HomeMy WebLinkAboutS-427701f
l
ocuSign Envelope ID 345B681D-914F-4F2D-AB59-7C192D3B78A3
Not to Scale
FRAME
(D I I O
•
\* \\\\\\\\\\\\\\`*
_\\\\\\\\\IIII�III
D
CAST IRON RING ANC
DR
)ABLE
NOTES.
1 8" AND 6" CLEAN -OUT RINGS AND COVERS ON SEWER MAINS SHALL BE EAST JORDAN IRON WORKS, INC
No 3698 (PRODUCT NO 00369803) OR APPROVED EQUAL CLEAN OUT SHALL BE A WATER TIGHT ASSEMBLY
2 IN UNIMPROVED AREAS, POUR A 8" THICK, 3'-0" SQUARE
CONCRETE, CLASS 3000, PAD AROUND THE RING AND COVER
3 INSTALL ASPHALT COLLAR PER STANDARD PLAN 106
STD. PLAN - 403.1
PUBLIC WORKS 8" OR 6" CLEANOUT "° Y
DEPARTMENT FOR SANITARY SEWER MAIN Martin PastuCtW26/2020
DATE
DocuSign Envelope ID 345B681D-914F-4F2D-AB59-7C192D3B78A3
<�
l
r-T-r----------
I I I I
�r--EX. SEWER MAIN
I 1 I I '
I
_PROPERTY LINE
S NEEDED) I I I 13'-O"
MIN --�{
R STUB
I I I o I
I I I M
FUTURE 4" SIDE SEWER
F�SEWWR
I I 1
i i I
f 2"x 4" STUD MARKING POST PAINTED
I I I I
6' CAP WHITE NTH THE WORD "SEWER' STENCILED
E X 6"
TEE i i i i I
IN3" HIGH BLACK LETTERS AND /6 WIRE
i SIDEWALK i • ?
WRAPPED AROUND THE STUD AND
I I I 1 I
EXTENDED TO THE TOP OF THE STUD
COUPLING (TYP)
L_J_L_________J e
I;
6"X6"X6" SURFACE CLEANOUT WITH CAST IRON RING AND COVER
I
(EAST JORDAN IRON WORKS PRODUCT NO 00367502 OR
IO
�
APPROVED EQUAL, SPECIFY 'SEWER" ON LID),
Fi
CLEANOUT TO BE CENTERED IN A 2'x2' CONCRETE PAD
CONCRETE PAD TO BE 8" IN DEPTH
_____________________T_
BEND AS
8"
REQUIRED
EXISTING SANITARY
_
SEWER MAIN -2
\
0% MIN SLOPE
1\
!`\ `FUTURE 4" SIDE SEWER
6" SEWER STUB 6"X6"XC WYE FUTURE 6"x 4" REDUCER
l
SEWER MAIN 517E X 6" TEE
ACCEPTABLE PROCEDURES FOR SIDE SEWER CONNECTIONS TO EXISTING SEWER MAIN
A VITRIFIED CLAY MAIN - CUT IN A NEW PVC "TEE" USING "STRONG -BACK" FLEXIBLE COUPLINGS (FERNCO OR APPROVED EQUAL).
B CONCRETE MAIN - CUT IN A NEW PVC "TEE" USING "STRONG -BACK" FLEXIBLE COUPLINGS (FERNCO OR APPROVED EQUAL)
C PVC k C900 PVC MAIN - CUT IN NEW TEE USING RIGID COUPLINGS OR CORE -DRILLED WITH A ROMAC SADDLE
(OR APPROVED EQUAL)
D. DUCTILE IRON MAIN - CORE -DRILLED WITH A ROMAC SADDLE (OR APPROVED EQUAL)
E LINED MAIN - CONNECTION TO SEWER MAINS THAT HAVE BEEN LINED (CIPP, ETC), CUT IN A NEW PVC "TEE" USING
"STRONG -BACK" FLEXIBLE COUPLINGS (FERNCO OR APPROVED EQUAL).
F HOPE - CORE -DRILLED WITH A ROMAC SADDLE "INSERTA-TEE' MAY BE USED ON SEWER MAINS 12" DIAMETER OR LARGER
G MANHOLE CONNECTION - ALL CONNECTIONS TO MANHOLES SHALL BE AT MANUFACTURED KNOCK -OUTS OR THE STRUCTURE
SHALL BE CORE -DRILLED AND USE KOR-N-SEAL BOOTS OR APPROVED EQUAL
NOTES.
1 PRIOR TO INSTALLATION OF A SANITARY SEWER STUB, A SIDE SEWER STUB PERMIT MUST BE PURCHASED FROM THE CITY OF
RENTON PUBLIC WORKS DEPARTMENT
2 UNLESS OTHERWISE SHOWN ON PLAN, SIDE SEWER SHALL HAVE A MINIMUM 2 5' COVER AT PROPERTY LINE OR 3-S' LOWER
THAN THE LOWEST HOUSE ELEVATION, WHICHEVER IS LOWER
3 SIDE SEWERS SHALL HAVE A MINIMUM 2 X SLOPE UNLESS APPROVED BY THE PUBLIC WORKS INSPECTOR
4 FOR INSPECTION OF THE SIDE SEWER STUB, CALL 24 HOURS IN ADVANCE. THE INSPECTION PHONE NUMBER IS ON THE SIDE
SEWER STUB PERMIT SITE MUST BE READY FOR INSPECTION AND A REPRESENTATIVE ON SITE WHEN INSPECTOR ARRIVES AT
THE APPOINTED TIME DO NOT BACKFILL THE TRENCH UNTIL APPROVAL IS GIVEN BY THE INSPECTOR
5 ALL TRENCH RESTORATION FOR SIDE SEWERS IN THE PUBLIC RIGHT-OF-WAY SHALL CONFORM TO STANDARD PLAN 110 OR 1102
6 THE SIDE SEWER STUB SHALL HAVE PIPE BEDDING IN ACCORDANCE WITH STANDARD PLAN 405
7 ALL SIDE SEWER STUBS SHALL BE INSTALLED BY A CONTRACTOR uCFNSED AND BONDED IN THE STATE OF WASHINGTON
-1�
SIDE SEWER STUB STD. PLAN-406.1
.- Pusuc WORKS INSTALLATION A
DEPARTMENT Martin PastuCh@Y26/202
(SEWER MAIN TO PROPERTY LINE)
DATE
TEBALDI ENGINEERING, LLC
PO BOX 121
SUMNER, WA 98390
(206) 450-5096
1 12
1 12:
WATER PLAN GENERAL NOTES Standard Plan No. 300
1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE CITY OF RENTON PUBLIC WORKS
STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS AND WSDOT / APWA STANDARD SPECIFICATIONS, LATEST EDITION AS
AMENDED BY THE CITY OF RENTON. A SET OF CITY APPROVED PLANS SHALL BE KEPT AT THE JOB SITE WHENEVER CONSTRUCTION
IS IN PROGRESS. A PRE -CONSTRUCTION CONFERENCE SHALL BE HELD PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR
AND OR DEVELOPER SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION.
2. ALL EXISTING UTILITIES SHALL REMAIN IN SERVICE DURING CONSTRUCTION UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL
CALL 1-800-424-5555 TO VERIFY UTILITY LOCATIONS BEFORE BEGINNING EXCAVATION.
3. ALL MATERIALS USED FOR THE CONSTRUCTION OF WATER SYSTEM IMPROVEMENTS SHALL BE NEW AND UNDAMAGED, AND
"CATALOG CUTS" FOR ALL MATERIALS SHALL BE APPROVED IN WRITING BY THE CITY OF RENTON PRIOR TO BRINGING ANY
MATERIALS ON -SITE.
4. ALL WATER MAIN PIPE MATERIALS SHALL BE CEMENT LINED DUCTILE IRON PIPE, THICKNESS CLASS 52 PER AWWA C 151 AND C
104. PIPE JOINTS SHALL BE PUSH -ON OR MECHANICAL JOINT. CAST IRON OR DUCTILE IRON PIPE FITTINGS SHALL BE CLASS 250AS
PER ANSI/AWWA C110/A21.10-82. ALL DUCTILE IRON PIPE AND FITTINGS SHALL BE WRAPPED WITH 8-MIL BLACK, TUBE -TYPE,
POLYETHYLENE PLASTIC PER AWWA C105 STANDARDS.
5. MINIMUM COVER FROM TOP OF WATER MAINS TO FINISHED GRADE SHALL BE 36 INCHES FOR PIPE DIAMETER OF 10-INCH OR LESS
AND 48 INCHES FOR PIPE DIAMETER OF 12-INCH AND LARGER. MAXIMUM COVER FOR ALL WATER MAINS SHALL BE 60INCHES.
ANY DEVIATIONS MUST BE APPROVED BY THE CITY OF RENTON PRIOR TO CONSTRUCTION. WHERE UTILITY CONFLICTS OCCUR,
THE PROFILE OF THE WATER MAIN SHALL BE ADJUSTED AS NECESSARY TO CLEAR CONFLICTS AND TO PROVIDE MINIMUM COVER.
PIPE DEFLECTION SHALL NOT EXCEED ONE-HALF OF PIPE MANUFACTURER'S SPECIFICATION FOR SIZE OF PIPE USED. ALLTRENCH
BACKFILL SHALL BE COMPACTED TO 95 PERCENT MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR TEST
METHOD (MDD) IN ROADWAYS, ROADWAY SHOULDERS, ROADWAY PRISM AND DRIVEWAYS, AND 85 PERCENT MDD IN UNPAVED
AREAS. ALL PIPE ZONE COMPACTION SHALL BE 95 MOD.
6. CONCRETE BLOCKING FOR WATER MAINS SHALL BE DESIGNED, INSTALLED AND POURED IN PLACE IN ACCORDANCE WITH CITY OF
RENTON STANDARD DETAILS AND SPECIFICATIONS AND SHALL BE INSTALLED AT ALL VERTICAL AND HORIZONTAL BENDS, FITTINGS
AND BASE OF HYDRANTS. MEGA -LUGS (OR SIMILAR PRODUCT) MAYBE REQUIRED ON ALL MECHANICAL JOINTS IN ADDITION TO
CONCRETE BLOCKING.
7. ALL NEW WATER MAIN PIPES AND FITTINGS SHALL HAVE A FOAM PIPE PIG RUN THROUGH THEM PRIOR TO BEING FLUSHED,
DISINFECTED, AND TESTED. CLEANING, PRESSURE AND PURITY TESTING SHALL BE DONE IN THE PRESENCE OF AND UNDER THE
SUPERVISION OF A CITY OF RENTON UTILITY INSPECTOR. THE CONTRACTOR SHALL SUPPLY, INSTALL AND REMOVE PLUGS,
CORPORATION STOPS, BLOW -OFF ASSEMBLIES, AND THRUST RESTRAINT / BLOCKING FOR TESTING AND PURITY ACCEPTANCE. NO
CONNECTION SHALL BE MADE BETWEEN THE NEW MAIN OR BETWEEN THE NEW WET -TAP VALVE TO AN EXISTING MAIN UNTIL
THE NEW PIPING HAS BEEN FOAM -PIGGED, DISINFECTED, FLUSHED, AND PASSED BOTH PRESSURE AND PURITY TESTING.
8. NEW WATER MAINS INCLUDING SERVICE LATERALS SHALL BE TESTED AT A STATIC PRESSURE OF 150 PSI ABOVE WORKING
PRESSURE WITH A MINIMUM OF 225 PSI TEST PRESSURE FOR 120 MINUTES WITH A MAXIMUM OF 5 PSI PRESSURE DROP DURING
THE ENTIRE TEST PERIOD. UPON SATISFACTORY COMPLETION OF THE PRESSURE TEST, THE LINE SHALL BE DISINFECTED, FLUSHED,
AND THEN WATER SAMPLES SHALL BE TAKEN FOR PURITY TESTING BY THE PUBLIC WORKS INSPECTOR.
9. THE CONTRACTOR SHALL NOTIFY THE CITY OF RENTON WATER UTILITY AND MAINTENANCE DEPARTMENTS AT LEAST 10 WORKING
DAYS PRIOR TO MAKING CONNECTIONS TO THE EXISTING WATER SYSTEM. THE CONTRACTOR SHALL EXPOSE THE EXISTING WATER
MAIN AND FITTINGS AT THE CONNECTION POINT BEFORE ORDERING THE NECESSARY ADAPTORS AND FITTINGS REQUIRED FOR
THE FINAL CONNECTION. THE CONTRACTOR SHALL EXCAVATE, REMOVE ALL SURFACE MATERIALS, AND PROVIDE SHORING AND
ALL MATERIALS REQUIRED FOR THE CITY OF RENTON TO PERFORM THE CONNECTION TO THE EXISTING WATER SYSTEM. THE
CONTRACTOR SHALL PROVIDE AND INSTALL BACKFILL, CONCRETE BLOCKING, AND COMPLETE SURFACE RESTORATION.
~�Y o STD. PLAN - 300.0
GNP WORKS PUBLIC WATER PLAN GENERAL NOTES
DEPARTMENT
'PFo$ MARCH 2O10
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES:
THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE EROSION AND SEDIMENT CONTROL ESC PLAN SET. ALL THE NOTES ON THE
(ESC)
LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER HEREBY REFERRED TO AS APPLICANT MAY STRIKE OUT IRRELEVANT NOTES IF NOT
APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC
ASPECTS, THEY SHALL BE ADDED AFTER THE ESC STANDARD PLAN NOTES.
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY
REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANTS CONTRACTOR.
2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL
PERMIT IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY
ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT.
3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION
COMMENCEMENT TO POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS.
4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS
PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF
RENTON SURFACE WATER DESIGN MANUAL SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD NO DISTURBANCE
( )
BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF
CONSTRUCTION.
5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT.
ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT
CLEAN AND TRACK -OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL
BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING
WATERS OF THE STATE.
6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE
TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON -SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE
WASHOUT AREAS.
7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF
SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL
SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER
CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION,
MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT.
8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY.
9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION
PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE
COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE
APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM
REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS,
CHANNELS, OR STORMWATER FACILITIES.
11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL.
12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST
THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED
ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM.
13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY.
14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS.
15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY.
16, BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM
DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED
TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING
CONDITION.
17, AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE
CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM.
18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL
PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE
TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT
FACILITY.
19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON -SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT,
ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION.
20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR
SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON.
AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW.
21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT -LADEN WATER FROM LEAVING THE PROJECT SITE,
ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON -SITE BMPS SHALL BE RESTORED TO THEIR FULLY
FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM,
DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH
WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST.
22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS
RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF
ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE.
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
STD. PLAN - 268.00
= PUBLIC WORKS EROSION AND SEDIMENT CONTROL FPR D
��� DEPARTMENT STANDARD PLAN NOTES GAZ 9/28/2018 1
u�worv:namlm:na•, DATE
w A s
CD
43524
/STERN �\a`
s/ONA L
2/12/24
:45 Al
3 REVISED PER CITY COMMENTS
2 REVISED PER CITY COMMENTS
1 REVISED PER CITY COMMENTS
NO. REVISION
DocuSign Envelope ID E212B987-C626-4330-A5D4-DO55AO107AF9
TRENCH WIDTH,
SEE NOTES
PIPE ZONE BEDDING AND
BACKFILL SEE NOTE 4 -
TRENCH WIDTH,
SEE NOTE 3
PIPE ZONE BEDDING AND SPAN -�
BACKFILL. SEE NOTE 4
FOUNDATION
LEVEL
RIGID PIPE NOTES:
I PIPE COMPACTION LIMITS SHOWN ON THIS PLAN ARE FOR PIPE
CONSTRUCTION IN AN EMBANKMENT FOR PIPE CONSTRUCTION IN
A TRENCH. THE HORIZONTAL LIMITS OF THE PIPE COMPACTION
ZONE SHALL BE THE WALLS OF THE TRENCH
2 O.D. IS EQUAL TO THE OUTSIDE DIAMETER OF A PIPE OR THE
OUTSIDE SPAN OF RPE-ARCH
3 SEE STANDARD WSDOTIAPWA SPECIFICATIONS SECTION 2-09.4 FOR
TRENCH WIDTH
4 PIPE ZONE BEDDING AND BACKFILL MATERIAL SHALL BE PLACED IN
S' LOCSE LAYERS AND COMPACTED TO 95% MAXIMUM DENSITY
EXCAVATE UNSTABLE MATERIAL DOWN TO FIRM SOIL AND REPLACE
WITH FOUNDATION MATERIAL CLASS A OR 8 PER STANDARD
WSDOT/APWA SPECIFICATIONS SECTION 9-03.17.
GRAVEL BACKFILL FOR PIPE ZONE BEDDING (WSDOT 9-03 12(3))
OR MAINTENANCE ROCK (WSDOT "11)(4))
RISE
FOUNDATION MATERIAL,
IF REQUIRED, SEE NOTE 5
PIPE - ARCH
C
PIPE TYPE
MINIMUM
PUBLIC?
PRIVATE?
ALLOWED IN ZONE 1
COVER (FT)
OF THE APA7
CORRUGATED
20
YES
YES
YES
STEEL PIPE
SPIRAL RIS STEEL
2.0
YES
YES
YES
PIPE
PLAIN CONCRETE
PIPE IPCPI
2 0
NO
YES
NO
REINFORCED
CONCRETE PIPE
1.0
YES
YES
NO
(RCPI
DUCTILE IRON PIPE
1.0
1 YES
VES
YES
CIRCULAR PIPE
DIAMETER
MINIMUM DISTANCE
BETWEEN BARRELS
12"TO24'
12-
30'TO98'
DIAMETER 13
10r TO 180'
48'
PIPE -ARCH
SPAN
MINIMUM DISTANCE
BETWEEN BARRELS
13"TO 36'
12-
43" TO 142"
SPAN, 3
148' TO 199'
1.,
UNLESS OTHERWISE NOTED, DRAWING 6 NOT TO SCALE (NTS
STD. PLAN - 220.00
m PUBLIC WORKS PIPE ZONE BEDDING AND APPRROVII))
-1�
COMPACTION DEPARTMENT - RIGID PIPE MartinPastucha 10/19/20
I-- n."...ro.b DATE
DocuSign Envelope ID: 381 B34D3-7EOA-476C-ADB3-4329FFEOC 108
SURFACE WATER STANDARD PLAN NOTES:
THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY
PROJECT THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLCANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT HOWEVER, THE
APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS. THEY SHALL BE ADDED AFTER THE
SURFACE WATER STANDARD PLAN NOTES
I BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON. HEREBY
REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANTS CONTRACTOR
2, THE APPLICANT SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY CITY. STATE. AND FEDERAL PERMITS PRIOR TO CONSTRUCTION.
3 ALL STORM DRAINAGE IMPROVEMENTS SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH THE LATEST EDITION OF THE CITY OF RENTON SURFACE
WATER DESIGN MANUAL (RENTON SWDML RENTON MUNICIPAL CODE (RAC). AND THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL
CONSTRUCTION PREPARED BY WSOOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA)_ IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT TO
CORRECT ANY ERROR, OMISSION OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THE PLANS ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST TO
THE CITY
4. APPROVAL OF THE ROAD, GRADING. PARKING, BUILDING. AND DRAINAGE PLAN DOES NOT CONSTITUTE AS APPROVAL OF ANY OTHER CONSTRUCTION (E.G WATE I,
SEWER. GAS. ELECTRICAL ETC.) PLANS FOR STRUCTURES SUCH AS BRIDGES. VAULTS AND RETAINING WALLS REWIRE A SEPARATE REVIEW AND APPROVAL BY
THE CITY PRIOR TO CONSTRUCTION, THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS. ANY DEVIATION
FROM THE APPROVED PLANS WILL REQUIRE COORDINATION FOLLOWED BY WRITTEN APPROVAL FROM THE CITY.
5 A COPY OF THE APPROVED PLANS SHALL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
6 THE LOCATIONS OF ALL EXISTING UTIUTIES SHOWN HEREON HAVE BEEN ESTABUSHED BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHALL
THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE IT IS THE SOLE RESPONSIBILITY OF APPLICANT AND THE APPLICANT'S
CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN. AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT
SHOWN HEREON THAT MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. THE APPLICANT SHALL RECORD ON THE AS -BUILT DRAWINGS ALL
UNDOCUMENTED UTILITIES DISCOVERED AND ANY CHANGES TO THE APPROVED PLANS THE APPLICANT SHALL IMMEDIATELY NOTIFY THE ENGINEER OF RECORD IF A
CONFLICT EXISTS.
7 VERTICAL DATUM SHALL BE NAVD 88 AND HORIZONTAL DATUM SHALL BE MAD 83 (WA STATE PLANE NORTH), UNLESS OTHERWISE APPROVED BY THE CITY.
REFERENCE BENCHMARK. DATUM. AND ELEVATIONS SHALL BE NOTED ON THE PLANS.
8 ALL UTILITY TRENCH BACKFILL AND ROADWAY SUBGRADE SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY PER SECTION 2.03 3(14)D - COMPACTION AND
MOISTURE CONTROL TESTS OF THE WSDOT STANDARD SPECIFICATIONS. IN PERMEABLE PAVEMENT AND OTHER INFILTRATION AREAS. ALL TRENCH BACKFILL SHALL
BE FIRM AND UNYIELDING BUT IN NO CASE SHALL BE COMPACTED TO MORE THAN 92%OF MAXIMUM DRY DENSITY.
9 OPEN CUTTING OF EXISTING ROADWAYS FOR STORM DRAINAGE WORK IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY AND NOTED ON THESE
APPROVED PLANS ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITY TRENCH RESTORATION STANDARDS
10. ALL PIPE AND STRUCTURES SHALL BE STAKED FOR SURVEY LINE AND GRADE PRIOR TO THE START OF CONSTRUCTION WHERE SHOWN ON THE PLANS OR WHERE
DIRECTED BY THE CITY, THE EXISTING MANHOLES CATCH BASINS OR INLETS SHALL BE ADJUSTED TO THE GRADE AS STAKED
11. ALL FLOW CONTROL FACILITIES SHALL BE INSTALLED AND IN OPERATION PRIOR TO, OR IN CONJUNCTION WITH, ANY CONSTRUCTION ACTIVITY UNLESS OTHERWISF
APPROVED BY THE CITY.
12. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON STANDARD
SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION
MATERIAL. AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE 80 THAT THE ENTIRE LENGTH OF THE PIPE WILL BE
SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING AND BACKFILL SHALL BE AS SHOWN ON THE CITY STANDARD PLAN 220.00. 220.10, AND
220.20
13, STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT 1, 2. OR S INSIDE AND OUTSIDE,
14. ALL DRAINAGE STRUCTURES SUCH AS CATCH BASINS AND MANHOLES SHALL BE FITTED WITH DUCTILE IRON. BOLT -LOCKING LIDS PER IHE CITY STANDARD PLAN
204.10. 204.20, 204.30, 20440. AND 2D4.50- STRUCTURES SHALL HAVE
• RECTANGULAR OR ROUND. SOLO LIDS WHEN NOT COLLECTING RUNOFF. AND OUTSIDE OF THE ROADWAY
• ROUND. SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND LOCATED WITHIN THE ROADWAY. BUT OUTSIDE OF THE CURB/GUTTER LINE
• ROUND. SOLID LIDS DISPLAYING THE CITY LOGO WHEN WITHIN THE PUBLIC RIGHT-OF-WAY OR IN AN EASEMENT TO THE CITY. PRIVATE STRUCTURE LIDS OUTSIDE
PUBLIC RIGHT-OF-WAY AND EASEMENTS TO THE CITY SHALL NOT DISPLAY THE CITY LOGO.
15. BUILDINGS AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE 4.1 EASEMENT WIDTHS AND BUILDING SETBACKS ONES OF THE RENTON SWDM
18, LIDS OF MANHOLES/CATCH BASINS WITHIN PUBLIC RIGHT -Of -WAY SHALL NOT BE ADJUSTED TO FINAL GRADE UNTIL AFTER PAVING ALL MANHOLEICATCH BASIN RIMS
SHALL BE ADJUSTED TO BE FLUSH WITH FINAL FINISHED GRADES, UNLESS OTHERWISE SHOWN
17. ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY RIGHT-OF-WAY SHALL BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3.1 SLOPE FROM THE EDGE OF THE
DRIVEWAY TO THE BOTTOM OF THE DITCH
UNLESS OTHERWISE NOTED, DRAWING IS NOT 70 SCALE (NTS
STD. PLAN - 267.00
UO+ PUBLIC WORKS SURFACE WATER STANDARD PLAN I ruyFHrlty
DEPARTMENT NOTES (1 OF 2) Martin PastuCha8/13/2020
a.F.�dneu48D DATE
BBA LAND SURVEY
N/A
CMT
CMT
2/12/24
CMT
CMT
1 1 /25
CMT
CHAT
ails null
ff Im ou
Ir NI7r als noN
11111=
CMT
10/21
1 CMT
a■a®t
CMT
BY
DATE
I AP P R
8
DocuSign Envelope ID: 6EECF5B6.602A-4E4A-B436-A317AA638878
I
SEE STANDARD PLANS 110, 110, 1, 110 Z AND III FOR PAVEMEN-
T RESTORATION REQUIREMENTS
SURFACE RESTORATION AS
SPECIFIED IN CONTRACT DOCUMENTS '
12' MIN. -- EXISTING PAVEMENT SURFACE
- - - - ---__- - - zF
_____
n n 6' MIN.. SEE NOTE 4
NEAT LINE TRENCH
'CRUSHED SURFACING TOP COURSE' PER
WSDOT STD SPEC 903 943). COMPACTED
TO 95% OF MAXIMUM DENSITY
'CRUSHED SURFACING TOP COURSE' PER
WSOOT STD SPEC 9-03.9(3). "BANK RUN
GRAVEL FOR TRENCH BACKFILL' PER
WSDOT STD SPEC 9-03 19, OR "GRAVEL
BORROW PER WSDOT STD. SPEC 9-03.14(1).
COMPACTED TO 95% OF MAXIMUM DENSITY
BENCH AS NEEDED FOR
SHORING SYSTEM WHEN
DEPTH IS 4' OR GREATER
PIPE
PIPE ZONE BEDDING AND BACKFILL i
PER STD PLANS 220.00 AND 220.10
• PUBLIC WORKS
l �" DEPARTMENT
I~ SEE NOTE 1
UNPAVED AREAS I PAVED AREAS
NOTES:
1 SEE WSOOT/APWA STANDARD SPECIFICATIONS SECTION 2-09.4 FOR
MEASUREMENT OF TRENCH WIDTH.
2. EXCAVATIONS OVER V DEEP SHALL COMPLY WITH THE SAFETY STANDARD
DESCRIBED IN CHAPTER 295.156 PART N OF THE WAC.
3. MAXIMUM BACKFILL DEPTH ABOVE PIPE SHALL NOT BE EXCEEDED. AS
DETERMINED BY PIPE MANUFACTURER,
4 IN PAVED AREAS, IF PIPE HAS LESS THAN T OF COVER. USE 'CRUSHED
SURFACING TOP COURSE" FOR THE ENTIRE BACKFILL DEPTH ABOVE PIPE ZONE
5. SEE CONSTRUCTION PLANS FOR SPECIFIC PROJECT REQUIREMENTS
VNlF55 Ori119N'!tT ti6rED [1RA'JJN[; It \01 Tt] t'A.I il,i•
STD. PLAN - 220.20
TYPICAL TRENCH AND BACKFILL �1GAZ 9/28/2018 1 9:45
All
DocuSign Envelope ID: 301 B34D3-7EOA-476C-ADB3-4329FFEOC 108
SURFACE WATER STANDARD PLAN NOTES:
I HE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY
PROJECT THE APPLICANT OR OWNER. HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT HOWEVER, THE
APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS. THEY SHALL BE ADDED AFTER THE
SURFACE WATER STANDARD PLAN NOTES
id ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES. WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK PLACED TO A MINIMUM DEPTH OF ONE (1) FOOT
AND SHALL MEET THE FOLLOWING SPECIFICATIONS
• 4-8INCH ROCK 140 - 70% PASSING;
• 2 - 4 INCH ROCK 130 - 40% PASSING; AND
• LESS THAN 2 INCH ROCK / 10 - 20% PASSING.
19. FOOTING DRAINAGE SYSTEMS AND ROOF DOWNSPOUT SYSTEMS SHALL NOT BE INTERCONNECTED AND SHALL SEPARATELY CONVEY COLLECTED FLOWS TO THE
CONVEYANCE SYSTEM OR FLOW CONTROL FACILITY ON THE SITE UNLESS APPROVED BY THE CITY FOOTING DRAINS SHALL NOT BE CONNECTED TO ON -SITE BMPS
20, THE END OF EACH STORM DRAIN STUB SHALL BE CAPPED. A CLEANOUT TOPPED WITH A BOLT40CKI14G UO MARKED'STORM' OR •DRAA W SHALL BE LOCATED AT THE
PROPERTY LINE OR AT THE POINT OF CONNECTION OF A PRIVATE STORM DRAINAGE CONVEYANCE SYSTEM PER THE CITY STANDARD PLAN 227.00.
21, ALL STORM SYSTEM EKTENSIONS SHALL BE STAKED FOR LINE AND GRADE BY A SURVEYOR LICENSED IN WASHINGTON STATE. AND CUT SHEETS SHALL BE PROVIDED
TO THE CITY PRIOR TO CONSTRUCTION
22 ALL NEW Y•INSTALLNEWLY-REHABILITATEDED AND (PUBLIC AND PRIVATE) STORMCONVEYANCE SYSTEMSINSPECTED BY MEANS OF REMOTE
CCTV
ACCOR04NG TO THE CITY STANDARD PLAN 2W D0 CCTV INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO THE CITY PRIOR TO RECEIVING APPROVAL TO INSTALL
PROJECT CURBS, GUTTERS ANWOR PAVEMENT.
23. ALL STORM SYSTEMS AND CONNECTIONS TO EXISTING MAINS SHALL BE TESTED IN ACCORDANCE WITH SECTION 744 3(11 OF THE WSDOT STANDARD SPECIFICATIONS
AND IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY, STORM DRAIN STUBS SHALL BE TESTED FOR ACCEPTANCE AT THE SAME TIME THE MAIN STORM IS
TESTED
24 FOR ALL DISTURBED PERVIOUS AREAS (COMPACTED, GRADED, LANDSCAPED. ETC.) OF THE DEVELOPMENT SITE TO MAINTAIN THE MOISTURE CAPACITY OF THE Son.
EITHER STOCKPILE AND REDISTRIBUTE THE EXISTING DUFF LAYER AND NATIVE TOPSOIL OR AMEND THE SOIL WITH COMPOST IN ACCORDANCE WITH STANDARD PLAN
25400
25 ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY DOES NOT RELIEVE THE APPLICANT OF THE CONTINUING LEGAL OBLIGATION ANMOR LIABILITY
CONNECTED WITH STORMWATER DISPOSAL THE CITY DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE STORM
SYSTEM PROVIDED DURING CONSTRUCTION
26 ADEQUATE SAFEGUARDS. SAFETY DEVICES. PROTECTIVE EQUIPMENT. FLAGGERS, AND ANY OTHER ACTIONS NEEDED TO PROTECT THE LIFE. HEALTH. AND SAFE TY OF
THE PUBLIC. AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK SHALL BE PROVIDED. ANY WORK WITHIN THE TRAVELED
RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE CITY ALL SECTIONS OF THE WSDOT
STANDARD SPECIFICATIONS 1-10 TEMPORARY TRAFFIC CONTROL SHALL APPLY
27 PROJECTS LOCATED WITHIN THE CITY'S AQUIFER PROTECTION AREA (APA) SHALL COMPLY WITH SPECIAL REQUIREMENT 06 OF THE RENTON SWDM AND AQUIFER
PROTECTION REGULATIONS (RMC 4-3-0501
28. PLACEMENT OF SURFACE APPURTENANCES (CATCH BASINIMANHOLE LIDS, CLEANOUTS, INLETS. ETC.) IN THE STREET TRAVEL LANE WHEEL PAIN, INTERSECTIONS Of
STREET TRAVEL LANES, BIKE LANES. SIDEWALKS. AND CROSSWALKS SHALL BE AVOIDED WHENEVER POSSIBLE ANY SURFACE APPURTENANCE PLACED IN A
SIDEWALK OR CROSSWALK SHALL BE FITTED WITH A NONSLIP OR NONSKID LID PER ADA REQUIREMENTS,
29 CLEARLY LABEL PUBLIC AND PRIVATE SYSTEMS ON THE PLANS. PRIVATE SYSTEMS SHALL BE MAINTAINED BY THE APPLICANT,
30. MINIMUM COVER OVER STORM DRAINAGE PIPE SHALL CONFORM TO TABLE 4.2.1A2 OF THE RENTON SWDM.
31. CONSTRUCTED PERMEABLE PAVEMENT SHALL BE PERMEABLE ENOUGH TO ABSORB WATER AT A MINIMUM RATE OF 20 INCHES PER HOUR IMMEDIATELY AFTER THE
PAVEMENT SURFACE HAS BEEN WETTED CONTINUOUSLY FOR AT LEAST 10 MINUTES COMPLIANCE WITH THIS MINIMUM RATE SHALL BE CHECKED PRIOR TO
CONSTRUCTION APPROVAL OF THE PAVEMENT COMPLIANCE MAY BE CHECKED USING A SIMPLE BUCKET TEST IN WHICH 5 GALLONS OF WATER IS POURED ONTO THE
PAVEMENT SURFACE ALL AT ONCE IF ONLY A MINOR AMOUNT OF WATER PONDS OR RUNS OFF THE SURFACE. THEN THE PAVEMENT IS CONSIDERED TO MEET THE
MINIMUM RATE OF ABSORPTION- AT LEAST ONE TEST SHALL BE CONDUCTED PER 1.000 SQUARE FEET OF PERMEABLE PAVEMENT. IF THIS TEST IS NOT CONCLUSIVE
THEN ANOTHER TEST PER ASTM C1701 SHALL BE CONDUCTED FOR LARGE AREAS (E.G., PARKING AREAS), TESTING OBSERVATION MAY BE ACCOMPLISHED WHIL.
WALKING BEHIND A SLOWLY MOVING WATER TRUCK DISCHARGING WATER AT A RATE SIMILAR TO THE BUCKET TEST. PERMEABLE PAVERS SHALL BE TESTED USIN
ASTM C1781.
UNLESS OTHERWISE NOTED, DRAWING 6 NOT 70 SCALE JUTS)
STD. PLAN - 267.10
mt PUBLIC WORKS SURFACE WATER STANDARD PLAN ISIjMal1W:
�� DEPARTMENT NOTES (2 OF 2) artin PaStuch&/13/2020
w'Wiiti9.96149D -AU
NO I111 "mm
DATU M
CITY OF
RENTON
Planning/Building/Public Works Dept.
9:48
�S-427�i01 IW-427703 R- 427703
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
yqi 07/10/2024
WASTEWATER UTILITY >+
jstowell 07/11 /2024
GASPAIRE SFR OFFSITE IMPROVEMENTS low 2/4/23
NOTES AND DETAIL
39XX NE 6TH STREET
III
3 OF
141