Loading...
HomeMy WebLinkAboutNOA_DNSM_Fire_Station_15_171002_Email If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: Error! Reference source not found. / Error! Reference source not found. NAME: MAILING ADDRESS: CITY/STATE/ZIP: TELEPHONE NO.: NOTICE OF APPLICATION AND PROPOSED DETERMINATION OF NON-SIGNIFICANCE- MITIGATED (DNS-M) A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: October 2, 2017 LAND USE NUMBER: LUA17-000632, ECF, CU-H, SA-A, MOD PROJECT NAME: Fire Station 15 PROJECT DESCRIPTION: The applicant is requesting Administrative Site Plan Review, Hearing Examiner Conditional Use Permit, State Environmental Policy Act (SEPA) Review, and a street modification request for the construction of a new fire station (Fire Station 15) in the Kennydale Neighborhood. The 1.09-acre site is located at 1404 N 30th St. The vacant parcel is currently a split zoned parcel. Approximately the first 120 feet of the property from N 30th St is located within the Commercial Neighborhood (CN) zoning classification and Residential High Density (RHD) land use designation. The north portion of the property is located within the Residential-6 (R-6) zoning classification and Residential Medium Density (RMD) land use designation. Improvements to property include a new 7,497 square foot fire station at the south part of the lot and a new water reservoir at the northern portion of the lot. The two projects are proposing to share an access drive along the west side of the property and a second driveway would be located closer to the east property line for fire truck exiting. The site slopes from north to south from approximately 226 feet to 208 ft (18 feet). The site is located within the Wellhead Protection Area Zone 2. The two projects would be constructed in two phases. Construction of the fire station would begin in February 2018 and end on December 2018. Exterior improvements include parking, driveways, landscaping, pedestrian sidewalks, and stormwater improvements. The applicant has identified 21 significant trees onsite and proposes to retain one (1) tree along the west side of the property. The following reports have been submitted with the land use application: Preliminary Technical Information Report, Arborist Tree Assessment, Trip Generation Assessment, and Geotechnical Report. PROJECT LOCATION: 1404 N 30th St, Renton, WA 98056 / APN 3342103245 OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS- M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance- Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14- day appeal period will follow the issuance of the DNS-M. PERMIT APPLICATION DATE: September 22, 2017 NOTICE OF COMPLETE APPLICATION: October 2, 2017 APPLICANT: Michael Kirk, City of Renton Director of Facilities, 1055 S Grady Way, Renton, WA 98057 / MKirk@rentonwa.gov / 425-430-6605 PROJECT CONTACT PERSON: Mary Jo Lux, Schreiber Starling Whitehead Architects, 901 5th Ave Seattle, WA 98164 / lux@sswarchitects.com / 206-682-8300 Permits/Review Requested: Environmental (SEPA) Review, Administrative Site Plan Review, Hearing Examiner Conditional Use Permit, and Street Modification Other Permits which may be required: Construction Permit, Fire Permit, Building Permit, Mechanical Permit, Electrical Permit, Right-of-Way Use Permit, Sign Permit Requested Studies: Preliminary Technical Information Report, Arborist Tree Assessment, Trip Generation Assessment, and Geotechnical Report Location where application may be reviewed: Department of Community & Economic Development (CED) – Planning Division, Sixth Floor Renton City Hall, 1055 S Grady Way, Renton, WA 98057 PUBLIC HEARING: Public hearing is tentatively scheduled for November 21, 2017 before the Renton Hearing Examiner in Renton Council Chambers at 11:00 AM on the 7th floor of Renton City Hall located at 1055 South Grady Way. CONSISTENCY OVERVIEW: Zoning/Land Use: The subject site is designated Residential High Density (RHD) / Residential Medium Density (RMD) on the City of Renton Comprehensive Land Use Map and Commercial Neighborhood (CN) / Residential-6 (R-6) on the City’s Zoning Map. Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-2-120A; 4-4; 4-6- 060; 4-9-030; 4-9-070; 4-9-200; and 4-9-250 and other applicable codes and regulations as appropriate. Proposed Mitigation Measures: The following Mitigation Measures will likely be imposed on the proposed project. These recommended Mitigation Measures address project impacts not covered by existing codes and regulations as cited above.  The applicant shall comply with the recommendations included in the Geotechnical Engineering Report, prepared by HWA GeoSciences Inc. (HWA) dated August 31, 2017, or an updated report submitted at a later date. Comments on the above application must be submitted in writing to Clark Close, Senior Planner, CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on October 16, 2017. This matter is also tentatively scheduled for a public hearing on November 21, 2017, at 11:00 AM, Council Chambers, Seventh Floor, Renton City Hall, 1055 S Grady Way, Renton. If you are interested in attending the hearing, please contact the Planning Division to ensure that the hearing has not been rescheduled at (425) 430-6578. Following the issuance of the SEPA Determination, you may still appear at the hearing and present your comments regarding the proposal before the Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional informatio n by mail, please contact the project manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION 2 2 1 222 226 224 223 218 2 1 7 216 214 213 209208 2132 12211209208 207 220 2 2 5 215 21013+00 14+00 Site Plan Legend PROPERTY LINE EXISTING TOPO LINES - SEE SURVEY UTILITIES - SEE CIVIL 215 NON-PERMEABLE CONCRETE PAVING - SEE CIVIL PERMEABLE CONCRETE PAVING - SEE CIVIL ASPHALT PAVING - SEE CIVIL Site Notes 1. Construction limits, spot elevations, grades and site utilities indicated for reference only, see Civil drawings for requirements. 2. Paving indicated for reference only, see Civil and Landscape drawings for requirements. 3. Landscaping indicated for reference only, see Landscape drawings for requirements. 4. Electrical site utilities described for reference only, see Electrical drawings for requirements. 5. Comply with City of Renton requirements for all Work in ROW. 6. Provide construction fence at limits of construction. Minimum fence height shall be six feet. Provide gates as necessary. 7. Field verify all relevant existing conditions and dimensions prior to the start of Work. Notify Architect immediately of any discrepancies. 8. Protect all existing conditions to remain on site and adjacent to Work area. Notify Architect of any damage to existing condtions to remain and restore or replace to original condition. 9. Confirm all underground utility locations prior to the start of Work and protect all existing conditions to remain. 10.Confirm locations of adjacent overhead utilites and protect all existing conditions to remain. A4.01 5 NORTH 30TH STREET PROJECT SEPARATION LINE RETAINING WALL 15' REAR SETBACK 10-FT LANDSCAPE BUFFERPATIO SLIDING SECURITY GATE FLAGPOLE RETAINING WALL PROPOSED FIRE STATION #15 CONCRETE RETAINING WALL FIRE HYDRANT PATIO FIREFIGHTER ENTRANCE GENERATOR TRASH ENCLOSURE PROPERTY LINE TYP FUTURE ROW ROAD EXTENSION SETBACK POST MOUNTED KEY PAD FENCE & MAN GATE 40' - 0 5/8"11' - 0"11' - 0"156' - 11 3/4" ROW CL SIDEWALK 21' - 10 3/16"21' - 11 9/16"43' - 9 3/4"8' - 0 7/16"(E) UTILITY POLE16' - 2"8' - 0"8' - 0"8' - 0"7' - 4"NEW FENCE AT EAST PROPERTY LINE NEW FENCE AT WEST PROPERTY LINE NEW FENCE AT NORTH PROPERTY LINE ADA PARKING SIGN CONCRETE APRON302' - 9 1/4"302' - 9 1/4"PARCEL: 334210-3245 ZONE: CN PROPERTY LINE / ZONE CHANGE CN ZONER-6 ZONECN ZONEPROPOSED CN ZONE(CURRENT R-6 ZONE)LIGHT POLE- SEE ELECT CONCRETE APRON BIKE RACK PROPOSED CONSTRUCTION TRAILER LOCATION ENCLOSURE SCREENINGFS #15RESERVOIRCONCRETE CURB RETAINING WALL @ PROP LINE- SEE CIVIL TYPICAL CURB- SEE CIVIL SLIDING GATE MOTOR PUBLIC PARKING (E) STORM DRAIN TO BE RELOCATED- SEE CIVIL 30' - 0 5/8"7 G 15' - 0"52' - 0"LOCATE BUILDING AT GRID INTERSECTION G-7. SEE CIVIL FDC PROPOSED RESERVOIR 10' - 0" 6" 16' - 0" 6" 6"6"24' - 0"20' - 0"4' - 6" 4' - 6"6"20' - 0"6"18' - 0"24' - 0"TYP 9' - 0" AREA SEPARATION LINE STEPPING STONES- SEE LANDSCAPE 14' - 2 5/8" 38' - 6 13/16" Client Project No: Date: SSW Architects Project No: CAG-17-046 17001 COR Permit No: A1.01 Site Plan Conditional Use Permit Fire Station 15 August 18, 2017 N Scale: 1" = 20'-0"A1.01 Site Plan2