Loading...
HomeMy WebLinkAboutCA_Bond Quantity Worksheet_Emerald Crest Department of Permitting and Environmental Review 35030 SE Douglas Str, Suite 210 Snoqualmie, WA 98065-9266 206-296-6600 TTY Relay: 711 Date:11/14/2016 Prepared by: Project Number: 160707 Applicant:Phone:206-508-6650 ext. 3604 PLANT MATERIALS (includes labor cost for plant installation) Type Unit Price Unit Quantity Cost PLANTS: Potted, 4" diameter, medium $5.00 Each 90.00 $ 450.00 PLANTS: Container, 1 gallon, medium soil $11.50 Each 275.00 $ 3,162.50 PLANTS: Container, 2 gallon, medium soil $20.00 Each 20.00 $ 400.00 PLANTS: Container, 5 gallon, medium soil $36.00 Each 0.00 $ - PLANTS: Seeding, by hand $0.50 SY 1166.00 $ 583.00 PLANTS: Slips (willow, red-osier)$2.00 Each 0.00 $ - PLANTS: Stakes (willow)$2.00 Each 180.00 $ 360.00 PLANTS: Stakes (willow)$2.00 Each 0.00 $ - PLANTS: Flats/plugs $2.00 Each 0.00 $ - TOTAL $ 4,955.50 Type Unit Price Unit Cost Compost, vegetable, delivered and spread $37.88 CY 0.00 $ - Decompacting till/hardpan, medium, to 6" depth $1.57 CY 0.00 $ - Decompacting till/hardpan, medium, to 12" depth $1.57 CY 150.00 $ 235.50 Hydroseeding $0.51 SY 0.00 $ - Labor, general (landscaping other than plant installation)$40.00 HR 3.00 $ 120.00 Labor, general (construction)$40.00 HR $ - Labor: Consultant, supervising $55.00 HR 12.00 $ 660.00 Labor: Consultant, on-site re-design $95.00 HR 0.00 $ - Rental of decompacting machinery & operator $70.00 HR 8.00 $ 560.00 Sand, coarse builder's, delivered and spread $42.00 CY 0.00 $ - Staking material (set per tree)$7.00 Each $ - Surveying, line & grade $250.00 HR 0.00 $ - Surveying, topographical $250.00 HR 0.00 $ - Watering, 1" of water, 50' soaker hose $3.62 MSF 48.00 $ 173.76 Irrigation - temporary $3,000.00 Acre 0.20 $ 600.00 Irrigation - buried $4,500.00 Acre 0.00 $ - Tilling topsoil, disk harrow, 20hp tractor, 4"-6" deep $1.02 SY 0.00 $ - TOTAL $ 2,349.26 ITEMS Unit Cost Unit Cost Fascines (willow) $ 2.00 Each 0.00 $ - Logs, (cedar), w/ root wads, 16"-24" diam., 30' long $1,000.00 Each 0.00 $ - Logs (cedar) w/o root wads, 16"-24" diam., 30'$400.00 Each 0.00 $ - Logs, w/o root wads, 16"-24" diam., 30' long $245.00 Each 0.00 $ - Logs w/ root wads, 16"-24" diam., 30' long $460.00 Each 0.00 $ - Rocks, one-man $60.00 Each 0.00 $ - Rocks, two-man $120.00 Each 0.00 $ - Root wads $163.00 Each 0.00 $ - Spawning gravel, type A $22.00 CY 0.00 $ - Weir - log $1,500.00 Each 0.00 $ - Weir - adjustable $2,000.00 Each 0.00 $ - Woody debris, large $163.00 Each 0.00 $ - Snags - anchored $400.00 Each 0.00 $ - Snags - on site $50.00 Each 0.00 $ - Snags - imported $800.00 Each 0 $ - * All costs include delivery and installation TOTAL $ - EROSION CONTROL ITEMS Unit Cost Unit Cost Backfill and Compaction-embankment $ 4.89 CY 0.00 $ - Crushed surfacing, 1 1/4" minus $30.00 CY 0.00 $ - Ditching $7.03 CY 0.00 $ - Excavation, bulk $4.00 CY 150.00 $ 600.00 Fence, silt $1.60 LF 240.00 $ 384.00 Jute Mesh $1.26 SY 0.00 $ - Mulch, by hand, straw, 2" deep $1.27 SY 0.00 $ - Mulch, by hand, wood chips, 2" deep $3.25 SY 0.00 $ - Mulch, by machine, straw, 1" deep $0.32 SY 0.00 $ - Piping, temporary, CPP, 6"$9.30 LF 0.00 $ - Piping, temporary, CPP, 8"$14.00 LF 0.00 $ - Piping, temporary, CPP, 12"$18.00 LF 0.00 $ - Plastic covering, 6mm thick, sandbagged $2.00 SY 0.00 $ - Rip Rap, machine placed, slopes $33.98 CY 0.00 $ - Rock Constr. Entrance 100'x15'x1'$3,000.00 Each 0.00 $ - Rock Constr. Entrance 50'x15'x1'$1,500.00 Each 0.00 $ - Sediment pond riser assembly $1,695.11 Each 0.00 $ - Sediment trap, 5' high berm $15.57 LF 0.00 $ - Sediment trap, 5' high berm w/spillway incl. riprap $59.60 LF 0.00 $ - Sodding, 1" deep, level ground $5.24 SY 0.00 $ - Sodding, 1" deep, sloped ground $6.48 SY 0.00 $ - Straw bales, place and remove $600.00 TON 0.00 $ - Hauling and disposal $20.00 CY 150.00 $ 3,000.00 Topsoil, delivered and spread $35.73 CY 0.00 $ - TOTAL $ 3,984.00 INSTALLATION COSTS ( LABOR, EQUIPMENT, & OVERHEAD) Critical Areas Mitigation Bond Quantity Worksheet Description The Watershed Company Project Description: Wetland Restoration Plan Project Name: Emerald Crest HOA Location: Renton, Washington Emerald Crest HOA HABITAT STRUCTURES* CA Remove fill Site Clean up 16 weeks in summer 3 years C24 09/09/2015 ls-wks-sensareaBQ.xls ls-wks-sensareaBQ.pdf GENERAL ITEMS ITEMS Unit Cost Unit Cost Fencing, chain link, 6' high $18.89 LF 0.00 $ - Fencing, chain link, corner posts $111.17 Each 0.00 $ - Fencing, chain link, gate $277.63 Each 0.00 $ - Fencing, split rail, 3' high (2-rail)$10.54 LF 115.00 $ 1,212.10 Fencing, temporary (NGPE)$1.20 LF 0.00 $ - Signs, sensitive area boundary (inc. backing, post, install)$28.50 Each 3.00 $ 85.50 TOTAL $ 1,297.60 $ 12,586.36 ITEMS Percentage of Construction Cost Unit Cost Mobilization 10%1 $ 1,258.64 Contingency 30%1 $ 3,775.91 TOTAL $ 5,034.54 MAINTENANCE AND MONITORING Maintenance, annual (by owner or consultant) Less than 1,000 sq.ft. and buffer mitigation only $ 1.08 SF 0.00 $ - Less than 1,000 sq.ft. with wetland or aquatic area mitigation $ 1.35 SF 0.00 $ - Larger than 1,000 sq. ft. but less than 5,000 sq.ft. of buffer mitigation $ 180.00 EACH 5.00 $ 900.00 Larger than 1,000 sq. ft. but less than 5,000 sq.ft. of wetland or aquatic area mitigation $ 270.00 EACH 0.00 $ - Larger than 5,000 sq.ft. but < 1 acre -buffer mitigation only $ 360.00 EACH 0.00 $ - Larger than 5,000 sq.ft. but < 1 acre with wetland or aquatic area mitigation $ 450.00 EACH 0.00 $ - Larger than 1 acre but < 5 acres - buffer and / or wetland or aquatic area mitigation $ 1,600.00 DAY 0.00 $ - Larger than 5 acres - buffer and / or wetland or aquatic area mitigation $ 2,000.00 DAY 0.00 $ - Monitoring, annual (by owner or consultant) Larger than 1,000 sq.ft. but less than 5,000 wetland or buffer mitigation $ 720.00 EACH 6.00 $ 4,320.00 Larger than 5,000 sq.ft. but < 1 acre with wetland or aquatic area impacts $ 900.00 EACH 0.00 $ - Larger than 1 acre but < 5 acres - buffer and / or wetland or aquatic area impacts $ 1,440.00 DAY 0.00 $ - Larger than5 acres - buffer and / or wetland or aquatic area impacts $ 2,160.00 DAY 0.00 $ - TOTAL $ 5,220.00 Total $22,840.90 NOTE: Projects with multiple permit requirements may be required to have longer monitoring and maintenance terms. This will be evaluated on a case-by- case basis for development applications. Monitoring and maintance ranges may be assessed anywhere from 5 to 10 years. (Construction Cost Subtotal) OTHER (10 hrs @ $90/hr) (4hr @$45/hr) (8 hrs @ 45/hr) (3 X SF total for 3 annual events; Includes monitoring) (3 X SF total for 3 annual events; Includes monitoring) (6hr @$45/hr) (16 hrs @ $90/hr) (24 hrs @ $90/hr) (10 hrs @ $45/hr) (WEC crew) (1.25 X WEC crew) (8 hrs @ 90/hr)