Geologic Assessment Report
Proposed Short Plat
11427 SE 162nd Street
Renton, Washington
PN: 008800-0260
Job: 14-036 Zwicker.GR
INTRODUCTION
This report presents the results of our landslide hazard assessment for the proposed subdivision to be
located at 11427 SE 162nd Street in Renton, Washington. The general location of the site is shown on
the attached Site Vicinity Map, Figure 1.
Our understanding of the project is based on our discussions with you, and our March 6, 2014 site visit.
We understand that you are in the process of subdividing the existing parcel, 008800-0260 into 4 total
lots. We understand that the proposed residences on the subdivided lots will be constructed utilizing
conventional wood framing and spread concrete footings. Additional site amenities will include the
ability to connect to public water and septic/sewer and other franchise utilities. Clearing and grading is
expected to be limited to that only required to construct the proposed access and required foundation
elements.
SCOPE
We understand that City of Renton is requesting a geotechnical report to address stormwater
management and other design issues related to the site development. The purpose of our services is to
evaluate the surface and subsurface conditions at the site as a basis for providing engineering
recommendations for the development of the site. Specifically, our scope of services for the project
included the following:
1. Reviewing the available geologic, hydrogeologic and geotechnical data for the site area.
2. Performing a geological reconnaissance of the site to assess the site’s soil, groundwater and
subsurface conditions.
3. Exploring shallow subsurface conditions at the site by monitoring the excavation of several test
pits across the site.
4. Evaluating the engineering characteristics of the soils encountered at the site, as appropriate.
5. Providing geotechnical recommendations for site infiltration site grading including site
preparation, subgrade reparation, fill placement criteria, suitability of on-site soils for use as
structural fill, temporary and permanent cut and fill slopes, drainage and erosion control
measures.
6. Providing site-specific seismic criteria based on the subsurface conditions encountered at the
site.
7. Preparing a written report summarizing our observations, conclusions and recommendations
along with the supporting data.
14-036 Harris.GR
December 28, 2016
Page 2
Subsurface explorations or laboratory testing were completed as part of this assessment.
SITE CONDITIONS
Surface Conditions
The subject parcel is located at 11427 SE 162nd Street in the City of Renton Washington. The site
consists of a single parcel that is rectangular in shape, approximately 300 feet in length (north to
south) by 100 feet in width (east to west), and encompasses 0.68acres. The site is an existing lot of
record that is currently developed with a single family residence. Access to the project parcel is from
SE 162nd Street.
This parcel is gently sloping with a sligh cross slope from north to south. Grades are less than 10
percent with an overall elevation change across the lot of less than 8 feet. Vegetation on the site
consists of a few ornamental trees and pasture grass areas. No surface water or seepage was observed
on the site at the time of our site visit. No evidence of erosion, soil movement, landslide activity or
deep-seated slope instability was observed at the site or within 300 feet of the site at the time of our
site visit.
Site Soils
The USDA Natural Resource Conservation Service Web Soil Survey for King County mapped the soils in
the area of the site as Alderwood gravelly sandy loam (AgC). The Alderwood soils are generally derived
from glacial till under conifers on slopes of 8 to 15 percent and are listed as having a minor erosion
hazard. Based on our site observations the near surface soils at the site is consistent with the mapped
soils. A copy of the SCS map for the site vicinity is attached as Figure 3.
Site Geology
The Geological Map of the Renton Quadrangle, King County, Washington by D.R. Mullineaux 1965,
indicates that the property is underlain by Vashon glacial Till (Qvt) and Recessional Stratified drift (Qik).
These glacial soils were deposited during the latest stage of the most recent Vashon Stade of the Fraser
Glaciation, approximately 12,000 to 15,000 years ago.
The glacial till (Qvt) consists of a mixture of silt, sand and gravel that was deposited ahead of the glacial
ice and subsequently overridden. The till soils typically exhibits high strength and low compressibility
characteristics while the landslide deposits can be considered normally consolidated. The drift soils were
deposited by meltwater from reseeding glacial ice and can be considered normally consolidated
exhibiting moderate strength and compressibility characteristics. An excerpt of the above referenced
map in included as Figure 3
Subsurface Explorations
On March 6, 2014 we visited the site and observed the excavation of two test pits to a maximum depth
of 7 feet for the purpose of determining infiltration feasibility for the project, soil samples were
collected for later analysis in our lab. The test pits were excavated by a track mounted excavator
operated by a licensed earthwork contractor.. The test pits were located in the field by our
representative by pacing from existing site features such as property corners and adjacent roadways
and fences. The approximate location of the test pits are indicated on the attached Site Plan as Figure
2.
A geotechnical engineer from our office logged the subsurface conditions encountered in each test pit,
obtained representative soil samples, and observed pertinent site features. Representative soil
14-036 Harris.GR
December 28, 2016
Page 3
samples obtained from the test pits were placed in sealed plastic bags and taken to our laboratory for
further examination and testing, as deemed appropriate.
Based on our experience in the area and extent of our explorations in the area it is our opinion that the
soils encountered in the test pits are generally representative of the soils at the site.
Because the soils encountered were consistent between the test sites and other exposed site soils, the
geologic maps, it is our opinion that no additional soils tests required to evaluate the subsurface
conditions at the site.
The explorations performed as part of this evaluation indicate conditions only at the specific locations
and that the actual condition in other locations could vary. Furthermore, the nature and extent of any
such variations would not become evident until additional explorations are performed or until
construction activities have begun.
Subsurface Conditions
Our test pits encountered uniform subsurface conditions that confirmed the geological mapping
stratigraphy. The site soils generally consisted of a minimum of 36 inches of weathered sandy gravel
with silt over a loose bedrock material. Our grainsize analysis showed that the site soils contained
approximately 26 percent gravel 64 percent sand and 10 percent fines. Based on our review of our
test pits, the upper weathered site soils in the area of development are consistent with the Alderwood
type soils. The soils encountered were visually classified in accordance with the Unified Soil
Classification System (USCS) described on Figure 5. The test pit logs are included as Figures 6.
Groundwater Conditions
Groundwater seepage was not observed in one of the test pits. Perched groundwater typically
develops when the vertical infiltration of precipitation through a more permeable soil is slowed at
depth by a deeper, less permeable soil type. We expect that perched groundwater may develop
seasonally atop the deeper and denser bedrock. Based on the observed mottling and nature of the
near surface soils, we anticipate fluctuations in the local groundwater levels will occur in response to
precipitation patterns, off-site construction activities, and site utilization.
CONCLUSIONS
Based on our site observations, subsurface explorations and engineering analysis, it is our opinion that
the proposed development is feasible from a geotechnical standpoint.
The residences may be supported on new conventional spread footings or floor slabs bearing on
competent native soils or on structural fill placed above these native soils. We understand that grading
at the site will be minimal, and will consist primarily of excavating the footings for the proposed
residence(s), site utilities, and the stormwater facilities. If grading activities will take place during the
winter season, the owner should be prepared to import free-draining granular material for use as
structural fill and backfill. Proper surface drainage and erosion control measures will reduce the risk
for future erosion at the site.
Site Preparation
Areas to be graded should be cleared of deleterious matter including any existing structures,
foundations, abandoned utility lines, debris and vegetation. The portions of the site covered with
vegetation should be stripped of any forest duff and organic-laden soils, based on our test pits we
anticipate stripping depths to be on the order of 6 to 18 inches. These materials can be stockpiled and
14-036 Harris.GR
December 28, 2016
Page 4
later used for erosion control. Material that cannot be utilized on the site should be removed from the
site.
Where placement of fill material is required, the stripped/exposed subgrade areas should be
compacted to a firm and unyielding surface prior to placement of any fill. Excavations for debris
removal should be backfilled with structural fill compacted to the densities described in the “Structural
Fill” section of this report.
We recommend that a member of our staff evaluate the exposed subgrade conditions after removal of
vegetation and topsoil stripping is completed and prior to placement of structural fill. The exposed
subgrade soil should be proof-rolled with heavy rubber-tired equipment during dry weather or probed
with a 1/2-inch-diameter steel rod during wet weather conditions.
Any soft, loose or otherwise unsuitable areas delineated during proof-rolling or probing should be
recompacted, if practical, or over-excavated and replaced with structural fill, based on the
recommendations of our site representative. The areas of old fill material should be evaluated during
grading operations to determine if they need mitigation; recompaction or removal.
Structural Fill
All material placed as fill associated with mass grading, as utility trench backfill, under building areas,
or under asphalt pavement should be placed as structural fill. The structural fill should be placed in
horizontal lifts of appropriate thickness to allow adequate and uniform compaction of each lift. Fill
should be compacted to at least 95 percent of MDD (maximum dry density as determined in
accordance with ASTM D-1557).
The appropriate lift thickness will depend on the fill characteristics and compaction equipment used.
We recommend that the appropriate lift thickness be evaluated by our field representative during
construction. We recommend that our representative be present during site grading activities to
observe the work and perform field density tests.
The suitability of material for use as structural fill will depend on the gradation and moisture content of
the soil. As the amount of fines (material passing US No. 200 sieve) increases, soil becomes
increasingly sensitive to small changes in moisture content and adequate compaction becomes more
difficult to achieve. During wet weather, we recommend use of well-graded sand and gravel with less
than 5 percent (by weight) passing the US No. 200 sieve based on that fraction passing the 3/4-inch
sieve, such as Gravel Backfill for Walls (9-03.12(2)). If prolonged dry weather prevails during the
earthwork and foundation installation phase of construction, higher fines content (up to 10 to
12 percent) will be acceptable. Material placed for structural fill should be free of debris, organic
matter, trash and cobbles greater than 6-inches in diameter. The moisture content of the fill material
should be adjusted as necessary for proper compaction.
Suitability of On-Site Materials as Fill
During dry weather construction, any non-organic on-site soil may be considered for use as structural
fill; provided it meets the criteria described above in the structural fill section and can be compacted as
recommended. If the soil material is over-optimum in moisture content when excavated, it will be
necessary to aerate or dry the soil prior to placement as structural fill. We generally did not observe
the site soils to be excessively moist at the time of our subsurface exploration program.
The native weathered and glacial till soils in the site generally consisted of silty gravel with fine sand.
These soils are generally comparable to “common borrow” material and will be suitable for use as
14-036 Harris.GR
December 28, 2016
Page 5
structural fill provided the moisture content is maintained within 3 percent of the optimum moisture
level. However, because of the high fines content, the till soils encountered across the site will likely
be unsuitable during extended periods of wet weather.
We recommend that completed graded-areas be restricted from traffic or protected prior to wet
weather conditions. The graded areas may be protected by paving, placing asphalt-treated base, a
layer of free-draining material such as pit run sand and gravel or clean crushed rock material
containing less than 5 percent fines, or some combination of the above.
Temporary Excavations
All job site safety issues and precautions are the responsibility of the contractor providing
services/work. The following cut/fill slope guidelines are provided for planning purposes only.
Temporary cut slopes will likely be necessary during grading operations or utility installation.
All excavations at the site associated with confined spaces, such as utility trenches and retaining walls,
must be completed in accordance with local, state, or federal requirements. Based on current
Washington Industrial Safety and Health Act (WISHA, WAC 296-155-66401) regulations, the shallow
upper soils on the site would be classified as Type C soils, whereas the very dense glacial till and
sandstone (bedrock) soils would be classified as Type A soils.
According to WISHA, for temporary excavations of less than 20 feet in depth, the side slopes in Type A
soils should be laid back at a slope inclination of ¾H:1V (Horizontal: Vertical) and Type C soils should be
laid back at a slope inclination of 1½H:1V or flatter from the toe to the crest of the slope. It should be
recognized that slopes of this nature do ravel and require occasional maintenance. All exposed slope
faces should be covered with a durable reinforced plastic membrane, jute matting, or other erosion
control mats during construction to prevent slope raveling and rutting during periods of precipitation.
These guidelines assume that all surface loads are kept at a minimum distance of at least one half the
depth of the cut away from the top of the slope and that significant seepage is not present on the
slope face. Flatter cut slopes will be necessary where significant raveling or seepage occurs, or if
construction materials will be stockpiled along the slope crest.
Where it is not feasible to slope the site soils back at these inclinations, a retaining structure should be
considered. Where retaining structures are greater than 4-feet in height (bottom of footing to top of
structure) or have slopes of greater than 15 percent above them, they should be engineered.
This information is provided solely for the benefit of the owner and other design consultants, and
should not be construed to imply that Development Engineering, PLLC assumes responsibility for job
site safety. It is understood that job site safety is the sole responsibility of the project contractor.
Foundation Support
Based on the subsurface soil conditions encountered across the site, we recommend that spread
footings for the new residences be founded on dense to very dense native soils or on structural fill that
extends to suitable native soils. Given the presence of fill material on the site it is anticipated that
some footings may be located in areas where existing fill material is present. Provided the exposed
soils area evaluated and verified by a representative from our office at time of construction to be
suitable to support the design loads we do not anticipate that the presence of the fill material on site
will be a detrimental factor to the site development.
The soil at the base of the footing excavations should be disturbed as little as possible. All loose, soft
or unsuitable material should be removed or recompacted, as appropriate. A representative from our
firm should observe the foundation excavations to determine if suitable bearing surfaces have been
prepared, particularly in the areas where the foundation will be situated on fill material.
14-036 Harris.GR
December 28, 2016
Page 6
We recommend a minimum width of 2 feet for isolated footings and at least 16 inches for continuous
wall footings. All footing elements should be embedded at least 18 inches below grade for frost
protection. Footings founded as described above can be designed using an allowable soil bearing
capacity of 2,000psf (pounds per square foot) for combined dead and long-term live loads. The weight
of the footing and any overlying backfill may be neglected. The allowable bearing value may be
increased by one-third for transient loads such as those induced by seismic events or wind loads.
Lateral loads may be resisted by friction on the base of footings and floor slabs and as passive pressure
on the sides of footings. We recommend that an allowable coefficient of friction of 0.40 be used to
calculate friction between the concrete and the underlying soil. Passive pressure may be determined
using an allowable equivalent fluid density of 300 pcf (pounds per cubic foot). Factors of safety have
been applied to these values.
We estimate that settlements of footings designed and constructed as recommended will be less than
1 inch, for the anticipated load conditions, with differential settlements between comparably loaded
footings of 1/2 inch or less. Most of the settlements should occur essentially as loads are being
applied. However, disturbance of the foundation subgrade during construction could result in larger
settlements than predicted.
Floor Slab Support
Slabs-on-grade, if constructed, should be supported on the medium dense native soils or on structural
fill prepared as described above. Any areas of old fill material should be evaluated during grading
activity for suitability of structural support. Areas of significant organic debris should be removed.
We recommend that floor slabs be directly underlain by a capillary break material with minimum 6-
inch thickness of coarse sand, pea gravel, or gravel containing less than 3 percent fines. The drainage
material should be placed in one lift and compacted to an unyielding condition.
A synthetic vapor barrier is recommended to control moisture migration through the slabs. This is of
particular importance where the foundation elements are underlain by the silty till, or where moisture
migration through the slab is an issue, such as where adhesives are used to anchor carpet or tile to the
slab.
A subgrade modulus of 400 kcf (kips per cubic foot) may be used for floor slab design. We estimate
that settlement of the floor slabs designed and constructed as recommended, will be 1/2 inch or less
over a span of 50 feet.
Permeable Pavement Subgrades
Pavement subgrade areas associated with “Permeable” surfacing should be prepared as previously
described in the “Site Preparation” section of this report, with the exception that care should be taken
to excavate to final subgrade only after heavy equipment work is complete and deeper utilities have
been installed. Over compaction of the subgrade should be avoided in order to preserve the ability of
the soils to absorb surface runoff at the rate specified.. Soft, loose or wet areas that are disclosed
should be recompacted or removed, as appropriate. Over-excavated areas should be backfilled with
compacted structural fill and sub-base material.
Site Drainage
All ground surfaces, pavements and sidewalks at the site should be sloped away from structures. Each
lot should also be carefully graded to ensure positive drainage away from all structures and property
14-036 Harris.GR
December 28, 2016
Page 7
lines. Surface water runoff from the roof area, driveways, perimeter footing drains, and wall drains,
should be collected, tightlined, and conveyed to an appropriate discharge point.
Based on our site evaluation, it is our opinion that the infiltration of stormwater at the site is possible
provided the bottom of the infiltration facility is kept within 24 inches of the existing ground surface.
Our grainsize analysis showed that the site soils contained approximately 26 percent gravel 64 percent
sand and 10 percent fines. Based on our review of our test pits, the upper weathered site soils in the
area of development are consistent with the Alderwood type sols. Based on this and our lab testing, it
is our opinion that infiltration is feasible at a low design rate. For a long term design infiltration rate,
we recommend using 1 inch per hour including all safety factors. A copy of our test pit soils logs and
grain size analysis is included for reference.
This information is provided solely for the benefit of the owner and other design consultants, and
should not be construed to imply that Development Engineering, PLLC assumes responsibility for job
site safety. It is understood that job site safety is the sole responsibility of the project contractor.
LIMITATIONS
We have prepared this report for the Owners, and other members of the design team for use in
evaluating a portion of this project. Subsurface conditions described herein are based on our
observations of exposed soils on the parcel. This report may be made available to regulatory agencies
or others, but this report and conclusions should not be construed as a warranty of subsurface
conditions. Subsurface conditions can vary over short distances and can change with time.
Within the limitations of scope, schedule and budget, our services have been executed in accordance
with generally accepted practices in this area at the time this report was prepared. No warranty,
express or implied, should be understood.
14-036 Harris.GR
December 28, 2016
Page 8
We trust this is sufficient for your current needs. Should you have any questions, or require additional
information, please contact us at your earliest convenience.
Respectfully submitted,
Development Engineering, PLLC
Glen Coad, PE
Owner
UB:WGC
DocID:14-036 Harris.GR
Attachments: Figure 1: Vicinity Map
Figure 2: Site Plan
Figure 3: SCS Soil Survey
Figure 4: USGS Geology Map
Figure 5: Soils Classification Chart
Figure 6: Test Pit Logs
Approximate Site Location
Not to Scale
DEVELOPMENT
ENGINEERING, PLLC
P.O. Box 446
Tacoma, WA 98401
Ph (253) 228-0513
www.de-civil.com
Site Vicinity Map
Zwicker Short Plat
11427 SE 162nd Street
Renton, Washington
Job No: 14-036 December 2016 Figure 1
DEVELOPMENT
ENGINEERING, PLLC
P.O. Box 446
Tacoma, WA 98401
Ph (253) 228-0513
www.de-civil.com
Site Plan
Zwicker Short Plat
11427 SE 162nd Street
Renton, Washington
Job No: 14-036 December 2016 Figure 2
TP-1 TP-2
DEVELOPMENT
ENGINEERING, PLLC
P.O. Box 446
Tacoma, WA 98401
Ph (253) 228-0513
www.de-civil.com
USDA Web Soil Survey
Zwicker Short Plat
11427 SE 162nd Street
Renton, Washington
Job No: 14-036 December 2016 Figure 3
DEVELOPMENT
ENGINEERING, PLLC
P.O. Box 446
Tacoma, WA 98401
Ph (253) 228-0513
www.de-civil.com
USGS Geologic Map
Zwicker Short Plat
11427 SE 162nd Street
Renton, Washington
Job No: 14-036 December 2016 Figure 4
DEVELOPMENT
ENGINEERING, PLLC
P.O. Box 446
Tacoma, WA 98401
Ph (253) 228-0513
www.de-civil.com
Soils Classification Chart
Zwicker Short Plat
11427 SE 162nd Street
Renton, Washington
Job No: 14-036 December 2016 Figure 5
Test Pit TP-1
Location: (See Figure 2)
Depth (ft.) Soil Type Description
0.0 - 1.0 Topsoil/ sod
1.0 - 4.0 SM Brown silty SAND/silt with gravel (loose, moist)
4.0 – 7.0 N/A Tan Sandstone bedrock dense easily excavated
Terminated at 7.0 feet below ground surface.
Slight caving observed.
slight groundwater seepage encountered at bedrock contact.
Test Pit TP-2
Location: (See Figure 2)
Depth (ft.) Soil Type Description
0.0 - 1.0 Topsoil/ sod
1.0 - 3.0 SM Brown silty SAND/silt with gravel (loose, moist)
3.0 – 6.0 N/A Tan Sandstone bedrock dense eas ily excavated
Terminated at 6 feet below ground surface.
Slight caving observed in upper soils.
No groundwater encountered.
Logged by WGC, 3/6/14
DEVELOPMENT
ENGINEERING, PLLC
P.O. Box 446
Tacoma, WA 98401
Ph (253) 228-0513
www.de-civil.com
Test Pit Logs
Zwicker Short Plat
11427 SE 162nd Street
Renton, Washington
Job No: 14-036 December 2016 Figure 6