Loading...
HomeMy WebLinkAboutP_Architectural_Elevation_Color_170621_v1CONSTRUCTIONFLOOR PLAN0"ROOF PLAN12' - 0"CCCCDDDDFFCHHIJJKKKLLH512NNNOOOMIN. 50 PERCENT (50%) TRANSPARENT WINDOWS AND/OR DOORS BETWEEN 4' AND 8' ABOVE GROUND'H' PAINTED CMU LOW WALL AND PLANTER'J' PAINTED SMOOTH HARDIE CEMENT PANEL - MAIN BODY'L' PAINTED SMOOTH HARDIE CEMENT PANEL -ACCENT SIGNAGE WALL'O' CERTAINTEED PRESIDIO METAL ROOFING - SLATE'F' AND 'N' WOOD AND METAL TRIM COLOR'K' HORIZNTAL CERTAINTEED MONOGRAM5" DUTCHLAP - TERRA COTTALevel 8-1' - 6"G. MerkelMarch 29 - 20171603 116TH Ave NESheetDate:Drawn By:Scale:Client:Suite 115Bellevue, WA 980041B17001464APRIL 24/2017 1/4" = 1'-0"A6.12800 NE SUNSET BLVD RENTON, WA 98056RENTON SUNSET SHELL C - STORESUNSET SHELLBUILDING COLOR MAP AND MATERIAL DETAILS 1/4" = 1'-0"1FRONT ELEVATION - SUNSET COLORRevision ScheduleRevisionNumberRevision Description RevisionDate