, a section of wetlands and buffers, and the forested slope and floodplain leading down to May Creek. These graphics included indications of where paths, boardwalks, viewing decks, and other amenities would be located within the landscape. Anna presented a series of precedent imagery to give a feel for the scale and materials of structures and amenities that may be found in the design. The precedent photographs covered subjects such as amenities, play areas, low-impact development features, trails and boardwalks, habitat restoration, signage, and public art. Group Discussion Following the presentation, there was an open group discussion. The following summarizes key topics discussed: • Betsy Severtsen asked for clarity on Americans with Disabilities Act (ADA) access. Anna described the different types of trail surfaces and routes. The paved trails within the active recreation would be ADA accessible along with the gravel loop trails and boardwalks throughout the wooded and riparian areas. However, the trail leading south to the adjacent neighborhood and north to the May Creek neighborhood would likely not be ADA accessible and would include stretches of stairs. However, efforts could be made to make these paths as user friendly and walkable as possible. • A question was asked about trail access to the east and if it was possible to create a future connection to other nearby trails and possibly up to Cougar Mountain. Jason Lederer elaborated on the fact that the City has an access easement to the east, which allows for a future trail connection. AGENDA ITEM # 8. b) Meeting Notes May 21, 2024 Page 4 • Derek expressed his excitement at seeing the option of a zipline in the play area, knowing that this is a popular feature in other parks. However, when it came to the cultural gardens and dog park, he had a question of where these would be most appropriate. He mentioned that the privately-owned parcel is already flat and disturbed, making it the perfect location for these amenities, but it may be many years before the City could purchase and develop these spaces. If an amenity like a dog park is in high demand, it might be wiser to plan it for a parcel that the City already owns. • The discussion of signage came up, with Derek suggesting signage similar to Newcastle’s but with Renton’s color palette. In addition, small signs with distances and trail names such as “wetland loop” at trail nodes were something that might be useful. An attendee asked about the trailheads and if the signage at the south neighborhood trailhead would be large and attention-getting or subtle because they did not want traffic stopping along Duvall Avenue NE and parking on the side of the road to access this trail. Anna clarified that only one entrance and trailhead would have larger signage, with all other trailheads and trails having more subtle signage. Next Steps and Closing The meeting ended with an overview of the next steps, including the plan for further community outreach and completing the preferred alternative concept design and master plan development in June and July, followed by Community Services Committee, Parks Commission, and City Council engagement, and grant funding and implementation in the future. AGENDA ITEM # 8. b) APPENDIX E OPINION OF PROBABLE COSTS AGENDA ITEM # 8. b) Northeast Renton Park Master Plan July 2024 Qty. Unit Unit Cost Subtotal a.Clear and grub site vegetation 9,000 SF 0.30$ 2,700$ b.Estimated tree removal 52 EA 770.00$ 40,040$ c.Remove asphalt paving 15,000 SF 1.40$ 21,000$ d.Miscellaneous demolition and debris removal 1 LS 5,000.00$ 5,000$ Subtotal Demolition & Clearing 68,740$ 2. Temporary Facilities a. Temporary construction fencing (chainlink) for site security, tree protection, and native plant protection 3,500 LF 15.00$ 52,500$ b.Temporary access and staging 1 LS 11,550.00$ 11,550$ c.Temporary erosion and sediment control 1 LS 70,000.00$ 70,000$ Subtotal Temporary Facilities 134,050$ 3. Earthwork a. Excavate to subgrade and stockpile for trails and park development area 6,200 CY 13.00$ 80,600$ b.Place and compact on-site stockpiled fill 6,200 CY 16.00$ 99,200$ c.Haul excess and unsuitable excavated fill material 725 CY 43.00$ 31,157$ d. Place import topsoil (6" average depth, all new planting bed areas)725 CY 55.00$ 39,853$ e.Finish grading (3-inch depth)168,000 SF 0.10$ 16,800$ Subtotal Earthwork 267,610$ 4. Utility Improvements a.Stormwater (incl LID elements, rain gardens)1 LS 200,000.00$ 200,000$ b.Electrical 1 LS 42,400.00$ 42,400$ c.Site Lighting (25' light poles with concrete bases)8 EA 9,750.00$ 78,000$ d.Communications including emergency beacons 2 EA 11,760.00$ 23,520$ Subtotal Utility Improvements 343,920$ 5. Asphalt Paving and Pavement Markings a.Install asphalt paving (2" on crushed aggregate base)23,340 SF 5.00$ 116,700$ b.Install crushed gravel shoulder (6" depth)60 CY 163.00$ 9,780$ c.Thickened asphalt edge 450 LF 16.00$ 7,200$ d.Install parking stall striping 32 EA 28.00$ 896$ e.Install cross hatching (firetruck turnaround)2,500 SF 3.40$ 8,500$ f.Install concrete wheel stops in parking area 20 EA 256.00$ 5,120$ Subtotal Asphalt Paving and Pavement Markings 148,196$ 6. Trails, Bridges, and Viewing Areas a. Install 5' wide boardwalk composite decking, bullrail, substructure, and pre-cast concrete pier blocks and attachment hardware 1 LS 125,760.00$ 125,760$ b.Install 5' wide concrete paving for pathways 764 SY 210.00$ 160,347$ c.Install 5' wide crushed gravel for pathways (6" depth)510 CY 163.00$ 83,130$ d. Install trail steps (pressure-treated 6- × 6-foot posts secured with rebar stakes)66 EA 1,400.00$ 92,400$ e. Install 5x12' footbridge with composite decking, framing, foundations, supports, guardrail, and concrete abutment 1 LS 59,040.00$ 59,040$ Subtotal Trails, Bridges, and Viewing Areas 520,677$ Item 1. Site Demolition and Clearing Opinion of Probable Construction Cost (OPCC) - Concept Design PA R K D E V E L O P M E N T AGENDA ITEM # 8. b) Northeast Renton Park Master Plan July 2024 7. Site Furnishings and Signage a.Furnish and install benches 12 EA 3,418.00$ 41,016$ b.Furnish and install grill 4 EA 1,800.00$ 7,200$ c.Furnish and install picnic tables 6 EA 8,159.00$ 48,954$ d.Furnish and install trash receptacles 4 EA 2,800.00$ 11,200$ e.Furnish and install bike racks 4 EA 6,300.00$ 25,200$ f.24' x 34' custom wooden picnic shelter 1 EA 170,000.00$ 170,000$ g.Park entry signage 1 EA 12,000.00$ 12,000$ h.Trail wayfinding portal post 8 EA 2,820.00$ 22,560$ i.Primary trailhead kiosk 1 EA 21,000.00$ 21,000$ j.Interpretive signs and supports 5 EA 5,000.00$ 25,000$ k.Split rail fencing 461 LF 37.00$ 17,057$ Subtotal Site Furnishings 401,187$ 8. Play Area Surfacing and Equipment a.Furnish Robinia"Jungle Dome" large climber 1 EA 70,430.00$ 70,430$ b.Furnish Robinia"Crawling Pyramid" small climber 1 EA 5,610.00$ 5,610$ c.Furnish "Spinner Plate" spinner seats 3 EA 1,380.00$ 4,140$ d.Furnish Robinia Up and Over Net 1 EA 3,240.00$ 3,240$ e.Furnish Carousel with seats 1 EA 10,730.00$ 10,730$ f.Furnish Robinia Entry Seesaw for 4 persons 1 EA 4,080.00$ 4,080$ g.Furnish Robinia Zip Line for Flat surroundings, 82'1 EA 15,090.00$ 15,090$ h.Install play area equipment 1 LS 60,000.00$ 60,000$ i.Furnish and install sand pit (24" depth)57 CY 114.00$ 6,443$ j.Furnish and install engineered wood fiber (12" depth)7,136 SF 3.05$ 21,765$ l.Furnish and install play area underdrain pipe 1 LS 17,510.00$ 17,510$ m.Install concrete curb 180 LF 60.80$ 10,944$ Subtotal Play Area Surfacing and Equipment 229,982$ 9. Planting a.Import and place topsoil (average 12" depth)2,000 CY 55.00$ 110,000$ b.Park plantings 15,000 SF 3.00$ 45,000$ c.Lawn hydroseed 40,000 SF 0.65$ 26,000$ d.Mulch (3" depth)509 CY 55.00$ 28,009$ Subtotal Planting 209,009$ 10. Irrigation a.Irrigation 55,000 SF 3.00$ 165,000$ Subtotal Irrigation 165,000$ Park Development Subtotal 2,488,371$ PA R K D E V E L O P M E N T AGENDA ITEM # 8. b) Northeast Renton Park Master Plan July 2024 11. In-stream and Riparian Habitat Enhancement a.Remove invasives 17,208 SF 2.45$ 42,158$ b. Large woody debris - place salvaged on-site logs with rootwads 15 EA 436.00$ 6,540$ c.Soil preparation (6" amendment)319 CY 58.00$ 18,482$ d.Planting - trees (5 gallon)70 EA 142.00$ 9,940$ e.Planting - shrub (1 gallon)400 EA 48.00$ 19,200$ f.Install mulch (3" depth)159 CY 55.00$ 8,763$ Subtotal In-stream and Riparian Habitat Enhancement 105,084$ 12. Wetland and Wetland Buffer Enhancement a.Remove invasives 128,510 SF 0.26$ 33,734$ b.Soil preparation (6" amendment)2,380 EA 58.00$ 138,029$ c.Jute fabric in planting areas with 4:1 or steeper slope 860 SF 5.25$ 4,515$ d.Planting - trees (5 gallon)260 EA 142.00$ 36,920$ e.Planting - trees (2 gallon)600 EA 78.00$ 46,800$ f.Planting - shrub (1 gallon)1,650 EA 48.00$ 79,200$ g.Planting emergent plug 4,130 EA 7.35$ 30,356$ h.Install mulch (3" depth)1,190 CY 55.00$ 65,445$ Subtotal Wetland and Wetland Buffer Enhancement 434,999$ 13. Forest Enhancement a.Remove invasives 14,993 SF 0.26$ 3,936$ b.Soil preparation (6" amendment)278 EA 58.00$ 16,103$ c.Jute fabric in planting areas with 4:1 or steeper slope 6,000 SF 5.25$ 31,500$ d.Planting - trees (5 gallon)70 EA 142.00$ 9,940$ e.Planting - shrub (1 gallon)350 EA 48.00$ 16,800$ f.Install mulch (3" depth)139 CY 55.00$ 7,635$ Subtotal Forest Enhancement 85,914$ Habitat Enhancement Subtotal 625,996$ HA B I T A T E N H A N C E M E N T AGENDA ITEM # 8. b) Northeast Renton Park Master Plan July 2024 14. Potential Custom Toilet Enclosure a.8' x 14' custom toilet enclosure 1 EA 145,870.00$ 145,870$ Potential Sewer Connection and Restroom Subtotal 145,870$ 15. Potential Sewer Connection and Restroom a. Clear and grub vegetation at proposed sewer conveyance (assumes 10-ft wide corridor)6700 SF 0.30$ 2,010$ b. Estimated tree removal within proposed sewer conveyance (assumes 10-ft wide corridor)17 EA 770.00$ 13,090$ c.Grinder pump station 1 EA 16,000.00$ 16,000$ d.Force main (to existing sewer)820 LF 30.00$ 24,600$ e.Directional drilling 820 LF 20.00$ 16,400$ f.Connection to existing system 1 LS 3,000.00$ 3,000$ d.Install Portland Loo 1 LS 500,000.00$ 500,000$ Potential Sewer Connection and Restroom Subtotal 575,100$ 16. Potential Park Expansion Area a.Clear and grub site vegetation 68,000 SF 0.30$ 20,400$ b.Estimated tree removal 10 EA 770.00$ 7,700$ c.Remove asphalt paving 910 SF 1.40$ 1,274$ d. 5' wide crushed gravel trail within park expansion parcel only 62 CY 163.00$ 10,106$ e.Dog park area fencing (5' tall chain link)492 LF 53.00$ 26,076$ f.Pea gravel at dog park area (6" depth)260 CY 74.00$ 19,240$ g.Sport courts (2 tennis courts/4 pickleball courts)1 LS 96,000.00$ 96,000$ h.Sport courts fencing (5' tall chainlink)600 LF 53.00$ 31,800$ i.Hydroseed mix for lawn 40000 SF 1.05$ 42,000$ j.Park plantings 15280 SF 2.00$ 30,560$ k.Irrigation 15280 SF 3.00$ 45,840$ Future Potential Park Expansion Area Subtotal 330,996$ AGENDA ITEM # 8. b) Northeast Renton Park Master Plan July 2024 Subtotal Park Development and Habitat Enhancement 3,114,367$ Mobilization (10%) 311,437$ Subtotal Construction + Mobilization 3,425,804$ Design Contingency (25%) 856,451$ Subtotal Const. + Mob. + Design Cont. 4,282,255$ Construction Contingency (10%) 428,225$ Subtotal Const. + Mob. + Design Cont. +Const. Cont.4,710,480$ Sales Tax (10.3%) 485,179$ TOTAL OPCC FOR PARK DEVELOPMENT AND HABITAT ENHANCEMENT (2024 Dollars)* 5,195,660$ Subtotal Toilet Enclosure 145,870$ Mobilization (10%) 14,587$ Subtotal Construction + Mobilization 160,457$ Design Contingency (25%) 40,114$ Subtotal Const. + Mob. + Design Cont. 200,571$ Construction Contingency (10%) 20,057$ Subtotal Const. + Mob. + Design Cont. +Const. Cont.220,628$ Sales Tax (10.3%) 22,725$ TOTAL OPCC FOR TOILET ENCLOSURE OPTION (2024 Dollars)* 243,353$ Subtotal Sewer Connection and Portland Loo 575,100$ Mobilization (10%) 57,510$ Subtotal Construction + Mobilization 632,610$ Design Contingency (25%) 158,153$ Subtotal Const. + Mob. + Design Cont. 790,763$ Construction Contingency (10%) 79,076$ Subtotal Const. + Mob. + Design Cont. +Const. Cont.869,839$ Sales Tax (10.3%) 89,593$ TOTAL OPCC FOR SEWER CONNECTION AND RESTROOM OPTION (2024 Dollars)* 959,432$ Sutotal Future Potential Park Expansion Area 330,996$ Mobilization (10%) 33,100$ Subtotal Construction + Mobilization 364,096$ Design Contingency (25%) 91,024$ Subtotal Const. + Mob. + Design Cont. 455,120$ Construction Contingency (10%) 45,512$ Subtotal Const. + Mob. + Design Cont. +Const. Cont.500,631$ Sales Tax (10.3%) 51,565$ TOTAL OPCC FOR FUTURE POTENTIAL PARK EXPANSION AREA (2024 Dollars)* 552,196$ AGENDA ITEM # 8. b) Northeast Renton Park Master Plan July 2024 NOTES: 2) In providing opinions of probable construction cost, the Client (City of Renton) understands that the Consultant (Anchor QEA L.L.C.) has no control over the cost or availability of labor, equipment or materials, or over market condition or the Contractor's method of pricing, and the consultant's opinions of probable construction costs are made on the basis of the Consultant's professional judgment and experience. The Consultant makes no warranty, expressed or implied, that the bids or the negotiated cost of the Work will not vary from the Consultant's opinion of probable construction cost. 4) Not Included (Construction Items): Environmental Cleanup, Portable Restroom Units, Public Art, Signage, Demolition of Existing House and Accessory Buildings, and Demolition of the Foundations Associated with Site Buildings. 3) Not Included (Construction Related): Design/Engineering Fees, Project Management, Survey, Planning & Design Review, Bidding, Construction Phase Project Management & Administration, Construction Inspection, Environmental Permitting, Property Purchase, Water Connection Utilities, and Permit Related Monitoring. 1) All costs are in 2024 dollars. AGENDA ITEM # 8. b) INTERLOCAL COOPERATIVE AGREEMENT between THE CITY OF BELLEVUE and CITY OF RENTON This Interlocal Cooperative Agreement (“Agreement”) is hereby entered into by and between the City of Bellevue (“City”) and the City of Renton to provide law enforcement mutual aid by the City of Renton Police Department (“RPD”), together the “Parties.” The authority of the cooperating agencies entering into this Agreement is that authority provided by Washington law including, and subject to, the general powers of the parties, the Washington Interlocal Cooperation Act as codified in RCW Chapter 39.34, and the Washington Mutual Aid Peace Officers Powers Act, RCW Chapter 10.93. WHEREAS, Snowflake Lane (“Special Event”) is held within Bellevue, WA city limits on specified dates during the months of November and December; and WHEREAS, the Special Event’s permit conditions requires a dedicated law enforcement presence, and the primary law enforcement agency with jurisdiction is the Bellevue Police Department (“BPD”); and WHEREAS, a condition of the City of Bellevue Special Event Permit requires the Special Event sponsor to pay the cost for all police officers assigned to the Special Event; and WHEREAS, the BPD has requested additional law enforcement resources from RPD to assist in providing a sufficient law enforcement presence in the City of Bellevue during the duration of the Special Event; and WHEREAS, RPD has agreed to provide law enforcement resources to the BPD and officer presence during the Special Event times, and is qualified to do so; NOW THEREFORE, the City and City of Renton agree to the following: 1. RESPONSIBILITIES OF BPD: a. The BPD will be responsible for providing RPD the specific dates, times, number of hours, number of commissioned officers requested to provide mutual aid during the Special Event (cumulatively referred to as “Event Opportunities”). b. The BPD will report to RPD any absence or tardiness of a committed RPD officer who fails to report to the Special Event. c. The BPD will designate an Incident Commander for the Special Event. 2. RESPONSIBILITIES OF RPD: a. The RPD will advertise to their certified and commissioned police officers who are in good standing with RPD, the mutual aid Event Opportunities. b. If RPD officers volunteer to fill the Event Opportunities, RPD will e-mail the BPD Special Event Captain the availability to fill the requested mutual aid AGENDA ITEM # 8. c) request. RPD will provide in the e-mail, the Special Event dates and number of police officers that are available. BPD will respond to the e-mail to confirm the commitment of the number of RPD officers needed. Once confirmed, RPD commits to fulfilling the mutual aid request for the confirmed number of officer(s). c. Once committed for the specified date, RPD will make all attempts to provide the committed number of officers for that date. BPD understands that unusual law enforcement occurrences or demands could arise which prevent RPD from staffing as needed to fulfill the request. In this circumstance, BPD and RPD will work together as soon as possible to find a solution agreeable to both. a. RPD Officers assigned to support BPD in this agreement shall provide law enforcement services for the Special Event. Such services shall include but are not limited to addressing issues of safety and security. Officers are expected to serve as a visual deterrent. These services are provided in RPD uniform. b. RPD is responsible for time-keeping and tracking the hours worked by its officers at the Special Event. 3. COMMAND STRUCTURE: All law enforcement personnel assigned to the Special Event will be integrated into an overall Unified Command system commanded by BPD. BPD shall take charge of the Special Event operations utilizing the Incident Command System unless the City specifically requests that a different agency or unit fulfill this responsibility, or unless the scope of the situation becomes multi-jurisdictional, in which case the provisions of the Statewide Mutual Aid plan become operative. Taking charge of an operation shall include directing the assignment of all personnel and equipment. The assigning of duties to officers of RPD shall be made by the supervising officer of the BPD unless that responsibility is delegated to a different agency. RPD officers assigned to specific tasks and/or posts and will perform their work under the direction of a BPD supervisor. BPD incident commander is in charge and responsible for overall coordination with RPD supervisors and/or officers in support of the Special Event. 4. COMPENSATION: Work performed under this Agreement will be billed directly to the Special Event sponsor/special event permit holder, Kemper Development Company (“KDC”). KDC is responsible for payment of overtime police services for the Special Event as a condition of its City of Bellevue Special Events Permit. RPD is responsible for billing KDC for the hours worked by its officers at the rate specified in the City of Bellevue Special Event Permit for Snowflake Lane. The City of Bellevue is not responsible for the billing or payment for work performed by RPD under this Agreement. 5. INDEPENDENT CONTRACTOR: The parties acknowledge and agree that in the performance of this Agreement, they are acting as independent contractors and not as agents of each other. The RPD is acting hereunder as an independent contractor so that control of personnel, standard of performance, discipline and all other aspects of performance shall be governed by RPD. AGENDA ITEM # 8. c) 6. INDEMNIFICATION: a. Each jurisdiction which is a party to this Agreement hereby agrees to accept liability for any act, error or omission of its own employees of whatever kind and nature and from whatever cause arising out of or connected with the performance of this Agreement. Each party agrees to indemnify and hold the other jurisdictions and their employees harmless from any such liability, claim, or cause of action, including amounts arising out of the performance, by that jurisdiction’s employees of this Agreement, except for that portion of the injuries and damages caused by the sole negligence of RPD or its officers or employees. All liability for salaries, wages and other compensation of law enforcement officers shall be that of their respective employers. b. Each of the Parties agrees that its obligations under Section 6 extend to any claim, demand, cause of action and judgement brought by, or on behalf of, any of its employees or agents. For this purpose, each of the Parties, by mutual negation, hereby waives, with respect to the other Party only, any immunity that would otherwise be available against such claims under the industrial insurance provisions of Title 51 RCW. In the event that any of the Parties incurs any judgement, award, and/or cost arising therefrom, including attorney fees, expenses, and costs shall be recoverable from the responsible Party to the extent of that Party’s negligence. 7. INSURANCE: Each party shall maintain insurance that is sufficient to protect itself against all applicable risks associated with this Agreement. 8. POLICE POWERS: In accordance with the authority under RCW 10.93.070(1), the City hereby consents to the full exercise of peace powers, within the City of Bellevue, Washington, by any and all properly certified or exempted police officers of the City of Renton for the term of the Event Opportunities. 9. DURATION: This Agreement is effective upon signature by all parties and shall extend through January 1, 2025. This Agreement shall automatically extend for consecutive one-year periods starting on January 1 of each year until termination as provided herein. 10. TERMINATION: Either party may terminate this Agreement upon 30 days prior written notification to the other Party. 11. ENTIRE AGREEMENT: The Parties agree that the Agreement is the complete expression of the terms hereto and any oral representations or understanding not incorporated herein are excluded. 12. MODIFICATIONS: Agreement modifications may be made only with the written approval of all Parties. 13. NO THIRD-PARTY BENEFICIARIES: There are no third-party beneficiaries to this Agreement, and this Agreement shall not impart any rights enforceable by any person or entity that is not a party hereto. AGENDA ITEM # 8. c) 14. SEVERABILITY: If any part, paragraph, section, or provision of this agreement is held to be invalid by any court of competent jurisdiction in the State of Washington, such adjudication shall not affect the validity of any remaining section, part, or provision of this agreement In witness thereof, the parties hereto have executed this Agreement by their duly authorized officials: CITY OF RENTON CITY OF BELLEVUE By: ___________________________ By: ___________________________ Armondo Pavone, Mayor Diane Carlson, City Manager Date: _________________________ Date: _________________________ Approved as to Form: _________________________________ AGENDA ITEM # 8. c) 1 CITY OF RENTON, WASHINGTON RESOLUTION NO. _______ A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING THE MAYOR AND CITY CLERK TO ENTER INTO AN INTERLOCAL AGREEMENT WITH CITY OF BELLEVUE FOR THE PURPOSE OF PROVIDING EXTRA-DUTY LAW ENFORCEMENT SERVICES REGARDING SPECIAL EVENT (SNOWFLAKE LANE) ENTITLED INTERLOCAL COOPERATIVE AGREEMENT BETWEEN THE CITY OF BELLEVUE AND CITY OF RENTON. WHEREAS, the City of Renton and City of Bellevue are authorized, pursuant to RCW Chapter 39.34, the Interlocal Cooperation Act, to enter into an interlocal government cooperative agreement; and WHEREAS, Snowflake Lane (“Special Event”) is held within Bellevue, WA city limits on specified dates during the months of November and December; and WHEREAS, the Special Event’s permit conditions require a dedicated law enforcement presence, and the primary law enforcement agency with jurisdiction is the Bellevue Police Department (“BPD”); and WHEREAS, the BPD has requested additional law enforcement resources from Renton Police Department (“RPD”) to assist in providing a sufficient law enforcement presence in the City of Bellevue during the duration of the Special Event; and WHEREAS, RPD officers are qualified to provide law enforcement resources to the BPD; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: SECTION I. The Mayor and City Clerk are hereby authorized to enter into an interlocal agreement with City of Bellevue regarding extra-duty law enforcement services entitled AGENDA ITEM # 8. c) RESOLUTION NO. _______ 2 Interlocal Cooperative Agreement between The City of Bellevue and City of Renton, attached hereto as Exhibit “A” and incorporated by this reference. PASSED BY THE CITY COUNCIL the day of , 2024. Jason A. Seth, City Clerk APPROVED BY THE MAYOR this day of , 2024. Armondo Pavone, Mayor Approved as to form: Shane Moloney, City Attorney RES- PD:24RES025:10/15/2024 AGENDA ITEM # 8. c) RESOLUTION NO. _______ 3 EXHIBIT “A” Interlocal Cooperative Agreement between The City of Bellevue and City of Renton AGENDA ITEM # 8. c) 1 CITY OF RENTON, WASHINGTON RESOLUTION NO. _______ A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, SETTING A PUBLIC HEARING DATE REGARDING VACATION OF THE WESTERLY 30’ OF UNOPENED LYONS AVE NE RIGHT-OF-WAY, SOUTH OF NE 4TH ST (DO STREET VACATION PETITION VAC-24-001). WHEREAS, a petition was filed with the City Clerk on or about August 8, 2024, pursuant to the requirements of chapter 35.79 RCW and Renton Municipal Code 9-14-2, petitioning for the vacation of the westerly 30’ of unopened Lyons Ave NE right-of-way, south of NE 4th St, as hereinafter more particularly described, and the petition was signed by the owners of more than two-thirds (2/3) of the property abutting upon that portion of the right-of-way sought to be vacated, and same being described in Exhibit “A,” and depicted in Exhibit “B,” attached hereto and made a part hereof as if fully set forth herein; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: SECTION I. That the 18th day of November, 2024, at the hour of 7:00 P.M., is hereby fixed as the date and time for a public hearing to consider the above-mentioned petition for vacating the right-of-way; which hearing is not more than sixty (60) days nor less than twenty (20) days from the date of passage of this resolution. SECTION II. The City Clerk is hereby authorized and directed to give notice of the time and date of the public hearing as provided in RMC 9-14-3.A, including instructions on accessing the hearing via Zoom, if applicable, and/or providing comment, and any and/or all persons interested AGENDA ITEM # 8. d) RESOLUTION NO. ________ 2 therein or objecting to said vacation may then appear and be heard, or they may file their written objections with the City Clerk at or prior to the time of public hearing on the vacation. SECTION III. After the close of the public hearing, the City Council shall determine whether the vacation of the right-of-way should be granted. If the City Council determines that the right- of-way should be vacated, the City reserves the right to retain an easement for public utilities and related purposes. SECTION IV. If the City Council determines that the right-of-way should be vacated, at a future date to be determined, the City Council shall determine the classification of the right-of- way to be vacated and, in accordance with the discretion provided in RCW 35.79.030, the amount of compensation, if any, to be paid by the petitioner-owner(s) to the City for such vacation. PASSED BY THE CITY COUNCIL the day of , 2024. ______________________________ Jason A. Seth, City Clerk APPROVED BY THE MAYOR this day of , 2024. ______________________________ Armondo Pavone, Mayor Approved as to form: Shane Moloney, City Attorney RES-24RES023:09/16/24 AGENDA ITEM # 8. d) RESOLUTION NO. ________ 3 AGENDA ITEM # 8. d) RESOLUTION NO. ________ 4 AGENDA ITEM # 8. d) 1 CITY OF RENTON, WASHINGTON ORDINANCE NO. ________ AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING SECTION 8-1-10 OF THE RENTON MUNICIPAL CODE, ESTABLISHING THE 2025 AND 2026 SOLID WASTE COLLECTION SERVICE RATES FOR ALL CUSTOMER CLASSES, AUTHORIZING CORRECTIONS, PROVIDING FOR SEVERABILITY, AND ESTABLISHING AN EFFECTIVE DATE. THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO ORDAIN AS FOLLOWS: SECTION I. All portions of the Renton Municipal Code in this ordinance that are not shown in strikethrough and underline edits or are not explicitly repealed herein remain in effect and unchanged. SECTION II. Section 8-1-10 of the Renton Municipal Code is amended as follows: The following schedule is hereby adopted as the monthly charges to be paid to the City for services rendered in each category: A. Residential Customers: 1. For garbage cans, carts, and/or garbage units: Single-family Every Other Week Garbage & Recycling, Weekly Yard Waste & Food Scraps Cart Service Level 2023 2025 Renton SWU Monthly Rates 2024 2026 Renton SWU Monthly Rates 20 Gallon Contractor Cart $16.07 18.36 $19.46 17.32 35 Gallon Contractor Cart $26.43 30.19 $32.00 28.48 45 Gallon Contractor Cart $33.32 38.05 $40.34 35.90 64 Gallon Contractor Cart $46.37 52.96 $56.13 49.96 AGENDA ITEM # 8. e) ORDINANCE NO. ________ 2 Single-family Every Other Week Garbage & Recycling, Weekly Yard Waste & Food Scraps Cart Service Level 2023 2025 Renton SWU Monthly Rates 2024 2026 Renton SWU Monthly Rates 96 Gallon Contractor Cart $68.46 78.20 $82.89 73.77 Each Additional 35 Gallon Cart $26.43 30.19 $32.00 28.48 Senior or disabled 20 Gallon Cart Rate (75% subsidy)/for Existing customers with a 20 Gallon Cart prior to May 31, 2008 $4.02 4.59 $4.87 4.33 Senior or disabled 20 Gallon Cart Rate (50% subsidy) $8.03 9.17 $9.72 8.65 Senior or disabled 35 Gallon Cart Rate (50% subsidy) $13.22 15.10 $16.01 14.25 Senior or disabled 45 Gallon Cart Rate (50% subsidy) $16.65 19.02 $20.16 17.94 Senior or disabled 64 Gallon Cart Rate (50% subsidy) $23.21 26.50 $28.09 25.00 Senior or disabled 96 Gallon Cart Rate (50% subsidy) $34.46 39.36 $41.72 37.13 AGENDA ITEM # 8. e) ORDINANCE NO. ________ 3 Single-family Every Other Week Garbage & Recycling, Weekly Yard Waste & Food Scraps Cart Service Level 2023 2025 Renton SWU Monthly Rates 2024 2026 Renton SWU Monthly Rates Extra Garbage, up to 15 gallons per unit/per pickup $4.92 5.62 $5.95 5.30 Extra 96 Gallon Food and Yard Waste Cart Rental $2.73 3.12 $3.30 2.94 Residential Return Trip Charge per pickup $7.08 8.09 $8.57 7.63 Cart Cleaning (per cart, per cleaning) $13.64 15.57 $16.51 14.69 Drive-in Charge (per month) $7.46 8.52 $8.04 9.03 Overweight/Oversize Container (per pickup) $3.94 4.50 $4.78 4.25 Re-delivery (one or more containers) $13.64 15.57 $16.51 14.69 Sunken Can Surcharge $9.37 10.70 $11.34 10.09 2. Residential customers are allowed to change their garbage service level once per year without incurring an administrative fee. Each garbage service level change per year above the once per year allowance will result in an administrative fee of thirty-five dollars ($35.00). The one (1) year period shall begin January 1 and shall end December 31 each year. 3. Senior and/or disabled customers who qualified under Subsection 8- 4-31.C of this Title for low-income rates for seventy-five percent (75%) subsidy AGENDA ITEM # 8. e) ORDINANCE NO. ________ 4 prior to May 31, 2008, are eligible for a four dollars dollar and two cents fifty-nine cent ($4.02 4.59) fee for 2023 2025 and a four dollars dollar and thirty-three cents eighty-seven cent ($4.33 4.87) fee for 2024 2026 for 20 Gallon Cart service. For services other than 20 Gallon Cart service, the rate schedule at the fifty percent (50%) subsidy as provided in Subsection 8-1-10.A.1 will apply. All senior and/or disabled customers qualifying under Subsection 8-4-31.C for low-income rates after May 31, 2008, are eligible for a fifty percent (50%) subsidy of the charges for the service level selected. 4. Premium Weekly Collection: Single-family residential customers may elect to have their garbage collected weekly for an additional fee of twenty-six thirty dollars and ninety-eight eighty-one cents ($26.98 30.81) per month for 2023 2025, and twenty-nine thirty-two dollars and seven sixty-six cents ($29.07 32.66) for 2024 2026. This fee will be added to the monthly garbage billing as an extra Premium Service Fee. 5. Miscellaneous Services: The City of Renton offers miscellaneous services at the following rates: Services Cost per Pick Up On-Call Bulky Waste Collection 2023 2025 Rates 2024 2026 Rates White Goods, except Refrigerators/Freezers per unit $86.39 98.66 $93.08 104.58 Refrigerators/Freezers per unit $92.44 105.58 $99.60 111.91 AGENDA ITEM # 8. e) ORDINANCE NO. ________ 5 Services Cost per Pick Up On-Call Bulky Waste Collection 2023 2025 Rates 2024 2026 Rates Sofas/Chairs per unit $80.34 91.75 $86.56 97.26 Mattresses per unit $77.30 88.29 $83.29 93.58 B. Commercial Customers: 1. Multi-family Carts: Customers have the following cart-based services available: Multi-family (“MF”) Cart Service Level 2023 2025 SWU Monthly Rates 2024 2026 SWU Monthly Rates Weekly Can and Cart MF One 20 Gallon Cart $26.48 29.40 $30.56 28.28 MF One 35 Gallon Garbage Cart $34.43 38.22 $39.73 36.77 MF One 45 Gallon Garbage Cart $42.72 47.43 $49.30 45.63 MF One 64 Gallon Contractor Cart $50.97 56.59 $58.82 54.44 MF One 96 Gallon Contractor Cart $67.52 74.96 $77.92 72.11 Extra MF Cart or Units -32 Gallon Equivalent $7.18 7.97 $8.29 7.67 MF Weekly 64 Gallon Food and Yard Waste (incl. Cart) $49.79 55.28 $57.46 53.18 AGENDA ITEM # 8. e) ORDINANCE NO. ________ 6 2. Commercial Carts: Customers have the following contractor cart- based services available: Commercial Cart Service Level 2023 2025 SWU Monthly Rates 2024 2026 SWU Monthly Rates Weekly Commercial Can and Cart One 20 Gallon Cart $41.81 46.41 $48.25 44.65 One 35 Gallon Garbage Cart $51.62 46.50 $53.66 49.66 One 45 Gallon Garbage Cart $58.85 53.00 $61.17 56.61 One 64 Gallon Garbage Cart $59.74 66.33 $68.95 63.81 One 96 Gallon Garbage Cart $73.40 81.49 $84.70 78.39 Extra Units – 32 Gallon Equivalent $7.47 8.28 $8.61 7.97 Weekly 35-Gallon Food and Yard Waste Cart $48.15 $51.04 Weekly 64 Gallon Food and Yard Waste Cart $49.79 55.28 $57.46 53.18 Customer Event Service $41.48 46.05 $47.87 44.30 AGENDA ITEM # 8. e) ORDINANCE NO. ________ 7 Commercial Cart Service Level 2023 2025 SWU Monthly Rates 2024 2026 SWU Monthly Rates (3 Carts: Garbage, Recycle, Food and Yard Waste/Day) 3. Commercial Detachable Containers One (1) to Eight (8) Yards: The rate for the handling of detachable containers approved by the City’s contractor and the City for use by commercial, industrial and multi-family residence establishments shall be as follows: a. Monthly Rates: Commercial Service Level 2023 2025 SWU Monthly Rates 2024 2026 SWU Monthly Rates Commercial Detachable Container (Loose) 1 Cubic Yard, 1 pickup/week $125.50 139.33 $144.83 134.04 1 Cubic Yard, 2 pickups/week $235.67 261.64 $271.97 251.70 1 Cubic Yard, 3 pickups/week $345.89 384.02 $399.18 369.43 AGENDA ITEM # 8. e) ORDINANCE NO. ________ 8 Commercial Service Level 2023 2025 SWU Monthly Rates 2024 2026 SWU Monthly Rates 1 Cubic Yard, 4 pickups/week $456.06 506.33 $526.32 487.10 1 Cubic Yard, 5 pickups/week $566.26 628.67 $653.49 604.79 1.5 Cubic Yards, 1 pickup/week $172.03 190.98 $198.52 183.73 1.5 Cubic Yards, 2 pickups/week $328.76 365.00 $379.40 351.13 1.5 Cubic Yards, 3 pickups/week $485.48 538.99 $560.27 518.52 1.5 Cubic Yards, 4 pickups/week $642.22 713.00 $741.15 685.92 1.5 Cubic Yards, 5 pickups/week $798.93 886.98 $922.00 853.29 2 Cubic Yards, 1 pickup/week $216.87 240.78 $250.28 231.63 AGENDA ITEM # 8. e) ORDINANCE NO. ________ 9 Commercial Service Level 2023 2025 SWU Monthly Rates 2024 2026 SWU Monthly Rates 2 Cubic Yards, 2 pickups/week $418.44 464.56 $482.90 446.91 2 Cubic Yards, 3 pickups/week $620.01 688.35 $715.52 662.20 2 Cubic Yards, 4 pickups/week $821.58 912.13 $948.14 877.48 2 Cubic Yards, 5 pickups/week $1,023.16 1,135.93 $1,180.78 1,092.78 3 Cubic Yards, 1 pickup/week $308.57 342.57 $356.10 329.56 3 Cubic Yards, 2 pickups/week $601.86 668.20 $694.58 642.82 3 Cubic Yards, 3 pickups/week $895.14 993.80 $1,033.04 1,956.05 3 Cubic Yards, 4 pickups/week $1,188.42 1,319.41 $1,371.50 1,269.29 AGENDA ITEM # 8. e) ORDINANCE NO. ________ 10 Commercial Service Level 2023 2025 SWU Monthly Rates 2024 2026 SWU Monthly Rates 3 Cubic Yards, 5 pickups/week $1,481.72 1,645.04 $1,709.98 1,582.55 4 Cubic Yards, 1 pickup/week $444.22 400.12 $461.76 427.35 4 Cubic Yards, 2 pickups/week $784.97 871.49 $905.89 838.38 4 Cubic Yards, 3 pickups/week $1,169.79 1,298.72 $1,350.00 1,249.39 4 Cubic Yards, 4 pickups/week $1,554.50 1,725.84 $1,793.97 1,660.28 4 Cubic Yards, 5 pickups/week $1,939.47 2,153.24 $2,238.24 2,071.44 6 Cubic Yards, 1 pickup/week $580.54 644.52 $669.97 620.04 6 Cubic Yards, 2 pickups/week $1,145.78 1,272.07 $1,322.29 1,223.75 AGENDA ITEM # 8. e) ORDINANCE NO. ________ 11 Commercial Service Level 2023 2025 SWU Monthly Rates 2024 2026 SWU Monthly Rates 6 Cubic Yards, 3 pickups/week $1,711.02 1,899.61 $1,974.60 1,827.45 6 Cubic Yards, 4 pickups/week $2,276.26 2,527.16 $2,626.93 2,431.16 6 Cubic Yards, 5 pickups/week $2,841.52 3,154.72 $3,279.26 3,034.88 8 Cubic Yards, 1 pickup/week $759.88 843.64 $876.94 811.59 8 Cubic Yards, 2 pickups/week $1,504.47 1,670.29 $1,736.23 1,606.84 8 Cubic Yards, 3 pickups/week $2,249.02 2,496.92 $2,595.50 2,402.07 8 Cubic Yards, 4 pickups/week $2,993.62 3,323.57 $3,454.78 3,197.32 8 Cubic Yards, 5 pickups/week $3,738.20 4,150.22 $4,314.07 3,992.57 AGENDA ITEM # 8. e) ORDINANCE NO. ________ 12 Commercial Service Level 2023 2025 SWU Monthly Rates 2024 2026 SWU Monthly Rates Extra Cubic Yard Loose in container, per cubic yard/per pickup $25.42 28.22 $29.34 27.15 Extra Cubic Yard Loose on ground, per cubic yard/per pickup $39.12 43.43 $45.14 41.78 Commercial Detachable Container (Compacted) 1 Cubic Yard Compactor $299.30 332.28 $345.40 319.66 1.5 Cubic Yards Compactor $432.51 480.18 $499.14 461.94 2 Cubic Yards Compactor $555.85 617.12 $641.49 593.68 3 Cubic Yards Compactor $818.64 908.87 $944.75 874.34 4 Cubic Yards Compactor $1,081.77 1,201.01 $1,248.43 1,155.39 AGENDA ITEM # 8. e) ORDINANCE NO. ________ 13 Commercial Service Level 2023 2025 SWU Monthly Rates 2024 2026 SWU Monthly Rates 6 Cubic Yards Compactor $1,607.25 1,784.40 $1,854.85 1,716.62 b. Rental Rates: Rental rates for one (1) to eight (8) yard containers will be paid in the monthly rates. c. Minimum Pickups: Minimum pickups for containers and compactors between one (1) and eight (8) yards will be once per week. 4. Extra Charges: a. The following extra charges will apply for commercial services, including Multi-family and Commercial Cart, Detachable and Roll Off Container services: Commercial Cart & Detachable Extra Service Fees 2023 2025 2024 2026 1 Yard Extra Pickup $32.07 35.61 $37.02 34.26 1.5 Yard Extra Pickup $43.96 48.81 $50.74 46.96 2 Yard Extra Pickup $55.44 61.55 $63.98 59.21 3 Yard Extra Pickup $87.56 78.87 $91.01 84.23 AGENDA ITEM # 8. e) ORDINANCE NO. ________ 14 Commercial Cart & Detachable Extra Service Fees 2023 2025 2024 2026 4 Yard Extra Pickup $102.25 113.52 $118.00 109.21 6 Yard Extra Pickup $148.38 164.73 $171.23 158.47 8 Yard Extra Pickup $194.21 215.62 $224.13 207.43 1 Yard Compactor Extra Pickup $76.50 84.94 $88.29 81.71 1.5 Yard Compactor Extra Pickup $110.55 122.73 $127.58 118.07 2 Yard Compactor Extra Pickup $142.07 157.72 $163.95 151.73 3 Yard Compactor Extra Pickup $209.22 232.28 $241.45 223.46 4 Yard Compactor Extra Pickup $276.47 306.95 $319.07 295.29 6 Yard Compactor Extra Pickup $410.78 456.05 $474.06 438.73 Commercial cart carry out charge if over 50 feet, per 25 ft/cart, container/pickup $7.72 8.57 $8.90 8.24 Return trip for carts/containers not available for collection at regularly scheduled pickup time $34.32 38.10 $39.60 36.65 Redelivery of Cart $11.49 12.76 $13.27 12.28 Redelivery of Container $22.98 25.51 $26.52 24.54 AGENDA ITEM # 8. e) ORDINANCE NO. ________ 15 Commercial Cart & Detachable Extra Service Fees 2023 2025 2024 2026 Cleaning (per cart, per yard container capacity) $11.49 12.76 $13.27 12.28 Stand-by Time for containers (per minute) $6.83 7.58 $7.88 7.29 Roll Off Extra Service Fees 2023 2025 2024 2026 Return Trip for Drop Box $36.73 39.47 $40.39 38.56 Container Cleaning Drop Box (per yard capacity) $13.26 14.25 $14.58 13.92 Drop Box to Other Facility (per one-way mile) $3.74 4.01 $4.11 3.92 Solid Lid on Drop Box (monthly rental) $93.47 100.46 $102.81 98.15 Drop Box Turn Around Charge $28.84 30.99 $31.72 30.28 Stand-by Time for Drop Box (per minute) $1.88 2.03 $2.07 1.98 Hourly Rates Rear/Side-Load Packer + Driver $129.15 138.80 $142.06 135.61 Front Load Packer + Driver $129.15 138.80 $142.06 135.61 Drop Box Truck + Driver $112.28 120.67 $123.50 117.90 AGENDA ITEM # 8. e) ORDINANCE NO. ________ 16 Roll Off Extra Service Fees 2023 2025 2024 2026 Additional Labor (per person) $49.10 52.77 $54.01 51.56 b. Any extra yardage charges determined by the collection contractor due to overflowing containers will be charged per yard at the one (1) yard rate listed under subsection 8-1-10.B.3.a. 5. Special Services: a. Special Event Services: Bundled Garbage, Recycling, and Food and Yard Waste Cart-based service is available upon request to customers sponsoring Special Events within the City. The daily fee for Special Event Services is forty-one forty-six dollars and forty-eight forty-five cents ($41.48 46.05) in 2023 2025 and forty-four forty-seven dollars and thirty eighty-seven cents ($44.30 47.87) for 2024 2026, per one (1) set of bundled carts. b. Special Services Unspecified: Whenever special services not contained within this schedule are required, the rate charged for those special services shall be negotiated between the City and the collection contractor. C. Commercial Roll Off Customers: Commercial Roll Off customers are those who have a ten (10) to forty (40) yard container or compactor. These large disposal containers are lifted, hauled, and weighed at the disposal facility. Commercial container customers pay solid waste fees based upon the number of pickups, corresponding weight-based fees, and a container rental fee. Compactor AGENDA ITEM # 8. e) ORDINANCE NO. ________ 17 customers pay solid waste fees based upon the number of pickups and corresponding weight-based disposal fees. 1. Base Pickup Fees: The base pickup fees are as follows on a per occurrence basis: Commercial Roll Off Rates are Per Pickup 2023 2025 2024 2026 10 Yards Container, loose $273.08 292.80 $299.67 286.74 15 Yards Container, loose $293.14 315.02 $322.42 307.79 20 Yards Container, loose $301.16 323.65 $331.25 316.22 25 Yards Container, loose $313.82 337.25 $345.17 329.51 30 Yards Container, loose $326.51 350.89 $359.12 342.83 40 Yards Container, loose $349.35 375.43 $384.24 366.81 10-15 Yards Compactor $308.36 331.38 $339.16 323.77 20 Yards Compactor $335.80 360.87 $369.35 352.59 25 Yards Compactor $348.37 374.37 $383.16 365.78 30 Yards Compactor $360.93 387.88 $396.99 378.98 40 Yards Compactor $383.38 412.00 $421.67 402.54 The minimum pickups are twice per month. 2. Rental Rates: The following are rental rates for permanent roll off containers: AGENDA ITEM # 8. e) ORDINANCE NO. ________ 18 Monthly Rental Rates 2023 2025 2024 2026 10 Yards Container $56.03 60.21 $61.63 58.83 15 Yards Container $79.99 85.96 $87.98 83.99 20 Yards Container $103.89111.64 $114.26109.08 25 Yards Container $115.87124.52 $127.44121.66 30 Yards Container $127.84137.39 $140.62134.24 40 Yards Container $157.55169.32 $173.29165.43 3. Disposal Fees: In addition to the base collection charge per pickup and the monthly rental fee, the customer must pay weight-based disposal fees plus applicable tax. E. Temporary Services: Temporary Services are Commercial Container and Roll Off services not to exceed ninety (90) days of service. Customers will be billed for container delivery, container rental, and container pickup based upon the number of pickups. For ten (10) to forty (40) yard containers, customers will be billed separate disposal charges based upon weight-based fees plus all applicable taxes. Customers will be required to provide an advanced payment in the amount of four hundred dollars ($400.00) for two (2) yard to eight (8) yard detachable containers and eight hundred dollars ($800.00) for ten (10) to forty (40) yard Roll AGENDA ITEM # 8. e) ORDINANCE NO. ________ 19 Off containers. The advanced payment will be held and applied to the final billing for services provided. 1. Temporary Container Base Pickup Fees: Commercial Temporary Service Per Pickup 2023 2025 2024 2026 2 Yard Temporary $70.93 78.75 $81.86 75.76 4 Yard Temporary $127.67 141.73 $147.33 136.35 6 Yard Temporary $181.85 201.89 $209.86 194.22 8 Yard Temporary $211.50 234.81 $244.08 225.89 10 – 40 Yard Temporary $241.73 259.78 $265.88 253.82 2. Temporary Container Rental Fees: Commercial Temporary Daily Rental 2023 2025 2024 2026 2 – 8 Yard Temporary $7.09 7.87 $8.18 7.57 4 Yard Temporary $7.09 $7.57 6 Yard Temporary $7.09 $7.57 8 Yard Temporary $7.09 $7.57 10 – 40 Yard Temporary $10.78 11.59 $11.86 11.32 AGENDA ITEM # 8. e) ORDINANCE NO. ________ 20 Commercial Temporary Monthly Rental 2023 2025 2024 2026 2 – 8 Yard Temporary $215.65 239.37 $248.80 230.25 4 Yard Temporary $215.65 $230.25 6 Yard Temporary $215.65 $230.25 8 Yard Temporary $215.65 $230.25 10 – 40 Yard Temporary $352.41 327.89 $360.68 344.32 3. Temporary Container Delivery Fee: A fee in the amount of seventy-seven dollars and eleven cents ($77.11) in 2023 and eighty dollars and ninety-seven cents ($80.97) in 2024, will be charged for each temporary container delivered to the customer. Commercial Temporary Delivery Fee 2025 2026 2- to 8-yard container, temporary $84.17 $87.49 10- to 40-yard container, temporary $82.87 $84.82 F. Classification and Appeal: Service category classifications shall be on the basis of the type and volume of solid waste and the purpose and type of the dwelling or facility being served as determined by the Public Works Administrator of the City, or the Administrator’s duly authorized representative. Any person who shall deem their classification improper may appeal to the Solid Waste Program Manager within forty-five (45) days following their classification or change of classification. After the decision of the Solid Waste Program Manager, AGENDA ITEM # 8. e) ORDINANCE NO. ________ 21 if the party appealing is still aggrieved, then the party may appeal to the Public Works Administrator, whose decision shall be final. SECTION III. These rates become effective with billings computed on or after January 1, 2025 for the 2025 rates and on or after January 1, 2026 for the 2026 rates. SECTION IV. Upon approval of the City Attorney, the City Clerk is authorized to direct the codifier to make necessary corrections to this ordinance, including the corrections of scriveners or clerical errors; references to other local, state, or federal laws, codes, rules, or regulations; or ordinance numbering and section/subsection numbering and references. The City Clerk is further authorized to direct the codifier to update any chapter, section, or subsection titles in the Renton Municipal Code affected by this ordinance. SECTION V. If any section, subsection, sentence, clause, phrase, or word of this ordinance should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality thereof shall not affect the constitutionality of any other section, subsection, sentence, clause, phrase, or word of this ordinance. SECTION VI. This ordinance shall be in full force and effect five (5) days after publication of a summary of this ordinance in the City's official newspaper. The summary shall consist of this ordinance's title. PASSED BY THE CITY COUNCIL the day of , 2024. Jason A. Seth, City Clerk AGENDA ITEM # 8. e) ORDINANCE NO. ________ 22 APPROVED BY THE MAYOR this day of , 2024. Armondo Pavone, Mayor Approved as to form: Shane Moloney, City Attorney Date of Publication: ORD-PW:24ORD017:10/03/2024 AGENDA ITEM # 8. e) 1 CITY OF RENTON, WASHINGTON ORDINANCE NO. ________ AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, GRANTING TO NEW CINGULAR WIRELESS PCS, LLC AND ITS AFFILIATES, SUCCESSORS AND ASSIGNS, THE RIGHT, PRIVILEGE, AUTHORITY AND NONEXCLUSIVE FRANCHISE EXTENSION FOR FIVE YEARS, TO CONSTRUCT, MAINTAIN, OPERATE, REPLACE AND REPAIR A TELECOMMUNICATIONS NETWORK FOR SMALL CELL TECHNOLOGY IN, ACROSS, OVER, ALONG, UNDER, THROUGH AND BELOW CERTAIN DESIGNATED PUBLIC RIGHTS-OF-WAY OF THE CITY OF RENTON, WASHINGTON PROVIDING FOR SEVERABILITY, AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, New Cingular Wireless PCS, LLC (“Franchisee”) was granted a five (5) year nonexclusive franchise pursuant to Ordinance 5936 on November 4, 2019 (“Franchise”); and WHEREAS, Section I.1 of Ordinance 5936 states “at any time not less than sixty (60) days before the expiration of the current Franchise term, Franchisee may make a written request for an additional Franchise term of five (5) years. City shall grant such request to Franchisee, in accordance with then-applicable laws, unless Franchisee is or has been in default of the terms of this Franchise beyond applicable notice and cure periods;” and WHEREAS, Renton Municipal Code 5-19-5 allows the Franchisee to renew its term unless certain ability, capacity, compliance, or other conditions exist; and WHEREAS, RCW 35A.47.040 does not restrict extension or renewal of this Franchise; and WHEREAS, the federal Telecommunications Act of 1996 (47 U.S.C. § 151 et seq.) does not restrict an extension of the Franchise; and WHEREAS, on May 29, 2024, the Franchisee submitted a written request to the City of Renton requesting an additional Franchise term of five years; and AGENDA ITEM # 8. f) ORDINANCE NO. ________ 2 WHEREAS, the City has reviewed the Franchise record and confirmed that the Franchisee is not in violation of conditions of RMC 5-19-5, and is not, nor has been, in default of the terms of the Franchise beyond applicable notice and cure periods. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO ORDAIN AS FOLLOWS: SECTION I. The Franchise granted by Ordinance 5936 is extended for five (5) years, subject to the Franchisee‘s acceptance by its authorized representative signing the Statement of Acceptance attached hereto as Exhibit A, and commencing on the effective date of this ordinance, set forth in Section III herein. SECTION II. If any section, subsection, sentence, clause, phrase, or word of this ordinance should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality thereof shall not affect the constitutionality of any other section, subsection, sentence, clause, phrase, or word of this ordinance. SECTION III. This ordinance shall be in full force and effect five (5) days after publication of a summary of this ordinance in the City's official newspaper. The summary shall consist of this ordinance's title. PASSED BY THE CITY COUNCIL the day of , 2024. ______________________________ Jason A. Seth, City Clerk AGENDA ITEM # 8. f) ORDINANCE NO. ________ 3 APPROVED BY THE MAYOR this day of , 2024. ______________________________ Armondo Pavone, Mayor Approved as to form: Shane Moloney, City Attorney Date of Publication: ORD-CED:24ORD015:10/17/2024 AGENDA ITEM # 8. f) ORDINANCE NO. ________ 4 EXHIBIT A STATEMENT OF ACCEPTANCE New Cingular Wireless PCS, LLC, for itself, its successors and assigns, hereby accepts and agrees to be bound by all lawful terms, conditions and provisions of the Franchise referenced in the extension attached hereto and incorporated herein by this reference. New Cingular Wireless PCS, LLC, a Delaware limited liability company By: AT&T Mobility Corporation Its: Manager AT&T Mobility Corporation By: _________________________________ Name: ____________________ Title: ____________________ STATE OF ________________) ) ss. COUNTY OF ______________) On this _____ day of ____________, 20___ before me personally appeared _____________________________, to me known to be the ____________________________ (title) of _____________________________(corporation), and acknowledged said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that he or she was authorized to execute said instrument and that the seal affixed (if any) is the corporate seal of said corporation. In Witness Whereof I have hereunto set my hand and affixed my official seal the day and year first above written. _______________________________________ Notary (Print) ____________________________ Notary Public in and for the State of __________ Residing at: ______________________________ My Commission expires: ______________ AGENDA ITEM # 8. f)