HomeMy WebLinkAboutCM_Construction Mitigation-Discription-Zion_170615_v1
Greenwood Heating
825 S Stacy St
Seattle Wash 98134
June 6, 2017
Construction Mitigation Description for the Project at:
1703 NE 43rd St
Renton Wash
Construction Mitigation Description:
Proposed Dates, --- August 7 2017 - November 27 2017
Hours of operation, --- 7:00am – 4:30pm Monday – Friday
Proposed Hauling routs, --- Highway 405 with Debris and excess Gravel.
Measures for dust, noise and mud.--- Minimal Parking Lot improvement, Dust will be watered
down for dust control.
Street clean up as necessary.
Hours of Trucking will be done during normal business hours.
Flagging will be used during minimal trucking.
No use of cranes on this project.
Sincerely Lynn Brown