Loading...
HomeMy WebLinkAboutS_Landscape Bond Quantities Worksheet_170620_v1wwwoo DEPARTMENT OF COMMUNITY "'Y of AND ECONOMIC DEVELOPMENT -�---�—� enton LANDSCAPE COST ESTIMATE WORKSHEET PROJECT NAME: ADDRESS: PREPARED BY: Planning Division 1055 South Grady Way -Renton, WA 95057 Phone: 425-430-7200 Fax: 425-430-7231 www.rentonwa.goov *OR ESTIMATE BY LANDSCAPE CONTRACTOR, WHICHEVER IS GREATER. 1 C:\Users\Owner\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\FPZW35FV\LANDSCAPE COST ESTIMATE WORKSHEET.docx 07{2015 r UNIT PRICE* UNIT TYPE QUANTITY PRICE SOD LAWN AREAS $500.00 MSF (1000 SQ FT) HYDROSEEDING $50.00 MSF (1000 SQ FT) Iir SOIL PREPARATION A. TOPSOIL (6 INCHES DEEP) $23.00 SY (SQUARE YARD) 6614 16- L B. MULCH (2 INCHES DEEP) $4.00 SY (SQUARE YARD) C. PEAT MOSS (TWO INCHES DEEP) $2.30 SY (SQUARE YARD) D. COMPOST 13 INCHES DEEP & TILLING $26.00 CY (CUBIC YARD) E. FERTILIZER $6.67 CY (CUBIC YARD) PLANT MATERIALS A. DECIDUOUS TREES 2.00" MINIMUM CALIPER $250.00 COST& LABOR 2 .r B. EVERGREEN TREES MINIMUM SIX (6) FEET OR ABOVE $225.00 COST & LABOR C. SHRUBS $35.00 COST & LABOR D. GROUND COVER $4.00 EACH COST & LABOR 7j Q SUB TOTAL BOND AMOUNT BOND AMOUNT SUB TOTAL 5 A *OR ESTIMATE BY LANDSCAPE CONTRACTOR, WHICHEVER IS GREATER. 1 C:\Users\Owner\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\FPZW35FV\LANDSCAPE COST ESTIMATE WORKSHEET.docx 07{2015 r *OR ESTIMATE BY LANDSCAPE CONTRACTOR, WHICHEVER IS GREATER. C:\Users\Owner\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outtook\FPZW35FV\LANDSCAPE COST ESTIMATE WORKSHEET.docx 07/2015 UNIT PRICE* UNITTYPE QUANTITY PRICE MISCELLANEOUS TREE STAKES $2,65 EACH PER STAKE & LABOR FENCING $28.50 LINEAR FOOT INCLUDE LABOR BERMING $17.50 LINEAR FOOT INCLUDES LABOR H/A IRRIGATION $0,80 SQUAREFOOT RELOCATING TREES ON SITE 36" BALL $260.00 EACH Alk 60" BALL $920.00 EACH'c RELOCATING SHRUBS ON SITE 12" BALL $26.00 EACH 24" BALL $33.Q0 EACH ADDITIONAL ITEMS i b SUB TOTAL BOND AMOUNT BOND SUB TOTAL: Page 1$ j a i MOP Page 2 $�- TOTAL BOND PRICE TOTAL BOND PRICE: *OR ESTIMATE BY LANDSCAPE CONTRACTOR, WHICHEVER IS GREATER. C:\Users\Owner\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outtook\FPZW35FV\LANDSCAPE COST ESTIMATE WORKSHEET.docx 07/2015