Loading...
HomeMy WebLinkAboutMindy's Pond costs pdfMindy's Place detention pond costs listed in elsewhere in the bond quantity checklist 12" CPE 217.8 lf @ 24.00 $5227.00 54" CB Type II and 2 extra feet 1ea $3,400 Pond overflow spillway 4cy @ 16.00 $64.00 Restrictor/oil separator 12" 1 ea @ 1,500 $1,500.00 Riprap placed 15 cy @ 42.00 $630.00 Chain Link fence 6' 370 lf @ 20.00 $7,400.00 Chain link gate 1 ea @ 1,400 $1,400 Wall retaining, concrete 945 sf @ 55.00 $51,975.00 Access road 91 sy @26.00 $2,366.00 Excavation bulk 1,150 cy @ 2.00 $2,300.00 Total $76,262