Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Mindy's Pond costs
Mindy's Place detention pond costs listed in elsewhere in the bond quantity checklist 12" CPE 217.8 lf @ 24.00 $5227.00 54" CB Type II and 2 extra feet 1ea $3,400 Pond overflow spillway 4cy @ 16.00 $64.00 Restrictor/oil separator 12" 1 ea @ 1,500 $1,500.00 Riprap placed 15 cy @ 42.00 $630.00 Chain Link fence 6' 370 lf @ 20.00 $7,400.00 Chain link gate 1 ea @ 1,400 $1,400 Wall retaining, concrete 945 sf @ 55.00 $51,975.00 Access road 91 sy @26.00 $2,366.00 Excavation bulk 1,150 cy @ 2.00 $2,300.00 Total $76,262