Loading...
HomeMy WebLinkAboutPN_Project_Narrative_and_Modification_Requests_20170327_v1CONSULTING ENGINEERS, LLC' March 27, 2017 Clark Close Senior Planner City of Renton - Current Planning 1055 South Grady Way Renton, WA 98057 RE: Project Narrative Earlington Townhomes Site Plan Review Dear Clark, 0000'�� � BlueFern DEVELOPMENT, LLC On behalf of Blue Fern Development and our entire consulting team, ESM Consulting Engineers is writing this letter in support of our application for a Site Plan Review of the Earlington Townhomes project in the City of Renton. Named after the surrounding neighborhood as well as the greenhouses which have historically occupied the site, this project represents Blue Fern's first project within the City of Renton. Blue Fern has been an active participant in the creation of urban infill communities within many other local jurisdictions, and this project is an opportunity which Blue Fern and the whole team is very excited about. Please allow this letter to serve as an introduction to our project as well as our formal Project Narrative. Design Context, Site Opportunities and Challenges The development of the Earlington Townhomes site with its close proximity to Renton's revitalized downtown core is a great opportunity for new housing within easy commuting distance of the City. The zoning very much encourages a high-density residential community. With this said, it is safe to say that the site is a challenging development site for several key reasons. Part of our goal in this project narrative is to give context and insight to many of our design concepts as our team seeks to creatively mitigate some of the inherent challenges of the site and produce a successful new community that contributes to Renton's sustainable growth. Site Location, Topography, and Dimensions Directly northwest of the intersection S. 132nd St and Renton Ave S., the site is triangular in shape with approx. 800 linear feet of frontage on Renton Avenue and 700 linear feet on 132nd. Clark Close March 27, 2017 Page 2 Although the site's topography could be considered 'moderately' steep, the grade change is particularly challenging in that it is nearly uninterrupted throughout the entirety of the site, gaining approximately 70 vertical feet along the western property boundary. Renton Ave S. is a busy arterial with traffic travelling at a greater speed than is conducive to a residential community with small children. The site's triangular shape is demanding to efficiently lay-out when compared to a more regular, rectangular-shaped assemblage of parcels with the same density allowances. This also means the site has a disproportionate amount of linear feet of frontage to buffer against relative to its total size. Community Plan & Access The continuous grade change across the site is a special challenge to vehicular circulation and our ability to meaningfully organize units and provide useful, practical open spaces as an amenity to homeowners. There was a very real challenge of avoiding fronting homes directly onto a busy arterial, while at the same time (after open discussion with the City) the mutual goal of providing an attractive view of the community from Renton Ave S. (and not simply a row of back yards and fences). To overcome these challenges, the site will be accessed from S. 132nd Street by a single cul-de-sac with 5 alleys that extend laterally (east-west) from the main drive aisle and cul- de-sac. Keeping the north south vehicular traffic to a single location (as opposed to some type of loop) and avoiding a through-road across the site were 2 central tenants to our design concept. This design minimizes grading (which is maximized at road locations), increases the functionality and efficiency of a triangular shaped site, and creates a community that is an extension of the more traffic-calmed S. 132nd St, to avoid fast- moving vehicles within our site. It also allows us to have a landscaped buffer to Renton Ave S. while allowing views of the fronts and sides of our townhomes. Green Courts & Alleys a Separation of Vehicular and Pedestrian Traffic Perhaps the most important component of our entire community is the conscious separation of vehicular and pedestrian traffic. This layout will provide primary access to 100% of our townhomes via a system of trails and green courts, allowing for a safe pedestrian design and encouraging the site to function as a neighborhood. Each home's front entrance opens onto a public, landscaped court that is lushly planted with a mixture of different colors and textures of foliage and trees. The reason we are able to achieve these functional, level, highly-landscaped, spaces is that we are consolidating vehicular traffic into the efficient alleys as described above. Separation of vehicular traffic onto alleyways and pedestrian traffic onto landscaped green spaces that connect with the site's larger public open spaces is the keystone design concept of Earlington Townhomes. Scope of the Proposed Development The community design includes 62 attached single -family townhomes. Our plan is to work with the natural grades instead of fighting against them. For this reason, every townhome on the site is either a daylight or tuck-under design. This allows us to consolidate the retaining walls which our topography necessitates, into the buildings themselves. The result is a shorter construction duration for the neighborhood, less retaining walls throughout the site itself, and, as mentioned above, the achievement of functional, level, open-spaces on an otherwise sloping site. The structures will be a mix of duplexes, triplexes, and 4-plexes, in an attempt to minimize interior units. Clark Close March 27, 2017 Page 3 Architecture, Climate, and Natural Light As the site is sloping from the north to south, the townhomes will take full advantage of the potential views by locating all living spaces to the south side of each unit with balconies and larger windows positioned to help capture both light as well as potential views. Our experience working with the families who are purchasing our townhomes has taught us an important lesson: natural light is paramount. In an attached townhome, parry walls are unable to provide light, so our design imperative is larger -than -typical windows on the south side of all units. The building design will contain a great deal of modulation, both along the faqade as well as the roofline, creating a pleasing appearance and helping to reduce the buildings mass to a more pedestrian feel. The building colors will be organic yet rich in nature and utilized in a way to enhance the building modulation and work with the site design as a whole. Further enhancing the buildings appearance, we have incorporated varying siding materials & reveal dimensions, Juliet balconies and large windows. Many homebuilders have strayed away from classic, Northwest design principals like pitched roofs and lap siding. We firmly believe it is possible to produce a modern, attractive, aesthetic while maintaining a connection to a design palette that make sense for not only our local climate, but also the reality that many families who choose attached houses are doing so because they are making a conscious decision to own a home that requires less maintenance. The reality is, it rains a lot in our area. Pitched roofs and lap siding are extremely effective at shedding moisture downwards and still look good after many seasons of hard wear. The ubiquitous, rectangular, flush panels that so many "modern" projects utilize don't weather our climate as well, and mean more maintenance for our buyers. In our planning for this community, we are making a decision to use more traditional materials while concentrating on unique and expressive glazing and landscaping design. Site Design and Green Space Amenities In addition to the green courts where many front doors are located, meandering sidewalks will connect to gathering spaces to help promote a sense of community. The layout of the site will include several open and green spaces situated along the frontage of Renton Avenue as well as at the termination of each green court located between buildings. Amenities include an outdoor recreation and open space area in the southeast corner of the site situated over the proposed storm vault. There will be a green plaza in the northern extent of the project that will include walkways that connect to the sidewalk along Renton Avenue. Trails run through the site connecting the different seating areas and offering opportunities for views out towards Mt. Rainier. Parking Solutions based on Experience Every single townhome in our community is being provided a 2 -car garage, which actually exceeds the maximum allowed by the City. This is important to us. Our experience selling townhomes has taught us that garages are very important to homeowners, and that people who buy townhomes will willingly use garage space for their vehicles, as long as Clark Close March 27, 2017 Page 4 they have additional storage space. In every project we have ever built, the units with garages sell first. Guest parking will be provided as street parking located along the main entry aisle, a safe enough distance from front doors to encourage use of garages, but not so far as to be problematic for guests. The 2 -car garage standard and our guest parking concept go hand-in-hand: the reality of a second parking spot is it provides families with 2 cars a way to keep both cars close to home, and families with 1 car a way to use some garage space as valuable storage while keeping room enough for their car. Net Density and Proposed Number of New Lots This specific application is for a Site Plan Review and not a subdivision. It is our intent to follow this application with a Unit Lot Subdivision. Therefore we are including information regarding our overall density as it relates to the parent parcel, but not including the range of sizes of any new lots which will be further developed in our next application according to the Unit Lot Subdivision ordinance. Based on our calculations as outlined on the enclosed density worksheet, we are allowed up to 49 townhomes in the R-14 zone since 14 units per acre yields 48.86 townhomes, rounded up to 49. We are allowed to increase the density by up to 30% (or up to 18.82 per acre) by providing affordable housing. We are proposing to provide 7 affordable homes since we are allowed one market rate bonus home for each affordable home. This yields 62 units total. Current Use of the Site and Existing Improvements The site is currently a nursery with multiple greenhouses, outbuildings, a retail building, and a caretaker's residence. The greenhouses vary in size, shape, and construction materials. The retail store covers approximately 1,096 square feet and is wood frame construction. The caretakers residence was constructed in 1965 and is approximately 2,820 square feet. Other site improvements include gravel and dirt driveways for access to the various greenhouses and storage areas that were part of the normal operation of the nursery. Most of the site is covered in either buildings or driveways. Zoning Designation of this Site and Neighboring Parcels The site is zoned R-14 (Residential 14 du/ac). The adjacent properties are zoned as follows: North - Renton Avenue, King County Zone R-12 (outside of city limits) East - Renton Ave, R-14 properties along the eastern side of Renton Ave. South - 132nd St, R-14 (11425 linear feet) and R-10 (Ell 75 linear feet) on south side of 132nd St West - R-14 (11280 linear feet) and R-8 (11300 linear feet) Land Use Permits Required The project requires approval of a Site Plan Review. It is our intent to follow this with application for a Unit Lot Subdivision to allow the division of the site into fee -simple lots for individual ownership. Clark Close March 27, 2017 Page 5 Estimated Construction Cost and Fair Market Value of the Project The total estimated construction cost is approximately $12 Million and the fair market value of the homes will depend on the market at the time they are completed. It is planned that the townhomes will be priced as medium -income homes, and allowing for our affordable units and the variability of the sizes and bedroom counts, at this time we have included in our application materials an estimate of $24.8M. Off -Site Improvements Extensive off-site improvements will be made as part of the proposed project. This includes frontage improvements along both Renton Avenue S. and S. 132nd Street. These improvements will include curb, gutter, sidewalks and planters as required by city design standards. Additional offsite water and sewer main extensions are being provided as per guidance received to date from the City. The sewer will be connected into the existing main in S. 132nd Street However, a small sewer main connection is being made at the intersection of Renton Ave and 132nd Street A new water main will be extended north in Renton Ave from this site up to a connecting point with an existing main in 130th Street. Trash Collection Refuse and recycling locations have been provided within each individual garage and trash pickup locations provided between buildings throughout the site. This will eliminate the potential for unsightly containers on site. Special Site Features or Critical Areas: A wetland and stream reconnaissance was conducted by our consulting biologist, Altmann Oliver Associates. No wetlands or streams were found on site. Our geotechnical engineer, Associated Earth Science, prepared a full geotechnical report which identifies that the site has slopes but none of which qualify for protective measures. The slopes on the site are generally less than 20 percent There are no other known or anticipated critical areas on the site. Distance From A Wetland to the Nearest Area of Work: There are no wetlands or streams located on the site. The nearest known wetland or stream is to the south of the Earlington Townhome site. This is a small drainage that runs east -west and is Ell 75 feet south from the southwest corner of the property and 0350 feet south from the southeast corner. Soil Type and Drainage Conditions The site contains Vashon Recessional Outwash, Vashon Lodgement Till, and fill material according to the geotechnical report prepared by Associated Earth Sciences, dated January 18, 2017. The site is located on a hillside and the surface water drains from the north to the south. There are no known drainage concerns or issues on the site or in the immediate vicinity/downstream. Estimated Quantities and Type of FII and Excavation: Clark Close March 27, 2017 Page 6 As indicated previously our intent is to utilize the Unit Lot Subdivision as a means to consolidate site development and townhome construction into one continuous phase that will help us minimize (both in quantity and timeline) our excavation and fill activities. This site would be exceedingly difficult to construct in 2 phases because of the utilization of the townhome foundations for so much of the site terracing. The purpose of proposed grading/filling will be to accommodate the construction of proposed buildings and roads. Final fill/grade quantities will be prepared as part of the clearing and grading permit(s). Preliminary estimates are as follows: Cut: 15,100 CY Fill: 3,700 CY Net Cut 11,400 CY Tree Removal The site contains 57 trees. The reality of the locations of the existing trees is that any attempt to maintain them given the scale of the filling and grading as well as their locations relative to the proposed road and cul-de-sac would make the project non - feasible. As trees 30" and greater are classified as landmark in the City of Renton and are prohibited from removal without an approved Land Development Permit, we will be applying for these permits in our subsequent engineering submittals. There are 7 trees on the site that meet this size threshold and will need to be removed as part of development activities. View Obstructions The residential units proposed will not exceed a height of 35' above the average grade level. Land to be Dedicated to the City of Renton The project will dedicate right-of-way along both Renton Ave and 132nd Street. The right of way dedication along 132nd Street is approximately 11.5 feet along that entire frontage. The right of way dedication along Renton Ave varies depending on the boundary and will result in a uniform right of way that meets City of Renton standards. The proposed roadway and cul-de-sac will also be dedicated to the City as a public road. No other dedications are anticipated. Model Homes, Job Shacks, Sales Trailers: It is anticipated that upon substantial completion of the project's infrastructure, construction of model homes will begin. The total number of model homes to be constructed is yet to be determined. Job trailers may be necessary during site development but will be addressed in pre -construction meetings. Proposed Modifications The proposed project includes the following modification requests: 1. Road Section Clark Close March 27, 2017 Page 7 The applicant is requesting a road standard modification to Renton Municipal Code 4-6-060.F. The proposed access will modify the code standard for a Residential Access Road and Public Cul -De -Sac. Per Renton Municipal Code 4-9-250.D.2 a modification to road standards can be permitted when it is demonstrated that the following conditions are met: a) Substantially implements the policy direction of the policies and objectives of the Comprehensive Plan Land Use Element and the Community Design Element and the proposed modification is the minimum adjustment necessary to implement these policies and objectives; The proposed road section provides a complete street for the use of the residents of the Farlington Townhomes community. It allows for a reduced street profile on a site that has extensive slopes and grading. Additionally the reduced profile will further promote the pedestrian friendly element of the community. b) Will meet the objectives and safety, function, appearance, environmental protection and maintainability intended by the Code requirements, based upon sound engineering judgment; The proposed road will meet the objectives of safety, function, appearance, environmental protection and maintainability as intended by the code. The proposed road section includes a large travel way for emergency access while also providing parldng on one side of the road. On the side with parldng it is proposed that the planting strip be on the outside edge of the sidewalk, so that people getting in and out of their vehicles will not be stepping directly into a planter but rather onto a sidewalk c) Will not be injurious to other property(ies) in the vicinity; The proposed road provides access to the townhomes only and will not be extended or improved any further to provide access to any other homes. The road will not be injurious to other properties. Standard Proposed Right of Way Width 53' 30' (back of curb to back of curb) Sidewalks 5' both sides 5' both sides Planting Strips 8' between curb & walk both sides 4.5' on east side between curb and sidewalk; ❑4' on west side at back of sidewalk. Street Trees In planter strip on both sides In planter strips on both sides Curbs Both sides Both sides Parking Lanes 6' one side 8' one side Paved Roadway Width 2 lanes - 20' 2 lanes - 20' Lane Widths 10' travel lanes 10' travel lanes Cul-de-sac ROW 55' Radius 51' Radius Per Renton Municipal Code 4-9-250.D.2 a modification to road standards can be permitted when it is demonstrated that the following conditions are met: a) Substantially implements the policy direction of the policies and objectives of the Comprehensive Plan Land Use Element and the Community Design Element and the proposed modification is the minimum adjustment necessary to implement these policies and objectives; The proposed road section provides a complete street for the use of the residents of the Farlington Townhomes community. It allows for a reduced street profile on a site that has extensive slopes and grading. Additionally the reduced profile will further promote the pedestrian friendly element of the community. b) Will meet the objectives and safety, function, appearance, environmental protection and maintainability intended by the Code requirements, based upon sound engineering judgment; The proposed road will meet the objectives of safety, function, appearance, environmental protection and maintainability as intended by the code. The proposed road section includes a large travel way for emergency access while also providing parldng on one side of the road. On the side with parldng it is proposed that the planting strip be on the outside edge of the sidewalk, so that people getting in and out of their vehicles will not be stepping directly into a planter but rather onto a sidewalk c) Will not be injurious to other property(ies) in the vicinity; The proposed road provides access to the townhomes only and will not be extended or improved any further to provide access to any other homes. The road will not be injurious to other properties. Clark Close March 27, 2017 Page 8 d) Conforms to the intent and purpose of the Code; By providing a complete street with full travel ways, parking, curb, gutter, planter, and sidewalk the proposed modification meet the intent of the code. While several of the design elements as proposed are reduced in size and scope, the road includes all elements of a complete street as required by the city. e) Can be shown to be justified and required for the use and situation intended; and The reduction is justified in order to accommodate the large grade change on the site and to encourage a pedestrian friendly neighborhood. f) Will not create adverse impacts to other property(ies) in the vicinity. The proposed road provides access to the townhomes only and will not be extended or improved any further to provide access to any other homes. The road will not create adverse impacts to other properties. 2. Refuse and Recyclables Standards The applicant is requesting a modification to the Refuse and Recyclables Standards as they are found in RMC 4-4-090. A the proposed units are intended to be fee simple townhomes there will not be a central refuse site. Rather it is proposed that each home will have their own individual refuse cans that they will take to collection points that are situated throughout the community. The collection points will only be used on the specified collection day and will not require additional screening. 3. Maximum Wall Plate Height We request a modification to the plate height restriction as described in 4-2-110A Development Standards for Residential Zoning Designations. Section 4-2-110A allows for 3 stories yet restricts the maximum wall plate height to 24' with an additional 6' vertical projection allowed for roofs with a slope of 4:12 or greater for a combined maximum building height of 30'. The Earlington Townhome site slopes from North to South which allows the use of a grade plane to help achieve the required 24' maximum plate height This however does not consider the required 12" stoop height found in 4-2-115 Residential Design and Open Space Standards: Section 3 Residential Design. Having the required 12" stoop height at the entry to each unit along with a step up of 4" from the top of stoop to the finished floor of each unit essentially drops the grade 16" from the finished floor at the fronts of each unit Utilizing grade elevations located 6' from the building's exterior walls further hinders the ability to achieve the 24' height limit since the site slopes away from each building on the south further increasing the distance from the finished floor and does not increase in height toward the north because of the private alleys. Lastly to account for proper Clark Close March 27, 2017 Page 9 drainage away trom each building a positive slope away from each garage to the alley is required and therefore all buildings need to be raised a distance to provide this positive slope again further increasing the distance from the units finish floor to grade. To achieve the required 24' plate height and overall 30' building height I have reduced all front stoops to 12" and only allowed for a 1" step from the top of stoop to finished floor. I have also eliminated the positive slope of each driveway and in some cases, would end up with a negative slope back toward the garage entries. I have limited the step from the garage to unit to be 7" maximum. The result is that I am able to get the plate heights to work however the building heights still exceed the height limit for several buildings by 0" to 7" respectively. Per the November 10, 2016 Pre -Application meeting under Building Standards: it was suggested that we could receive an increase in height up to 32' per the Administrative Policy/Code Interpretation # CI -91. Per this allowance, we would like to request an increase to the building plate height of at least 2' allowing for a maximum plate height of 26'-0" along with the additional 6' allowing a total building height of 32'. This would allow for the 12" stoop additional height to the finished floor and positive drainage away from each garage edge to the private alleys. Submittal Attachments The following application materials are included with this cover letter and narrative. 1. Pre -Application Meeting Summary; 2. Waiver Form; 3. Land Use Permit Master Application Form; 4. Fees; 5. Project Narrative (this letter); 6. Environmental Checklist; 7. Density Worksheet; 8. Plat Certificate or Title Report; 9. Draft Legal Documents; 10. Construction Mitigation description; 11. Affidavit of Installation of Public Information Sign; 12. Affidavit of Installation of Public Outreach Sign; 13. Proof of Neighborhood Meeting; 14. Neighborhood Detail Map; 15. Site Plan Drawings: a. Preliminary Plat Site Plan; b. Existing Conditions Plan (Topography Map); c. Conceptual Landscape Plan; d. Boundary and Topographic Survey ; e. Tree Cutting/Land Clearing Plan; f. Generalized Utilities Plan; g. Conceptual Grading Plan; h. Drainage Control Plan; and i. Street Profile Plan; 16. Floor Plans; Clark Close March 27, 2017 Page 10 17. Tree Retention/Land Clearing (Tree Inventory) Plan; 18. Tree Retention Worksheet; 19. Arborist Report; 20. Wetland Assessment; 21. Geotechnical Report; 22. Letter of Understanding Geologic Risk; 23. Drainage Report; 24. Architectural Elevations; 25. Screening Detail, Refuse/Recycling; 26. Traffic Study; 27. Plan Reductions; 28. Digital Copy; 29. Colored Maps for Display. We understand that these items represent a complete list of required materials and the applications will be deemed complete for processing upon intake. We look forward to working with you through the City's review and approval process. Should you have any questions, or require additional information, please contact me directly at 253-838-6113. Sincerely, �ELVAMANN Associate/Senior Planner ESM CONSULTING ENGINEERS, LLC. CC: Jordan Salisbury, Blue Fern Development Benjamin Paulus, Blue Fern Development John Graves, Blue Fern Development k �esm8leng rlesm-jobs11938100110161docu mentlletter-003.docx