HomeMy WebLinkAbout6_SC_Conditions_of_Approval_Checklist_With_Explanations_171113 Cascade Greens Short Plat – Conditions of Approval 1. The applicant shall provide an updated Short Plat plan that provides for the required 5-foot setback between the existing home and the proposed 20-foot wide shared driveway. The Short Plat plan shall be provided to the Current Planning Project Manager for review and approval prior to construction permit issuance. If the setback cannot be met by a revision to the driveway, the Short Plat would not be approved without demolition of the structure or parts of the structure that would bring the home into compliance with the required 5 foot setback. N/A Existing house has been demolished with approved Demo Permit 2. The applicant shall provide detailed landscape plans compliant with RMC 4-8-120 for both on- site and off-site landscaping to the Current Planning Project Manager at the time of construction permit review. The detailed landscape plans shall be reviewed and approved by the Current Planning Project Manager prior to construction permit issuance. Landscape plan has been revised with new tree count 3. The applicant shall provide an updated tree retention plan and tree retention worksheet compliant with RMC 4-8-120. The final tree retention plan shall be provided for review and approval by the Current Planning Project Manager prior to construction issuance. Tree retention has been revised with new tree count 4. The applicant must provide sufficient information to show how the students that walk to school or the nearest high school bus stop would have a safe walking route to the nearby intersection at SE 162nd St and 116th Ave SE and intersection at SE 162nd St and 114th Ave SE where safe walking routes are available. If a safe route to school is not identified to the intersections, then the applicant will be required to provide a safe walking path, which may entail some off-site improvements. A safe walking route to the intersections on either side of the project site shall be identified and approved by the Current Planning Project Manager prior to construction permit application. If off-site improvements are required to accommodate a safe walking rout, such constriction shall be included with the construction permit application and be completed prior to short plat recording. New plan has been drawn and submitted for gravel path and footbridge from CG W. to 114th 5. The applicant shall provide a Geotechnical Report, to be provided to the Current Planning Project Manager and Plan Reviewer, for review and approval as part of construction permit application. If the Geotechnical Report provides different analysis or conclusions than what are stated in the Technical Drainage Report, the Drainage Report and any utility plans shall be updated and provided as part of construction permit application. Included 6. The applicant shall provide Water and Sewer availability certificates from Soos Creek Water and Sewer District with the construction permit application. Included 7. The applicant shall provide a revised short plat plan identifying compliance with the shared driveway standards and emergency access standards, including but not limited to the minimum 5 foot separation from the property line and the 20 foot width. Such plan shall clearly identify the easement location on all proposed lots. The revised plan shall be submitted for review and approval to the Current Planning Project Manager prior to construction permit issuance. Included 8. The applicant shall update all plans that identify the width of private driveway to be consistent with the revised short plat plan. All plans to be revised shall be provided to the Current Planning Project Manager, for review and approval as part of construction permit application. Included 9. All lots shall take access from the proposed shared driveway. A note to this effect shall be recorded on the face of the short plat. Complete 10. The applicant shall remove the carport on the east side of the existing home where the private driveway is to be located and to provide for the required setback between the existing home and driveway. The carport shall be demolished, and documentation of such demolition shall be provided to the Current Planning Project Manager prior to recording of the short plat. N/A Existing house has been demolished with approved Demo Permit