Loading...
HomeMy WebLinkAboutExhibit 9 Letter from GeoEngineers 8410 154th Avenue NE Redmond, Washington 98052 425.861.6000 May 21, 2015 City of Renton 1055 South Grady Way Renton, Washington 98057 Attention: Rocale Timmons Subject: Engineering Consultation and Review Letter 2 Mindy’s Place Preliminary Plat Detention Pond Design Renton, Washington File No. 0693-076-00 INTRODUCTION This letter summarizes our engineering consultation and second round of review for the proposed Mindy’s Place Preliminary Plat Detention Pond Design project in Renton, Washington. The project site is located at the intersection of 160th Avenue SE and SE 141st Street. Our services were completed in general accordance with our proposal dated August 25, 2014 and authorized by the City of Renton on January 26, 2015. We previously provided review comments for the project in our letter dated February 11, 2015. We have received and reviewed the following documents for the project. These documents are in addition to those listed in our February 11, 2015 letter: ■ Reply to Review Comments letter and structural calculations by Lucia Engineering titled “Mindy’s Place, CIP Retaining Wall Calculations” dated March 12, 2015. ■ Retaining wall plan sheet by Lucia Engineering titled “Mindy’s Place, CIP Retaining Walls” dated March 12, 2015. ■ Detention pond plan sheet, Sheet 12-180, by DMP, Inc. titled “Mindy’s Place, Detention Pond Details” dated May 5, 2015. This letter addresses the geotechnical aspects of the peer review. Reid Middleton, Inc., under subcontract to GeoEngineers, completed the structural aspects of the peer review, the results of which are provided in Appendix A. City of Renton | May 21, 2015 Page 2 File No. 0000-001-00 File No. 0693-076-00 REVIEW COMMENTS We appreciate the responses provided by the designers. Based on our review of the above documents, we take no exception to the geotechnical design methodologies or resulting designs. Additionally, the designers have adequately addressed our previous geotechnical comments as they relate to the design of the retaining walls we reviewed for this project. As noted in Appendix A, there are still several structural issues and comments that need to be addressed by the designers as part of the structural review. Responses to the review comments in Appendix A should be made in an itemized letter form. We recommend that the permit applicant have the structural engineer respond and resubmit to the City of Renton for additional review SUMMARY This letter completes our geotechnical review of the detention pond design for the Mindy’s Place project in Renton, Washington. Corrections or comments made during the review process do not relieve the designer from compliance with code requirements, conditions of approval, and permit requirements; nor is the designer relieved of responsibility for a complete design in accordance with the laws of the State of Washington. This review is for general compliance with the standards of local geotechnical engineering practices as it relates to the project. LIMITATIONS We have prepared this letter for use by the City of Renton to evaluate the geotechnical aspects of the Mindy’s Place Preliminary Plat Detention Pond Design project in Renton, Washington. The information presented in this letter is based on review of available geotechnical data and technical documents listed above and our experience in the area; no additional subsurface explorations were completed for the project. Corrections or comments made during the review process do not relieve the designer from compliance with code requirements, conditions of approval, and permit requirements; nor is the designer relieved of responsibility for a complete design in accordance with the laws of the State of Washington. This review is for general compliance with the standards of local geotechnical engineering practice as it relates to the project. Within the limitations of scope, schedule and budget, our services have been executed in accordance with generally accepted practices in this area at the time this letter was prepared. No warranty or other conditions, express or implied, should be understood. APPENDIX A Reid Middleton Review Comment Letter