Loading...
HomeMy WebLinkAboutP_Architectural_170922_v12 2 1 222 226 224 223 218 2 1 7 216 214 213 209208 2132 12211209208 207 220 2 2 5 215 21013+00 14+00 Site Plan Legend PROPERTY LINE EXISTING TOPO LINES - SEE SURVEY UTILITIES - SEE CIVIL 215 NON-PERMEABLE CONCRETE PAVING - SEE CIVIL PERMEABLE CONCRETE PAVING - SEE CIVIL ASPHALT PAVING - SEE CIVIL Site Notes 1. Construction limits, spot elevations, grades and site utilities indicated for reference only, see Civil drawings for requirements. 2. Paving indicated for reference only, see Civil and Landscape drawings for requirements. 3. Landscaping indicated for reference only, see Landscape drawings for requirements. 4. Electrical site utilities described for reference only, see Electrical drawings for requirements. 5. Comply with City of Renton requirements for all Work in ROW. 6. Provide construction fence at limits of construction. Minimum fence height shall be six feet. Provide gates as necessary. 7. Field verify all relevant existing conditions and dimensions prior to the start of Work. Notify Architect immediately of any discrepancies. 8. Protect all existing conditions to remain on site and adjacent to Work area. Notify Architect of any damage to existing condtions to remain and restore or replace to original condition. 9. Confirm all underground utility locations prior to the start of Work and protect all existing conditions to remain. 10.Confirm locations of adjacent overhead utilites and protect all existing conditions to remain. A4.01 5 NORTH 30TH STREET PROJECT SEPARATION LINE RETAINING WALL 15' REAR SETBACK 10-FT LANDSCAPE BUFFERPATIO SLIDING SECURITY GATE FLAGPOLE RETAINING WALL PROPOSED FIRE STATION #15 CONCRETE RETAINING WALL FIRE HYDRANT PATIO FIREFIGHTER ENTRANCE GENERATOR TRASH ENCLOSURE PROPERTY LINE TYP FUTURE ROW ROAD EXTENSION SETBACK POST MOUNTED KEY PAD FENCE & MAN GATE 40' - 0 5/8"11' - 0"11' - 0"156' - 11 3/4" ROW CL SIDEWALK 21' - 10 3/16"21' - 11 9/16"43' - 9 3/4"8' - 0 7/16"(E) UTILITY POLE16' - 2"8' - 0"8' - 0"8' - 0"7' - 4"NEW FENCE AT EAST PROPERTY LINE NEW FENCE AT WEST PROPERTY LINE NEW FENCE AT NORTH PROPERTY LINE ADA PARKING SIGN CONCRETE APRON302' - 9 1/4"302' - 9 1/4"PARCEL: 334210-3245 ZONE: CN PROPERTY LINE / ZONE CHANGE CN ZONER-6 ZONECN ZONEPROPOSED CN ZONE(CURRENT R-6 ZONE)LIGHT POLE- SEE ELECT CONCRETE APRON BIKE RACK PROPOSED CONSTRUCTION TRAILER LOCATION ENCLOSURE SCREENINGFS #15RESERVOIRCONCRETE CURB RETAINING WALL @ PROP LINE- SEE CIVIL TYPICAL CURB- SEE CIVIL SLIDING GATE MOTOR PUBLIC PARKING (E) STORM DRAIN TO BE RELOCATED- SEE CIVIL 30' - 0 5/8"7 G 15' - 0"52' - 0"LOCATE BUILDING AT GRID INTERSECTION G-7. SEE CIVIL FDC PROPOSED RESERVOIR 10' - 0" 6" 16' - 0" 6" 6"6"24' - 0"20' - 0"4' - 6" 4' - 6"6"20' - 0"6"18' - 0"24' - 0"TYP 9' - 0" AREA SEPARATION LINE STEPPING STONES- SEE LANDSCAPE 14' - 2 5/8" 38' - 6 13/16" Client Project No: Date: SSW Architects Project No: CAG-17-046 17001 COR Permit No: A1.01 Site Plan Conditional Use Permit Fire Station 15 August 18, 2017 N Scale: 1" = 20'-0"A1.01 Site Plan2 UP 1 A4.02 1 A4.03 2 A4.03 3 A4.03 4 A4.03 A4.01 1 A4.012 A4.01 3 A4.01 4 STATION OFFICE 103 APPARATUS BAY 119 LOBBY 100 LAUNDRY 114 FITNESS 113 BUNK 4 112 BUNK 3 111 BUNK 2 110 BUNK 1 109 DECON 121 CUSTODIAL 120 HOSE STORAGE 122 BUNKER GEAR 123 DAY ROOM 108 DINING 107 KITCHEN 106 PATIO PATIO SHOP 124 PANTRY 105 DOUBLE CHECK VALVE ASSEMBLY SPRINKLER RISER COMM 117 ADA RESTROOM 101 HALL 102A OFFICER'S OFFICE 104 8' - 1"14' - 7"4' - 8"3' - 2"1' - 10"24' - 0"2' - 4"2' - 8"5' - 4"CORRIDOR 102 HALL 102DHALL 102C HALL 102B LOCKERS 102E ALCOVE 119A 100101 102-1102-2102B108-1107 109 110 111 112 102A 102D 123 103104117 114113-1124120108-2 102C 119-4119-3 ADA SHOWER 115 SHOWER 116 1162' - 1"2' - 1 1/2"EQ3' - 0"EQ1' - 9" 3' - 0" 2' - 0" 3' - 0" 7' - 3" 3' - 0" 3' - 0" 2' - 0" 3' - 4" 4' - 8" MIN 18"24"40"16"44"140"40"108"28"32"40"64"72"96"56"654 13' - 0" 5' - 0" 23' - 0"40' - 0"10' - 0" 32 7 A B 5' - 8" 4' - 6" 5' - 4" 5' - 0" 24' - 0" 5' - 0" 27' - 4"9' - 0"C D E G H J 3' - 0" 3' - 3" 11" 5' - 10" 7' - 8" 3' - 4" 2' - 11"2' - 1"1' - 7 1/2"F 2' - 8 1/2" 4' - 7"7' - 6" 7' - 0" 9' - 6"10' - 6"1' - 3"2' - 0"4' - 6"12"3' - 6"4" 3' - 4" 1' - 4" 23' - 0" 4' - 0" 14' - 0" 4' - 0" 14' - 0" 4' - 0"2' - 1"7' - 5"113-248" 24" 10' - 0" 4' - 6"1 5/8"106 2' - 1"1' - 0" 8' - 10" 8' - 10" 8' - 8" 2" 8' - 10"EQ3' - 0"EQEQ3' - 0"EQEQ3' - 0"EQ55"32 1/2"5' - 6" 2" 7 5/8"MIN18".3' - 6" 3' - 6"2"2" 11' - 0" 2' - 10"MIN18".4"11"3' - 0"11"3' - 0"2' - 0" 3' - 4" 4' - 8" 7 5/8" INTERIOR BOLLARD- TYP OF (9)MIN18".MIN18".MIN18".LOCATE BUILDING AT GRID INTERSECTION G-7. SEE CIVIL W4 W4 W4 W4 W4 W4 W2W2 W1 W1 W4 W4 W4 7 5/8" W1 W4 P4 P2 P3 P3 P2 P2 P2 P2 P2 P2 P2 P2 P2 P1 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 W4 W4 W2A W2 3"3"3"3"16' - 0"34' - 8"16' - 0"9' - 6" 5' - 6 1/2" 3' - 0" MEDICAL 118 115 118 5' - 6" 12' - 0" 5' - 6" 11' - 0" 18' - 0"1 5/8"1 5/8"2 A4.02 4 A4.02 18"4' - 0" 14' - 0" 4' - 0" 14' - 0" 119-1 119-2 3 A4.02 5 A4.03 3"3"3"3" W1 P2 P2 P1 P1 P2 FD FD FD FD FD FD FD FD FD FD FD FD FEC FE 2 A4.03 3 A4.03 MEZZANINE 201 MECHANICAL CHASE CORRIDOR BELOW APP BAY BELOW COMPRESSOR 543 C D E F 4' - 5 3/8" ALIGN MEZZANINE SLAB W/ FACE OF WALL BELOW W5 P2 W1 P2 P2 2 A4.02 5' - 0"5' - 0"3 A4.02 Floor Plan Notes 1. Wood stud walls are dimensioned to face of stud UON 2. CMU walls are dimensioned to face of CMU UON 3. Dimensions noted as clear are from final finished surface to final finished surface. 4. See Sheet A7.2 for interior partition types. Interior partitions to be type P2 if not marked otherwise 5. See Sheet A6.1 for exterior wall types. Exterior wall types to match elevations 6. See slab plans A2.1 & A2.2 as well as Structural drawings for recessed slabs. 7. See Structural drawings for AESS (Architecturally Exposed Structural Steel) members. All exposed steel structure including columns, beams and metal deck shall be painted 8. Structural, Mechanical, and Electrical components identified on architectural plans are for general information and are not intended to fully describe such features - refer to Structural, Mechanical, and Electrical drawings for a full description. 9. All conduit, piping, and ductwork to be concealed UON or in an exposed ceiling space. Paint all exposed conduits, piping and ductwork 10.Provide blocking and backing for wall-mounted materials, accessories, equipment, and furnishings - Coordinate with all other disciplines. See FF&E plans A3.2 for additional wall backing locations. Floor Plan Legend DS Downspout- See FEC Fire Extinguisher Cabinet- Recessed - See TB-XX MB-XX Tackboard (TB) CFCI, Markerboard (MB) CFCI & Flat screen monitor (FS) OFCI- See Schedule on A9.1- Refer to interior elevations for dimensioned locations FE Fire Extinguisher- Wall Mounted PB-XX FS-XX Floor drain & sump- See Mech- 2' x 2' square sump @ 1/8" per foot FD MW Microwave DW Dishwasher FEC Fire Extinguisher Cabinet FE Fire Extinguisher - Wall Mounted HR Hose Reel AD Air Drop Client Project No: Date: SSW Architects Project No: CAG-17-046 17001 COR Permit No: 17-000172 A3.01 Floor Plans Conditional Use Permit Fire Station 15 August 18, 2017 N Scale: 1/8" = 1'-0"A3.01 First Floor Plan1 N Scale: 1/8" = 1'-0"A3.01 Mezzanine Plan2 UP STATION OFFICE APPARATUS BAY LOBBY LAUNDRY FITNESS BUNK 4 BUNK 3 BUNK 2 BUNK 1 DECON CUSTODIAL HOSE STORAGE BUNKER GEAR DAY ROOM DINING KITCHEN PATIO PATIO SHOPCHARGINGPANTRY DOUBLE CHECK VALVE ASSEMBLY SPRINKLER RISER COMM ADA RESTROOM R R R R F OFFICER'S OFFICE DW MW MURPHY BEDW D FUTURE AID CAR FS-15 ENGINE LOCKERS CORRIDOR1 A4.02 1 A4.03 2 A4.03 3 A4.03 4 A4.03 A4.01 1 A4.012 A4.01 3 A4.01 4 PHOTOS HOSE RACK (OFOI) EXTRACTOR (OFOI) SOAP DISPENSER (OFOI) DRYER CABINET (OFOI) CHAIN STORAGE CLEAR AREA FOR BI-FOLD DOORS LOCKER- TYP OF (20)5' - 0"4' - 6"LOCKERS HR HR 35 GALLON SOAP (OFOI) AD AD SHOWER ADA SHOWER HALL HALL HALL HALL PROPOSED HAM RADIO LOCATION BROCHURES65432 7 A B C D E G H J 5' - 8"4' - 6"5' - 4"5' - 0"24' - 0"5' - 0"27' - 4"9' - 0"13' - 0" 5' - 0" 23' - 0"40' - 0"10' - 0" F DF TV TV TV TV BOLLARD TYP 12"24"TV WALKWAY4' - 5"4' - 0"5' - 0"3' - 0"10' - 0"6' - 3"4' - 0"2' - 6"4' - 6" 3' - 6" 9' - 0"11' - 8 1/4"11' - 8 1/4"3' - 6"5' - 6"7' - 0"2' - 10"21' - 2"3' - 4"18"2' - 6"2' - 0"4' - 6 5/8"4' - 0"4' - 10"4' - 0"4' - 10"4' - 0"4' - 6 5/8"2' - 0"4' - 11 3/4" MEDICAL 2 A4.02 4 A4.02 2' - 6" 2' - 6"1' - 3"3 A4.02 24" 24" 5 A4.03 6' - 9"ALERTING FE FEC MEZZANINE 2 A4.03 3 A4.03 MECH CHASE CORRIDOR BELOW APP BAY BELOW COMPRESSOR 543 C D E F 2 A4.02 3 A4.02 5' - 0"24' - 0"5' - 0"5' - 0" 23' - 0" Floor Plan Notes 1. Wood stud walls are dimensioned to face of stud UON 2. CMU walls are dimensioned to face of CMU UON 3. Dimensions noted as clear are from final finished surface to final finished surface. 4. See Sheet A7.2 for interior partition types. Interior partitions to be type P2 if not marked otherwise 5. See Sheet A6.1 for exterior wall types. Exterior wall types to match elevations 6. See slab plans A2.1 & A2.2 as well as Structural drawings for recessed slabs. 7. See Structural drawings for AESS (Architecturally Exposed Structural Steel) members. All exposed steel structure including columns, beams and metal deck shall be painted 8. Structural, Mechanical, and Electrical components identified on architectural plans are for general information and are not intended to fully describe such features - refer to Structural, Mechanical, and Electrical drawings for a full description. 9. All conduit, piping, and ductwork to be concealed UON or in an exposed ceiling space. Paint all exposed conduits, piping and ductwork 10.Provide blocking and backing for wall-mounted materials, accessories, equipment, and furnishings - Coordinate with all other disciplines. See FF&E plans A3.2 for additional wall backing locations. Floor Plan Legend DS Downspout- See FEC Fire Extinguisher Cabinet- Recessed - See TB-XX MB-XX Tackboard (TB) CFCI, Markerboard (MB) CFCI & Flat screen monitor (FS) OFCI- See Schedule on A9.1- Refer to interior elevations for dimensioned locations FE Fire Extinguisher- Wall Mounted PB-XX FS-XX Floor drain & sump- See Mech- 2' x 2' square sump @ 1/8" per foot FD MW Microwave DW Dishwasher FEC Fire Extinguisher Cabinet FE Fire Extinguisher - Wall Mounted HR Hose Reel AD Air Drop Client Project No: Date: SSW Architects Project No: CAG-17-046 17001 COR Permit No: 17-000172 A3.02 FF&E Plans Conditional Use Permit Fire Station 15 August 18, 2017 N Scale: 1/8" = 1'-0"A3.02 First Floor FF&E1 N Scale: 1/8" = 1'-0"A3.02 Mezzanine FF&E2 First Floor ELEV. = 0' - 0" Mezzanine Parapet ELEV. = 23' - 9" 1 A4.03 2 A4.03 3 A4.03 4 A4.03 Average Grade ELEV. = 0' - 2 1/2"BUILDING HEIGHT = 23' - 6 1/2"= 212.0' = 212.2' = 235.75' HORIZONTAL SIDING PANEL- TAUPE HORIZONTAL SIDING PANEL- TAN VERTICAL SIDING PANEL- RED HORIZONTAL SIDING PANEL- TAUPE OVERHEAD DOOR TYP STOREFRONT ROOF & FASICA- GRAY BOLLARD TYP METAL DOOR TYP ANTENNAS- MOUNTED TO SIDE OF WALL 6 5 4 3 27 13' - 0"5' - 0"23' - 0"40' - 0"10' - 0"7' - 3"5 A4.03 EXISTING GRADE AVERAGE GRADE FALL PROTECTION ANCHOR TYP NEW GRADE First Floor ELEV. = 0' - 0" App Bay Roof ELEV. = 21' - 0" Mezzanine Parapet ELEV. = 23' - 9" 1 A4.02 NEW GRADE Average Grade ELEV. = 0' - 2 1/2"CONCRETE RETAINING WALL HORIZONTAL SIDING PANEL- TAUPE VERTICAL SIDING PANEL- RED WINDOW TYP ROOF & FASCIA- GRAY WINDOW COLUMN- GRAY BUILDING HEIGHT = 23' - 6 1/2"STOREFRONT = 212.0' = 212.2' = 235.75' ABCDEGHJF 2 A4.02 4 A4.02 3 A4.02 6"9' - 0"9' - 0"5' - 6"3' - 6" 1' - 6" 7' - 6"9' - 0"10' - 10" 5' - 8" 4' - 6" 5' - 4" 5' - 0" 24' - 0" 5' - 0" 27' - 4"9' - 0"4' - 0"14' - 0"2' - 0"CONDUCTOR HEAD & DOWNSPOUT TYP EXISTING GRADEAVERAGE GRADE HORIZONTAL SIDING PANEL- TAN First Floor ELEV. = 0' - 0" App Bay Roof ELEV. = 21' - 0" Mezzanine Parapet ELEV. = 23' - 9" 1 A4.03 2 A4.03 3 A4.03 4 A4.03 Average Grade ELEV. = 0' - 2 1/2" = 212.0' = 212.2' = 235.75'BUILDING HEIGHT = 23' - 6 1/2"METAL COLUMN- GRAY ROOF & FASCIA- GRAY HORIZONTAL SIDING PANEL- TAUPE DOOR TYP BIFOLD DOOR TYP BOLLARD TYP WINDOW TYP STOREFRONT HORIZONTAL SIDING PANEL- TAUPE VERTICAL SIDING PANEL - RED STRUCTURAL FRAMING ROOF & FASCIA- GRAY HORIZONTAL SIDING PANEL- TAN VERTICAL SIDING PANEL- RED 65432 7 13' - 0" 5' - 0" 23' - 0"40' - 0"10' - 0" CLERESTORY STOREFRONT 3' - 0" 5 A4.03 GUTTER TYP FALL PROTECTION ANCHOR TYP EXISTING GRADE NEW GRADE First Floor ELEV. = 0' - 0" Mezzanine Parapet ELEV. = 23' - 9" 1 A4.02 Average Grade ELEV. = 0' - 2 1/2" HORIZONTAL SIDING PANEL- TAN ROOF- GRAY BUILDING HEIGHT = 23' - 6 1/2"HORIZONTAL SIDING PANEL- TAUPE WINDOW TYP FASCIA & GUTTER- GRAY VERTICAL SIDING PANEL- RED HORIZONTAL SIDING PANEL- TAUPE STOREFRONT VERTICAL SIDING PANEL- RED = 212.0' = 212.2' = 235.75' A B C D E G H JF 2 A4.02 4 A4.02 9' - 0" 27' - 4" 5' - 0" 24' - 0" 5' - 0" 5' - 4" 4' - 6"5' - 8" 3 A4.02 FALL PROTECTION ANCHOR TYP NEW GRADE EXISTING GRADE SMALLEST RECTANGLE TO ENCLOSE ENTIRE STRUCTURE BUILDING FOOTPRINT 6' OFFSET AVERAGE GRADE CALCUALTIONS ORDINANCE NUMBER 5576 NORTH: (212.5+214.9) / 2 = 213.7 EAST: (214.9 + 213.5) / 2 = 214.2 SOUTH: (213.5 + 207.9) / 2 = 210.7 WEST: (207.9 + 212.5) / 2 = 210.2 848.8 / 4 = 212.2 = EXISTING AVG GRADE ELEVATION 212.5' ELEVATION 213.1' ELEVATION 214.9' ELEVATION 216.0' ELEVATION 213.8' ELEVATION 213.6'ELEVATION 207.9' ELEVATION 208.0' FS-15 BUILDING 6' - 0"6' - 0"6' - 0"6' - 0"First Floor ELEV. = 0' - 0" Average Grade ELEV. = 0' - 2 1/2" BUILDING 6' - 0"CONCRETE RETAINING WALL METAL SLAT SWINGING GATES TRASH / RECYCLE BINS BEHIND GATES 6" 14' - 0" 6" 29' - 4" METAL SLAT ENCLOSURE 3' - 0"B Client Project No: Date: SSW Architects Project No: CAG-17-046 17001 COR Permit No: 17-000172 A4.01 Exterior Elevations Conditional Use Permit Fire Station 15 August 18, 2017 Scale: 1/8" = 1'-0"A4.01 Exterior Elevation - North1 Scale: 1/8" = 1'-0"A4.01 Exterior Elevation - East2 Scale: 1/8" = 1'-0"A4.01 Exterior Elevation - South (N 30th Street)3 Scale: 1/8" = 1'-0"A4.01 Exterior Elevation - West4 Scale: 1/8" = 1'-0"A4.01 Exterior Elevation - Trash Enclosure5 First Floor ELEV. = 0' - 0" App Bay Roof ELEV. = 21' - 0" Low Roof ELEV. = 10' - 0" Mezzanine Parapet ELEV. = 23' - 9" 1 A4.03 2 A4.03 3 A4.03 4 A4.03 LOBBY STATION OFFICE OFFICER'S OFFICE 65432 7 A5.01 1 A5.01 2 A5.01 3 A5.01 4 A5.01 5 APPARATUS BAY SHOPADA RESTROOM 13' - 0" 5' - 0" 23' - 0"40' - 0"10' - 0" 5 A4.033' - 0" First Floor ELEV. = 0' - 0" App Bay Roof ELEV. = 21' - 0" Mezzanine ELEV. = 11' - 0"Low Roof ELEV. = 10' - 0" Mezzanine Roof ELEV. = 19' - 0" Mezzanine Parapet ELEV. = 23' - 9" 1 A4.03 2 A4.03 3 A4.03 4 A4.03 65432 7 A5.01 6 13' - 0" 5' - 0" 23' - 0"40' - 0"10' - 0" APPARATUS BAY BUNKER GEARLAUNDRYSHOWER MEZZANINE DAY ROOM KITCHEN A5.01 2 A5.01 1 5 A4.03 ROOFTOP MECHANICAL UNIT First Floor ELEV. = 0' - 0" App Bay Roof ELEV. = 21' - 0" Low Roof ELEV. = 10' - 0" 1 A4.03 2 A4.03 3 A4.03 4 A4.03 65432 7 A5.01 1 A5.01 2 A5.01 10 13' - 0" 5' - 0" 23' - 0"40' - 0"10' - 0" 3' - 0" DECON APPARATUS BAYFITNESSCORRIDORBUNK 2 5 A4.03 First Floor ELEV. = 0' - 0" App Bay Roof ELEV. = 21' - 0" Mezzanine ELEV. = 11' - 0"Low Roof ELEV. = 10' - 0" Mezzanine Parapet ELEV. = 23' - 9" 1 A4.03 2 A4.03 3 A4.03 4 A4.03 65432 7 DINING HALL HALL ALCOVE APPARATUS BAY HOSE STORAGE 5 A4.03 MECHANICAL CHASE 4' - 0"4' - 0"13' - 0" 5' - 0" 23' - 0"40' - 0"10' - 0" ROOFTOP MECHANICAL UNIT ON CONCRETE CURB Client Project No: Date: SSW Architects Project No: CAG-17-046 17001 COR Permit No: 17-000172 A4.02 Building Sections Conditional Use Permit Fire Station 15 August 18, 2017 Scale: 1/8" = 1'-0"A4.02 EW Section - Lobby1 Scale: 1/8" = 1'-0"A4.02 EW Section - Mezzanine2 Scale: 1/8" = 1'-0"A4.02 EW Section - Bunk Rooms4 Scale: 1/8" = 1'-0"A4.02 EW Section - Chase3 First Floor ELEV. = 0' - 0" Mezzanine ELEV. = 11' - 0"Low Roof ELEV. = 10' - 0" Mezzanine Parapet ELEV. = 23' - 9" 1 A4.02 MEZZANINE LAUNDRY FITNESS HALL HALL ROOFTOP MECHANICAL UNIT ON CURB ABCDEGHJF A5.01 10 SIM MEDICAL OFFICER'S OFFICE 5' - 0" 5' - 8" 4' - 6" 5' - 4" 5' - 0" 24' - 0" 5' - 0" 27' - 4"9' - 0" 2 A4.02 4 A4.02 5' - 8 1/4" 3 A4.02 MECHANICAL CHASE First Floor ELEV. = 0' - 0" Low Roof ELEV. = 10' - 0" 1 A4.02 BUNK 1 BUNK 2 BUNK 3 BUNK 4KITCHENDINING ABCDEGHF 4' - 6" 5' - 4" 5' - 0" 24' - 0" 5' - 0" 27' - 4" 9' - 0" A5.01 5 SIM A5.01 10 SIM 3' - 8"1' - 2" ADA RESTROOM A5.02 3 A6.02 7 2 A4.02 4 A4.02 3 A4.02 First Floor ELEV. = 0' - 0" Low Roof ELEV. = 10' - 0" 1 A4.02 CORRIDORLOBBY ABCDEGHF 4' - 6" 5' - 4" 5' - 0" 24' - 0" 5' - 0" 27' - 4" 9' - 0" A5.01 10 SIMP2P2 A5.02 1 2 A4.02 4 A4.02 3 A4.02 3' - 0"1' - 2" First Floor ELEV. = 0' - 0" Mezzanine ELEV. = 11' - 0" Mezzanine Parapet ELEV. = 23' - 9" 1 A4.02 APPARATUS BAY ABCDEGHJF 5' - 0" 4' - 0" 1' - 11" 12' - 5"12" A6.02 7 OPP 5' - 8" 4' - 6" 5' - 4" 5' - 0" 12' - 0" 12' - 0" 5' - 0"27' - 4" 9' - 0" 2 A4.02 4 A4.02 3 A4.02 A5.02 2 SIM 1' - 2"3' - 0" First Floor ELEV. = 0' - 0" App Bay Roof ELEV. = 21' - 0" Low Roof ELEV. = 10' - 0" 1 A4.02 BCDEGHF 2 A4.02 4 A4.02 3 A4.02 4' - 6" 5' - 4" 5' - 0" 24' - 0" 5' - 0" 27' - 4" 1' - 2"3' - 2"5' - 6" 3' - 6" 1' - 6" 7' - 6" 9' - 0"6" 9' - 0" BUNKER GEARSHOP HOSE STORAGE DECON CUSTODIAL Client Project No: Date: SSW Architects Project No: CAG-17-046 17001 COR Permit No: 17-000172 A4.03 Building Sections Conditional Use Permit Fire Station 15 August 18, 2017 Scale: 1/8" = 1'-0"A4.03 NS Section- Mezzanine3 Scale: 1/8" = 1'-0"A4.03 NS Section- Station House1 Scale: 1/8" = 1'-0"A4.03 NS Section- Corridor2 Scale: 1/8" = 1'-0"A4.03 NS Section- App Bay4 Scale: 1/8" = 1'-0"A4.03 NS Section- Support5