HomeMy WebLinkAboutCedarCroft aka Alpine Nursery Final Plat Staff Report LUA17-000240DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
HEX Report Cedarcroft Final Plat LUA 17-000240, FP
A. REPORT TO THE HEARING EXAMINER
DATE: December 7, 2017
Project Name Cedarcroft Final Plat (aka Alpine Nursery)
Owner: Toll Brothers
Address: 9720 NE 120th Place, Suite 100, Kirkland, WA 98034
Contact: Paul Ollestad, Toll Brothers
File Number: LUA17-000240, FP
Project Manager: Ann Fowler
Project Summary: Final Plat approval for a 27 lot subdivision with three tracts for open space, tree
retention, and drainage. The subject property is a collection of three parcels located on
the south side of SE 144th St between 160th Ave SE and 161st Ave SE. The resulting
9.64-acre site is located within the Residential-4 dwelling units per acre (R-4) zoning
classification. The 27 lots would result in a density of 3.98 dwelling units per acre. Lot
sizes would range from 8,000 square feet to 13,369 square feet. Access to the plat is
proposed via an extension of 161st Ave SE and a partial extension of 160th Ave SE. All
existing structures on site are proposed to be demolished. There are 598 significant
trees on the site of which the applicant is to retain 102 trees. There appears to be no
critical areas located on site. The applicant has submitted a Wetland Assessment,
Drainage Report, Arborist Report, Traffic Impact Analysis, and a Geotechnical
Engineering study with the application.
Project Location: 14609 and 14625 161st Ave SE, 16023 SE 144 St, Renton, Washington
Section 23, Township 23, Range 05
Site Area: 419,918 SF (9.64 acres)
B. EXHIBITS:
Exhibit 1: Staff Report dated December 4, 2017
Exhibit 2: HEX Preliminary Plat Report and Exhibits (LUA15-000018)
Exhibit 3: SEPA Determination of Non-Significance - Mitigated (DNS-M)
Exhibit 4: Conditions of Compliance Letter
Exhibit 5: Final Plat Map
Exhibit 6: Vicinity Map
Exhibit 7: Approved Civil Construction Plans
Exhibit 8: Street Modification Approval
Exhibit 9: Addendum to Traffic Study
City of Renton Department of Community & Economic Development Hearing Examiner Recommendation
Cedarcroft Final Plat LUA17-000240, FP
December 7, 2017 Page 2 of 6
HEX Report Cedarcroft Final Plat LUA 17-000240, FP
C. FINDINGS OF FACT (FOF):
1. The applicant, Toll Brothers, filed a request for approval of a 27-lot final plat.
2. The Environmental Review Committee (ERC), the City's responsible State Environmental Policy Act (SEPA)
official, issued a Determination of Non-Significance – Mitigated with Mitigation Measures on February
23, 2015 for the subject proposal.
3. Staff from various City departments are reviewing the application materials to identify compliance with
all conditions of project approval.
4. The subject site is located at 14609 and 14625 161st Ave SE, 16023 SE 144 St, Renton, Washington. The
plat is located in Section 23, Township 23, Range 05.
5. The subject site comprises of 9.64 acres (419,918 square feet).
6. The Preliminary Plat (LUA15 - 000018) received approval from the City on April 6, 2015.
8. The property is located within the R-4 zone and RLD Comprehensive Plan designation.
10. The Final Plat complies with both the Zoning Code and the Comprehensive Plan.
11. The applicant has complied with the following conditions imposed by the ERC on February 23, 2015:
Compliance Environmental Review Committee (ERC) Imposed Conditions
Condition #1 - All earthwork performed and implemented by the applicant shall be
consistent with the recommendation of the geotechnical report, prepared by Earth
Solutions NW. dated June 5, 2014.
Staff Comment: The Project construction complied with these criteria; construction was
supervised by a licensed professional geotechnical engineer and approved by City
inspectors.
Condition #2 - Additional secondary review is required for the proposed 7-8 foot
stormwater pond wall during the final engineering design which includes hydro-
geotechnical evaluations for buoyancy and lining, structural review and wall drainage
relief against potential hydrostatic pressures. The secondary review shall be conducted
by an independent reviewer selected by the City at the applicant’s expense and shall be
approved by the City’s Plan Reviewer prior to engineering plan approval.
Staff Comment: Secondary review of the proposed stormwater pond wall was
completed by Reid Middleton prior to approval and issuance of the Civil Construction
Permit #U15007366. The pond wall was constructed in accordance with the approved
plans.
Condition #3 - The applicant shall be required to provide, to the Current Planning Project
Manager, tree retention inspection/monitoring reports after initial clearing, final
grading, and annually for two years by a qualified professional forester. The
City of Renton Department of Community & Economic Development Hearing Examiner Recommendation
Cedarcroft Final Plat LUA17-000240, FP
December 7, 2017 Page 3 of 6
HEX Report Cedarcroft Final Plat LUA 17-000240, FP
12. The applicant has complied with the following conditions of preliminary plat approval from the Hearing
Examiner’s Decision dated April 6, 2015:
inspection/monitoring reports shall identify any retained trees that develop problems
due to changing site conditions and prescribe mitigation.
Staff Comment: The applicant has provided a final tree retention report which identified
a total of 113 retained trees, excluding dead/dying trees. The report identifies 16 trees
with visible problems not attributed to the changing site conditions and prescribed a
mitigation plan for the removal and/or care of the trees of concern.
Condition #4 - The applicant shall submit a revised Traffic Study including an analysis of
impacts caused by the proposed development to the 156th Ave SE/SE144th St and the
156th Avenue SE/SE 142nd Street intersections and recommend appropriate mitigation
as necessary. The revised study shall be submitted to/approved by the City’s Plan
Reviewer, and applicable mitigation shall be incorporated in the proposal, prior to
engineering permit approval. The applicant shall also be responsible for paying their fair
share of the cost of a new signal to be installed at the 156th Avenue SE/SE 142nd Street
intersection based on any new PM peak hour trips generated from the subdivision. The
fee will be based on new PM peak hour trips/1,310 Total PM peak hour trips x $500,000
(cost of new signal) and shall be paid prior to the recording of the final plat.
Staff Comment: The submittal and approval of the traffic study addendum was
completed prior to civil construction permit approval as required in the condition. The
conclusion of the study was that the development resulted in a net decrease in PM peak
hour trips based on the existing site use and concluded that no fair share contribution
should be required towards the construction of the signal. See Exhibit 9 for addendum
to the traffic study.
Compliance Hearing Examiner’s Decision Imposed Conditions
Condition #1 – The applicant shall comply with mitigation measures issued as part of the
Mitigated Determination of Non-Significance for the proposal.
Staff Comment: This project complied with the DNS-M as described in FOF 11 in Section
of this document.
Condition #2 – All proposed street names shall be approved by the City.
Staff Comment: Street names have been approved by City staff and are shown on the final
plat map
Condition #3 – All lot corners at intersections of dedicated public rights-of-way, except
alleys, shall have minimum radius of fifteen feet (15’).
Staff Comment: All lot corners at intersections of dedicated public rights-of-way have
fifteen feet (15’) radii.
Condition #4 – Side sewer lines shall be installed eight feet (8') into each lot if sanitary
sewer mains are available, or provided with the subdivision development.
Staff Comment: Side sewer lines were installed eight feet (8’) into each lot.
City of Renton Department of Community & Economic Development Hearing Examiner Recommendation
Cedarcroft Final Plat LUA17-000240, FP
December 7, 2017 Page 4 of 6
HEX Report Cedarcroft Final Plat LUA 17-000240, FP
Condition #5 – All utilities designed to serve the subdivision shall be placed underground.
Any utilities installed in the parking strip shall be placed in such a manner and depth to
permit the planting of trees. Those utilities to be located beneath paved surfaces shall be
installed, including all service connections, as approved by the Department of Public
Works. Such installation shall be completed and approved prior to the application of any
surface material. Easements may be required for the maintenance and operation of
utilities as specified by the Department of Public Works.
Staff Comment: All utilities designed to serve the subdivision were placed underground.
Utilities installed in the parking strip were placed in such a manner and depth to permit
the planting of trees. Those utilities located beneath paved surfaces were installed as
approved by the Department of Public Works. The installation was completed and
approved prior to the application of the surface material. Easements are provided for the
maintenance and operation of utilities as specified by the Department of Public Works and
are shown on the final plat map
Condition #6 - Any cable TV conduits shall be undergrounded at the same time as other
basic utilities are installed to serve each lot. Conduit for service connections shall be laid
to each lot line by the Applicant as to obviate the necessity for disturbing the street area,
including sidewalks, or alley improvements when such service connections are extended
to serve any building. The cost of trenching, conduit, pedestals and/or vaults and laterals
as well as easements therefore required to bring service to the development shall be
borne by the developer and/or land owner. The applicant shall be responsible only for
conduit to serve his development. Conduit ends shall be elbowed to final ground
elevation and capped. The cable TV company shall provide maps and specifications to the
applicant and shall inspect the conduit and certify to the City that it is properly installed.
Staff Comment: All cable TV conduits were undergrounded at the same time as other
basic utilities were installed to serve each lot. Conduit for service connections were laid to
each lot line. The cost of trenching, conduit, pedestals and/or vaults and laterals as well
as easements that was required to bring service to the development was borne by the
developer and/or land owner.
Condition #7 – The applicant shall install all street name signs necessary in the subdivision
prior to final plat approval.
Staff Comment: All street name signs have been installed.
Condition #8 – The applicant shall obtain a demolition permit and all required inspections
for the removal of the existing single family residences and detached accessory structures
prior to Final Plat recording.
Staff Comment: The applicant obtained a demolition permit, Permit No. B16005398 from
the City and removed the structures.
Condition #9 – The applicant shall establish and record a permanent and irrevocable deed
restriction on the property title of the tree protection tract. Such deed restriction shall
prohibit development, alteration, or disturbance within the tract except for the purposes
of installing Administrator approved amenities or habitat enhancement activities, as part
of an enhancement project, which has received prior written approval from the City. A
covenant shall be placed on the tract restricting its separate sale and shall be recorded
prior to or concurrent with the recording of the Final Plat.
City of Renton Department of Community & Economic Development Hearing Examiner Recommendation
Cedarcroft Final Plat LUA17-000240, FP
December 7, 2017 Page 5 of 6
HEX Report Cedarcroft Final Plat LUA 17-000240, FP
Staff Comment: The tree protection tract is identified as Tract C on the final plat. Plat
note #3 restricts the development, alteration, disturbance of the trees within Tract C.
Condition #10 – The applicant shall place permanent fencing on the perimeter of the tree
protection tract. This shall be accomplished by installing a wood, split-rail fence with
applicable signage. The Administrator may approve pedestrian-sized openings for the
purpose of facilitating passive recreation within the tract for the benefit of the
community. The Administrator may authorize alternate styles and/or materials for the
required fencing. The proposed fencing shall be submitted to, and approved by, the
Current Planning Project Manager prior to engineering permit approval.
Staff Comment: The applicant submitted a fencing and signage detail for the required
fencing and signage along the boundary of the tree protection tract. The fencing and
signage detail was reviewed and approved by the City Current Planning Project Manager.
The approved fencing and signage details can be found on plan number R-390032.
Condition #11 – A street modification shall be submitted to, and approved by, the Current
Planning Project Manager prior to engineering permit approval for a modification of the
160th Ave SE street cross section, south of Road ‘A’, in order to realign the extension of
160th Ave SE to the west.
Staff Comment: The street modification request was submitted and approved by the City
as part of the Civil Construction Permit application. See Exhibit 8 for Approved Street
Modification.
Condition #12 – A street modification shall be submitted to, and approved by, the Current
Planning Project Manager, prior to engineering permit approval, for a modification to
reduce the required right-of-way width of Road ‘A’ from 53 feet to 47 feet.
Staff Comment: The street modification request was submitted and approved by the City
as part of the Civil Construction Permit application. See Exhibit 8 for Approved Street
Modification.
Condition #13 – The applicant shall be required to record a public access easement across
the proposed soft surface trail extended from the termination of 160thAve SE sidewalk,
through the proposed Tree Retention Tract (Tract ‘C’), to 161st Ave SE. The easement
shall be recorded prior to, or concurrent with, the recording of the Final Plat.
Staff Comment: The public access easement is shown on the final site plan and will be
recorded concurrently with the recording of the Final Plat.
Condition #14 – A covenant shall be recorded on the face of the plat restricting vehicular
access for proposed Lots 17-20 to the proposed public alley/unnamed road and proposed
Lots 1-8, 21-27 from 160th St Court SE. Additionally, proposed Lots 17-20’s front yards and
front façade/elevations shall be oriented to the north (SE 144th St).
Staff Comment: Restricted vehicular access for Lots 17-20 is noted on the Final Plat. The
driveway aprons for Lots 1-8, 21-27 are installed along 160th St Court SE. The front yards
and front façade elevations of lots 17-20 will be oriented to the north (SE 144th St) and will
be reviewed as part of the building permit applications for each individual lot.
Condition #15 – The applicant shall be required to create a homeowners’ association and
maintenance agreement(s) for the shared utilities, stormwater facilities, and
maintenance and responsibilities for all shared improvements of this development. A
draft of the document(s) shall be submitted to Current Planning Project Manager for
City of Renton Department of Community & Economic Development Hearing Examiner Recommendation
Cedarcroft Final Plat LUA17-000240, FP
December 7, 2017 Page 6 of 6
HEX Report Cedarcroft Final Plat LUA 17-000240, FP
D. CONCLUSIONS:
1. The subject site is located in the R-4 Zone and RLD Comp Plan designation and complies with the
zoning and development standards established with this designation. See FOF 10 in Section C of this
document.
2. The Final Plat satisfies the conditions imposed by the preliminary plat process. See FOF 12 in Section
C of this document.
3. The Final Plat complies with the Subdivision Regulations of Renton Municipal Code (RMC) 4-7.
4. The Final Plat complies with mitigation measures required by the Environmental Review Committee
as part of the State Environmental Policy Act (SEPA) process. See FOF 11 in Section C of this
document.
E. RECOMMENDATION:
Staff recommends approval of Cedarcroft Final Plat, File No. LUA17-000240, FP as depicted in Exhibit 6,
subject to the following conditions:
1. All plat improvements shall be either constructed or deferred to the satisfaction of City staff prior
to the recording of the plat.
SUBMITTED THIS 7th DAY OF DECEMBER, 2017
____________________________
PLANNING DIVISION
review and approval by the City Attorney and Property Services section prior to the
recording of the final plat.
Staff Comment: The applicant has created a homeowner’s association maintenance
agreement and has submitted a draft of the documents for review and approval by the
City Attorney and Property Services section prior to final plat recording.