Loading...
HomeMy WebLinkAboutPRE_PreApp_Meeting_Comments_COR_2017-05-18_170829_v1N I V 101 XOTLUL 1 U67, L� i-•. of • & Economic Developme' Planning Division I Contact Information: Planner: Clark H. Close, 425-430-7289 Public Works Plan Reviewer: Ian Fitz -James, 425-430-7288 Fire Prevention Reviewer: Corey Thomas, 425-430-7024 Building Department Reviewer: Craig Burnell, 425-430-7290 Please retain this packet throughout the course of your project as a reference. Consider giving copies of it to any engineers, architects, and contractors who work on the project. You will need to submit a copy of this packet when you apply for land use and/or environmental permits. Pre-screening: When you have the project application ready for submittal, call and schedule an appointment with the project manager to have it pre-screened before making all of the required copies. The pre -application meeting is informal and non-binding. The comments provided on, the proposal are based on the codes and policies in effect at the time of review. The applicant is cautioned that the development regulations are regularly amended and the proposal will be formally reviewed under the regulations in effect at the time of project submittal. The information contained in this summary is subject to modification and/or concurrence by official decision -makers (e.g., Hearing Examiner, Planning Director, Development Services Director, Department of Community & Economic Development Administrator, Public Works Administrator and City Council). AUTHORITY �� � N� �� � � �� �� KU �� "~" �~ "°" =~ ^^ ^~ ~~ ~� ~~ ^~~ DATE: May 1Q,ZO17 TO: Clark Close, Senior Planner FROM: Corey Thomas, Fire Plans Reviewer/inspector III SUBJECT: Fire Station 15 and N 30th 1. Preliminary fire flow is 1,750 gpm. Two fire hydrants are required. One within 150 -feet and one within 300 -feet. One hydrant exists across the street. One new hydrant shall be provided and be within 50 -feet of the fire department connection for the fire sprinkler system. 2. Approved fire sprinkler and fire alarm systems are required throughout all the buildings. Direct outside access is required to the fire sprinkler riser room. Fire alarm system is required to befully addressable and full detection is required. Separate pians and permits required bythe fire department. ]. Fire department apparatus access roadways are required within 150 -feet of all points on the building. Fire lane signage required for the on-site roadway. Required turning radius are 25 -feet inside and 45 -feet outside. Roadways shall be a minimum of 20 -feet wide. Roadways shall support a minimum of a 30 -ton vehicle and 75 -psi point loading. 4. Separate plans and permits are required for any proposed fuel tanks for on-site generators. DATE: May 18,2O17 TO: Clark Close, Senior Planner FROM: Ian Fitz-Jmnnes,Civil Plan Reviewer SUBJECT: Utility and Transportation Comments for Kennvda|eReservoir and Fire Station #15 PRE 17-000172 non- binding and may be subject to modification and/or concurrence by official City decision -makers. Review comments may also need to be revised based on site planning and other design changes required by City staff or made | have completed apreliminary review ofthe application for the proposed Kennydale Reservoir and Fire Station #15located at14O4N.3OmStreet (KC Parcel ID: 33421O3J45). The City ofRenton isplanning to short plat the property into two lots with one lot used for a 1.29 million gallon water reservoir and the other lot used for a new fire station for the Renton Regional Fire Authority. WATER COMMENTS 1. Water service is provided by the City ofRenton. bisinthe Valley service area inthe 435' hydraulic pressure zone. The approximate static water pressure is9Qpsi ataground elevation 2. There isonexisting 12"water main south ofthe site inN.3Oth Street that can deliver 2,8)O gallons per minute (oon). Reference Project File WTR27OO4S6inCOR Maps for record drawings. The site is served by an existing 3/4" domestic water service. This service may be reused for the new fire station. H Ma PREl7-0OO17ZCivil Pre -App ' xennvualeReservoir and Fire Station #1S-pxczr-0oo1rz Page zo,s BelowMay 18, 2017 basummary of the existing fire hydrants in the vicinity of the site. Installation of additional fire hydrants or retrofit of existing fire hydrants may be required by the Renton Regional Fire Authority. a. on the southern frontage ofN.30th Street south across the street from the site (COR Facility ID HYD -N-00001). b. At the southwest corner of the intersection of N. 30th Street and the Interstate 405 ramps (COR Facility 0 . c At the southeast corner of the intersection of Park Avenue N. and N. 30th Street approximately 250' west of the site (COR Facility ID HYD -N-00174). 4. Based on the review of the information submitted for the pre -application, the Renton Regional Fire Authority has determined that the preliminary fire demand for the development is 1,750 gpnn. 5. Afire sprinkler stub with adouble detector check valve assembly / inanexterior underground vault within private property per COR Standard Plan 360.2 shall be installed for backflow prevention for the fire station. The DDCl/Amay beinstalled inthe building ifitmeets the conditions as shown on COR Standard Plan 360.5 for the installation of DDCVA inside a building. The fire department connection (FDQ shall be within 50'of a fire hydrant or in a location approved bythe Renton Regional Fire Authority. Apost indicator valve (P|V) per City standards isrequired onthe fire line. The fire sprinkler stub and appurtenance shall besized bv aregistered fire sprinkler designer/ contractor. 6. Areduced pressure backflow assembly(RPBA) shall beinstalled behind the existing meter within private property. The RPBAshall beinstalled inside anabove ground heated enclosure per COR Standard Plan 35O.2. The RPBAmay belocated inside the building ifadrainage outlet for the relief valve is provided and the location is approved by the City Plan Reviewer and City Water Utility Department. 7. A separate meter is required for landscape irrigation per COR Standard Plan 320.1. Adouble check valve assembly (DCVA)onprivate propertyisrequired behind the meter per COR Standard Plan ]4O.Q. 8. New water mains to serve reservoir shall be located in a water/ utilities easement where it passes through the tract. 9. Aseparate meter isrequired for landscape irrigation per COR Standard Plan 32O.1. Adouble check valve assembly (DCVA) on private property is required behind the meter per COR Standard Plan ]4O.8. 10. Water system improvements shall be designed inaccordance with AppendixJof the City's 2012 Water System Plan. Adequate horizontal and vertical separation between new water mains and other existing and proposed utilities (sewer lines, storm drains, gas lines, power and communication ducts) shall be provided for the operation and maintenance of the water main. H:\CED\P|anninA\[urren P|anninQ\PREAPPS\2017 PREI7-00Ul7ZCivil Pre -App Kennydale Reservoir and Fire Station #15 — PRE17-000172 Page 3 of 5 May 18, 2017 Retaining walls, rockeries, or similar structures cannot be installed over the water main unless the water main is installed inside of a steel casing. 11. The site is located within Zone 2 of the City's Aquifer Protection Area. 12. Per RMC 4-1-18013-2b, City -owned properties are exempt from all system development charges. SEWER COMMENTS 1. Sewer service is provided by the City of Renton. There is an existing 8" concrete sewer flowing from east to west south of the site in N. 30th Street. Reference Project File WWP2700179 in COR Maps for record drawings. There is also an existing 8" concrete sewer flowing from north to south along the eastern boundary of the site. The sewer begins at a manhole (COR Facility ID MH3489) approximately 130' feet north of the site's southeast corner. Reference Project File WWP2700179 in COR Maps for record drawings. The sewer is located in a 10' sewer easement along the property line. 2. The new side sewer far the fire station shall be a minimum of 6" and shall run at a slope of at least 2%. 3. All wastewater from proposed garage areas shall be routed through a City approved oil/water separator prior to discharge into the sewer main. 4. Per RMC 4 -1 -180B -2b, City -owned properties are exempt from all system development charges. STORM DRAINAGE COMMENTS 1. The project site is currently vacant. The site consists of grassy areas with some trees scattered throughout. The site slopes gently from the northeast to the southwest. There is no existing on-site conveyance system. There is an existing 12" piped conveyance system along the N. 301h Street frontage. The City does not have record drawings for this system. 2. Drainage plans and a drainage report complying with the adopted 2017 Renton Surface Water Design Manual (RSWDM) will be required. 3. Refer to Figure 1.1.2.A —Flow Chart in the RSWDM to determine what type of drainage review is required for this site. The site falls within the City's Peak Rate Flow Control Standard (Existing Conditions). The site falls within the East Lake Washington drainage basin. 4. On-site BMPs satisfying Core Requirement #9 in the RSWDM will be required for the site. 5. Enhanced basic water quality treatment is required for this site. 6. New storm drain shall be designed and sized in accordance with the standards found in Chapter 4 of the 2017 RSWDM. The sizing of new storm systems must account for any off-site tributary area that may be conveyed by the new storm system. H:\CED\Planning\Current Planning\PREAPPS\2017 Preapps\17-000172.Clark\17-0518 PRE17-000172 Civil Pre -App Comments.docx xennyualeReservoir and Fire Station ms-pxczr-0ooz7z ` Page 4mr5 ` May 18, 2017 _ 7. Storm drainage improvements along public street frontages are required to conform to the city's street standards. 0. Ageotechnical report for the site isrequired. Information onthe water table and soil permeability (i.e. infiltration testing), with recommendations of appropriate on-site BMP options with typical designs for the site from the geotechnical engineer, shall be submitted with the land use application. The soils report shall have all ofthe required information listed in Section C of the RSWDM. A Construction Stormwater General Permit from the Washington Department of Ecology is required as site clearing will disturb more than one acre. 10.Per RMC 4-1-18OB-2b, are exempt from all system development dharges. TRANSPORTATION/STREET COMMENTS 1. The transportation impact fees do not apply to this project. 2. N.3OmStreet bclassified asaminor arterial. The current street section consists ofapavement section ofapproximately 4Z inwidth with a[i5'curb and 5'concrete sidewalk along each side ofthe roadway. Per the King County Assessor's Map, the existing right of way width for the portion ofN.]iY»street adjacent tothe site is6O/. Per RMC 4-6-060, the minimum right of way width for eminor arterial with four lanes b91'. The paved roadway width isS4'consisting of4-11'travel lanes and 3—S/bike lanes. AO.57 curb, 8' planter, 8' sidewalk, and 2' clear behind sidewalk are required along each side of the pavement. A right of way dedication of 15.5' would be required to provide the half right of way width. The City's Transportation Department has looked atthis portion of N. 30th Street and recommends keeping the curb line inthe established location. The City would support astreet modification to keep the existing concrete curb and concrete sidewalk in place. Right ofway dedication would be required to account for future improvements consisting of an 8' planter, 8' sidewalk and 2' behind the back of sidewalk. A right of way dedication of approximately 11' would berequired toaccommodate future right ofway improvements. Final right ofway dedication would be determined by survey. Astreet modification toleave the existing frontage improvements in place and use the modified right of way width should be submitted with the site plan submittal. The drive aisle tract shall conform to the shared driveway standards found in RMC 4-6-060. Shared driveways shall bewholly inatract. Share driveways shall not bemore than 3OO'in length. The paved surface shall beaminimum ofl6/but may beupto2D'tomeet Renton Regional Fire Authority standards. The maximum grade ofthe shared driveway shall not exceed 1596. Drainage improvements per City standards are required along the shared driveway. H:\[ED\Pbnning\Curren P|annin«\PREAPPS\2017 1OPRE17-0OU17ZCivil Pre -App Kennydale Reservoir and Fire Station #1a-pncz7*ooz7z Page Sm3 May 18, 2017 ' -^ 4. ATraffic Impact Analysis (TIA) as the ITE manual does not recognize this use as having a trip generation high enough to publish. S.Street lighting per City standards is required along the N.30th Street frontage. Astreet lighting analysis and plan shall be submitted with the construction permit. 6 Paving and trench restoration within the City of Renton right of way shall comply with the City's Street Restoration and Overlay requirements. GENERAL COMMENTS 1. The fees listed are for 2017 The fees that are current at the time of the respective permit issuance will be levied. Please see the City of Renton website for the current fee schedule. 2. All new utility lines (i.e. electrical, phone, and cable services, etc>within the site must be underground. The construction of franchise utilities must be inspected and approved by the City of Renton franchise inspector. 3. Retaining walls that are 4' or taller from bottom of footing and stormwater detention vaults will require aseparate building permit. Structural calculations and plans prepared bvalicensed engineer will berequired aspart ofthe building permit review. 4. All civil plans shall conform to the current City of Renton survey and drafting standards. Current drafting standards can be found on the City of Renton website. S. Aseparate plan submittal will berequired for aconstruction permit for utility work and street improvements. All plans shall be prepared by a licensed Civil Engineer in the State of Washington. 6 Please see the City of Renton Development Engineering website for the Construction Permit Application and Construction Permit Process and Submittal Requirements. Please contact the City to schedule a construction permit intake meeting. l All plan review for the City is now paperless. Please see for more information. PRE17-0OU172Civil Pre -App DATE: May 1Q,2O17 TO: Pre -Application File No. l7-OOO172 FROM: Clark H.Close, Senior Planner SUBJECT: Fire Station 15and Kemnyda1eReservoir 1404 N 30th St General: We have completed a preliminary review of the pre -application for the above - referenced development proposal. The following comments on development and permitting issues are based onthe pre -application submittals made tmthe City of Renton by the applicant and the codes in effect #mthe date of review. The applicant is cautioned that information contained in this summary may be subject to modification and/or concurrence by official decision -makers (e.g, Hearing Examiner, Community & Economic Development Administrator, Public Works Administrator, Planning Director, Development Sen/ices Director, and City Council). Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant. The applicant is encouraged to review all applicable sections of the Renton Municipal Code. The Development Regulations are available for purchase for $50.00 plus tax from the Finance Division on the first floor of City Hall or online atvvxvvv.rentonxva.8ov. Project Proposal: The subject property is located at 1404 N 30th St along the west side of 1-405 freeway atExit 6/APN33421O3245>.The project site totals 1.D9acres <47,532sOinarea and is located within the Commercial Neighborhood (CN) and Residentia|-6/R-6\zoning classifications. The CN zoned parcel has a lot size of approximately 19,625 sf and the R-6 zoned parcel has a lot size of approximately 27,907 sf. The pre -application packet indicates that the City -owned parcel is being considered as a condition of the rezoning of the residential |o1 to the east of the site (Parcel No. 3342103240) from R -G to CN as part of the planned Kennyda|e Neighborhood Market and Gas Station Project (PRE16-OOO684). The pre -application packet indicates that the City is moving forward with plans to design and construct new fire station and a water tower for potable drinking water storage on the site. The two projects are a collaboration of the Renton Regional Fire Authority (RRFA), Community Services' Facilities Division and the Public Works Department's Utility Systems Division. Asho,t plat is proposed with a tract for access. A new property line would divide the lot into a northern and southern portion, with the proposed reservoir property in the northern part of the lot. The proposed Ore station building would be a new ±7,500 square foot station to support emergency response operations and periodic training. Fire Station 15 is the result of investments inthe RRF4^ayapproved bvvoters inApril 2O1G. The proposed water tower would be constructed on 24" augercast piles and measures approximately 50 feet in diameter and 100 feet in height, from the tank base to the top of the H:\CED\P|anning\CurnentPlanning\PREAPPS\17-OOO17Z Fire Station 15 and Kennydale Reservoir Page 2 of 9 1404 N 30th St self -supported dome roof (approx. 1.29 MG). The roof would have an access hatch, safety railing, and vent that would increase the overall height of the water tower, from the top of the vent to the reservoir base, to 103 feet. To meet the requirements of the Federal Aviation Administration, some marking lights would be installed on the roof. The project also includes offsite utility improvements to facilitate improvements to the water system, including replacement of the existing water main and construction of pressure reducing valve (PRV) stations within the paved right-of-way. Current Use: The subject parcel is currently vacant or undeveloped with grass lawn and trees, plus some understory plants. Comprehensive Plan Land Use Designation: The proposed fire station is located within the Residential High Density (RHD) land use designation and the water tower is located within the Residential Medium Density (RMD) land use designation. In order for the proposal to be considered under the 2017 Comprehensive Plan Map Amendment (CPA) and email request needs to be sent to City of Renton, Long Range Planning (Paul Hintz). Zoning: The project site is split -zoned. The southern third to one-half is zoned Commercial Neighborhood (CN) and the remainder is zoned Residential -6 (R-6). The water tower would be considered to be Medium Utility: "Moderate scale facilities serving the City, including subregional switching stations (one hundred fifteen (115) kv and smaller), and municipal sewer, water, and storm water facilities not included in a Council -adopted utility system plan." (Requires an Administrative Conditional Use Permit in the R-6 and CN Zones.") Within the R-6 zone, any aboveground public utility facilities, such as water towers, reservoirs, water treatment facilities, and pump stations shall be treated with public art, subject to approval by the Arts Commission. The fire station would be considered to be a City Government Facility: "Facilities of any unit of City government. Types of facilities include community centers, public works maintenance facilities, courts of law, fire halls, and other types of municipal facilities. This definition excludes city government offices, jails, parks, transit centers, park & rides, sewage treatment plants, municipally owned golf course or airports, and libraries." (Requires a Hearing Examiner Conditional Use Permit in all zones.) Development Standards: Following an approved Comprehensive Plan Map Amendment and Rezone of 1404 N 30th St, the future project would be subject to RMC 4-2-120A, "Development Standards for Commercial Zoning Designations" effective at the time of complete application (noted as "R-6 or CN standards" herein). The table below notes the current development standards for the R-6 and CN zones: Type of Standard R-6 CN Minimum Lot Size 7,000 square feet 5,000 square feet Minimum Lot Width 60 feet — interior lot None 70 feet — corner lot Minimum Lot Depth 90 feet None Min Front Yard 25 feet 15 feet the minimum setback may be reduced to 0 ft. through site plan review Max Front Yard None 20 feet* *maximum setback may be modified through the site plan review. H:\CED\Planning\Current Planning\PREAPPS\17-000172 Fire Station 15 and Kennydale Reservoir Page 3 of 9 1404 N 30th St Side Yard Combined 15 ft. with None, except 15 ft. if lot abuts or is adjacent to a lot not less than 5 ft. on zoned residential. either side. Rear Yard 25 feet None, except 15 ft. if lot abuts a lot zoned residential. Side Yard Along -A- 25 feet Min 15 feet; Max 20 feet Street The minimum setback may be reduced to 0 ft. through the site plan review process, provided blank walls are not located within the reduced setback. Building Coverage 40% 65% of total lot area or 75% if parking is provided Ratio within the building or within an on-site parking garage. Maximum 55% N/A Impervious Surface Building Orientation N/A All commercial uses shall have their primary entrance and shop display window oriented toward the street frontage. Maximum Gross N/A 5,000 gross sq. ft. The maximum size shall not be Floor Area of Any exceeded, except by conditional use permit. The Single Commercial maximum requested size/standard change that may Use on a Site be allowed by an Administrative Conditional Use Permit is 20% or 1,000 gross sq. ft. These restrictions do not apply to residential uses subject to net density limitations. Height 24 feet— Wall Plate 35 feet* *Public facilities are allowed height bonuses per RMC 4-2-120C. # of Stories 2 N/A Parking Detached Dwelling: A A minimum and maximum of 2.5 per 1,000 square feet minimum of 2 per of net floor area; except big -box retail sales, which is dwelling unit, however, allowed a maximum of 5.0 per 1,000 square feet of net 1 per dwelling unit may floor area if shared and/or structured parking is be permitted for 1 provided. bedroom or less dwelling units. Bicycle Parking One-half (0.5) bicycle The number of bicycle parking spaces shall be equal to parking space per one ten percent (10%) of the number of required off-street dwelling unit. vehicle parking spaces. On Site Street 10 -feet Frontage Landscaping Tree Retention 30% 10% Other Development Standards: Screening: Screening must be provided for all surface -mounted and roof top utility and mechanical equipment. The site plan application will need to include elevations and details for the proposed methods of screening. See RMC 4-4-095for specific requirements. Refuse and Recycling Areas: Other nonresidential development requires a minimum of three (3) square feet per every one thousand (1,000) square feet of building gross floor area shall be provided for recyclables deposit areas and a minimum of six (6) square feet per one thousand (1,000) square feet of building gross floor area shall be provided for refuse deposit areas. The calculated area for a 7,500 sf nonresidential building is 67.5 sf. However, a total minimum area H:\CED\Planning\Current Plan ni ng\PREAP PS\17-000172 Fire Station 15and KemnydaleReservoir Page 4of9 1404 N30th St of one hundred (100) square feet shall be provided for recycling and refuse deposit areas. The submitted materials do not identif,m refuse and recycling area. A conceptual site plan meeting the requirements of RMC 4-4-090, shall be submitted with the formal land use application. Outdoor refuse and recyc|ab|esdeposit areas and collection points shall not be located in any required setback or landscape areas. Enclosures for outdoor refuse or necyc|ab|es deposit areas/collection points and separate buildings used primarily to contain a refuse or recyc|ab|es deposit area/collection point shall have gate openings at least twelve feet (12') wide for haulers, a self-closing door mechanism, screening, and a roof over the structure. The architectural design of any structure enclosing an outdoor refuse or recyc|ab|es deposit area or any building primarily used tocontain a refuse orrecydab|esdeposit area shall beconsistent with the design of the primary structure on the site as determined by the Development Services Division Director through Site Plan review. Landscaping: All portions of the development area not covered by structures, required parking, access, circulation or service areas, must be landscaped with native, drought -resistant vegetative cover. The rnininnunn on-site landscape width required along street frontages is 10 feet, except where reduced through the site plan development review process. All surface parking lots shall have perimeter landscaping and interior parking lot landscaping meeting the standards ofRMC 4-4-D7O. For projects abutting a less intensive zone or use, a fifteen -foot (15') wide partially sight - obscuring landscaped visual barrier, or ten -foot /10'\ wide fully sight -obscuring landscaped visual barrier, isrequired along common property lines. Please refer to landscape regulations for additional general and specific landscape requirements. ^4conceptual landscape plan and landscape meeting the requirements in RMC 4-8-120D.12, shall bmsubmitted with a land use application and mdetailed landscape plan and landscape analysis shall besubmitted with mbuilding permit application. Significant Tree Retention: Significant trees shall be retained in the following priority order: Priority One: Landmark trees; significant trees that form ocontinuous canopy; significantbees on slopes greater than 20Y6; significant trees adjacent to critical areas and their associated buffers; and significant trees over 6O'/nheight orgreater than 18°caliper. Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; other significant native evergreen ordeciduous trees; and other sign/f native Priority Three: Alders and cottonwoods shall be retained when all other trees have been evaluated for retention and are not able toberetained, unless the alders on6/orcottonwoods are used aspart ofonapproved enhancement project within ocritical area orits buffer. The Administrator may require independent review of any land use application that involves tree removal and land clearing at the City's discretion. Afornna| tree retention plan would be reviewed atthe time ofBuilding Permit application. Please note that all healthy significant trees existing mmthe project site would be required to beconsidered ms part of the tree retention calculations. Fences arRetaining Walls: All fences orretaining walls must bedesignated on the landscape plan and grading plan. A fence and/or wall detail should also be included on the proposed plans. H:\[ED\Planning\CunentPbnning\PREAPPS\17-OUO172 Fire Station 15and KennydaleReservoir Page Sof9 1404N30thSt Afence taller than seven feet (7') requires abuilding permit or a written exemption from the Building official. New or existing fencing would need to comply with RIVIC4-4-D4O. Retaining vva||s shall be composed of brick, rock, textured or patterned concrete, or other masonry product that complements the proposed building and site development. There shall be a minimum three-foot (Y) landscaped setback at the base of retaining walls abutting public rights- of-way. A retaining vva|| that isfour feet /4'\ or taller, as measured by the vertical distance from the bottom of the footing to the finish grade at the top of the vxa||, also requires a building permit. Please refer to retaining wall standards (RIVIC 4-4-040) for additional information. Parking: The applicant will be required otthe time of land use application to provide a parking analysis of the subject site with calculations based on the land use. The applicant is proposing approximately 12 parking spaces for the identified ±7|500 sfstructure. Required parking ratios are not specified in Renton Municipal Code for fire stations ormwater tower and would need to be determined. The applicantwill berequired atthe time mfland use permit tmprovide m parking analysis of the subject site. The analysis would include adequate parking counts and dimensions mfstalls and drive aisles. See RMC 4-4'080fornnore details ° Parking Space Dimensions: It should be noted that the parking regulations specify standard stall dimensions of feet x 20 feet, compact dimensions of8Y2feet x 16 feet and parallel stall dimensions of 9 feet x 23 feet. ADA accessible stalls must be a minimum of 8 feet in width by 20 feet in length, with an adjacent access aisle of 8 feet in width for van accessible spaces. Up to 40 percent of stalls may be compact spaces designated for employee parking, and up to 30 percent of stalls may be compact spaces if designated for all users. The appropriate amount of ADA accessible stalls based on the total number ofspaces must beprovided. Loading: please note that buildings which utilize ground level service or loading doors are required to provide a rnininnunn offorty five feet 445'\ of clear maneuvering area in front of each door. Access: Driveway widths are limited by the driveway standards, in RMC 4-40801. The location of ingress and egress driveways shall be subject to approval of the [omonnunbY and Economic Development Department under curb cut permit procedures. There shall be a minimum of forty feet (40') between driveway curb returns where there is more than one driveway on property under unified ownership orcontrol and used as one premises. Driveways shall not exceed forty percent (40%) of the street frontage. The width of any driveway shall not exceed fifty feet (50'). There shall not be more than two (l) driveways for each three hundred thirty feet (330') of street frontage onproperty under unified ownership orcontrol. Street Improvements: Please refer to comments from Plan Review Engineering for street requirements. Pedestrian Access: A pedestrian connection shall be provided from all public entrances tothe street, in order to provide direct, clear and separate pedestrian walks from sidewalks to building entries and internally from buildings to abutting properties. The site plan includes m public surface parking lot and a pedestrian entrance between the proposed building and the public sidewalk onA/30thSt. Signs: Signs are required to meet the nnininnunn standards of RMC 4-4-100 "Sion Regulations" and require sign permit review which is different than building permit review. There are specific comnnnerda|si8nregu|ationsinRK4C4-4-1OOE.S.a"BusinessSigns—Genenai" H:\CED\P|anninn\[urnentPlanni Fire Station 1Sand Kennyda|eReservoir Page 6ofg - 1404 N 30th St • Freestanding, Ground, Roof and Projecting 8Voms: Each individual business establishment may have only one sign for each street frontage of any one of the following types: Freestanding, root ground, projecting or combination. Each sign shall not exceed an area greater than one and one-half (1-1/2) square feet for each lineal foot of property frontage which the business occupies up to a maximum of three hundred (300) square feet; or if such sign is multi- faced, the rnaxirnunn allowance shall not be more than three hundred /300\ square feet. However, a onaxinnurn ofone-half /1/2\ of the allowed square footage isallowed oneach face. • Signs within the Urban Design Area, Maximum Height of Freestanding Signs: Freestanding ground -related monument signs, with the exception of primary entry signs, shall be limited to five feet (5) above finished grade, including support structure. " Wall Signs: VVa|| signs are permitted with a total copy area not exceeding twenty percent /2D96\ofthe building facade towhich itisapplied. � Small Parking and Traffic Control Signs: Parking and traffic control signs two (2) square feet orless onprivate property are allowed without asign permit. Lighting: New parking lot and building lighting would require a lighting plan and shall meet the lighting standards (RMC 4-4-075). A detailed lighting plan and analysis is required as part of the building permit submittal. ' Critical Areas: The she is located in Zone 3 of the Wellhead Protection Area and also contains regulated slopes (>15%&<=25%),If any fill is proposed, mfill source statemet'momld be required. A geotechnical analysis for the site may be required. The analysis would need to assess soil conditions and detail construction measures to assure building and water tower stability. It /s theapplicant's responsibility to ascertain whether any additional critical areas or environmental concerns are present on the site during site development or building construction. The City may also require an applicant toprepare ahydstudy if the proposal has the potential to significantly impact groundwater quantity orquality, and sufficient information is not readily available. Such a report shall be prepared by a qualified professional at the applicant's expense. Additiona|ky, geotechnical studies by licensed professionals, such as a geotechnical engineer and/or engineering geologist, shall berequired. The required studies shall demonstrate the following review criteria can be met: (a) The proposal will not increase the threat ofthe geological hazard toadjacent or abutting propertiesbeyond pre -development conditions; and (b) The proposal will not adversely impact other critical areas; and (c) The development can be safely accommodated on the site. Environmental Review: The proposal would be subject to Washington State Environmental Policy Act (SEPA) due to the size of the projects. Therefore, an environmental checklist is a submittal requirement. An environmental determination would be made by the Renton Environmental Review Committee. This determination is subject to appeal by either the project proponent, by a citizen of the community, or another entity having standing for an appeal. Permit Requirements: The proposed projects would require an Administrative Conditional Use Fire Station 15 and Kennydale Reservoir Page 7 of 9 1404 N 30th St Plan Review for development of the Fire Station in the CN Zone or a water tower over 60 feet in height, a short plat to divide the parcel into two (2) separate lots, and Environmental (SEPA) Review. The purpose of the Site Plan process is the detailed arrangement of project elements so as to be compatible with the physical characteristics of a site and with the surrounding area. An additional purpose of Site Plan is to ensure quality development consistent with City goals and policies General review criteria includes the following: a. Compliance and Consistency. Conformance with plans, policies, regulations and approvals, including: b. Off -Site Impacts. Mitigation of impacts to surrounding properties and uses. c. On -Site Impacts. Mitigation of impacts to the site. d. Access and Circulation. Safe and efficient access and circulation for all users. e. Open Space. Incorporation of public and private open spaces to serve as distinctive project focal points and to provide adequate areas for passive and active recreation by the occupants/users of the site. f. Views and Public Access. Provision of view corridors to shorelines and Mt. Rainier, incorporates public access to shorelines, and arranges project elements to protect existing natural systems where applicable. g. Services and Infrastructure. Availability of public services and facilities to accommodate the proposed use. h. Signage. Use of signs primarily for the purpose of identification and management of sign elements — such as the number, size, brightness, lighting intensity, and location — to complement the visual character of the surrounding area, avoid visual clutter and distraction, and appear in proportion to the building and site to which they pertain; and I. Phasing. Inclusion of a detailed sequencing plan with development phases and estimated time frames, if applicable. Conditional Use Permit Decision Criteria: The Administrator or the Hearing Examiner shall consider, as applicable, the following factors for applications: 1. Consistency with Plans and Regulations: The proposed use shall be compatible with the general goals, objectives, policies and standards of the Comprehensive Plan, the zoning regulations and any other plans, programs, maps or ordinances of the City of Renton. 2. Appropriate Location: The proposed location shall not result in the detrimental overconcentration of a particular use within the City or within the immediate area of the proposed use. The proposed location shall be suited for the proposed use. 3. Effect on Adjacent Properties: The proposed use at the proposed location shall not result in substantial or undue adverse effects on adjacent property. 4. Compatibility: The proposed use shall be compatible with the scale and character of the neighborhood. H:\CED\Planning\Current Planning\PREAPPS\17-000172 Fire Station 15 and Kennydale Reservoir Page 8 of 9 1404 N 30th St S. Parking: Adequate parking is, or will be made, available. 6. Traffic. The use shall ensure safe movement for vehicles and pedestrians and shall mitigate potential effects on the surrounding area. 7. Noise, Light and Glare: Potential noise, light and glare impacts from the proposed use shall be evaluated and mitigated. & Landscaping: Landscaping shall be provided in all areas not occupied by buildings, paving, or critical areas. Additional landscaping may be required to buffer adjacent properties from potentially adverse effects of the proposed use. Short Plats are generally processed administratively; however, it would be combined with the overall application, and a decision rendered by the Hearing Examiner. There may be other approvals (modifications, variances, etc.) required depending on the final scope of the proposal. All applications following the rezone can be reviewed concurrently in an estimated time frame of 12 weeks once a complete application is accepted. The 2017 application fees are the following: Hearing Examiner Site Plan Review Fee is $3,500; SEPA Review (Environmental Checklist) is $1,500; Conditional Use Permit is $3,000; Short Plat is $5,000. Any modification request would be reviewed with the land use application and would costs $250 each. A 3% technology fee would also be assessed at the time of land use application. Detailed information regarding the land use application submittal is provided in the attached handouts. In addition to the required land use permits, separate construction, building and sign permits would be required. Public Information Sign: The applicant is required to install a public information sign for the proposed land use action on the subject property per the specifications provided within the public information sign handout. The applicant is solely responsible for the construction, installation, maintenance, removal, and any costs associated with the sign. Public Meeting: A neighborhood meeting, according to RMC 4-8-090, is required for: a. Preliminary plat applications; b. Planned urban development applications; and c. Projects estimated by the City to have a monetary value equal to or greater than ten million dollars ($10,000,000), unless waived by the Administrator. The intent of this meeting is to facilitate an informal discussion between the project developer and the neighbors regarding the project. The neighborhood meeting shall occur after a pre - application meeting and before submittal of applicable permit applications. The public meeting shall be held within Renton city limits, at a location no further than two (2) miles from the project site. Public Outreach Sign: Projects estimated by the City to have a monetary value equal to or greater than $10,000,000 requires the applicant to install a public outreach sign. Public outreach signs are intended to supplement information provided by public information signs by allowing an applicant to develop a personalized promotional message for the proposed development. H:\CED\Planning\Current Planning\PREAPPS\17-000172 Fire Station 1Sand ^�!''"�=Reservok, - -`- 'page 9of3 1404N30thSt The sign isa}so intended to provide public with a better sense of proposed development by displaying a colored rendering of the project and other required or discretionary information that lends greater understanding of the project. impact mitigation Feea:|naddidontotheappUcmb|ebui|dingandconstrucbonfees impact fees may berequired. Such fees would apply toall projects andxvou|dbeoa|cu|atedotthetirneof building permit application and payable prior to building permit issuance. A handout listing Renton's development -related fees is available on the City of Renton website for your review. Note: When the formal application materials are complete, the applicant is strongly encouraged to have one copy of the application materials pre-screened at the 6th floor front counter prior tosubmitting the complete application package. Please cell Clark Close, Senior Planner, at 425-438-7289for amappointment. Expiration: Upon site plan or conditional use permit approval, the site plan approval is valid for two (2) years with a possible two-year extension. H:\[ED\PanninQ\[unentPlan ning\PREAP P6\17-0]U17Z — I ml o PROPOSED RESERVOIR FfR#FJG14TFA,,J',' PAPW46A- FIREotrawsk PARViNG" — I ml