HomeMy WebLinkAboutA_Critical_Areas_Exemption_Signed_Request_20170424_v1DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
7
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Critical Areas Exemption.doc Rev: 2/2017
CRITICAL AREAS EXEMPTION
(FOR SEPA EXEMPT ACTIVITIES)
Planning Division
1055 South Grady Way, Renton, WA 98057
Phone: 425-430-7294 | www.rentonwa.gov
Applicant Name Project Name Phone Number
Parcel Number Project Address
Type of Critical Area Work Occurs in
Critical Area
PURPOSE: Exempt activities provided with a letter of exemption from the Development Services
Administrator may intrude into a critical area or required buffer (subject to any conditions or
requirements provided by the Administrator).
APPLICABILITY OF EXEMPTIONS: The following is a general list of activities that may be exempt from
the critical areas regulations. More specific descriptions of the activities are contained in the Critical
Areas Regulations. Some of the listed activities may not be exempt in certain critical areas. The Planning
Division will evaluate your request according to the City of Renton Critical Areas Regulations in RMC 4-3-
050C, J, L, and N.
I AM REQUESTING A CRITICAL AREAS EXEMPTION FOR ONE OR MORE OF THE FOLLOWING ACTIVITIES:
Conservation, Enhancement, and Related Activities:
Conservation or preservation of soil, water, vegetation, fish, and other wildlife
Enhancement activities as defined in RMC 4-11
Any critical area and/or buffer restoration, or other mitigation activities that have been
approved by the City
Research and Site Investigation:
Nondestructive education and research
Site investigative work necessary for land use application submittals such as surveys, soil
logs, etc.
WSDOT Attn: Linda Cooley I-405/SR 167 Direct Connector Project 425-456-8586
State roadway R/W at I-405/SR 167 I/C construction office: 3000 E Valley Road, Renton, WA 98057
Bellevue address: 600 108th Ave NE Suite 400, Bellevue, WA 98004
Brief Description of Project
This exemption is necessary to allow trucks to access an existing haul road from the northbound on-ramp to I-405 from
northbound SR 167. The temporary access road will impact 5,321 square feet of Panther Creek wetland buffer. The
temporarily disturbed areas will be re-vegetated with indigenous plants appropriate to the site conditions.
wetland buffer x Work Occurs
in Buffer
8
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Critical Areas Exemption.doc Rev: 2/2017
Agricultural, Harvesting, and Vegetation Management:
Harvesting wild foods
Existing/Ongoing agricultural activities
Removal of dead, terminally diseased, damaged, or dangerous ground cover or hazardous
trees which have been certified as such by a forester, registered landscape architect, o r
certified arborist
Surface Water Alteration:
New surface water discharges provided the discharge meets the requirements of the
Storm and Surface Water Drainage Regulations
New or modified regional storm water facilities
Flood hazard reduction
Roads, Parks, Public and Private Utilities:
Relocation of Existing Utilities out of Critical Area and Buffer
Maintenance, operation, and repair of existing parks, trails, roads, facilities, and utilities
Installation, construction, replacement, or operation of utilities, traffic control, and
walkways within existing improved right-if-way or easement
Modification of existing utilities and streets by 10% or less
Management and essential tree removal for public or private utilities, roads and public
parks
Wetland Disturbance, Modification, and Removal:
Any activity in small Category 3 wetlands
Temporary disturbances of a wetland due to construction activities that do not include
permanent filling
Maintenance and Construction for Existing Uses and Facilities:
Remodeling, replacing, or removing existing structures
Normal and routine maintenance and repair of any existing public or private uses and
facilities where no alteration of the critical area and required buffer or additional fill
materials will be placed
Construction activity connected with an existing single family residence or garage,
provided that no portion of the new work occurs closer to the critical area or required
buffers than the existing structure and/or the developed area of the site
Existing activities which have not been changed, expanded or altered provided they
comply with the applicable requirements of RMC 4-10
Emergency Activities:
Removal of trees or ground cover by a City department, agency, public, or private utility in
an emergency situation
Public interest emergency use, storage, and handling of hazardous materials by
governmental organizations in an Aquifer Protection Area
ADDITIONAL PERMITS: Additional permits from other agencies may be required. It is the applicant’s
responsibility to obtain these other approvals. Information regarding these other requirements may be
found at http://apps.oria.wa.gov/opas/.
9
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Critical Areas Exemption.doc Rev: 2/2017
I, the undersigned, declare under penalty of perjury under the laws of the State of Washington, that to
the best of my knowledge the above information is true and complete.
Applicant Signature: Date:
For City Use Only
Exemption Granted Exemption Denied
Jennifer Henning, Planning Director
Department of Community & Economic Development
Date
Conditions of Approval:
April 24, 2017