HomeMy WebLinkAboutAddendum B -TalbotTALBOT HILL RESERVOIR PARK IMPROVEMENTS BID PHASE ADDENDUM B November 15, 2024 Addendum B - Page 1 of 2 ADDENDUM – B TO THE CONTRACT DOCUMENTS FOR City of Renton TALBOT HILL RESERVOIR PARK IMPROVEMENTS Project Issued: October 29, 2024 Addendum B Issued: November 15, 2024 Bid Opening Date: November 21, 2024 To: All Holders of Bid/Contract Documents: This addendum forms part of the Contract Documents and modifies the original Plans and Specifications, for which proposals are due on the date and time above. Acknowledge receipt of this addendum on “Addenda Received” of the Bid Documents in the Contract Documents. Failure to do so might subject the bidder to disqualification. This addendum shall clarify the Contract Documents as follows: Item No. 1 – Bidder Questions & Responses Memorandum #2 Item No. 2 – Specification 00 80 00 Form A: Bid Form, Section A. BID SCHEDULE - Correction 1.Item No. 29 is revised to 10 Boulders. 2.The following items are added to the Bid Schedule: A-35 3 EA Tennis Court Nets A-36 3 EA Pickleball Court Nets 3.Additional Work for Minor Changes is revised to Item No. A-37 Item No. 3 – Specification 01 20 00 Payment Procedures, Section 1.3 Payment Schedule, Bid Items 1.The following revisions are made to the Bid Items: 35.BID ITEM NO. A-35: TENNIS COURT NETS a.This Bid item includes all labor, materials, equipment, and incidentals necessary to procure and install new tennis court nets. b.Payment for this Bid item will be made at the unit price named in the Bid Schedule for each Tennis Court Net installed. TALBOT HILL RESERVOIR PARK IMPROVEMENTS BID PHASE ADDENDUM B November 15, 2024 Addendum B - Page 2 of 2 36. BID ITEM NO. A-36: PICKLBALL COURT NETS a. This Bid item includes all labor, materials, equipment, and incidentals necessary to procure and install new pickleball court nets. b. Payment for this Bid item will be made at the unit price named in the Bid Schedule for each Pickleball Court Net installed. 37. BID ITEM NO. A-37: ADDITIONAL WORK FOR MINOR CHANGES Item No. 4 – Drawing C.04 1. The following General Note is hereby added to C.04: "1. In accordance with City of Renton and WSDOT standard specifications, the water service pipe shall be 3/4" diameter Type "K" soft copper tubing or Polyethylene SDR 11 PE 4710. Install fittings as required at points of connection.” 11/15/2024 MEMORANDUM #2 DATE: November 15, 2024 TO: Potential Bidders CC: Dean Koonts, HBB Landscape Architecture FROM: Betsy Severtsen, RLA, ASLA - Capital Projects Coordinator SUBJECT: Bidder Questions & Responses #2 - Talbot Hill Reservoir Park Improvements 1. Bidder Question: • Drawing Reference: L.02; Plan shows 3 Tennis Court Nets, can you provide Pay Item No. where the tennis nets get paid? Response • A bid form line item will be added for the Tennis Court Nets via Addendum B. 2. Bidder Question: • Drawing Reference: L.02; Plan shows 3 Pickleball Nets in addition to the 6 moveable Pickleball Nets, can you provide where this item should be paid? Bid Form only shows 6 Moveable Pickleball Nets. Response • A bid form line item will be added for the Pickleball Court Nets via Addendum B. 3. Bidder Question • Bid Form Pay Item #29 has 9 Landscape Boulders for install. Plan Sheet L0.1 shows 10. Please clarify. Response • The 10 boulders in Drawing No L.01 is correct. Bid Form Pay Item #29 is revised to 10 Boulders via Addendum B. City of Renton Parks and Recreation Department 11/12/2024 4. Bidder Question • Please provide a photo of existing bench that we need to match for the new benches at the courts. Response 5. Bidder Question • Please provide information on what is the pipe size for the Water Line 11/15/2024 Response • The pipe shall be ¾” diameter. The General Note will be revised via Addendum B. End of Bidder Questions and Responses Section 00 80 00 – Bid Form Revised – Addendum B November 15, 2024 Talbot Hill Reservoir Park Improvements Bid Form Page 1 of 9 CITY OF RENTON HAND DELIVER TO: OFFICE OF THE CITY CLERK RENTON CITY HALL – LOBBY 1055 S. GRADY WAY, RENTON, WA, 98057 for the TALBOT HILL RESERVOIR PARK IMPROVEMENTS CAG-24-229 Bids Due: 1:30 PM PST November 21, 2024 Bidder’s Name: Address: Telephone: (MUST BE COMPLETED AND SIGNED) Having carefully examined the Bidding Documents and Instructions to Bidders, the Project site and conditions affecting the Work, and all Addenda, the undersigned Bidder certifies that: (i) it has the personnel and means to complete the Work and (ii) it will furnish all labor, materials, equipment, and management to perform all Work required by, and in strict accordance with, the above-named documents for the following sum within the time fixed. All Bid amounts shall include overhead, profit, bonds, insurance, WA State Sales Tax (WSST) and any other expense required to complete the Work. The undersigned Bidder certifies that it is, at the time of submitting the Bid, and shall remain throughout the period of the Contract, licensed by the State of Washington to perform the type of work required under the Contract Documents. It further certifies that it is skilled and regularly engaged in the general class and type of work called for in the Contract Documents. B I D F O R M Section 00 80 00 – Bid Form Revised – Addendum B November 15, 2024 Talbot Hill Reservoir Park Improvements Bid Form Page 2 of 9 A. BID SCHEDULE Insert values for Unit Price (Dollars.Cents) and Total Price (Dollars.Cents) into Bid Table. Measurement and payment descriptions for each item listed in the Schedule of Bid items are set forth in Section 01 20 00. Item No. Approx. Qty Unit Description of Item Unit Price Dollars.Cents Total Amount Dollars.Cents A-1 1 LS Mobilization & Demobilization (not to exceed 8% of Total Base Bid) A-2 1 LS Erosion & Sediment Control A-3 1 LS Demolition & Salvage A-4 1 LS Clear & Grub A-5 1 LS Earthwork & Subgrade Preparation A-6 25 TON Structural Fill A-7 1 EA ADA Parking Stall Sign w/ Footing A-8 71 TON Crushed Surfacing Top Course A-9 57 TON HMA Cl. 3/8 IN. PG58H-22 A-10 1 LS Asphalt Parking Lot Crack Repair A-11 6900 SF Asphalt Parking Lot Sealant A-12 11 CY Cement Concrete Pavement w/ Reinforcing A-13 1 LS Reservoir Concrete Lid: Diamond Grind & Drainage Joint Retrofit A-14 240 LF Extruded Cement Concrete Curb A-15 1 LS Asphalt Pavement Markings & Striping A-16 1 LS Sport Court Surfacing, Leveling, Crack Repair, & Striping A-17 1 LS Replace Wood (Studs & Panels) & Repaint Practice Wall A-18 1 EA Fabric Shade Structure including Engineering Plans/Calculations for Building Permit A-19 1 LS Fabric Shade Structure Four Footings, Attachments, & Reinforcing Section 00 80 00 – Bid Form Revised – Addendum B November 15, 2024 Talbot Hill Reservoir Park Improvements Bid Form Page 3 of 9 A-20 1 EA Bicycle Rack w/ Attachments A-21 1 LS Two Removable Bollards w/ Four Receivers A-22 1 LS Chain Link Fence w/ Sleeved Posts, Gates, & Windscreen A-23 1 LS Drinking Fountain & Utilities (Water & Sanitary Sewer) A-24 1 EA Drinking Fountain A-25 1 EA Trash Receptacle A-26 1 LS Six Moveable Pickleball Nets & Nine Pickleball Paddle Racks A-27 1 LS Planting (Sod, Soil, Mulch, Watering) A-28 255 LF 12” Depth Root Barrier A-29 10 EA Boulders Installation A-30 4 EA Bench w/ Back, Wood Beam, & Chain w/ Pad Lock A-31 2 EA Divider Net Structure, Nets, & Footings A-32 1 LS Pedestrian Bridge – Shop Fabricated Aluminum Structure including Engineering Plans/Calculations for Building Permit A-33 1 LS Pedestrian Bridge – Four Concrete Footings, One Headwall, & Two Wingwalls, w/ Attachments & Reinforcing A-34 1 LS Plumbing, Traffic Control Plan, Environmental Stormwater Discharge, and other regulatory permits as required A-35 3 EA Tennis Court Nets A-36 3 EA Pickleball Court Nets A-37 1 LS Additional Work for Minor Changes $65,000 $65,000 SUBTOTAL = $______________________.________ WA STATE SALES TAX (10.3%) = $_______________.________ Section 00 80 00 – Bid Form Revised – Addendum B November 15, 2024 Talbot Hill Reservoir Park Improvements Bid Form Page 4 of 9 TOTAL = $______________________.________ B. BASE BID The Bidder agrees to complete the Work for this Project for the following Base Bid amount: _______________________________________________________________ DOLLARS (words) $______________________________________________________________ (numerals) C. TRENCH EXCAVATION SAFETY PROVISIONS The Base Bid amount includes any trench-excavation safety provisions required for compliance with Chapter 39.04 RCW and Chapter 49.17 RCW, as applicable, and the amount included in the Base Bid is: $_______________ D. SUBCONTRACTOR LISTING If the project is expected to cost $1,000,000 or more, as required by RCW 39.30.060, every Bidder must complete and provide the included Subcontractor listing forms (Forms C and D) in accordance with the applicable timing requirements. E. RECEIPT OF ADDENDA Bidder acknowledges receipt of the following addenda: Addendum No. Addendum No. Addendum No. Addendum No. All requirements therein are included in the appropriate Bid amount. F. CONDITIONS OF PROPOSAL 1. Determination of Low Bidder: a. The City of Renton (alternatively referred to as “Owner” or “City”) reserves the right to award the Contract for the Project based on the Contractor’s Base Bid and any selected Alternates(s), in whatever manner is in the City’s best interest. 2. Overhead and Profit: All of the above Bid Prices shall include overhead, profit, bonds, insurance, and any other expense required to complete the Work. G. PERIOD OF BID VALIDITY/ACCEPTANCE OF BID The undersigned hereby agrees that this Bid shall be a valid and firm offering for the period of sixty (60) days from the Bids Due date. Within sixty (60) days from the Bids Due date, the City will act either to accept the Bid from the lowest responsive and responsible Bidder, or to reject all Bids. The City reserves the right to request extensions of such Bid acceptance period. Section 00 80 00 – Bid Form Revised – Addendum B November 15, 2024 Talbot Hill Reservoir Park Improvements Bid Form Page 5 of 9 The acceptance of a Bid will be evidenced by a written Notice of Intent to Award Contract to the Bidder whose Bid is under consideration for acceptance, together with a request to furnish a bond (if required), evidence of required insurance to execute the Agreement set forth in the Contract Documents, and other designated documents. H. EXECUTION OF CONTRACT If the written Notice of Intent to Award Contract is mailed, telegraphed, or delivered via facsimile to the undersigned within the period of Bid validity noted above, or any time thereafter before this Bid is withdrawn, the undersigned will, within ten (10) days after the date of such notification, execute the City of Renton Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum (“Agreement”) set forth in the Contract Documents. I. TIME FOR COMPLETION Substantial Completion - The undersigned hereby agrees to Substantially Complete all the Work under the Base Bid (and accepted Alternates) no later than May 23, 2025, following Notice to Proceed. Notice to Proceed – Anticipated date for Notice to Proceed is January 6, 2025. Final Completion – All the Work shall achieve Final Completion in accordance with the Contract Documents within 30 calendar days after the date of Substantial Completion. J. LIQUIDATED DAMAGES The undersigned agrees to pay the Owner as liquidated damages the sum of $750.00 for each calendar day beyond the date upon which Substantial Completion of the entire Work is required to be complete until Substantial Completion is achieved, in accordance with the Contract Documents. K. BID SECURITY (As per the Bidding Documents) If applicable, Bid Security must be submitted with the Bid Form. L. BID FORM ATTACHMENTS TO BE COMPLETED WITH BID FORM The following document is attached to the Bid Form and must be executed by the Contractor in connection with the Bid From for it to be complete: • Attachment 1 – Non-Collusion, Anti-Trust and Minimum Wage Affidavit M. ACKNOWLEDGMENT The undersigned acknowledges that it has read, understands, and agrees to comply with all federal and state non-discrimination laws, regulations, and policies during the performance of the Work. Section 00 80 00 – Bid Form Revised – Addendum B November 15, 2024 Talbot Hill Reservoir Park Improvements Bid Form Page 6 of 9 Legal Name of Person or Entity Submitting Bid: _____ NOTE: If Bidder is a corporation, write State of Incorporation; if a partnership, give full names and addresses of all parties below. Authorized Signatory: Title: Printed Name: Address: City: State: Zip Code: Date: Telephone: Fax: Washington Contractor's License No.: Federal Tax ID #: E-mail address: Washington State UBI No.: Expiration Date: Section 00 80 00 – Bid Form Revised – Addendum B November 15, 2024 Talbot Hill Reservoir Park Improvements Bid Form Page 7 of 9 CERTIFICATION OF COMPLIANCE WITH PREVAILING WAGE PAYMENT STATUTES The undersigned Bidder hereby certifies, under the penalty of perjury, that within the three- year period immediately preceding the Bid Submission date, the Bidder has not been determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries, or through a civil judgment entered by a court of limited or general jurisdiction, to have willfully violated, as defined in RCW 49.48.082, any provision of chapters 49.46, 49.48, or 49.52 RCW. I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct. Legal Name of Person or Entity Submitting Bid Signature of Authorized Official* Printed Name Title Date City State Check One: Sole Proprietorship ☐Partnership ☐Joint Venture ☐Corporation ☐ LLC ☐ State of Incorporation, or if not a corporation, State where business entity was formed: If a co-partnership, give firm name under which business is transacted: *If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner. Section 00 80 00 – Bid Form Revised – Addendum B November 15, 2024 Talbot Hill Reservoir Park Improvements Bid Form – Attachment 1 Page 8 of 9 Bid Form – Attachment 1 This form must be submitted with the Bid Form NON-COLLUSION AFFIDAVIT The undersigned, having been duly sworn, deposes and says, that he/she is the identical person who submitted the forgoing Bid, and that such Bid is genuine and not sham or collusive or made in the interest or on behalf of any person not therein named, and further, that the deponent has not directly induced or solicited any other Bidder on the foregoing Work or equipment to put in a sham Bid, or any other person or corporation to refrain from Bidding, and that deponent has not in any manner sought by collusion to secure to himself or to any other person any advantage over the other Bidder or Bidders. AND CERTIFICATION RE: ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER The City of Renton (“City”) and Bidder recognize that in actual economic practice overcharges resulting from anti-trust violations are in fact usually borne by the Bidder. Therefore, the Bidder hereby assigns to the City any and all claims for such overcharges as to goods and materials purchased in connection with this Contract, except as to overcharges resulting from anti-trust violations commencing after the date of the bid, quotation, or other event establishing the price under this Contract. In addition, the Bidder warrants and represents that such of his suppliers and subcontractors shall assign any and all such claims to the City, subject to the aforementioned exception. AND MINIMUM WAGE AFFIDAVIT FORM The undersigned, having been duly sworn, deposed, says and certif that in connection with the performance of the Work of this Project, (a) I will pay each classification of laborer, workman, or mechanic employed in the performance of such Work; not less than the prevailing rate of wage or not less than the minimum rate of wages as specified in the principal Contract and (b) that I have read the above and foregoing statement and certificate, know the contents thereof and the substance as set forth therein is true to my knowledge and belief. [SIGNATURE PAGE FOLLOWS] Section 00 80 00 – Bid Form Revised – Addendum B November 15, 2024 Talbot Hill Reservoir Park Improvements Bid Form – Attachment 1 Page 9 of 9 FOR: NON-COLLUSION AFFIDAVIT, ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER AND MINIMUM WAGE AFFIDAVIT Legal Name of Person or Entity Submitting Bid Signature of Authorized Official* Printed Name Title Date City State Subscribed and sworn to before me on this day of , 20 . End of Bid Form DIVISION 01 – GENERAL REQUIREMENTS TALBOT HILL RESERVOIR PARK IMPROVEMENTS Section 01 20 00 – Payment Procedures Revised – Addendum B November 15, 2024 Contract No. CAG-24-229 01 20 00 - 1 Talbot Hill Reservoir Park Improvements November 15, 2024 PART 1 GENERAL 1.1 SECTION INCLUDES A. Procedures for preparation and submittal of applications for progress payments. B. Documentation of changes in Contract Sum and Contract Time. C. Modification procedures. D. Procedures for preparation and submittal of application for final payment. 1.2 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplemental Conditions and Division 1 specification sections, apply to this section. B. See General Conditions for all requirements pertaining to retainage. C. Payment items for the work of this Contract are listed in the Bid Schedule, Section 00 80 00 of these Specifications. All costs for items of work, which are not specifically mentioned to be included in a particular payment item, shall be included in the listed lump sum/unit price item most closely associated with the work involved. The lump sum/unit price and payment made for each item listed shall constitute full compensation for furnishing all labor, materials, and equipment, for performing the work. Any associated costs for Contractor quality control, environmental protection, safety requirements, and reporting for which separate payment is not otherwise provided shall be considered incidental to the project and shall be included in a related Bid item as appropriate. 1.02 MEASUREMENT AND PAYMENT PROCEDURES A. Measurement and payment descriptions for each item listed in the Schedule of Bid items are set forth in this Section and throughout these Specifications. B. The method of measurement and computations to be used in determination of quantities of material furnished or of work performed under the Contract will be those methods generally recognized as conforming to good engineering practice and will be carried to the proper significant figures or fractions of units for each item to conform to the usual practice of the City. C. Items of work for which payment is made by a “lump sum” will be measured as a complete unit. Partial payment, if made, will be made according to the completed percentage of the various components of the lump sum item detailed in a Schedule of Values. D. Measurement of Quantities 1. Unless otherwise specified, measurements will be made horizontally or vertically. 2. Structures will be measured according to neat lines indicated on the Plans or as altered by the Engineer to fit field conditions. 3. For any item that is measured by the linear foot, the measurement shall be made parallel to the base or foundation upon which such structures are placed, unless otherwise noted on the Plans or specified. 4. When a complete structure or structural unit or piece of equipment is specified as the DIVISION 01 – GENERAL REQUIREMENTS TALBOT HILL RESERVOIR PARK IMPROVEMENTS Section 01 20 00 – Payment Procedures Revised – Addendum B November 15, 2024 Contract No. CAG-24-229 01 20 00 - 2 Talbot Hill Reservoir Park Improvements November 15, 2024 unit of measurement, the unit will be construed to include all fittings and accessories necessary for full unit operation. 5. Measurements by weight shall be done on certified platform scales or, when reviewed and accepted by the Engineer, on a completely automated weighing and recording system. The Contractor shall furnish the Engineer with duplicate licensed weighmaster’s certificates showing actual net weights. The City will accept the certificates from certified landfills as evidence of weights delivered. 6. No measurement will be made for work performed or materials placed outside of lines indicated on the Plans or established by the Engineer; materials wasted, used, or disposed of in a manner not called for under the Contract; material rejected after it has been placed, by reason of the failure of the Contractor to conform to the provisions of the Contract; hauling and disposing of rejected materials; material remaining on hand after completion of the work; or other work or material payment for which is contrary to the provisions of the Contract. E. For any and all work not specifically described in the separate Bid items listed in the Bid Schedule, the Contractor shall include the cost of said work in the prices bid for which such work is appurtenant thereto and no additional payment will be allowed therefor. 1.3 PAYMENT SCHEDULE A. Scope: 1. Payment for the various items of the bid sheets, as further specified herein, shall include all compensation to be received by the Contractor for furnishing all tools, equipment, supplies, and manufactured articles, and for all labor, operations, and incidentals appurtenant to the items of Work being described, as necessary to complete the various items of the Work all in accordance with the requirements of the Contract Documents, including all appurtenances thereto, and including all costs of compliance with the regulations of public agencies having jurisdiction, including Safety and Health Administration of the U.S. Department of Labor (OSHA). No separate payment will be made for any item that is not specifically set forth in the Bid Schedules, and all costs therefore shall be included in the prices named in the Bid Schedules for the various appurtenant items of Work. 2. The Owner shall not pay for material quantities, which exceed the actual measured amount used and approved by the Engineer. 3. It is the intention of these Specifications that the performance of all Work under the bid for each item shall result in the complete construction, in an accepted operating condition, of each item. 4. Work and material not specifically listed in the proposal but required in the Plans, Specifications, and general construction practice, shall be included in the bid price. No separate payment will be made for these incidental items. B. Bid Items: 1. BID ITEM NO. A-1: MOBILIZATION AND DEMOBILIZATION (NOT TO EXCEED 8% OF TOTAL BASE BID) DIVISION 01 – GENERAL REQUIREMENTS TALBOT HILL RESERVOIR PARK IMPROVEMENTS Section 01 20 00 – Payment Procedures Revised – Addendum B November 15, 2024 Contract No. CAG-24-229 01 20 00 - 3 Talbot Hill Reservoir Park Improvements November 15, 2024 a. This Bid item shall include all costs associated with preparatory work and operations performed by the Contractor including, but not limited to, those necessary for the movement of its personnel, equipment, supplies and incidentals to the project site; temporary fencing, field office and chemical toilets, permits, schedules, utility coordination and submittals, bonds and insurance, and costs for performing any administrative element of work not included in other Bid items. At the completion of work, this Bid item shall include removing all equipment, materials, and facilities that were necessary to do the work as well as overall site cleanup and all project closeout procedures. The total cost provided by Contractor for this bid item shall not exceed 8% of the total base bid amount. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 2. BID ITEM NO. A-2: EROSION & SEDIMENT CONTROL a. This Bid item encompasses all labor, materials, equipment, and incidentals required for the implementation of erosion and sediment control measures, including installation and maintenance of inlet protection, silt fencing, concrete washout, stabilized construction entrance, exposed soil stabilization, CSWPP supervision, and other best management practices (BMPs) necessary to prevent soil erosion and water pollution during construction. This Bid item also encompasses the maintenance of BMP measures and their removal at the completion of the project. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 3. BID ITEM NO. A-3: DEMOLITION & SALVAGE a. This Bid item includes all labor, materials, equipment, and incidentals necessary for the demolition and salvage of existing site elements as indicated in the project plans. The work includes removal, transportation, and recycling or disposal of debris generated from demolition activities in accordance with local regulations. The work includes measures to protect existing facilities including Utility locates and surveying, covers/barriers, and other protective measures. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 4. BID ITEM NO. A-4: CLEAR & GRUB a. This Bid item consists of all materials, labor, and equipment necessary to clear the site of all vegetation, debris, and root systems as required for site preparation. This includes the disposal of removed materials in accordance with local regulations. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 5. BID ITEM NO. A-5: EARTHWORK & SUBGRADE PREPARATION DIVISION 01 – GENERAL REQUIREMENTS TALBOT HILL RESERVOIR PARK IMPROVEMENTS Section 01 20 00 – Payment Procedures Revised – Addendum B November 15, 2024 Contract No. CAG-24-229 01 20 00 - 4 Talbot Hill Reservoir Park Improvements November 15, 2024 a. This Bid item includes all excavation, grading, and subgrade preparation necessary to achieve the required site elevations and specifications. It involves site leveling, compaction, and stabilization as necessary for subsequent work. The work includes trench excavation safety provisions. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 6. BID ITEM NO. A-6: STRUCTURAL FILL a. This Bid item encompasses all labor, materials, equipment, and incidentals required for the installation of structural fill. This includes the sourcing, placement, and compaction of structural fill material as specified in the project plans. b. Measurement and payment for this Bid item will be based on the tonnage of structural fill installed and will be paid at the unit price of ton as named in the Bid Schedule. 7. BID ITEM NO. A-7: ADA PARKING STALL SIGN W/ FOOTING a. This Bid item includes the provision and installation of an ADA-compliant parking stall sign, including the necessary footing and anchoring materials as specified in the project plans. b. Payment for this Bid item will be made at the unit price named in the Bid Schedule for each sign installed. 8. BID ITEM NO. A-8: CRUSHED SURFACING TOP COURSE a. This Bid item consists of all labor, materials, equipment, and incidentals needed to install crushed surfacing top course material as specified in the project plans. This includes grading and compacting the top course material. b. Measurement and payment for this Bid item will be based on the tonnage of crushed surfacing top course installed and will be paid at the unit price of ton as named in the Bid Schedule. 9. BID ITEM NO. A-9: HMA CL. 3/8 IN. PG58H-22 a. This Bid item includes all labor, materials, equipment, and incidental work necessary for the installation of Hot Mix Asphalt (HMA) Class 3/8 inch, PG58H- 22 as specified in the project plans. This encompasses surface preparation, compaction, and finishing. b. Measurement and payment for this Bid item will be based on the tonnage of HMA installed and will be paid at the unit price of ton as named in the Bid Schedule. 10. BID ITEM NO. A-10: ASPHALT PARKING LOT CRACK REPAIR a. This Bid item includes all labor, materials, equipment, and incidentals necessary for the repair of cracks in the asphalt parking lot as specified in the project plans. This includes preparation, filling, and sealing of all identified cracks. DIVISION 01 – GENERAL REQUIREMENTS TALBOT HILL RESERVOIR PARK IMPROVEMENTS Section 01 20 00 – Payment Procedures Revised – Addendum B November 15, 2024 Contract No. CAG-24-229 01 20 00 - 5 Talbot Hill Reservoir Park Improvements November 15, 2024 b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 11. BID ITEM NO. A-11: ASPHALT PARKING LOT SEALANT a. This Bid item includes all labor, materials, equipment, and incidentals necessary for the application of sealant to the asphalt parking lot, as per the specifications provided. This includes surface preparation and application of sealant to the entire lot. b. Measurement and payment for this Bid item will be based on the square footage of asphalt sealant applied and will be paid at the unit price per square foot as named in the Bid Schedule. 12. BID ITEM NO. A-12: CEMENT CONCRETE PAVEMENT W/ REINFORCING a. This Bid item includes all labor, materials, equipment, and incidentals necessary for the installation of cement concrete pavement with reinforcing as specified in the project plans. This encompasses subgrade preparation, placement, finishing, and curing of the concrete. b. Measurement and payment for this Bid item will be based on the cubic yard of cement concrete pavement installed and will be paid at the unit price per cubic yard as named in the Bid Schedule. 13. BID ITEM NO. A-13: RESERVOIR CONCRETE LID: DIAMOND GRIND & DRAINAGE JOINT RETROFIT a. This Bid item includes all labor, materials, equipment, and incidentals necessary for diamond grinding of the reservoir concrete lid and retrofitting drainage joints as specified in the project plans. This work includes surface preparation and application of any required treatments. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 14. BID ITEM NO. A-14: EXTRUDED CEMENT CONCRETE CURB a. This Bid item consists of all labor, materials, equipment, and incidentals necessary for the installation of extruded cement concrete curb as per the specifications provided. This includes site preparation, forming, pouring, and finishing of the curb. b. Measurement and payment for this Bid item will be based on the linear footage of curb installed and will be paid at the unit price per linear foot as named in the Bid Schedule. 15. BID ITEM NO. A-15: ASPHALT PAVEMENT MARKINGS & STRIPING a. This Bid item includes all labor, materials, equipment, and incidentals necessary for the installation of asphalt pavement markings and striping as specified in the project plans. This includes layout, application, and curing of all markings. b. Payment for this Bid item will be made at the lump sum price named in the Bid DIVISION 01 – GENERAL REQUIREMENTS TALBOT HILL RESERVOIR PARK IMPROVEMENTS Section 01 20 00 – Payment Procedures Revised – Addendum B November 15, 2024 Contract No. CAG-24-229 01 20 00 - 6 Talbot Hill Reservoir Park Improvements November 15, 2024 Schedule. 16. BID ITEM NO. A-16: SPORT COURT SURFACING, LEVELING, CRACK REPAIR, & STRIPING a. This Bid item consists of all labor, materials, equipment, and incidentals necessary for the surfacing, leveling, crack repair, and striping of the sport court as specified in the project plans. This includes surface preparation and application of all materials. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 17. BID ITEM NO. A-17: REPLACE WOOD (STUDS & PANELS) & REPAINT PRACTICE WALL a. This Bid item includes all labor, materials, equipment, and incidentals necessary to replace the wood studs and panels and repaint the practice wall as specified in the project plans. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 18. BID ITEM NO. A-18: FABRIC SHADE STRUCTURE INCLUDING ENGINEERING PLANS/CALCULATIONS FOR BUILDING PERMIT a. This Bid item encompasses all labor, materials, equipment, and engineering services necessary for the design and installation of the fabric shade structure, including all required documentation for building permits as per the project specifications. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 19. BID ITEM NO. A-19: FABRIC SHADE STRUCTURE FOUR FOOTINGS, ATTACHMENTS, & REINFORCING a. This Bid item includes all labor, materials, equipment, and incidentals necessary for the installation of four footings, attachments, and reinforcing for the fabric shade structure as specified in the project plans. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 20. BID ITEM NO. A-20: BICYCLE RACK W/ ATTACHMENTS a. This Bid item includes all labor, materials, equipment, and incidentals necessary for the provision and installation of a bicycle rack with all required attachments as specified in the project plans. b. Payment for this Bid item will be made at the unit price named in the Bid Schedule for each bicycle rack installed. 21. BID ITEM NO. A-21: TWO REMOVABLE BOLLARDS W/ FOUR RECEIVERS a. This Bid item includes all labor, materials, equipment, and incidentals DIVISION 01 – GENERAL REQUIREMENTS TALBOT HILL RESERVOIR PARK IMPROVEMENTS Section 01 20 00 – Payment Procedures Revised – Addendum B November 15, 2024 Contract No. CAG-24-229 01 20 00 - 7 Talbot Hill Reservoir Park Improvements November 15, 2024 necessary for the shop drawing submittal, fabrication, and installation of two removable bollards and the four receivers as specified in the project plans. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 22. BID ITEM NO. A-22: CHAIN LINK FENCE W/ SLEEVED POSTS, GATES, & WINDSCREEN a. This Bid item includes all labor, materials, equipment, and incidentals necessary for the installation of a chain link fence with sleeved posts, gates, and windscreen as specified in the project plans. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 23. BID ITEM NO. A-23: DRINKING FOUNTAIN & UTILITIES (WATER & SANITARY SEWER) a. This Bid item includes all labor, materials, equipment, and incidentals necessary for the installation of drinking fountain water and sanitary sewer utilities as specified in the project plans. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 24. BID ITEM NO. A-24: DRINKING FOUNTAIN a. This Bid item includes all labor, materials, equipment, and incidentals necessary for the installation of a drinking fountain as specified in the project plans. b. Payment for this Bid item will be made at the unit price named in the Bid Schedule for each drinking fountain installed. 25. BID ITEM NO. A-25: TRASH RECEPTACLE a. This Bid item includes all labor, materials, equipment, and incidentals necessary for the provision and installation of a trash receptacle as specified in the project plans. b. Payment for this Bid item will be made at the unit price named in the Bid Schedule for each trash receptacle installed. 26. BID ITEM NO. A-26: SIX MOVEABLE PICKLEBALL NETS & NINE PICKLEBALL PADDLE RACKS a. This Bid item includes all labor, materials, equipment, and incidentals necessary for the provision and installation of six moveable pickleball nets and nine paddle racks as specified in the project plans. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 27. BID ITEM NO. A-27: PLANTING (SOD, SOIL, MULCH, WATERING) a. This Bid item consists of all labor, materials, equipment, and incidentals DIVISION 01 – GENERAL REQUIREMENTS TALBOT HILL RESERVOIR PARK IMPROVEMENTS Section 01 20 00 – Payment Procedures Revised – Addendum B November 15, 2024 Contract No. CAG-24-229 01 20 00 - 8 Talbot Hill Reservoir Park Improvements November 15, 2024 necessary for planting, including the provision of sod, soil, mulch, and watering as specified in the project plans. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 28. BID ITEM NO. A-28: 12” DEPTH ROOT BARRIER a. This Bid item includes all labor, materials, equipment, and incidentals necessary for the installation of a 12-inch depth root barrier as specified in the project plans. b. Measurement and payment for this Bid item will be based on the linear footage of root barrier installed and will be paid at the unit price per linear foot as named in the Bid Schedule. 29. BID ITEM NO. A-29: BOULDERS INSTALLATION a. This Bid item includes all labor, materials, equipment, and incidentals necessary for the installation of boulders as specified in the project plans. This encompasses site preparation, placement, and stabilization of boulders. b. Payment for this Bid item will be made at the unit price named in the Bid Schedule for each boulder installed. 30. BID ITEM NO. A-30: BENCH W/ BACK, WOOD BEAM, & CHAIN W/ PAD LOCK a. This Bid item consists of all labor, materials, equipment, and incidentals necessary for the installation of benches with backs, wood beams, and chains with padlocks as specified in the project plans. b. Payment for this Bid item will be made at the unit price named in the Bid Schedule for each bench installed. 31. BID ITEM NO. A-31: DIVIDER NET STRUCTURE, NETS, & FOOTINGS a. This Bid item includes all labor, materials, equipment, and incidentals necessary for the installation of a divider net structure, including nets and footings as specified in the project plans. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 32. BID ITEM NO. A-32: PEDESTRIAN BRIDGE – SHOP FABRICATED ALUMINUM STRUCTURE INCLUDING ENGINEERING PLANS/CALCULATIONS FOR BUILDING PERMIT a. This Bid item includes all labor, materials, equipment, and incidentals necessary for the design, fabrication, and installation of the aluminum pedestrian bridge, including the engineering plans and calculations required for the building permit. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 33. BID ITEM NO. A-33: PEDESTRIAN BRIDGE – FOUR CONCRETE FOOTINGS, ONE DIVISION 01 – GENERAL REQUIREMENTS TALBOT HILL RESERVOIR PARK IMPROVEMENTS Section 01 20 00 – Payment Procedures Revised – Addendum B November 15, 2024 Contract No. CAG-24-229 01 20 00 - 9 Talbot Hill Reservoir Park Improvements November 15, 2024 HEADWALL, & TWO WINGWALLS, W/ ATTACHMENTS & REINFORCING a. This Bid item includes all labor, materials, equipment, and incidentals necessary for the construction of four concrete footings, one headwall, and two wingwalls for the pedestrian bridge, including necessary attachments and reinforcing as specified in the project plans. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 34. BID ITEM NO. A-34: PLUMBING, TRAFFIC CONTROL PLAN, CONSTRUCTION STORMWATER GENERAL PERMIT, AND OTHER REGULATORY PERMITS AS REQUIRED a. This Bid item includes all labor, materials, equipment, and incidentals necessary to secure all required permits and to complete all necessary plumbing work, the development of a traffic control plan and compliance with environmental regulations related to stormwater discharge. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 35. BID ITEM NO. A-35: TENNIS COURT NETS a. This Bid item includes all labor, materials, equipment, and incidentals necessary to procure and install new tennis court nets. b. Payment for this Bid item will be made at the unit price named in the Bid Schedule for each Tennis Court Net installed. 36. BID ITEM NO. A-36: PICKLBALL COURT NETS a. This Bid item includes all labor, materials, equipment, and incidentals necessary to procure and install new pickleball court nets. b. Payment for this Bid item will be made at the unit price named in the Bid Schedule for each Pickleball Court Net installed. 37. BID ITEM NO. A-37: ADDITIONAL WORK FOR MINOR CHANGES a. This Bid item includes all labor, materials, equipment, and incidentals necessary to perform additional work for minor changes that may occur during the course of the project, as agreed upon by the Contractor and the Owner. b. Payment for this Bid item will be made at the lump sum price named in the Bid Schedule. 1.3 SCHEDULE OF VALUES A. Submit for Owner approval, electronic format of Schedule of Values, a minimum of 15 days before first Application for Payment submittal. Approved Schedule of Values will be used by the Owner as the basis for progress payments. B. The Schedule of Values shall consist of a detailed breakdown of the Bid items. A separate schedule shall be prepared for each Bid item. Each schedule shall include: 1. All the quantities for each of the various kinds of work as indicated on the Plans and Specifications. DIVISION 01 – GENERAL REQUIREMENTS TALBOT HILL RESERVOIR PARK IMPROVEMENTS Section 01 20 00 – Payment Procedures Revised – Addendum B November 15, 2024 Contract No. CAG-24-229 01 20 00 - 10 Talbot Hill Reservoir Park Improvements November 15, 2024 2. A developed unit price for each kind of work. The unit prices developed for each kind of work shall be the same for all similar elements of the work, unless the Contractor can demonstrate to the Engineer’s sole satisfaction that the same kind of work is more costly in one element than another. 3. An extended price for each kind of work equal to the quantity times the developed unit price. 4. The Schedule of Values shall have a subtotal of the extended prices prepared for each element of the work. C. For each Schedule of Values, the sum of all extended prices shall equal the lump sum contract price for that Bid item. All work indicated on the Plans and Specifications shall be included in the lump sum contract price for the Bid item. An unbalanced breakdown will not be acceptable. D. The Engineer will review and approve the Schedule of Values. Unbalancing of the Schedule of Values to favor one item of work over another shall be cause for rejection. If the Engineer indicates that changes to the schedules are required, the Contractor shall review and resubmit the schedules. E. The Contractor shall be solely responsible for ensuring that each Schedule of Values is a correct and true representation of the work at all times. Any corrections required by the Engineer shall be promptly made by the Contractor regardless of when and by whom these corrections were discovered. The corrected values shall be used to determine future payments and to adjust previous payments. In no case shall the sum of all payments determined using the Schedule of Values exceed the lump sum contract price for the Bid item. F. Revise schedule to list approved Change Order Proposals (COP), with each Application for Payment. 1.4 APPLICATIONS FOR PROGRESS PAYMENTS A. Payment Period: Submit at intervals stipulated in the Agreement, if not stipulated, at monthly intervals. B. Prior to first Application for Payment, submit approved Intent to Pay Prevailing Wages forms for Contractor and all subcontractors. Without exception, processing of an Application for Payment will not begin until approved copies are on file with Owner for each classification of laborers, workers, or mechanics employed by Contractor or subcontractors included in that Application. 1. Submit a list of all subcontractors and suppliers. 2. Submit instructions to Owner for the disposition of retainage funds. a. In accordance with chapter 60.28 of the Revised Code of Washington (RCW), Owner shall reserve a contract retainage not to exceed Five percent of the moneys earned by Contractor as trust fund for the protection and payment of: 1) The claims of any person and Owner arising in accordance with the Contract Documents. 2) The state with respect to taxes imposed pursuant to Title 82 RCW which may be due from such Contractor. b. The funds held in retainage shall be held until forty-five (45) days following Final Acceptance subject to the provisions of chapters 39.12 and 60.28 RCW. DIVISION 01 – GENERAL REQUIREMENTS TALBOT HILL RESERVOIR PARK IMPROVEMENTS Section 01 20 00 – Payment Procedures Revised – Addendum B November 15, 2024 Contract No. CAG-24-229 01 20 00 - 11 Talbot Hill Reservoir Park Improvements November 15, 2024 c. Contractor's written instructions should be addressed to the Owner with a copy to the Architect. d. At the option of Contractor, the moneys reserved by Owner shall be either: 1) Retained in a fund by Owner. 2) Bonded for all or any portion of the contract retainage in a form acceptable to Owner; or 3) Deposited in an interest-bearing account in a bank, mutual savings bank, or savings and loan association. 4) Placed in escrow with a bank or trust company by Owner. (a) Escrow Agent: If the retained funds are to be placed in escrow, Contractor will select the escrow agent, subject to approval by Owner. The selected agent must be a bank or trust company in the State of Washington. (b) Pursuant to electing the escrow option, an escrow agreement shall be executed by Contractor, Owner, and bank. Three copies of the agreement should be completed and executed by Contractor and returned to Owner for joint execution, who in turn will forward all copies to the bank for receipt and acceptance. The bank will retain one copy and return one copy each to Contractor and Owner. A completed and signed escrow agreement must be on file with Owner for payment before Contractor's first application is processed. (c) Escrow Payments: As each progress estimate is presented for payment, Contractor shall make a vouchered request for the retained funds that are to be placed in escrow. Upon receiving a retainage invoice, Owner will issue a check payable to Contractor and the bank jointly. Such checks will be mailed to the bank and Contractor will receive copies of check transmittal letters. (d) Escrow Investments: The bank shall invest the retained funds in bonds and other securities selected by Contractor from the following list approved by Owner: (1) Bills, certificates, notes or bonds of the United States. (2) Other obligations of the United States or its agencies. (3) Obligations of any corporation wholly owned by the government of the United States. (4) Indebtedness of the Federal National Mortgage Association. (5) Time deposits in commercial banks, mutual savings banks, and savings and loan associations in the State of Washington. (e) Deposits in savings accounts in commercial banks, mutual savings banks, and savings and loan associations in the State of Washington. (f) The investments selected must mature on or prior to the date set for completion of the contract, including extensions thereof or forty-five (45) days following the Final Acceptance of the improvement or work. Interest on such investments shall be paid to Contractor as it accrues. (g) Escrow Costs and Fees: All escrow costs and fees shall be paid by Contractor, in accordance with the Escrow Agreement. DIVISION 01 – GENERAL REQUIREMENTS TALBOT HILL RESERVOIR PARK IMPROVEMENTS Section 01 20 00 – Payment Procedures Revised – Addendum B November 15, 2024 Contract No. CAG-24-229 01 20 00 - 12 Talbot Hill Reservoir Park Improvements November 15, 2024 (h) Release of Escrow Investments to Contractor: Upon Final Acceptance and the expiration of forty-five (45) days following the date of Acceptance, and contingent upon Contractor's compliance with provisions of the public works statutes, Owner will issue written instructions to the bank to release to Contractor the investment held in escrow. If there should be either unpaid taxes or other unsatisfied claims against the retained percentage, the provisions of the Escrow Agreement will govern. C. Submit draft Application for Payment to Owner for approval 10 days prior to submittal of actual Application for Payment. D. Present required information in digital form. E. Application for Payment Form: As provided by the Owner F. Execute certification by signature of authorized officer. G. Use data from approved Schedule of Values. Provide dollar value in each column for each line item for portion of work performed. H. List each authorized Change Order as a separate line item, listing Change Order number and dollar amount as for an original item of Work. I. Submit one signed digital image of each Application for Payment. J. Include the following with the application: 1. Construction progress schedule revised and current as specified in Section 01 32 16. 2. Partial release of liens from major Subcontractors and vendors. 3. Affidavits attesting to off-site stored products if any. 4. Statements of Intents to Pay Prevailing Wages as documented by the Washington State Department of Labor and Industries for each contractor or subcontractor included on the Pay Application. 5. List with Contractor, sub-contractors, and all sub-sub-contractors invoice amounts, UBI number, and Affidavit of Intent’s number. 6. Copies of Certified Payroll from Contractor and all sub-contractors. K. When Owner requires substantiating information, submit data justifying dollar amounts in question. Provide one copy of data with cover letter for each copy of submittal. Show application number and date, and line item by number and description. 1.5 MODIFICATION PROCEDURES A. Owner will advise of minor changes in the Work not involving an adjustment to Contract Sum or Contract Time as authorized by the Conditions of the Contract by issuing supplemental instructions on Owner's standard form. B. For other required changes, Owner will issue a Field Authorization (FA) signed by the Owner, A/E and Contractor instructing Contractor to proceed with the change, for subsequent inclusion in a Change Order. 1. The document will describe the required changes, will identify an initial estimate of the DIVISION 01 – GENERAL REQUIREMENTS TALBOT HILL RESERVOIR PARK IMPROVEMENTS Section 01 20 00 – Payment Procedures Revised – Addendum B November 15, 2024 Contract No. CAG-24-229 01 20 00 - 13 Talbot Hill Reservoir Park Improvements November 15, 2024 probable cost of any changes, and will designate method of determining any change in Contract Sum or Contract Time. 2. Promptly execute the change. C. For changes for which advance pricing is desired, Owner will issue a request for Change Order Proposal (COP) that includes a detailed description of a proposed change with supplementary or revised drawings and specifications, a change in Contract Time for executing the change and the period of time during which the requested price will be considered valid. Contractor will prepare and submit a fixed price quotation within 5 days. D. Contractor may propose a change by submitting a request for change to Owner, describing the proposed change and its full effect on the Work, with a statement describing the reason for the change, and the effect on the Contract Sum and Contract Time with full documentation. E. Computation of Change in Contract Sum: Will be as specified in the Agreement and the General Conditions. 1. For change requested by Owner for work falling under a fixed price contract, the amount will be based on Contractor's price quotation. 2. For change requested by Contractor, the amount will be based on the Contractor's request for a Change Order as approved by Owner. 3. For change ordered by Owner without a quotation from Contractor, the amount will be determined by Owner based on the Contractor's substantiation of costs as specified for Time and Material work. F. Substantiation of Costs: Provide full information required for evaluation. 1. Provide following data: a. Quantities of products, labor, and equipment. b. Taxes, insurance, and bonds. c. Overhead and profit. d. Justification for any change in Contract Time. e. Credit for deletions from Contract, similarly documented. f. Invoices and receipts for products, equipment, and subcontracts, similarly documented. 2. For Time and Material work, submit itemized account and supporting data after completion of change, within time limits indicated in the Conditions of the Contract. G. Execution of Change Orders: Owner will issue Change Orders for signatures of parties as provided in the Conditions of the Contract. H. After execution of Change Order, promptly revise Schedule of Values and Application for Payment forms to record each authorized Change Order as a separate line item and adjust the Contract Price. I. Promptly revise progress schedules to reflect any change in Contract Time, revise sub- schedules to adjust times for other items of work affected by the change, and resubmit. J. Promptly enter changes in Project Record Documents. 1.6 APPLICATION FOR FINAL PAYMENT DIVISION 01 – GENERAL REQUIREMENTS TALBOT HILL RESERVOIR PARK IMPROVEMENTS Section 01 20 00 – Payment Procedures Revised – Addendum B November 15, 2024 Contract No. CAG-24-229 01 20 00 - 14 Talbot Hill Reservoir Park Improvements November 15, 2024 A. Prepare Application for Final Payment as specified for progress payments, identifying total adjusted Contract Sum, previous payments, and sum remaining due. B. Application for Final Payment will not be considered until the following have been accomplished: 1. Closeout procedures specified in Section 01 70 00. 2. Contractor's Certification of Payment of Debts Claims. 3. Contractor's Certificate of Release of Liens. 4. Owner's approval of Closeout submittals specified in Section 01 78 00. 5. Completion of punchlist with Owner’s approval. 6. Completion of all Change Orders. 7. Submittal of Affidavit of wages paid for Contractor and subcontractors. 8. L&I release. 9. Sign-off of all required permits. 10. Posting of Certificate of Occupancy. PART 2 PRODUCTS - NOT USED PART 3 EXECUTION - NOT USED END OF SECTION