CITY OF RENTON
Public Works Department
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: Burnett Avenue S Sidewalk & Utilities Replacement Project
CAG-23-299, Project No. 4244
C.O.# 01
CONTRACTOR: Active Construction, Inc.
SUMMARY OF PROPOSED CHANGE:
This change order is for the removal of an existing corroded and partially collapsed 8-inch storm line across
Burnett Ave S and to replace it with a 45-
change order also deletes bid item C1 in Schedule C that is not used for the contract.
ITEM Alteration Under This Change Order Unit Qty. Unit Price Total Price
1 Remove and replaced 45-feet of 8-inch storm drain pipe LS 1 $25,061.70 $25,061.70
Subtotal $25,061.70
Sales Tax 10.3% (not applicable to Schedule C) $0.00
Total $25,061.70
ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE
THIS ORDER
ESTIMATED CONTRACT
TOTAL AFTER CHANGE
$897.897.00 $897,897.00 $25,061.70 $922,958.70
SIGNATURES:
Contractor: _______________________________________________________________ Date: _______________
Ryan Burks, Active Construction, Inc
Project Engineer: _______________________________________________________________ Date: _______________
Jonathan Chavez, Project Manager
Approved By: _______________________________________________________________ Date: _______________
Ron Straka, Utility Systems Director
Approved By: _______________________________________________________________ Date: _______________
Martin Pastucha, PW Administrator
Approved By: _______________________________________________________________ Date: ________________
Shane Moloney, Renton City Attorney
Attest: ________________________________________________________________ Date: _______________
Jason Seth, City Clerk
CAG-23-299, CO #1-24
Approved by Cheryl Beyer via email 10/11/2024
N/A