Loading...
HomeMy WebLinkAboutP_Proposed_Floor_Plans_180402_v1UPUPDN(E) CLASSROOM(E) WOMEN'S(E) MEN'S(E) STO.(E) STORAGE. SANCTUARY (360 SEATS)(E) MAIN LOBBY(E) MEETING RMSEATING = 140(E) CLASSROOM(E) WOMEN'S BATH.(E) MEN'S BATH.(E) CLASSROOM(E) CLASSROOM(E) CLASSROOM(E) CLASSROOM(E) CLASSROOM(E) CLASSROOM(E) CLASSROOM(E) 5 TOILETS(E) 3 SINKS(E) URINALS(E) 2 TOILETS(2) SINKS(E) COVERED ENTRY(R) CHOIR STAGEEXIST WALL LINEDROP DOWN SCREEN+21"STOR.UP 3 RISERSLANDSCAPING(N) LOBBY ADDITION+0" FIN. FLR.12'-0"(N) SANCTUARY ADDITION+12" FIN.FLR.A /V / L BOOTH DN+12" +12" FIN.FLR.DNDN+12" +0" +0" 100STOR.3' - 6"3' - 6"3' - 6"3' - 6"5' - 0"1021033'-3"+/-3'-3"+/-10'-9"UPDNUPUPUP10' - 0"NEW STEPSEXIST. STEP10'-9"45°24' - 5"ALIGNALIGN21' - 0"13' - 3"10010012' - 0"4'-5".7' - 6"8'-7".ALIGN4' - 8"101EQEQ69' - 2" (FIELD VERIFY TO MATCH EXISTING)2' - 10"2' - 10"SIM.+0" FIN. FLR.105CLOSET1'-0"FILLED-IN PORTION OF STAGE3' - 6"3' - 6"3' - 6"5'-3".3' - 3"3' - 3"UPEXIST. STRUCTUREPROPOSED STRUCTURE2'-4".1'-2".(72 SEATS)POSSIBLE W/C AREASPOSSIBLE W/C AREA7'-0" 6'-0" 1'-3" 1047' - 0"7' - 0"UPA7.05AREA OF WORK(E) CLASSROOM(E) CLASSROOM(E) CLASSROOM(E) KITCHEN(E) OFFICE(E) LIBRARY(E) BANQUET RM SEATING = 80(E) STORAGE(E) YOUTH OFFICE(E) CLASSROOM(E) CORRIDOR(E) CORRIDOR21620 84th Ave. S.Ste. 200Kent, WA 98032(253) 468-7696www.ihbarchitects.comIHBThe drawings and plans set forth onthis set as instrument of service are,and shall remain, the property ofIHB Architects. Use of this drawingis limited to a specified project forpersons named hereon. And for aconstruction of one building. Anyuse or reuse of said drawings isstrictly prohibited without writtenpermission of IHB ArchitectsPARCEL NO:drawn by:date:job No:reviewed by:revisions:IHB4230592372/20/2018 3:51:06 PMA2.1A2.1 PROPOSEDFLOOR PLANSFUPC - Sanctuary Addition & Remodel3811 NE 21st St,Renton, WA 98056Project NumberFeb 20, 2018JS/OG/DSSCALE: 1/8" = 1'-0"PROPOSED MAIN FLOOR PLANN.FLOOR PLAN NOTES1. ALL OUTSIDE AND INSIDE DIMENSIONS ARE TO BE FACE OF STUDS (UNLESS NOTED OTHERWISE ON PLANS).2. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS.3. ALL EXTERIOR DOORS SHALL BE OPENABLE FROM INSIDE WITHOUT USE OF KEYS.4. PROVIDE CONT. HANDRAIL AT STAIRS A MIN. OF 1-1/2" AWAY FROM WALL.5. HANDRAIL ENDS SHALL BE RETURNED OR SHALL TERMINATE IN NEWEL POSTS OR SAFETY TERMINALS.6. FIRE STOPS: FIRE BLOCKING IS REQUIRED IN ALL STUD WALLS AT CEIILNGS & FLOOR LEVELS. THE VERTICAL DISTANCE BETWEEN BLOCKING SHALL NOT EXCEED 10 FT.WALL SCHEDULEWL-1INTERIOR GWB WALL: 5/8" GWB EA. SIDE OF 2x6 WD STUDS @ 16" O.C. EXTERIOR WOOD WALL: 5/8" GWB W/PVA V.B. O/ 2x6 WD STUDS @ 16" O.C. R-21 BATT INSULATION WHERE SHOWN PLUS R-4 CONTINUOUS INSULATION 7/16" OSB SHEATHING MOISTURE BARRIER (TYVEK) EXTERIOR FINISH (SEE ELEV.) WL-3SCALE: 1/8" = 1'-0"PROPOSED LOWER FLOOR PLANN.FIRE SPRINKLER/RISER RM.WL-2 INTERIOR GWB WALL: 5/8" GWB EA. SIDE OF 2x4 WD STUDS @ 16" O.C. SEATING/PARKING DATA:SANCTUARY SEATING = 360CHOIR STAGE SEATING = 72TOTAL SEATING = 442PARKING REQUIRED:432 SEATS / 5 = 88 STALLS EXISTING PARKING = 103 STALLSBUILDING AREA DATA:EXISTING BLDG AREA = 17,211 S.F.PROPOSED EXTENSION = 1,689 S.F.AREA % INCREASE = 9.8%