HomeMy WebLinkAboutExhibit_8_Construction_MitigationPreliminary Construction Mitigation Plan
For
Cedar Ridge Short Plat
Proposed Construction Dates (begin and end dates):
Based on this preliminary short plat application date, we anticipate construction permits for
utilities and plat infrastructure (roads, sidewalks, etc.) to be finalized later this year (2017) to early
next year (2018). Based on that timeline, we anticipate utility and plat infrastructure construction
to begin in the Spring of 2018 and end during the summer of 2018. Home construction on the lots
should begin during the summer of 2018 and run through at least the winter of 2018 and possibly
longer, depending on lot sales.
Hours and Days of Operation:
Construction activities will be limited to the hours between 7:00am and 8:00pm, Monday through
Friday and 9:00am and 8:00pm Saturday. In addition, haul hours are limited to the hours between
8:30am and 3:30pm on Saturdays, unless approved in writing in advance by the development
services division. No work permitted on Sundays.
Proposed Hauling/Transportation Routes:
The site is accessible from two directions. From the south via 156th Avenue SE / Maple Valley
Highway / I-405 and from the north via 156thAvenue SE / NE 4th Street / I-405.
Measures to be implemented to minimize dust, traffic and transportation impact, erosion,
mud, noise and other noxious characteristics:
Water Truck, Temporary Erosion Control Plan, BMPs, construction proposed during City of
Renton permitted work hours.
Any special hours proposed for construction or hauling (i.e. weekends, late nights):
No special hours for construction or hauling are anticipated or proposed at this time.
Preliminary Traffic Control Plan:
Site is located along SE 2nd Place (classified residential access) at the intersection with 156th
Avenue SE (classified Minor Arterial). Anticipate “construction ahead” warning signs north and
south of the project along 156th Avenue SE and on SE 2nd Place west of the project site. Flaggers
and additional signage will be provided when work is required in either right-of-way. Construction
staging / parking will be limited to on-site and along SE 2nd Place. Site will be accessed from SE
2nd Place.
Final Traffic Control Plan will be provided at the time of Engineering approval.