Loading...
HomeMy WebLinkAboutPN_Project_Narrative_170613_v2M NSULTINC ENGINEERS, LLC June 13, 2017 Mr. Clark Close Senior Planner City of Renton - Current Planning 1055 South Grady Way Renton, WA 98057 RE: Project Narrative Earlington Townhomes PPUD/Preliminary Plat Dear Clark: 100 0001' �. BlueFern DEVELOPMENT, LLC On behalf of Blue Fern Development and our entire consulting team, ESM Consulting Engineers is writing this letter in support of our application for a Preliminary Planned Unit Development and Preliminary Plat of the Eadington Townhomes project in the City of Renton. Named after the surrounding neighborhood as well as the greenhouses which have historically occupied the site, this project represents Blue Fern's first project within the City of Renton. Blue Fern has been an active participant in the creation of urban infill communities within many other local jurisdictions, and this project is an opportunity which Blue Fern and the whole team is very excited about. Please allow this letter to serve as an introduction to our project as well as our formal Project Narrative. Design Context; Site Opportunities and Challenges The development of the Earlington Townhomes site with its close proximity to Renton's revitalized downtown core is a great opportunity for new housing within easy commuting distance of the City. The zoning very much encourages a high-density residential community. With this said, it is safe to say that the site is a challenging development site for several key reasons. Part of our goal in this project narrative is to give context and insight to many of our design concepts as our team seeks to creatively mitigate some of the inherent challenges of the site and produce a successful new community that contributes to Renton's sustainable growth. Site Location, Topography, and Dimensions Directly northwest of the intersection S. 132nd St and Renton Ave S., the site is triangular in shape with approx. 800 linear feet of frontage on Renton Avenue and 700 linear feet on 132nd. Mr. Clark Close June 13, 2017 Page 2 Although the site's topography could be considered 'moderately' steep, the grade change is particularly challenging in that it is nearly uninterrupted throughout the entirety of the site, gaining approximately 70 vertical feet along the western property boundary. Renton Ave S. is a busy arterial with traffic travelling at a greater speed than is conducive to a residential community with small children. The site's triangular shape is demanding to efficiently lay -out when compared to a more regular, rectangular -shaped assemblage of parcels with the same density allowances. This also means the site has a disproportionate amount of linear feet of frontage to buffer against relative to its total size. Community Plan & Access The continuous grade change across the site is a special challenge to vehicular circulation and our ability to meaningfully organize units and provide useful, practical open spaces as an amenity to homeowners. There was a very real challenge of avoiding fronting homes directly onto a busy arterial, while at the same time (after open discussion with the City) the mutual goal of providing an attractive view of the community from Renton Ave S. (and not simply a row of back yards and fences). To overcome these challenges, the site will be accessed from S. 132nd Street by a single cul-de-sac with 5 alleys that extend laterally (east -west) from the main drive aisle and cul- de-sac. Keeping the north south vehicular traffic to a single location (as opposed to some type of loop) and avoiding a through -road across the site were 2 central tenants to our design concept. This design minimizes grading (which is maximized at road locations), increases the functionality and efficiency of a triangular shaped site, and creates a community that is an extension of the more traffic -calmed S. 132nd St, to avoid fast- moving vehicles within our site. It also allows us to have a landscaped buffer to Renton Ave S. while allowing views of the fronts and sides of our townhomes. Green Courts & Alleys - Separation of Vehicular and Pedestrian Traffic Perhaps the most important component of our entire community is the conscious separation of vehicular and pedestrian traffic. This layout will provide primary access to 100% of our townhomes via a system of trails and green courts, allowing for a safe pedestrian design and encouraging the site to function as a neighborhood. Each home's front entrance opens onto a public, landscaped court that is lushly planted with a mixture of different colors and textures of foliage and trees. The reason we are able to achieve these functional, level, highly -landscaped, spaces is that we are consolidating vehicular traffic into the efficient alleys as described above. Separation of vehicular traffic onto alleyways and pedestrian traffic onto landscaped green spaces that connect with the site's larger public open spaces is the keystone design concept of Earlington Townhomes. Scope of the Proposed Development The community design includes 60 attached single-family townhomes. Our plan is to work with the natural grades instead of fighting against them. For this reason, every townhome on the site is either a daylight or tuck -under design. This allows us to consolidate the retaining walls which our topography necessitates, into the buildings themselves. The result is a shorter construction duration for the neighborhood, less retaining walls throughout the site itself, and, as mentioned above, the achievement of functional, level, open -spaces on an otherwise sloping site. Mr. Clark Close June 13, 2017 Page 3 Architecture, Climate, and Natural Light As the site is sloping from the north to south, the townhomes will take full advantage of the potential views by locating all living spaces to the south side of each unit with balconies and larger windows positioned to help capture both light as well as potential views. Our experience working with the families who are purchasing our townhomes has taught us an important lesson: natural light is paramount. In an attached townhome, party walls are unable to provide light, so our design imperative is larger -than -typical windows on the south side of all units. The building design will contain a great deal of modulation, both along the fapade as well as the roofline, creating a pleasing appearance and helping to reduce the buildings mass to a more pedestrian feel. The building colors will be organic yet rich in nature and utilized in a way to enhance the building modulation and work with the site design as a whole. Further enhancing the buildings appearance, we have incorporated varying siding materials & reveal dimensions, Juliet balconies and large windows. Many homebuilders have strayed away from classic, Northwest design principals like pitched roofs and lap siding. We firmly believe it is possible to produce a modern, attractive, aesthetic while maintaining a connection to a design palette that make sense for not only our local climate, but also the reality that many families who choose attached houses are doing so because they are making a conscious decision to own a home that requires less maintenance. The reality is, it rains a lot in our area. Pitched roofs and lap siding are extremely effective at shedding moisture downwards and still look good after many seasons of hard wear. The ubiquitous, rectangular, flush panels that so many "modern" projects utilize don't weather our climate as well, and mean more maintenance for our buyers. In our planning for this community, we are making a decision to use more traditional materials while concentrating on unique and expressive glazing and landscaping design. Site Design and Green Space Amenities In addition to the green courts where many front doors are located, meandering sidewalks will connect to gathering spaces to help promote a sense of community. The layout of the site will include several open and green spaces situated along the frontage of Renton Avenue as well as at the termination of each green court located between buildings. Amenities include an outdoor recreation and open space area in the southeast corner of the site situated over the proposed storm vault. There will be a green plaza in the northern extent of the project that will include walkways that connect to the sidewalk along Renton Avenue. Trails run through the site connecting the different seating areas and offering opportunities for views out towards Mt. Rainier. Parking Solutions based on Experience Every single townhome in our community is being provided a 2 -car garage, which actually exceeds the maximum allowed by the City. This is important to us. Our experience selling townhomes has taught us that garages are very important to homeowners, and that people who buy townhomes will willingly use garage space for their vehicles, as long as Mr. Clark Close June 13, 2017 Page 4 they have additional storage space. In every project we have ever built, the units with garages sell first Guest parking will be provided as street parking located along the main entry aisle, a safe enough distance from front doors to encourage use of garages, but not so far as to be problematic for guests. The 2 -car garage standard and our guest parking concept go hand-in-hand: the reality of a second parking spot is it provides families with 2 cars a way to keep both cars close to home, and families with 1 car a way to use some garage space as valuable storage while keeping room enough for their car. Net Density and Proposed Number of New Lots Based on our calculations as outlined on the enclosed density worksheet, we are allowed up to 49 townhomes in the R-14 zone since 14 units per acre yields 46.58 townhomes, rounded up to 47. We are allowed to increase the density by up to 30% (or up to 18.82 per acre) by providing affordable housing. We are proposing to provide 7 affordable homes since we are allowed one market rate bonus home for each affordable home. This yields 60 units total. Current Use of the Site and Existing Improvements The site is currently a nursery with multiple greenhouses, outbuildings, a retail building, and a caretaker's residence. The greenhouses vary in size, shape, and construction materials. The retail store covers approximately 1,096 square feet and is wood frame construction. The caretaker's residence was constructed in 1965 and is approximately 2,820 square feet. Other site improvements include gravel and dirt driveways for access to the various greenhouses and storage areas that were part of the normal operation of the nursery. Most of the site is covered in either buildings or driveways. Zoning Designation of this Site and Neighboring Parcels The site is zoned R-14 (Residential 14 du/ac). The adjacent properties are zoned as follows: North - Renton Avenue, King County Zone R-12 (outside of city limits) East - Renton Ave, R-14 properties along the eastern side of Renton Ave. South - 132nd St, R-14 (11425 linear feet) and R-10 (Ell 75 linear feet) on south side of 132nd St West - R-14 (11280 linear feet) and R-8 (11300 linear feet) Land Use Permits Required The project requires approval of a Preliminary Planned Unit Development and a Preliminary Plat. It is our intent to develop the site into fee -simple lots for individual ownership. Estimated Construction Cost and Fair Market Value of the Project The total estimated construction cost is approximately $12 Million and the fair market value of the homes will depend on the market at the time they are completed. It is planned that the townhomes will be priced as medium -income homes, and allowing for our Mr. Clark Close June 13, 2017 Page 5 affordable units and the variability of the sizes and bedroom counts, at this time we have included in our application materials an estimate of $24.8M. Off -Site Improvements Extensive off-site improvements will be made as part of the proposed project This includes frontage improvements along both Renton Avenue S. and S. 132nd Street These improvements will include curb, gutter, sidewalks and planters as required by city design standards. Additional offsite water and sewer main extensions are being provided as per guidance received to date from the City. The sewer will be connected into the existing main in S. 132nd Street However, a small sewer main connection is being made at the intersection of Renton Ave and 132nd Street. A new water main will be extended north in Renton Ave from this site up to a connecting point with an existing main in 130th Street. Trash Collection Refuse and recycling locations have been provided within each individual garage and trash pickup locations provided between buildings throughout the site. This will eliminate the potential for unsightly containers on site. Special Site Features or Critical Areas: A wetland and stream reconnaissance was conducted by our consulting biologist, Altmann Oliver Associates. No wetlands or streams were found on site. Our geotechnical engineer, Associated Earth Science, prepared a full geotechnical report, which identifies that the site has slopes but none of which qualify for protective measures. The slopes on the site are generally less than 20 percent There are no other known or anticipated critical areas on the site. Distance From A Wetland to the Nearest Area of Work: There are no wetlands or streams located on the site. The nearest known wetland or stream is to the south of the Earlington Townhome site. This is a small drainage that runs east -west and is Ell 75 feet south from the southwest corner of the property and 11350 feet south from the southeast comer. Soil Type and Drainage Conditions The site contains Vashon Recessional Outwash, Vashon Lodgement Till, and fill material according to the geotechnical report prepared by Associated Earth Sciences, dated January 18, 2017. The site is located on a hillside and the surface water drains from the north to the south. There are no known drainage concerns or issues on the site or in the immediate vicinity/downstream. Estimated Quantities and Type of FII and Excavation: The purpose of proposed grading/filling will be to accommodate the construction of proposed buildings and roads. Final fill/grade quantities will be prepared as part of the clearing and grading permit(s). Preliminary estimates are as follows: Mr. Clark Close June 13, 2017 Page 6 Cut: 15,000 CY Fill: 3,350 CY Net Cut 11,650 CY Tree Removal The site contains 57 trees. The reality of the locations of the existing trees is that any attempt to maintain them given the scale of the filling and grading as well as their locations relative to the proposed road and cul-de-sac would make the project non - feasible. As trees 30" and greater are classified as landmark in the City of Renton and are prohibited from removal without an approved Land Development Permit, we will be applying for these permits in our subsequent engineering submittals. There are 7 trees on the site that meet this size threshold and will need to be removed as part of development activities. View Obstructions The residential units proposed will not exceed a height of 35' above the average grade level. Land to be Dedicated to the City of Renton The project will dedicate right-of-way along both Renton Ave and 132nd Street. The right of way dedication along 132nd Street is approximately 11.5 feet along that entire frontage. The right of way dedication along Renton Ave varies depending on the boundary and will result in a uniform right of way that meets City of Renton standards. The proposed roadway and cul-de-sac will also be dedicated to the City as a public road. No other dedications are anticipated. Model Homes, Job Shacks, Sales Trailers: It is anticipated that upon substantial completion of the projects infrastructure, construction of model homes will begin. The total number of model homes to be constructed is yet to be determined. Job trailers may be necessary during site development but will be addressed in pre -construction meetings. Proposed Modifications The proposed project includes the following modification requests as detailed in the Statement Addressing Compliance: 1. Modifications to the Bulk Standards to include: a. Lot width; b. Lot Depth; C. Setbacks; d. Private open space; e. Building coverage; f. Impervious Surface; g. Wall Plate Height; 2. Refuse and recyclables; 3. Maximum number of Units per Building; Mr. Clark Close June 13, 2017 Page 7 4. Maximum Retaining Wall Height; Submittal Attachments The following application materials are included with this cover letter and narrative. 1. Pre -Application Meeting Summary; 2. Waiver Form; 3. Land Use Permit Master Application Form; 4. Fees; 5. Project Narrative (this letter); 6. Environmental Checklist; 7. Density Worksheet; 8. Plat Certificate or Title Report; 9. Draft Legal Documents; 10. Construction Mitigation description; 11. Affidavit of Installation of Public Information Sign; 12. Affidavit of Installation of Public Outreach Sign; 13. Proof of Neighborhood Meeting; 14. Neighborhood Detail Map; 15. Site Plan Drawings: a. Preliminary Plat Site Plan; b. Existing Conditions Plan (Topography Map); C. Conceptual Landscape Plan; d. Boundary and Topographic Survey, e. Tree Cutting/Land Clearing Plan; f. Generalized Utilities Plan; g. Conceptual Grading Plan; h. Drainage Control Plan; and i. Street Profile Plan; 16. Floor Plans; 17. Tree Retention/Land Clearing (Tree Inventory) Plan; 18. Tree Retention Worksheet; 19. Arborist Report; 20, Wetland Assessment; 21. Geotechnical Report; 22. Letter of Understanding Geologic Risk; 23. Drainage Report; 24. Architectural Elevations; 25. Screening Detail, Refuse/Recycling; 26. Traffic Study; 27. Plan Reductions; 28. Digital Copy; 29. Colored Maps for Display. Mr. Clark Close June 13, 2017 Page 8 We understand that these items represent a complete list of required materials and the applications will be deemed complete for processing upon intake. We look forward to working with you through the City's review and approval process. Should you have any questions, or require additional information, please contact me directly at 253-838-6113. Sincerely, ESM C ULTING ENGINEERS, LLC EVAN MANN Associate/Senior Planner CC: Jordan Salisbury, Blue Fern Development Benjamin Paulus, Blue Fern Development John Graves, Blue Fern Development � kesm8lengrlesm-jobs11938100110161docu mentlletter-004.docx